2013 – 2018 Comprehensive Integrated Transport Plan

Total Page:16

File Type:pdf, Size:1020Kb

2013 – 2018 Comprehensive Integrated Transport Plan 2013 – 2018 COMPREHENSIVE INTEGRATED TRANSPORT PLAN Table of contents Table of contents ......................................................................................................................................................... I Tables VI Figures VIII Executive summary ................................................................................................................................................... X 1.1 INTRODUCTION ............................................................................................................................................... X 1.2 CAPE TOWN A SNAPSHOT ............................................................................................................................... XI 1.3 TCT'S STAKEHOLDERS ......................................................................................................................................XIII 1.4 TCT: A NEW TRANSPORT AUTHORITY AND A NEW CHALLENGE ......................................................................... XV 1.4.1 vision and objectives .................................................................................................................. xv 1.4.2 tct's constitutional by-law ........................................................................................................ xviii 1.5 OPERATIONAL STRUCTURE OF TCT ................................................................................................................ XVIII 1.5.1 structure of tct ............................................................................................................................ xviii 1.5.2 tct’s overarching principle....................................................................................................... xviii 1.5.3 objectives and targets ............................................................................................................... xix 1.6 THE USER ACCESS PRIORITY ............................................................................................................................ XXI 1.7 MINI REVIEW OF THIS CITP ........................................................................................................................... XXXVI 1. Introduction .............................................................................................. ERROR! BOOKMARK NOT DEFINED. 1.1 OVERVIEW OF THE COMPREHENSIVE INTEGRATED TRANSPORT PLAN ................................................................. 1 1.2 METHODOLOGY ............................................................................................................................................. 1 1.3 COMMUNICATION AND CONSULTATION PROCESS........................................................................................... 2 1.4 CONTEXT ........................................................................................................................................................ 2 2. Transport vision and objectives ................................................................................................................ 3 2.1 TRANSPORT VISION AND OBJECTIVES ............................................................................................................... 3 2.2 ACHIEVEMENT OF THE VISION .......................................................................................................................... 4 2.3 INFORMANTS TO THE TRANSPORT VISION .......................................................................................................... 5 2.4 IMPORTANT TRANSPORT STAKEHOLDERS ........................................................................................................... 8 3. Transport register .......................................................................................................................................... 9 3.1 PURPOSE OF THE TRANSPORT REGISTER ............................................................................................................. 9 3.2 OVERVIEW OF THE 2006 - 2011 CITP .............................................................................................................. 9 3.2.1 lessons learnt from the previous integrated transport plan ................................................. 11 3.3 CAPE TOWN FACT SHEET ............................................................................................................................... 12 3.4 DEMOGRAPHICS AND SOCIO-ECONOMIC OVERVIEW .................................................................................. 15 3.4.1 population and household growth ......................................................................................... 15 3.4.2 household characteristics .......................................................................................................... 17 3.4.3 population growth forecast ...................................................................................................... 18 3.5 DEMAND AND SUPPLY OVERVIEW.................................................................................................................. 21 3.5.1 modal split .................................................................................................................................... 21 3.5.2 transportation modelling ........................................................................................................... 27 3.5.3 2013 household travel survey .................................................................................................... 27 3.6 DEMAND AND SUPPLY - DETAILED ANALYSIS ................................................................................................... 