Kowloon Bay, Hong Kong Review of Operations – Business in Hong Kong Progress of Major Development Projects

Total Page:16

File Type:pdf, Size:1020Kb

Kowloon Bay, Hong Kong Review of Operations – Business in Hong Kong Progress of Major Development Projects MEGA CUBE Kowloon Bay, Hong Kong Review of Operations – Business in Hong Kong Progress of Major Development Projects Status of property developments with anticipated completion during the period to the end of 2020 Harbour Park 208 Tung Chau Street, Cheung Sha Wan (33.41% owned) Site area “Harbour Park”, a 26-storey residential development, 6,528 square feet commands breathtaking views of Victoria Harbour and surrounding green parks. Metro Harbour Plaza, Gross floor area as well as another sizeable shopping mall under 55,077 square feet development, are both within walking distance, Residential units offering unrivalled living convenience to its 161 residents. Only minutes from Nam Cheong MTR Station, the transport nexus of West Rail and Tung Completion Chung lines, “Harbour Park” enjoys a comprehensive 26 January 2018 transportation network and close proximity to the future Express Rail Link West Kowloon Station. Harbour Park, Cheung Sha Wan, Hong Kong 45 Pottinger Street, Central (19.10% owned) Situated at the intersection of the historical Site area Pottinger Street and the bustling thoroughfare 9,067 square feet of Lyndhurst Terrace, the project enjoys Gross floor area convenient access to public transport, 135,995 square feet including Central MTR Station and Airport Express Terminal. Construction of the Expected completion superstructure work is close to complete Second quarter of 2018 and it will become a tasteful shopping and fine dining community, bringing vibrancy to the heart of SOHO. This commercial development will be held for rental purpose upon completion. 45 Pottinger Street, Central, Hong Kong (artist’s impression) Henderson Land Development Company Limited 46 Annual Report 2017 Review of Operations – Business in Hong Kong • Progress of Major Development Projects Lot No. 1752 in DD No. 122, Tong Yan San Tsuen, Yuen Long (100% owned) Site area Surrounded by lush greenery in a 27,864 square feet tranquil environment, the site will be developed into 16 three-storey Gross floor area villas. Superstructure works are in 27,864 square feet progress. Residential units 16 Lot No. 1752 in DD No. 122, Tong Yan San Tsuen, Yuen Long, Hong Kong (artist’s impression) Expected completion Third quarter of 2018 Wellesley 23 Robinson Road, Mid-Levels (25.07% owned*) Located in the upscale Mid-Levels Site area district, “Wellesley” is a 30-storey 31,380 square feet premier residential development and Gross floor area the construction of the superstructure 156,900 square feet is in progress. Residential units (* the Group’s interest is 50% after 90 the allocation of the relevant residential units to each of the Expected completion involved developers separately on a Third quarter of 2018 proportional basis under the “Deed of Mutual Grant and Covenant and Management Agreement”.) Wellesley, Mid-Levels, Hong Kong (artist’s impression) Henderson Land Development Company Limited Annual Report 2017 47 Review of Operations – Business in Hong Kong • Progress of Major Development Projects Seven Victory Avenue 7 Victory Avenue, Ho Man Tin (100% owned) Site area “Seven Victory Avenue” is situated in a 9,865 square feet well-established district, which houses many prestigious and highly sought-after Gross floor area schools. Adjacent to the upmarket 83,245 square feet residential neighbourhood of Kadoorie Residential units Hill and within easy reach of Mong Kok 250 East MTR station, this 27-storey boutique apartment tower offers residents both Expected completion tranquility and modern lifestyle Third quarter of 2018 convenience. Construction has proceeded to the superstructure stage. Seven Victory Avenue, Ho Man Tin, Hong Kong (artist’s impression) Park One 1, 3 Nam Cheong Street and 180 Tung Chau Street, Cheung Sha Wan (100% owned) “Park One” is close to Tung Chau Street Park Site area and Nam Cheong Park, allowing residents to 8,559 square feet embrace a refreshing and aesthetic environment. Gross floor area Shopping arcades and MTR stations are within 77,029 square feet walking distance, offering unparalleled living convenience to its residents. Superstructure Residential units works are in progress and this 38-storey 129 residential-cum-commercial tower has been specially designed to maximise the magnificent Expected completion Fourth quarter of 2018 sea views. Park One, Cheung Sha Wan, Hong Kong (artist’s impression) Henderson Land Development Company Limited 48 Annual Report 2017 Review of Operations – Business in Hong Kong • Progress of Major Development Projects PARK REACH 33 Shap Pat Heung Road (formerly known as project at Yuen Long Town Lot No. 527) (79.03% owned) Site area 6,131 square feet Gross floor area 21,453 square feet Residential units 63 PARK REACH, Yuen Long, Hong Kong (artist’s impression) Expected completion First quarter of 2019 Situated adjacent to the Group’s project “The Reach”, this site will be developed into a 8-storey residential-cum-commercial development. Superstructure works are under way. This residential development was well received by buyers at its launch in December 2017 with all its 63 boutique apartment units sold out on the first day of its release. Henderson Land Development Company Limited Annual Report 2017 49 Review of Operations – Business in Hong Kong • Progress of Major Development Projects NOVUM EAST 856 King’s Road, Quarry Bay (100% owned) Site area Located close to the Quarry Bay MTR 17,720 square feet station, the interchange of Island Line and Tseung Kwan O Line, this 32-storey Gross floor area residential-cum-commercial development 177,817 square feet will allow upper floor residences to enjoy Residential units panoramic views of the Victoria Harbour 464 and the lush greenery of Braemar Hill. Superstructure works are in progress. It was Expected completion launched for presales in November 2017 First quarter of 2019 with satisfactory market response. NOVUM EAST, Quarry Bay, Hong Kong (artist’s impression) 8-30A Ka Shin Street, Tai Kok Tsui (100% owned) Located next to the Group’s “Eltanin • Square Site area Mile” with Olympic MTR station in its 19,610 square feet proximity, this commercial-cum-residential Gross floor area development is surrounded by a vibrant 176,315 square feet neighbourhood with various amenities and shopping arcades. Superstructure works are Residential units in progress. 514 Expected completion Second quarter of 2019 8-30A Ka Shin Street, Tai Kok Tsui, Hong Kong (artist’s impression) Henderson Land Development Company Limited 50 Annual Report 2017 Review of Operations – Business in Hong Kong • Progress of Major Development Projects Eden Manor 88 Castle Peak Road, Kwu Tung (100% owned) Site area Located in a unique enclave with the 154,280 square feet Hong Kong Golf Club, Fanling Lodge and The Hong Kong Jockey Club – Gross floor area Beas River Country Club in its 555,399 square feet proximity, “Eden Manor” comprises Residential units 25 villas and 8 residential towers. 590 Thanks to the shimmering glass curtain walls that maximise light and visibility, Expected completion residents can enjoy sprawling open Second quarter of 2019 Eden Manor, Kwu Tung, Hong Kong (artist’s impression) views of lush greenery. Construction has proceeded to the superstructure stage and it was launched for pre-sales in March 2017. South Walk • Aura 12 Tin Wan Street, Aberdeen (100% owned) Superstructure works are in progress Site area and it will be developed into a 4,060 square feet 26-storey boutique apartment tower Gross floor area with some ground-level retail 37,550 square feet shops. Some of the residential units on the upper level of the building Residential units will enjoy sweeping views as far as 142 Lamma Island. Expected completion Second quarter of 2019 South Walk • Aura, Aberdeen, Hong Kong (artist’s impression) Henderson