112 Fifth Ave North Seattle, WA 98109 (206) 633-0303

Total Page:16

File Type:pdf, Size:1020Kb

112 Fifth Ave North Seattle, WA 98109 (206) 633-0303 112 Fifth Ave North Seattle, WA 98109 (206) 633-0303 The Puget Sound Affiliate office is located in Belltown across from Fisher Plaza, just north of the intersection of Denny Way and Fifth Avenue next to Fat City Motors. Office entrance is located on the back of the building. Access the entrance via the alley between John Street and Denny Way. Driving Directions From I-5 North OR South Take Exit 166 (Mercer Street / Seattle Center). Head west on Mercer. Turn left onto 5th Ave N (there’s a stoplight here and QFC will be on your right). Turn left onto John St. Turn right into the alley immediately following, between Taylor Ave. N. and 5th Ave. N. Note: If the alley is blocked at John St. due to construction, circle the block and enter from Denny Way. From Highway 99 North Continue on Alaskan Way Viaduct Exit onto Western Ave Turn right onto Cedar St Continue onto 5th Ave N From Highway 99 South Slight right onto Aurora Ave N (signs for Denny Way/Downtown) Take the 1st right onto John St Turn right into the alley immediately following, between Taylor Ave. N. and 5th Ave. N. Note: If the alley is blocked at John St. due to construction, circle the block and enter from Denny Way. John 112 Fifth Avenue N. 112 Fifth Ave North Seattle, WA 98109 (206) 633-0303 Parking Below is the view of the Komen entrance: Komen Puget Sound- view from the alley entrance If there is a parking space available amongst our tandem parking, please feel free to use the spot; just alert the front desk that you are parked there. There are also parking lots available (for a fee) in the same alley, as well as street parking on John Street, between Taylor and 5th Avenue North. .
Recommended publications
  • Blue Urbanism: Inviting Urban Play on Seattle's North Waterfront Scan L Design Master Studio, Autumn 2014 [Larch 501/Arch504]
    Blue Urbanism: Inviting Urban Play on Seattle's North Waterfront Scan l Design Master Studio, Autumn 2014 [Larch 501/Arch504] Instructors: Nancy Rottle (LA), Jim Nicholls (ARCH), and Leann Andrews (PhD BE) Teaching Assistant: VeraEve Giampietro (LA & UDP) With Gehl Architects/Cititek: Bianca Hermansen GUIDING PRINCIPLES FOR SEATTLE'S CENTRAL WATERFRONT (adopted by City Council): • Create a waterfront for all. • Put the shoreline and innovative, sustainable design at the forefront. • Reconnect the city to its waterfront. • Embrace and celebrate Seattle’s past, present and future. • Improve Access and Mobility (for people and goods). • Create a bold vision that is adaptable over time. • Develop consistent leadership–from concept to construction to operations. PROJECT DESCRIPTION Seattle's Central Waterfront is heralded as one of the most significant civic projects in the city's history. With imminent removal of the Alaskan Way Viaduct and current replacement of the aging Elliott Bay Seawall, Seattle has begun to envision and enact a great "waterfront for all." Removal of the viaduct and rerouting of Alaskan Way along the waterfront will create abundant new and qualitatively different public space, while the seawall replacement will provide for a more ecologically functional edge. However, while the team led by James Corner Field Operations has proposed and designed a new waterfront between Piers 48 and 62/63, less attention has been paid to the waterfront segment between Piers 62/63 and the Olympic Sculpture Park. With the reconfiguration of Alaskan Way, this northern segment offers rich opportunities for better public, pedestrian, bicycle and ecological space along a less-traveled roadway.