32 3.6.1 supply ............................................................................................................................................ 32 3.6.2 demand ........................................................................................................................................ 53 3.6.3 utilisation ........................................................................................................................................ 67 3.7 OTHER PUBLIC TRANSPORT SERVICES .............................................................................................................. 72 3.7.1 metered taxis ............................................................................................................................... 72 3.7.2 transport for learners ................................................................................................................... 73 3.7.3 tour operators .............................................................................................................................. 73 3.7.4 tuk tuks ........................................................................................................................................... 73 3.7.5 dial a ride system ......................................................................................................................... 73 3.8 ROAD NETWORK MANAGEMENT ................................................................................................................... 74 3.8.1 freeway management system ................................................................................................. 74 3.8.2 navigational systems .................................................................................................................. 75 3.8.3 fare collection .............................................................................................................................. 75 3.8.4 transport information centre (tic) ............................................................................................. 75 3.8.5 irt monitoring and surveillance .................................................................................................. 78 3.8.6 accidents ...................................................................................................................................... 78 3.8.1 bridge management system .................................................................................................... 80 3.8.2 traffic signal system ..................................................................................................................... 80 3.8.3 safety and security ...................................................................................................................... 80 3.8.4 enforcement ................................................................................................................................ 81 3.9 FREIGHT LOGISTICS SYSTEM ............................................................................................................................ 83 3.9.1 introduction .................................................................................................................................. 83 3.9.2 freight demand ........................................................................................................................... 83 3.9.3 freight movement ....................................................................................................................... 90 3.9.4 freight volumes ............................................................................................................................ 91 3.9.5 incident management .............................................................................................................. 93 3.10
Recommended publications
  • CURRICULUM VITAE JONATHAN CROWTHER OPERATIONS MANAGER Environmental Management Planning & Approvals, Africa
    CURRICULUM VITAE JONATHAN CROWTHER OPERATIONS MANAGER Environmental Management Planning & Approvals, Africa QUALIFICATIONS M.Sc 1988 Environmental Science B.Sc (Hons) 1983 Geology B.Sc 1982 Geology and Geography z EXPERTISE Jonathan is the SLR Operations Manager for Environmental Management Planning & Approvals, Africa. He has over 30 years of experience with expertise in a wide Environmental Impact and range of environmental disciplines, including Environmental Impact and Social Social Assessment Assessments (ESIA), Environmental Management Plans, Environmental Planning, Environmental Environmental Compliance & Monitoring, and Public Participation & Facilitation. Management He has project managed a large number of offshore oil and gas EIAs for various Plans/Programmes exploration and production activities in Southern Africa. He also has extensive Public Participation & experience in large scale infrastructure projects including some of the largest road Facilitation projects in South Africa, ESIAs for waste landfill facilities, general industry and the Environmental Compliance built environment. & Monitoring PROJECTS Oil and Gas Exploration and Production Total E&P South Africa B.V. Provided environmental support ahead of an exploration well drilling operation, Provision of environmental environmental compliance services during the drilling operation and appointed to services for well drilling in prepare a close-out report on completion of the drilling operation. Project director, Block 11B/12B, offshore client liaison, report compilation and ECO services. South Coast, South Africa (2019 - ongoing) . 1 CURRICULUM VITAE JONATHAN CROWTHER Total E&P South Africa B.V. TEPSA is the holder of an Environmental Management Programme to undertake Application to amend exploration well drilling in Block 11B/12B offshore of the South Coast, South Africa. Environmental Management An amendment application was undertaken to change the well completion status Programme Block 11B/12B, described in the programme.