Land Development Company Limited Annual Report 2017 51 Review of Operations – Business in Hong Kong • Progress of Major Development Projects 15 Middle Road, Tsim Sha Tsui (100% owned) Site area 28,309 square feet Gross floor area 339,651 square feet Expected completion Second quarter of 2019 15 Middle Road, Tsim Sha Tsui, Hong Kong (artist’s impression) The project at “15 Middle Road” atop East Tsim Sha Tsui MTR station, which is just one stop from the forthcoming Express Rail Link West Kowloon Station, will be developed into a Ginza-style commercial property, comprising medical, dining, retail and carparking facilities. Its purpose-built medical floors, which are designed by a team of professional medical design consultants, will be equipped with various advanced facilities (such as an air purification system and back-up power supply) so as to meet various medical requirements. The podium carpark will have access to retail floors, allowing greater convenience for shoppers. In addition, it features quality restaurants on its uppermost floors, bringing customers not only an unparalleled dining experience, but also a fascinating view of Victoria Harbour. This 340,000-square-foot development is scheduled for completion in 2019 and pre-marketing is under way. Henderson Land Development Company Limited 52 Annual Report 2017 Review of Operations – Business in Hong Kong • Progress of Major Development Projects NOVUM WEST 460 Queen’s Road West, Sai Ying Pun (100% owned) Site area Located right next to “HKU” MTR station 28,027 square feet with Western Harbour Tunnel in the proximity, NOVUM WEST enjoys Gross floor area convenient access to every part of the 272,439 square feet city. With many prestigious schools Residential units just steps way, this 35-storey development 645 is complemented by duo residential clubhouses and a chic shopping mall to Expected completion offer a vibrant living environment. Third quarter of 2019 Superstructure works are in progress and it was launched for pre-sales in May 2017 with positive market response. NOVUM WEST, Sai Ying Pun, Hong Kong (artist’s impression) 218 Electric Road, North Point (100% owned) The redevelopment of the former “Newton Site area Hotel Hong Kong” will consist of a 9,600 square feet 22-storey Grade-A office tower and two Gross floor area floors of shops, supported by a podium 143,997 square feet garden and a two-level underground car park.
Recommended publications
  • Paper on the Proposed Kwu Tung North and Fanling North
    立法會 Legislative Council LC Paper No. CB(1)925/13-14(07) Ref: CB1/PL/DEV Panel on Development Meeting on 25 February 2014 Background brief on the proposed Kwu Tung North and Fanling North New Development Areas Purpose This paper provides background information on the proposed Kwu Tung North ("KTN") and Fanling North ("FLN") New Development Areas ("NDAs") and gives a brief account of the views and concerns expressed by Members on the subject at the meetings of the Legislative Council ("LegCo") and the Panel on Development ("DEV Panel") since July 20131. Background 2. The Planning and Development Study on the North East New Territories commissioned in 1998 identified KTN, FLN and Ping Che/Ta Kwu Ling ("PC/TKL") as suitable NDAs for development in one scheme, namely the NENT NDAs. In view of the slower growth of population, the NENT NDAs proposals were shelved in 2003. Four years later, the findings of the "Hong Kong 2030: Planning Vision and Strategy" recommended proceeding with the NDA developments to address the long-term housing need and to create more employment opportunities. 1 KTN and FLN NDAs are two of the three NDAs (KTN, FLN and Ping Che/Ta Kwu Ling) proposed under the North East New Territories ("NENT") NDAs project. On 4 July 2013, having gone through three stages of public engagement from 2008 to 2012 on the proposed project, the Administration announced that it would first proceed with the planning of KTN and FLN NDAs. The proposed Ping Che/Ta Kwu Ling NDA will be reviewed and re-planned.