    [Show full text]
  • Redefining Urban Food Systems to Identify Optimal Rooftop Community Garden Locations
    REDEFINING URBAN FOOD SYSTEMS TO IDENTIFY OPTIMAL ROOFTOP COMMUNITY GARDEN LOCATIONS: A SITE SUITABILITY ANALYSIS IN SEATTLE, WASHINGTON by Ana E. Stoudt A Thesis Presented to the FACULTY OF THE USC GRADUATE SCHOOL UNIVERSITY OF SOUTHERN CALIFORNIA In Partial Fulfillment of the Requirements for the Degree MASTER OF SCIENCE (GEOGRAPHIC INFORMATION SCIENCE AND TECHNOLOGY) May 2015 Copyright 2015 Ana E. Stoudt i DEDICATION I dedicate this paper to my parents, friends, and coworkers for their constant support throughout this entire process. Without them, I would not have made it here today. ii ACKNOWLEDGMENTS I am forever grateful to my advisor, Professor Warshawsky, for his encouragement and guidance throughout this experience. iii TABLE OF CONTENTS DEDICATION ................................................................................................................................ ii ACKNOWLEDGMENTS ............................................................................................................. iii LIST OF TABLES ........................................................................................................................ vii LIST OF FIGURES ..................................................................................................................... viii LIST OF ABBREVIATIONS ......................................................................................................... x ABSTRACT ..................................................................................................................................
    [Show full text]
  • Downtown Access Strategy Phase 1 Context Setting: Projects to Be Constructed in the Next 10 Years Table of Contents
    DOWNTOWN ACCESS STRATEGY PHASE 1 Context Setting: Projects to be Constructed in the Next 10 Years September 25, 2013 Downtown Access Strategy Phase 1 Context Setting: Projects to be Constructed in the Next 10 Years Table of Contents I. Introduction ................................................................................................. 1 II. Review of Existing Plans, Projects, and Programs ......................................... 2 III. Potential Construction Concerns and Opportunities .................................. 3 A. Existing Construction Planning Tools 3 B. SDOT’s Construction Hub Coordination Program 4 C. Construction Mitigation Strategies Used by Other Cities 7 D. Potential Construction Conflicts and Opportunities 10 IV. Future Transportation Network Opportunities ......................................... 12 A. North Downtown 12 B. Denny Triangle / Westlake Hub 14 C. Pioneer Square / Chinatown-ID 15 D. Downtown Core and Waterfront 16 V. Future Phases of Downtown Access Strategy ............................................. 18 A. Framework for Phase 2 (2014 through 2016) 18 B. Framework for Phase 3 (Beyond 2016) 19 - i - September 25, 2013 Downtown Access Strategy Phase 1 Context Setting: Projects to be Constructed in the Next 10 Years I. INTRODUCTION Many important and long planned transportation and development projects are scheduled for con- struction in Downtown Seattle in the coming years. While these investments are essential to support economic development and job growth and to enhance Downtown’s stature as the region’s premier location to live, work, shop and play, in the short-term they present complicated challenges for con- venient and reliable access to and through Downtown. The Downtown Seattle Association (DSA) and its partners, Historic South Downtown (HSD) and the Seat- tle Department of Transportation (SDOT), seek to ensure that Downtown Seattle survives and prospers during the extraordinarily high level of construction activity that will occur in the coming years.
    [Show full text]
  • Alaskan Way Viaduct & Seawall Replacement Program
    Alaskan Way Viaduct & Seawall Replacement Program Central Waterfront 01.09 Learning, Listening, and Moving Ahead - Replacing the Alaskan Way Viaduct and Seawall A diverse group of elected offi cials, transportation “As I spoke with individuals and business leaders, fi ve objectives agencies and experts, interest groups, and the public have emerged that guided my decision making. First, the solution must worked over the last year on a solution for the Alaskan improve safety by removing the existing unsafe viaduct. Second, Way Viaduct and Seawall along the central waterfront. the solution must be affordable, and the state’s contribution to Six principles guided the evaluation of possible solutions and eight scenarios were evaluated. Each scenario included the solution must not be over $2.8 billion. Third, the solution investments to transit, city streets, I-5, SR 99, and demand must cause the least construction disruption to our maritime management strategies. What we learned provides a industry and central waterfront businesses. Fourth, the solution critical foundation for reaching a decision. must provide capacity and mobility now and in the future, for freight, vehicles, and transit users. And fi fth, the solution must The following is a summary of the six guiding principles: contribute to improving the health of our environment and open up Seattle’s waterfront. I have concluded that the bored tunnel • Improve public safety. hybrid alternative is the most balanced solution and best meets these objectives.” • Provide effi cient movement of people and –Governor Chris Gregoire goods now and in the future. • Maintain or improve downtown Seattle, “This agreement will improve our transportation system, improve regional, the port and state economies.