    [Show full text]
  • Saturday, 13Th March 2010
    Road Closures Saturday, 11 March 2017 Area Details Time of Closure Foreshore, Cape Town CBD Hertzog Boulevard and Saturday, 15h00 – Sunday, 11h30 outbound carriageway between Heerengracht Street and Christiaan Barnard (Oswald Pirow) Green Point Helen Suzman Boulevard and Saturday, 12h00 – Sunday, 21h00 Beach Road to Traffic Circle (City bound carriageway) Noordhoek, Hout Bay Chapman’s Peak Drive (M6) and Saturday, 18h00 – Sunday, 18h00 Noordhoek Road (M6) to Princess Street Sunday, 12 March 2017 Area Details Time of Closure Foreshore Hertzog Boulevard 00h00 – 11h30 - Both carriageways between Heerengracht Street and Nelson Mandela Boulevard (N2) Foreshore Heerengracht Street 00h00 – 11h30 - Both carriageways between Hans Strijdom Avenue (Fountain Circle) and Coen Steytler Avenue Foreshore DF Malan Drive from entrance to Media24 building 00h00 – 11h30 and Hertzog Boulevard Woodstock, University Estate De Waal Drive (M3) 05h30 – 11h30 - Outbound between Roodebloem Road and Hospital Bend. Traffic will be diverted to Main Road CBD, Woodstock Nelson Mandela Boulevard (N2) Eastbound 05h30 – 11h30 Hospital Bend (N2, M3) - Settlers Way (N2) to Muizenberg (M3) ramp 05h30 – 11h30 Interchange (Southbound) - M3 on-ramp from Groote Schuur Hospital (Anzio Road - Southbound) Mowbray, Rondebosch, M3 (Rhodes Drive, Union Avenue, Paradise Road, 06h00 – 11h45 Newlands, Claremont, Edinburgh Drive) Southbound Bishopscourt - Including all on-ramps between Nelson Mandela Boulevard up to Trovato Link Wynberg, Constantia, Tokai M3 Freeway (Blue Route) 06h00 –
    [Show full text]
  • Buitengewone Provinsiale Koerant Provincial Gazette Extraordinary
    P ROVINSIE P ROVINCE OF W ES-K AAP W ESTERN C APE Buitengewone Provinsiale Koerant Provincial Gazette Extraordinary P.K./P.N. No. 88 11 APRIL 2002 No. 5853 DEPARTEMENT VAN VERVOER AANSOEKE OM OPENBARE PADVERVOERPERMITTE Besonderhede ten opsigte van aansoeke om openbare padvervoerpermitte (soos ingedien by die onderskeie Plaaslike Padvervoerrade) met aanduiding van, eerstens die verwysingsnommer, en dan— (1) Aansoeknommer; (2) die naam van die aansoeker en ID nommer; (3) die plek waar die aansoeker sy besigheid dryf of wil dryf, asook sy posadres; (4) die aard van die aansoek; (5) die getal en tipe voertuie, met inbegrip van die dravermoë of die bruto voertuigmassa van die voertuie wat by die aansoek betrokke is; (6) die klas of klasse van goedere wat vervoer word of vervoer staan te word; en (7) die punte waartussen of die roete of roetes waaroor of die gebied of gebiede waarbinne die padvervoer onderneem word of die voorgenome padvervoer onderneem staan te word; waar enige van (1) tot (7) van toepassing is, word ingevolge artikel 14(1) van die Wet op Padvervoer, 1977 (Wet No 74 van 1977), hieronder gepubliseer. Ingevolge regulasie 4 van die Padvervoerregulasies, 1977, moet skriftelike vertoë ter ondersteuning of bestryding van hierdie aansoeke, binne 21 (een-en-twintig) dae vanaf die datum van hierdie publikasie, in viervoud of per hand ingedien word by of per geregistreerde pos gestuur word aan, die betrokke padvervoerraad en in enkelvoud of per hand ingedien word by of per geregistreerde pos gestuur word aan, die aansoeker by sy gepubliseerde adres (sien (3)). Plaaslike Padvervoerraad Kaapstad Adres waarheen vertoë gerig moet word: Die Sekretaris Plaaslike Padvervoerraad Privaatsak X8 Goodwood 7460 5853—1 2 No.