    [Show full text]
  • Permanent Secretary, Chief Executive's Office Session No
    Index Page Replies to initial written questions raised by Finance Committee Members in examining the Estimates of Expenditure 2017-18 Controlling Officer : Permanent Secretary, Chief Executive's Office Session No. : 10 File Name : CEO-2-e1.docx Reply Question Serial Serial No. No. Name of Member Head Programme CEO001 0122 CHAN Tanya 21 (1) Chief Executive's Office CEO002 0123 CHAN Tanya 21 (1) Chief Executive's Office CEO003 0126 CHAN Tanya 21 (1) Chief Executive's Office CEO004 0128 CHAN Tanya 21 (1) Chief Executive's Office CEO005 0129 CHAN Tanya 21 (2) Executive Council CEO006 0130 CHAN Tanya 21 (1) Chief Executive's Office CEO007 0131 CHAN Tanya 21 (1) Chief Executive's Office CEO008 2257 CHU Hoi-dick 21 (1) Chief Executive's Office CEO009 2259 CHU Hoi-dick 21 (1) Chief Executive's Office CEO010 2275 CHU Hoi-dick 21 (1) Chief Executive's Office CEO011 1092 IP LAU Suk-yee, Regina 21 (1) Chief Executive's Office CEO012 2546 KWOK Ka-ki 21 (1) Chief Executive's Office CEO013 0740 KWOK Wing-hang, Dennis 21 (1) Chief Executive's Office CEO014 0741 KWOK Wing-hang, Dennis 21 (1) Chief Executive's Office CEO015 0742 KWOK Wing-hang, Dennis 21 (1) Chief Executive's Office CEO016 0743 KWOK Wing-hang, Dennis 21 (1) Chief Executive's Office CEO017 0744 KWOK Wing-hang, Dennis 21 (1) Chief Executive's Office CEO018 2687 LEUNG Kenneth 21 (1) Chief Executive's Office CEO019 2688 LEUNG Kenneth 21 (1) Chief Executive's Office CEO020 2689 LEUNG Kenneth 21 (1) Chief Executive's Office CEO021 2691 LEUNG Kenneth 21 (1) Chief Executive's Office CEO022 2846
    [Show full text]
  • OFFICIAL RECORD of PROCEEDINGS Thursday, 11 July
    LEGISLATIVE COUNCIL ─ 11 July 2013 15169 OFFICIAL RECORD OF PROCEEDINGS Thursday, 11 July 2013 The Council met at half-past Nine o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE JASPER TSANG YOK-SING, G.B.S., J.P. THE HONOURABLE ALBERT HO CHUN-YAN THE HONOURABLE LEE CHEUK-YAN THE HONOURABLE JAMES TO KUN-SUN THE HONOURABLE CHAN KAM-LAM, S.B.S., J.P. THE HONOURABLE LEUNG YIU-CHUNG THE HONOURABLE EMILY LAU WAI-HING, J.P. THE HONOURABLE TAM YIU-CHUNG, G.B.S., J.P. THE HONOURABLE TOMMY CHEUNG YU-YAN, S.B.S., J.P. THE HONOURABLE FREDERICK FUNG KIN-KEE, S.B.S., J.P. THE HONOURABLE VINCENT FANG KANG, S.B.S., J.P. THE HONOURABLE WONG KWOK-HING, B.B.S., M.H. DR THE HONOURABLE JOSEPH LEE KOK-LONG, S.B.S., J.P. THE HONOURABLE JEFFREY LAM KIN-FUNG, G.B.S., J.P. 15170 LEGISLATIVE COUNCIL ─ 11 July 2013 THE HONOURABLE ANDREW LEUNG KWAN-YUEN, G.B.S., J.P. THE HONOURABLE WONG TING-KWONG, S.B.S., J.P. THE HONOURABLE RONNY TONG KA-WAH, S.C. THE HONOURABLE CYD HO SAU-LAN THE HONOURABLE STARRY LEE WAI-KING, J.P. DR THE HONOURABLE LAM TAI-FAI, S.B.S., J.P. THE HONOURABLE CHAN HAK-KAN, J.P. THE HONOURABLE CHAN KIN-POR, B.B.S., J.P. DR THE HONOURABLE PRISCILLA LEUNG MEI-FUN, S.B.S., J.P. THE HONOURABLE CHEUNG KWOK-CHE THE HONOURABLE WONG KWOK-KIN, B.B.S. THE HONOURABLE IP KWOK-HIM, G.B.S., J.P.
