EMR: Anhui Integrated Transport Sector Improvement Project (June
Total Page:16
File Type:pdf, Size:1020Kb
Environmental Monitoring Report Semestral Report January 2012 PRC: Anhui Integrated Transport Sector Improvement Project Prepared by Shanghai Ship & Shipping Research Institute for Anhui Provincial Department of Transport and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ADB FINANCED ANHUI INTEGRATED TRANSPORT SECTOR IMPROVEMENT PROJECT Semiannual Report on Environmental and Safety Supervision (June - December, 2011) 1st Phase Prepared by: Environmental and Safety Supervision Office of Anhui Integrated Transport Sector Improvement Project (Seal) Date: January 20, 2012 3 Table of Contents 1 PROJECT OVERVIEW 5 1.1 Project Overview (Part A) ................................................................................. 5 1.2 Project Overview (Part B) ................................................................................. 9 2 OVERVIEW OF ENVIRONMENTAL PROTECTION AND SAFETY PRODUCTION SUPERVISION 14 2.1 Responsibilities of Environmental Protection and Safety Production Supervision 14 2.2 Supervision Agencies, Contractors and Personnel ...................................... 14 2.3 Objectives of Environmental Protection ........................................................ 22 2.4 Main Work of Environmental Protection and Safety Production Supervision23 3 ENVIRONMENTAL AND SAFETY SUPERVISION 31 3.1 Environmental Monitoring .............................................................................. 32 3.2 Implementation, Problems and Correction Proposals of Environmental Protection Measures ............................................................................................. 59 3.3 Supervision of Safety in Production .............................................................. 72 4. ENVIRONMENT MONITORING OF THE AREA NEAR TUOHU LAKE NATURE RESERVE 82 4.1 Environment Monitoring ................................................................................. 82 4.2 Environmental Supervision and Management .............................................. 86 5 MILESTONE EVENTS OF ENVIRONMENTAL AND SAFETY SUPERVISION 90 6 APPENDIX: SITE PHOTOS 93 6.1 Photos of Sites with Environmental Protection and Safety Measures ........ 93 6.2 Photos of Sites with Environmental Protection and Safety Problems ........ 98 4 According to the requirement of Memorandum of Loan Review Mission for Loan No.: 2600-PRC: Anhui Integrated Transport Sector Improvement Project, the semiannual external monitoring report on environmental and health risks during implementation (Jan-Jun 2012) should be submitted to ADB. This report is on the basis of the monitoring report submitted on October 17, 2011, and prepared in accordance with the latest requirements of ADB. The main contents are as follows: 1 PROJECT OVERVIEW The whole ADB financed project includes two parts: (A) Xuzhou to Mingguang Expressway (Anhui Section): a totally enclosed and full-overpass vehicle loading highway (Class Ⅰ) designed with bridges and culverts, the total length is 139.032km, the design speed is 120km/h and the subgrade width is 27m. The budgetary estimate of the project is 6,245,497,800 RMB. (B) Local Highway Improvement Project: composed of 9 roads, namely 3 reconstruction subprojects (with a total length of about 172km), 4 rehabilitation subprojects (with a total length of about 202km) and 2 security subprojects (with a total length of about 78km ), and the total length is about 452km. The total project investment is estimated at about 2.2 billion RMB. 1.1 Project Overview (Part A) The project overview and implementation progress of each bid section of XM Expressway are shown in Table 1.1-1. Table 1.1-1 List of Project Overview and Implementation Progress Name Project Overview and Implementation Progress Supervision Chief Supervision Engineer Office: Anhui Zhongxing Project Unit Construction Supervision Company, responsible for overall 5 supervision of the project; supervision has been carried out by the supervisors. No. 1 Site supervision office: Anhui Kexing Traffic Construction Project Supervision Co., Ltd., responsible for the supervision of Bid 1, 2 and 3. No. 2 Site supervision office: Beijing