    [Show full text]
  • ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement
    ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX L Economics Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: PARSONS BRINCKERHOFF J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Economics Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Economics Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Introduction and Summary ................................................................................................................. 1 1.1 Introduction ................................................................................................................................................ 1 1.2 Build Alternatives Overview ....................................................................................................................... 2 1.2.1 Overview of Bored Tunnel Alternative (Preferred) ..........................................................................
    [Show full text]
  • ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement
    ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX M Air Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: PARSONS BRINCKERHOFF J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Air Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group, Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Air Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Summary ..............................................................................................................................................1 1.1 Alternatives Considered .............................................................................................................................1 1.2 Build Alternatives Overview .......................................................................................................................2 1.2.1 Bored Tunnel Overview ..................................................................................................................
    [Show full text]
  • 2.86-Acres | 124395 Sf
    2.86-acres | 124,395 sf REQUEST FOR PROPOSALS: unique development opportunity premier seattle land site located in south lake union INVESTMENT CONTACTS: Lori Hill Rob Hielscher Bob Hunt Managing Director Managing Director Managing Director Capital Markets International Capital Public Institutions +1 206 971 7006 +1 415 395 4948 +1 206 607 1754 [email protected] [email protected] [email protected] 601 Union Street, Suite 2800, Seattle, WA 98101 +1 206 607 1700 jll.com/seattle TABLE OF CONTENTS Section I The Offering 4 Introduction Investment Highlights Site Summary Objectives and Requirements Transaction Guidelines Section II Project Overview & Development Potential 17 South Lake Union Map and Legend Project Overview Zoning Zoning Map seattle Development Considerations Development Potential Section III RFP Process and Requirements 34 Solicitation Schedule Instructions and Contacts RFP Requirements Evaluation Process Post Selection Process Disclosures Section IV Market Characteristics 50 Market Overview Market Comparables Neighborhood Summary Regional Economy Section V Appendices 74 NORTH See page 75-76 for List of Appendix Documents Copyright ©2018 Jones Lang LaSalle. All rights reserved. Although information has been obtained from sources deemed reliable, Owner, Jones Lang LaSalle, and/or their representatives, brokers or agents make no guarantees as to the accuracy of the information contained herein, and offer the property without express or implied warranties of any kind. The property may be withdrawn without notice. If the recipient of this information has signed a confidentiality agreement regarding this matter, this information is subject to the terms of that agreement. Section I THE OFFERING 4 | Mercer Mega Block | Request for Proposals 520 REPLACE MERCER STREET LAKE UNION DEXTER AVE N ROY STREET ROY 99 NORTH Last large undeveloped site in South Lake Union | Mercer Mega Block | Request for Proposals 5 THE OFFERING INTRODUCTION MERCER MEGA BLOCK JLL is pleased to present the Mercer Mega Block, a 2.86-acre site acquisition opportunity.
    [Show full text]
  • SR 520, I-5 to Medina
    I-5 to Medina: Bridge Replacement and HOV Project | Supplemental Draft EIS Chapter 5—Freeway Volumes and Operations What is in this chapter? This chapter presents the transportation team’s findings for the SDEIS freeway analysis. It describes freeway traffic volumes and operations on the SR 520 freeway mainline and ramps during morning (a.m.) and afternoon (p.m.) peak (highest use) Freeway traffic volume refers to how many periods. The chapter also discusses the results of the freeway vehicles and/or people use or would like to traffic volume forecasts and operations analysis of the No Build use a freeway. Alternative and Build (6-Lane) Alternative options. Freeway traffic operation refers to how traffic is moving or flowing, and is discussed in terms of speeds, travel times, and What is traffic currently like on congestion. SR 520? The existing configuration of SR 520 does not meet current WSDOT design guidelines, which affects the freeway’s capacity to provide reliable and safe travel for buses and carpools (HOV) and general-purpose traffic. Roadway capacity in the SR 520 Reliability is defined by how travel times corridor is constrained by: vary over time. On any given day, unusual circumstances such as crashes can dramatically change the performance of the Narrow shoulders and lanes on the corridor and across the roadway, affecting both travel speeds and bridge throughput volumes. Commuters who take congested highways to and from work are well aware of this. When asked about their Short acceleration lane lengths at the SR 520/Montlake commute, they will say "it takes me 45 interchange and Lake Washington Boulevard on-ramps minutes on a good day, but an hour and 15 minutes on a bad day." Poor sight distance at roadway curves, resulting in slower Unreliable traffic conditions affect how and when people choose to travel.