    [Show full text]
  • Sheung Shui Kwu Tung North NDA Notes Enlarge Plan B Enlarge Plan
    PO 3.5 5.3 5.2 WONG MAU HANG 5.7 Leachate SHAN TS Treatment Works W 6.5 8.6 Filter Bed TS 5.5 SHR W¤_ 9.5 5.9 5.5 6.0 CUL TS TS 6.9 Sheung Pak Tsuen TS TS 7.1 PO TUNG FUNG 3.6 5.1 TS TS TS 6.9 TS TS PO 5.5 AU 6.5 SHR PO 5.9 9.0 TS 3.1 TS 6.9 6.6 PO PO TS TS 3.8 5.6 7.2 TS 5.5 TS TS 5.7 9.4 P 6.9 6.7 ESS TS TS TS 7.1 PO TS TS TS 7.7 CUL 8.6 PO TS 6.3 TS 5.5 8.1 TS TS W 5.0 PO TS W⁄ PO 4.5 W⁄⁄m¶˜† TS TS 3.7 6.3 5.6 TS Long Valley 7.6 7.5 6.6 WO KENG SHAN Sheung Shui Heung CUL TS PO TS TS SHEUNG SHUI HEUNG Sitting-out Area No.3 7.5 5.4 5.0 CUL W⁄⁄C TS PO TS 8.5 7.6 Sheung Shui Playground CUL 3.1 6.2 W 5.4 7.6 5.2 PO 8.6 TS CUL 6.8 W⁄⁄m¶˜† 5.4 TS 7.4 PO TS 7.4 7.2 TS Sheung Shui Heung PO SEUNG MA Tak Yuet 5.5 5.8 PO Liu Pok PO 5.2 Sitting-out Area No.6 LEI YUE Lau 7.7 Lo Wu 6.6 Ta Kwu Ling Farm 3.8 3.2 10.7 TS PO PO MIU KENG TS TS KONG NGA 7.1 Sheung Shui 9.6 TS 8.0 TS PO CHEUNG SHAN 5.2 6.7 6.6 Tin Ping Road Garden 8.2 PO TS 5.8 TS TS 7.4 CUL TS TS 8.3 TS TS TS TS Shun Yee TS TAI SHEK MO 6.9 ¥·V…ˆƒ PO TS San Tsuen SHAN TONG TS 8.9 TS 3.6 3.3 Heung TSFiring Range 3.6 TS TS TS j¤¸ TS PAK HOK SHEK WU HUI TS Tse Koo PO SHAN CUL PO Hang Ma Tso Lung TS SEWAGE TREATMENT WORKS 4.8 10.2 CHEUNG PO TAU CHAM SHAN 6.5 TS San Tsuen Ngam Pin 4.2 5.0 6.0 TS TAI HOM TUK 3.5 4.8 CUL Lo Wu 300m Range 6.0 6.9 9.7 4.5 6.5 7.7 TS Tai Yuen 7.5 TS PAI TAU LO PRINCESS HILL ‡” 5.4 Tsuen 14.2 WaterTS Treatment 6.6 Works 6.2 TS 7.7 TS 8.7 TS TS 3.5 3.0 Wai Loi Tsuen TS 6.0 6.2 8.9 CUL 6.2 8.0 Lo Wu TS 6.6 CAT HILL WANG LENG 7.2 Firing Correctional Institution TS Range
    [Show full text]
  • Board Minutes AAB/7/2013-14
    Board Minutes AAB/7/2013-14 ANTIQUITIES ADVISORY BOARD Minutes of the 165th Meeting on Wednesday, 4 December 2013 at 3:00 p.m. in Conference Room, Hong Kong Heritage Discovery Centre Kowloon Park, Haiphong Road, Tsim Sha Tsui, Kowloon Present: Mr Andrew Lam Siu-lo, JP (Chairman) Mr Stephen Chan Chit-kwai, BBS, JP Prof Rebecca Chiu Lai-har, JP Prof Chung Po-yin Prof Ho Pui-yin Mr Tim Ko Tim-keung Ms Lilian Law Suk-kwan, JP Mr Philip Liao Yi-kang Mr Kenny Lin Ching-pui Prof Tracey Lu Lie-dan Ms Janet Pau Heng-ting Ms Yvonne Shing Mo-han, JP Dr Winnie Tang Shuk-ming, JP Ms Karen Tang Shuk-tak Dr Joseph Ting Sun-pao Ms Ava Tse Suk-ying, SBS Sr Wong Bay Mr Asa Lee (Secretary) Senior Executive Officer (Antiquities and Monuments) Leisure