    [Show full text]
  • Vol. Ci No. 1 March 2016
    MARCH 2016 MARCH VOL. CI NO. 1 CI NO. VOL. VOL. CI NO. 1 MARCH 2016 THE DIOCESAN COLLEGE, RONDEBOSCH College Address: Campground Road, Rondebosch, 7700, Tel 021 659 1000, Fax 021 659 1013 Prep Address: Fir Road, Rondebosch, 7700; Tel 021 659 7220 Pre-Prep Address: Sandown Road, Rondebosch, 7700; Tel 021 659 1037/47 Editor: Mr CW Tucker [email protected] OD Union Section Editor: Mrs R Wilke [email protected] OD Union Section Editorial Committee: Mr CW Tucker, Dr P Murray, Mr B Robertson, Mrs D O’ Rourke OD Union E-mail: [email protected] Museum and Archives: Dr P Murray [email protected] website: www.bishops.org.za FOUNDED IN 1849 BY THE BISHOP OF CAPE TOWN, AS A CHRISTIAN FOUNDATION INCORPORATED BY ACT OF PARLIAMENT, 1891 Visitor HIS GRACE THE ARCHBISHOP OF CAPE TOWN, THABO CECIL MAKGOBA Members of the College Council Chairman Mr MJ Bosman Bishop GQ Counsell, Mr DG Burton, Mr PG van Tonder, Mr A Selby, Dr E Fullard, Mr T Mashologu, Mrs T Moyo, Mr PM Apleni, Dr N Shaikh and Mr CJ Haw Principal: Mr G Pearson, B. Com, HDE, B Ed COLLEGE STAFF Deputy Principal: Mr V Wood, B Ed, BA, HDE Deputy Headmasters Mr S Henchie, MA (Economics) Mr MS Bizony, B.Sc (Hons) Ms B Kemball, BA, HDE, FDE (I SEN) Mr PG Westwood, B.Sc (Hons) Mr K Kruger; B Sc (Erg), HDE Mr W Wallace, BA (Hons), HDE Mr D Russell, B Com, HDE Assistant Deputy Headmaster Mr R Jacobs, B.Sc(Ed) Mr M Mitchell, MBA, M Mus, HDE, LTCL, FTCL, UPLM, UTLM Mr J Nolte, B.Soc.Sci (Hons); B Psych, PGCE Mr R Smith, BA (Hons) SportsSci (Biokmetics), PGCE Academic Staff Mr JH Swift, B SocSci, HDE Mr RPO Hyslop, BA (FA), HDE Mrs A van Selm, BA, PGCE Mr PL Court, BA (Hons), BA, HDE Mrs J Campbell, M Sc (Education), B.Sc, HDE Mrs GM Bassett, BMus Mrs R Manie, BA, STD; Child Development and Dr PL Murray, DPhil, MA, BA (Classics), Cert Lit (Italian) Barriers to Learning Mr L Glanvill, B Sc (Hons); HDE Rev T Wilke, M Ed (Ed.
    [Show full text]
  • Road Closures
    Road Closures Saturday, 7 March 2020 Area Details Time of closure Cape Town CBD - Castle Street between Strand Street & Saturday, 12h00 – Darling Street Sunday, 14h30 - Darling Street between Lower Plein & Saturday, 15h00 – Buitenkant Street Sunday, 14h30 - Strand Street & Newmarket Street between Saturday, 21h00 – Lower Plein Street & Russel Road Sunday, 11h30 - Nelson Mandela Boulevard incoming Strand Saturday, 19h00 – Street off-ramp Sunday, 11h30 Green Point - Helen Suzman Boulevard from Beach Road Saturday, 14h00 – to Traffic Circle (City-bound carriageway) Sunday, 21h00 Noordhoek, Hout Bay - Chapman’s Peak Drive (M6) and Noordhoek Saturday, 18h00 – Road (M6) to Princess Street Sunday, 18h00 Sunday, 8 March 2020 Area Details Time of closure Cape Town CBD - Strand Street & Newmarket Street between 04h00 – 11h30 Adderley Street & Russel Road Cape Town CBD - Darling Street between Adderley Street & 04h00 – 14h30 Canterbury Street - Sir Lowry Rd between Canterbury Street & Christiaan Barnard Street Woodstock, University Estate - Phillip Kgosana Drive (M3) 05h30 – 12h30 o Outbound between Roodebloem Road and Hospital Bend. Traffic will be diverted to Main Road CBD, Woodstock - Nelson Mandela Boulevard (N2) Eastbound 05h30 – 12h30 Hospital Bend (N2, M3) - Settlers Way (N2) to Muizenberg (M3) ramp 05h30 – 12h30 Interchange (Southbound) - M3 on-ramp from Groote Schuur Hospital (Anzio Road - Southbound) Mowbray, Rondebosch, - M3 (Rhodes Drive, Union Avenue, Paradise 06h00 – 12h30 Newlands, Claremont, Road, Edinburgh Drive) Southbound Bishopscourt
    [Show full text]