    [Show full text]
  • Arts in Seattle
    ARTS IN SEATTLE ARCHITECTURE AND DESIGN ................................................................................................................................2 EXPERIENCE MUSIC PROJECT..........................................................................................................................................2 SEATTLE PUBLIC LIBRARY , CENTRAL..............................................................................................................................4 SMITH TOWER ......................................................................................................................................................................5 CHAPEL OF ST. IGNATIUS ..................................................................................................................................................7 OLYMPIC SCULPTURE PARK ..............................................................................................................................................9 SEATTLE ART MUSEUM....................................................................................................................................................11 GAS WORKS PARK ............................................................................................................................................................12 SPACE NEEDLE..................................................................................................................................................................13 SEATTLE ARCHITECTURE FOUNDATION,
    [Show full text]
  • ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX Q Hazardous Materials Discipline Report
    ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX Q Hazardous Materials Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: SHANNON & WILSON, INC J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Hazardous Materials Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group, Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Hazardous Materials Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Introduction and Summary ........................................................................................... 1 1.1 Introduction .......................................................................................................................... 1 1.2 Build Alternatives Overview ................................................................................................. 2 1.2.1 Bored Tunnel Alternative ..........................................................................................
    [Show full text]
  • Downtown Seattle
    Commercial Revalue 2015 Assessment Roll AREA 30 King County, Department of Assessments Seattle, Wa. Lloyd Hara, Assessor Department of Assessments Accounting Division Lloyd Hara 500 Fourth Avenue, ADM-AS-0740 Seattle, WA 98104-2384 Assessor (206) 205-0444 FAX (206) 296-0106 Email: [email protected] http://www.kingcounty.gov/assessor/ Dear Property Owners: Property assessments for the 2015 assessment year are being completed by my staff throughout the year and change of value notices are being mailed as neighborhoods are completed. We value property at fee simple, reflecting property at its highest and best use and following the requirement of RCW 84.40.030 to appraise property at true and fair value. We have worked hard to implement your suggestions to place more information in an e-Environment to meet your needs for timely and accurate information. The following report summarizes the results of the 2015 assessment for this area. (See map within report). It is meant to provide you with helpful background information about the process used and basis for property assessments in your area. Fair and uniform assessments set the foundation for effective government and I am pleased that we are able to make continuous and ongoing improvements to serve you. Please feel welcome to call my staff if you have questions about the property assessment process and how it relates to your property. Sincerely, Lloyd Hara Assessor Area 30 Map The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice.
    [Show full text]
  • Report on Alaskan Way Viaduct and Related Projects
    What’s Up Next In The Seattle Squeeze PSRC Transportation Policy Board – April 11 1 Current construction Alaskan Way Viaduct removal • Removes the viaduct (including foundations and ramps) and restores the street • Approximately 6 months of construction Filling and sealing the Battery Street Tunnel • Decommissions systems, fills and seals tunnel • Utility work and street improvements on Battery Street • Approximately 24 months of construction North surface street connections • Reconnects Harrison, Thomas and John streets across rebuilt Seventh Avenue North (formerly Aurora Avenue North) • Adds bus lane between Harrison Street and Denny Way • Approximately 15 months of construction 2 What to expect from viaduct demolition Machinery, not explosives Working quickly and safely • Work at multiple locations at once. • Impact work daytime only. • Except short durations for ramps and over railroad tracks. • Spraying/misting water to control dust. • Monitoring vibration and noise to ensure work stays within permitted limits. • Shielding or nets to protect nearby buildings. 3 Viaduct demolition along the Waterfront Demolition along the waterfront • Area 2: Crews continuing demolition from Columbia Street, moving north along the waterfront 4 Temporary pedestrian bridge • Crews are currently building the temporary pedestrian bridge on Western Avenue between Marion and Columbia streets. • Temporary bridge runs between Colman Dock and First Avenue along Western Avenue and Columbia Street (red line). • Temporary bridge will open this summer before crews remove a section of the current pedestrian bridge over Alaskan Way (orange line). 5 Filling and sealing the Battery Street Tunnel Scope of work • Decommission and remove the tunnel’s utility and mechanical systems. • Fill the tunnel and seal its entrances.
    [Show full text]