and Cultural Services Department Absent with Apologies: Mr Chan Ka-kui, BBS, JP Prof Ho Puay-peng, JP Mr Tony Lam Chung-wai Mr Joseph Luc Ngai Prof Billy So Kee-long Mr Conrad Wong Tin-cheung, BBS, JP 2 In Attendance: Development Bureau Mr Albert Lam Deputy Secretary (Works)1 Miss Vivian Ko Commissioner for Heritage Leisure and Cultural Services Department Ms Cynthia Liu, JP Deputy Director (Culture) Dr Louis Ng Assistant Director (Heritage and Museums) Mr Tom Ming Executive Secretary (Antiquities and Monuments) Mrs Ada Yau Curator (Archaeology) (for item 3 only) Dr Alan Fung Assistant Curator I (Buildings Survey) (for item 4 only) Planning Department Miss Fiona Lung Acting Assistant Director/Metro Architectural Services Department Mr Fong Siu-wai Assistant Director (Property Services) Mr Lam Sair-ling Senior Maintenance Surveyor/Heritage 3 Opening Remarks The Chairman thanked Members and representatives from government bureau and departments for attending the meeting.
    [Show full text]
  • Minutes of 1101 Meeting of the Town Planning Board Held on 11.3.2016 Present Permanent Secretary for Development Chairman
    Minutes of 1101st Meeting of the Town Planning Board held on 11.3.2016 Present Permanent Secretary for Development Chairman (Planning and Lands) Mr Michael W.L. Wong Mr Stanley Y.F. Wong Vice-Chairman Mr Roger K.H. Luk Professor S.C. Wong Professor Eddie C.M. Hui Dr C.P. Lau Ms Julia M.K. Lau Mr Clarence W.C. Leung Ms Anita W.T. Ma Dr W.K. Yau Mr Sunny L.K. Ho Mr Dominic K.K. Lam Ms Christina M. Lee Mr H.F. Leung - 2- Mr Stephen H.B. Yau Mr F.C. Chan Mr Frankie W.C. Yeung Mr Peter K.T. Yuen Mr Philip S.L. Kan Dr Lawrence W.C. Poon Chief Engineer (Works), Home Affairs Department Mr Martin W.C. Kwan Principal Environmental Protection Officer (Metro Assessment) Environmental Protection Department Mr Ken Y.K. Wong Director of Lands Ms Bernadette H.H. Linn Director of Planning Mr K.K. Ling Deputy Director of Planning/District Secretary Mr Raymond K.W. Lee Absent with Apologies Professor P.P. Ho Mr Laurence L.J. Li Ms Bonnie J.Y. Chan Professor K.C. Chau Mr H.W. Cheung Dr Wilton W.T. Fok - 3- Mr Ivan C. S. Fu Mr Lincoln L.H. Huang Ms Janice W.M. Lai Mr Patrick H.T. Lau Mr David Y.T. Lui Principal Assistant Secretary (Transport) 3 Transport and Housing Bureau Miss Winnie M.W. Wong In Attendance Assistant Director of Planning/Board Miss Fiona S.Y. Lung Chief Town Planner/Town Planning Board Mr Louis K.H.