Lutiaotong International Engineering Consulting Co., Ltd., responsible for the supervision of Bid 4, 5, 6 and 7. No. 3 Site supervision office: Wuhan Guangyi Engineering Consulting Co., Ltd., responsible for the supervision of Bid 8, 9, 10 and 11. No. 4 Site supervision office: Anhui High-grade Highway Engineering Supervision Co., Ltd., responsible for the supervision of Bid 13. No. 5 Site supervision office: Beijing Huatong Highway and Bridge Supervision and Consulting Co., Ltd., responsible for the supervision of Bid 12, 14 and 15. Supervision has been carried out by the supervisors of each resident supervision company. Bid 1: Jiangsu Hengji Highway and Bridge Co., Ltd. Construction Section Stake No.: K3+200 ~ K16 +800; the total length is 13.6 km. Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) subgrade, bridge and culvert projects are under construction. Bid 2: Chongqing Fuling Highway and Bridge Engineering Co., Ltd. Section Stake No.: K16 +800 ~ K30 +705; the total length is Contractor 13.905 km. Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) subgrade, bridge and culvert projects are under construction. Bid 3: Xuchang Guangli Highway Construction Co., Ltd. Section Stake No.: K30 +705 ~ K40 +905; the total length is 10.2 km. Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) subgrade, bridge and culvert projects are under construction. 6 Bid 4: Anhui Highway and Bridge Engineering Group Co., Ltd. Section Stake No.: K40 +905 ~ K52 +175; the total length is 11.27 km. Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) subgrade, bridge and culvert projects are under construction. Bid 5: Anhui Province Highway and Port Engineering Co., Ltd. Section Stake No.: K52 +175 ~ K53 +975; the total length is 1.8 km. Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) subgrade, bridge and culvert projects are under construction. Bid 6: Hunan Shaoyang Highway and Bridge Construction Co., Ltd. Section Stake No.: K53 +975 ~ K62 +230; the total length is 8.255 km. Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) subgrade, bridge and culvert projects are under construction. Bid 7: China Railway 24th Bureau Group Co., Ltd. Section Stake No.: K62 +230 ~ K73 +096.82; the total length is 10.867km.Implementation progress: the construction of resident and mixing stations is completed; preparations for commencement of subgrade, bridge and culvert are undergoing. Bid 8: SinoHydro Corporation Engineering Bureau 15 Co., Ltd. Section Stake No.: K73+067.5 ~ K87+074; the total length is 14.007km.Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) subgrade, bridge and culvert projects are under construction. Bid 9: Chaohu Highway and Bridge Corporation. Section Stake No.: K87+074~K101+563; the total length is 14.489km.Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) subgrade, bridge and culvert projects are under construction. Bid 10: Chaoyang Construction Group Co., Ltd. Section Stake No.: K101+563~K104+203; the total length is 2.64km. Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) the construction of bridge 7 pile foundation work has been basically completed. Bid 11: Anhui Province Highway and Bridge Engineering Corporation. Section Stake No.: K104+203~K105+708; the total length is 1.505km. Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) the construction of the main pier pile and approaching bridge pile foundation work, pile cap and pier column work is completed. Bid 12: Shanghai No. 1 Municipal Engineering Co., Ltd. Section Stake No.: K105+708~K116+190.5; the total length is 10.483 km.Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) subgrade, bridge and culvert projects are under construction. Bid 13: CCCC 3rd Highway Engineering Co., Ltd. Section Stake No.: K116+190.5 ~ K119+366.5; the total length is 3.176 km.Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) the construction of the main pier pile and approaching bridge pile foundation work is completed. Bid 14: Wuxi Communication Engineering Co., Ltd. Section Stake No.: K119+366.5~K134+700; the total length is 15.334 km. Project implementation progress: (1) resident construction is completed; (2) mixing stations have been built; (3) subgrade, bridge and culvert projects are under construction.