  • Commission of Inquiry Into Allegations of Police Inefficiency in Khayelitsha and a Breakdown in Relations Between the Community and Police in Khayelitsha Phase One
    COMMISSION OF INQUIRY INTO ALLEGATIONS OF POLICE INEFFICIENCY IN KHAYELITSHA AND A BREAKDOWN IN RELATIONS BETWEEN THE COMMUNITY AND POLICE IN KHAYELITSHA PHASE ONE Richard Bosman Date: 6 February 2014 Source: Pages 1900-2013 of Commission transcript COMMISSIONER: We will now move on to our next witness who is Mr Bosman. MR KATZ: Yes he is here Commissioner. He is here and he’s got no objection to taking the oath. COMMISSIONER: That’s good to know. And he knows that these are public proceedings and he doesn’t mind – he knows these are public proceedings? MR KATZ: Yes I know but you usually ask the witness whether they wish to take the oath. COMMISSIONER: I know. I also ask the witness whether they know they are public proceedings so I thought seeing as how you were going to tell us, you could confirm that as well. Mr Bosman if you’d like to take a seat over here. Good afternoon Mr Bosman. I apologise, we’ve been keeping you waiting for over 24 hours now. MR BOSMAN: Two days. COMMISSIONER: Yes, but thank you very much for making yourself available. We are grateful and I know that you have no difficulty with your name being made public and your evidence being ma de public. MR BOSMAN: None whatsoever, I have no objection to taking the oath also. COMMISSIONER: And you have no objection to taking the oath according to your counsel. MR BOSMAN: None whatsoever Commissioner. COMMISSIONER: And would you repeat after me? RICHARD BOSMAN – (sworn states) COMMISSIONER: Mr Katz? MR KATZ: Thank Madam Commissioner.
    [Show full text]
  • Modelling Service Reliability of a Heterogeneous Train Fleet Operating on Aged Infrastructure
    Modelling service reliability of a heterogeneous train fleet operating on aged infrastructure Nathan Wilson Thesis presented in fulfilment of the requirements for the degree of Master of Engineering (Industrial Engineering) in the Faculty of Engineering at Stellenbosch University Prof Romano Del Mistro, Prof Cornelius J. Fourie, Prof Corne Schutte March 2017 The financial assistance of the PRASA Engineering Research Chair towards this research is hereby acknowledged. Opinions expressed and conclusions arrived at, are those of the author and are not necessarily to be attributed to PRASA Stellenbosch University https://scholar.sun.ac.za Declaration By submitting this thesis electronically, I declare that the entirety of the work contained therein is my own, original work, that I am the sole author thereof (save to the extent explicitly otherwise stated), that reproduction and publication thereof by Stellenbosch University will not infringe any third party rights and that I have not previously in its entirety or in part submitted it for obtaining any qualification. Date: March 2017 Copyright © 2017 Stellenbosch University All rights reserved ii Stellenbosch University https://scholar.sun.ac.za Abstract The Passenger Rail Agency of South Africa is in the process of introducing new rolling stock into their current aged fleet of rolling stock. This poses several technical challenges relating to amongst other the operation of the mix of old and new trains on the same infrastructure. The objective of this study was therefore to determine the effect on service reliability in terms of punctuality, when old trains are incrementally replaced by new trains. Punctuality was measured by number of delays, total delay minutes and average delay duration over a specified time period.