    [Show full text]
  • Public Meeting with the Kwu Tung North Residents
    Appendix 9 Agreement No. CE 61/2007 North East New Territories New Development Areas Planning and Engineering Study - Investigation Gist of Public Meeting with the Kwu Tung North Residents Date : 29 July 2012 (Sunday) Time : 2:30pm Venue : Sheung Shui Ku Tung Public Oi Wah School Overall Development Strategies The New Development Areas (NDAs) should be developed in Sandy Ridge and Ping Che/Ta Kwu Ling, to minimize the impacts to existing residents; Some villagers expressed that constructing the NDA at the expense of existing residents to solve the problems due to the Government's mistakes in housing policy and doubly-non permanent residents policy was unfair to the villagers. The Government had not taken the locals’ concerns into considerations, such as the growing population in Sheung Shui. The shopping malls were now occupied by chain stores, development aimed to cater for the needs of tourists from the Mainland; Kwu Tung North (KTN) should be developed with the top priority given to improve the living of the existing residents. However, it was considered that the villagers would not be able to benefit from the KTN NDA development; NDAs development should cater for the existing affected parties rather than the future population of the NDAs; Some suggested that the Fanling Lodge should be developed first or it could be used as a rehousing site for the affected residents as it had a large site area and a low usage rate; Some worried about the health issues that the NDAs development would bring to the residents, such as air pollution, etc.; Some were concerned about that the construction cost of proposed infrastructure of the NDAs development was too high; and Some demanded to shelve the development proposals and opposed to any collusion.
    [Show full text]
  • Historic Building Appraisal of the Eight New Items
    N77 Historic Building Appraisal Kowloon City Ferry Piers, Passenger Pier, To Kwa Wan, Kowloon Along the coastline of To Kwa Wan (土瓜灣), Passenger Pier (客輪碼頭) of Historical the Kowloon City Ferry Piers (九龍城碼頭) were completed in 1956. The pier Interest bears witness to the development of Hong Kong’s transport and the development of eastern Kowloon in the second half of the 20th century. The idea of a ferry pier in Kowloon City was mooted in 1951 when the Harbour Ferry Services Advisory Committee recommended that first priority should be given to a new passenger ferry service between Kowloon City and Wan Chai. The pier was bought into use on 3 July 1956, when ferry service of Hong Kong and Yaumati Ferry Company (香港油蔴地小輪船有限公司) (HKYFC) started operating between Kowloon City and Tonnochy Road Ferry Pier (杜老誌道碼頭) of Wan Chai. However, this ferry service was terminated since 24 June 1967 due to the outbreak of riots that year. Another passenger ferry service between Kowloon City and North Point, which is still in operation at present, was launched in 1963. Moreover, from 1975 to 1980 there was also a ferry service between Kowloon City and Sau Kei Wan (筲箕灣), the Hong Kong-side of which was changed to Tai Koo Shing (太 古城) between 1980 and 1983. Ferry service between Kowloon City and Sai Wan Ho (西灣河) was maintained between 1983 and 1987. Nowadays, the Kowloon City pier only serves ferry service to North Point. The Passenger Pier is a utilitarian structure in the Modernist or International Architectural Modern style, featuring flat roof, smooth flat plain undecorated surfaces often Merit painted white, the complete elimination of all mouldings and ornament, and the adoption of reinforced concrete post-and-slab construction with flat slab floors and a flat roof-slab carried on concrete columns or posts.