    [Show full text]
  • DIRECTIONS to the ALPHEN BOUTIQUE HOTEL Alphen Drive, Constantia, 7806 L GPS Co-Ordinates: 34 00’ 45.44S 18 27’ 03.62E
    WESTERN CAPE 16 23 PENINSULA 8 4 14 22 9 10 5 11 3 21 ALPHEN 2 17 6 1 13 18 19 The ALPHEN BOUTIQUE HOTEL is situated in close proximity to: 12 1 1.5 kms Constantia Village Shopping Centre 2 750 m Constantia Sports Centre 20 15 3 6 kms Cavendish Square 4 19.4 kms Table Mountain Cable Way 5 6 kms Kirstenbosch Botanical Gardens 6 5.2 kms Cecilia Forest Walk 7 45 kms Cape Point Nature Reserve 8 14.8 kms CBD Cape Town 9 6.8 kms Newlands Cricket Stadium 10 7.1 kms Newlands Rugby Stadium 11 23 kms Cape Town International Airport 12 13.8 kms Muizenberg Beach 13 13.8 kms Hout Bay 14 22.3 kms Camps Bay 7 15 16.8 kms Kalk Bay 16 18.4 kms V&A Waterfront 17 4.5 kms Royal Cape Golf Course 18 7.2 kms Steenberg Golf Club 19 9.5 kms Westlake Golf Club 20 7.2 kms Clovelly Golf Club 21 6.4 kms Kenilworth Race Course 22 56.6 kms Stellenbosch Winelands 23 80 kms Franschhoek Winelands DIRECTIONS DIRECTIONS TO THE ALPHEN BOUTIQUE HOTEL Alphen Drive, Constantia, 7806 l GPS Co-ordinates: 34 00’ 45.44S 18 27’ 03.62E LOCATION Centrally situated on the Cape Peninsula and at the gateway of the Constantia Valley, The Alphen Boutique Hotel is a mere 25 minutes from Cape Town City Centre, Cape Town International Airport and False Bay Beaches. FROM CAPE TOWN INTERNATIONAL AIRPORT FROM BLOUBERSTRAND / NORTHERN SUBURBS (± 25 minutes) (± 40 minutes) • Take the N2 to City for about 12.5 km and take Rhodes Drive • Take the M14 until you get to the R27 (M3) turn off to Muizenberg • Take the R27 towards Table Bay/City • Follow the M3, past UCT for about 9 km • Take the N2 to
    [Show full text]
  • Fifa 2010 World Cup
    FIFA 2010 WORLD CUP Transport Technical Report Part B July 2003 Prepared by: CSIR HHO Africa Arup Contact person: Mr Richard Gordge CSIR Transportek P O Box 395 Stellenbosch South Africa 7599 Tel: +27 21 888-2611 Fax: +27 21 888-2694 Email: [email protected] Date: July 2003 PART B FIFA 2010 World Cup Contents 1. GAUTENG_________________________________________ 1 1.1 General Transport Review ___________________________________________ 1 1.2 Transport Mode Split ________________________________________________ 1 1.3 Airports_____________________________________________________________ 2 1.4 Road Network _______________________________________________________ 2 1.4.1 National Links ________________________________________________________ 2 1.4.2 Gauteng Network ______________________________________________________ 3 1.4.3 Patterns of Demand for Road Space______________________________________ 3 1.4.4 Congestion Management Strategy ________________________________________ 3 1.4.5 Road Infrastructure Upgrade Programs___________________________________ 4 1.4.6 Major Road Routes for the FIFA 2010 World Cup _______________________ 4 1.5 Public Transport ____________________________________________________ 5 1.5.1 Overview ______________________________________________________________ 5 1.5.2 Gautrain Rapid Rail___________________________________________________ 7 1.5.3 Rail Extensions and Stations ____________________________________________ 8 1.6 Key Issues relating to the Effective Hosting of the FIFA 2010 World Cup ________________________________________________________________
    [Show full text]
  • Provincial Land Transport Framework (2011/12 – 2015/16)
    Provincial Land Transport Framework (2011/12 – 2015/16) Executive Summary Department of Transport & Public Works Strategy, Planning & Coordination Document Version: Final Draft 1 April 2011 Abbreviations Abbreviation Description AADT Average Annual Daily Traffic ACSA Airport Company South Africa ADTT Average Daily Truck Traffic CoCT City of Cape Town CSIR Council of Scientific and Industrial Research CTIA Cape Town International Airport DBSA Development Bank of Southern Africa DM District Municipality DORA Division of Revenue Act DOT National Department of Transport DTPW Department of Transport and Public Works GABS Golden Arrow Bus Services IDP Integrated Development Plan IPTN Integrated Public Transport Network IRPTN Integrated Rapid Public Transport Network IRT Integrated Rapid Transit in the City of Cape Town ITP Integrated Transport Plan LDV Light Delivery Vehicles MAP Million Annual Passengers MEC Member of the Executive Council MEDS Micro-economic Development Strategy MRA Municipal Regulating Entity MTEF Medium Term Expenditure Framework NLTA National Land Transport Act 5 of 2009 NLTSF National Land Transport Strategic Framework NMT Non-Motorised Transport NMV Non-Motorised Vehicle NPTR National Public Transport Regulator NSDP National Spatial Development Perspective PGDS Provincial Growth and Development Strategy PGWC Provincial Government Western Cape PLTF Provincial Land Transport Framework POLB Provincial Operating License Board PRASA Passenger Rail Agency South Africa PRE A Provincial Regulating Entity PSDF Provincial Spatial
    [Show full text]
  • Tides and Water Level Working Group
    World- Wide Navigational Warning Service Sub-Committee Cape Town, South Africa 28 Aug – 1 Sep 2017 The 2017 WWNWS-SC Working Group Meeting will be held in Newlands, a suburb of Cape Town, South Africa. Cape Town is home not only to beautiful wine lands, stunning beaches and a multicultural population, but is also home to one of the 7 Natural wonders of the world – Table Mountain. Cape Town is the provincial capital city of the Western Cape. As the seat of the National Parliament it is also the legislative capital of South Africa. Located on the shore of Table Bay, Cape Town was first developed by the Dutch East India Company as a supply station for Dutch ships sailing to East Africa, India, and the Far East. Jan van Riebeeck's arrival on 6 April 1652 established the first permanent European settlement in South Africa. Cape Town quickly outgrew its original purpose as the first European outpost at the Castle of Good Hope, becoming the economic and cultural hub of the Cape Colony. Until the Witwatersrand Gold Rush and the development of Johannesburg, Cape Town was the largest city in South Africa. Newlands is an upmarket suburb of Cape Town, South Africa. It is located at the foot of Table Mountain in the Southern Suburbs of Cape Town, and is the wettest suburb in South Africa due to its high winter rainfall. It is best known for Kirstenbosch Botanical Gardens, Newlands Forest, Newlands Cricket Ground and Newlands Stadium, a rugby union and football venue. It is also the original home of Ohlsson's Cape Breweries, which is still located next to the rugby grounds.
    [Show full text]
  • 01 04 2011 Final Pltf
    • Initiate a programme under the Safer Journey’s Strategy for the rural areas (see above) to educate both vehicle owners and NMT groups on safety rules of the road. • Encourage businesses / co-ops / factories / farmers etc to provide bicycle parking and storage. Tourists: • Initiate formation of NMT forums/interest groups in local areas to put together local NMT friendly tourism routes. • Encourage guest houses, through local tourism forums/interest groups, to supply free bikes for the duration of the stay to encourage cycling around local areas. • Liaise with BEN and other agencies/ business to discuss the opportunity to install bike supply/rental systems in certain urban centres such as Stellenbosch, Worcester and Tulbagh, and in particular at strategic rail stations. • Establish a programme to train local guides that can run bicycle tours. Urban Scholars: • Promote cycling to school and initiate safety awareness training modules at schools. • Support local municipality officials to respond to the need to provide appropriate infrastructure where required (a range of paths making up a continuous network linking schools and sports fields and rail stations where applicable, priority signalling systems, road crossing facilities and safe parking). Urban Students: • Support local municipality officials to respond to the need to provide appropriate infrastructure where required (including pedestrianised zones, NMT links from rail stations, road crossing facilities, priority signalling, parking, storage and showers). • Discourage University and College planners from providing vehicle parking and rather encourage planners to create pedestrianised campuses. This will require promotion of the use of a more appropriate parking ratio by the relevant Local Authority land use departments who generally encourage the use of vehicles by using outdated zoning scheme parking standards.
    [Show full text]