    [Show full text]
  • OFFICIAL RECORD of PROCEEDINGS Wednesday, 25
    HONG KONG LEGISLATIVE COUNCIL ― 25 May 1994 3947 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 25 May 1994 The Council met at half-past Two o’clock PRESENT THE PRESIDENT THE HONOURABLE JOHN JOSEPH SWAINE, C.B.E., LL.D., Q.C., J.P. THE CHIEF SECRETARY THE HONOURABLE MRS ANSON CHAN, C.B.E., J.P. THE FINANCIAL SECRETARY THE HONOURABLE SIR NATHANIEL WILLIAM HAMISH MACLEOD, K.B.E., J.P. THE ATTORNEY GENERAL THE HONOURABLE JEREMY FELL MATHEWS, C.M.G., J.P. THE HONOURABLE ALLEN LEE PENG-FEI, C.B.E., J.P. THE HONOURABLE MRS SELINA CHOW LIANG SHUK-YEE, O.B.E., J.P. THE HONOURABLE MARTIN LEE CHU-MING, Q.C., J.P. DR THE HONOURABLE DAVID LI KWOK-PO, O.B.E., LL.D., J.P. THE HONOURABLE NGAI SHIU-KIT, O.B.E., J.P. THE HONOURABLE PANG CHUN-HOI, M.B.E. THE HONOURABLE SZETO WAH THE HONOURABLE TAM YIU-CHUNG THE HONOURABLE ANDREW WONG WANG-FAT, O.B.E., J.P. THE HONOURABLE LAU WONG-FAT, O.B.E., J.P. THE HONOURABLE EDWARD HO SING-TIN, O.B.E., J.P. THE HONOURABLE RONALD JOSEPH ARCULLI, O.B.E., J.P. THE HONOURABLE MARTIN GILBERT BARROW, O.B.E., J.P. 3948 HONG KONG LEGISLATIVE COUNCIL ― 25 May 1994 THE HONOURABLE MRS MIRIAM LAU KIN-YEE, O.B.E., J.P. THE HONOURABLE LAU WAH-SUM, O.B.E., J.P. DR THE HONOURABLE LEONG CHE-HUNG, O.B.E., J.P. THE HONOURABLE JAMES DAVID MCGREGOR, O.B.E., I.S.O., J.P.
    [Show full text]
  • Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
    Site Formation and Associated Infrastructural Works for February 2013 Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery Project Profile Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery Project Profile (prepared in accordance with the Environmental Impact Assessment Ordinance (Cap. 499)) February 2013 Civil Engineering and Development Department i Site Formation and Associated Infrastructural Works for February 2013 Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery Project Profile Project Profile Table of Contents 1. BASIC INFORMATION ...................................................................................................1 1.1 Project Title ..........................................................................................................1 1.2 Purpose and Nature of Project ...........................................................................1 1.3 Name of Project Proponent ................................................................................1 1.4 Location and Scale of Project and History of the Site .....................................1 1.5 Number and Types of Designated Projects to be Covered by the Project Profile ................................................................................................2 1.6 Name and Telephone Number of Contact Person ............................................3 2. OUTLINE OF PLANNING AND IMPLEMENTATION
    [Show full text]
  • Public Engagement of the Task Force on Land Supply Final PE Report
    Public Engagement of the Task Force on Land Supply Final PE Report Submitted by A-World Consulting Limited to Task Force on Land Supply on 27 December 2018 Table of Content 1 Introduction……………………………………………………………………………………………………….2 1.1 Background ............................................................................................. 2 1.2 The Consultants ...................................................................................... 6 2 Executive Summary ……………………………………………………………………………………………7 2.1 Public Engagement Design and Process.................................................. 7 2.2 View Collection, Analysis and Findings ................................................... 8 2.3 Overall Evaluation and Awareness of the PE .......................................... 9 Section One: Public Engagement Programme 1 Programme Design……………………………………………………….…………………………………… 2 1.1 Overall Design ......................................................................................... 2 1.2 PE Process ............................................................................................... 2 1.3 Mechanism of View Collection and Analysis .......................................... 3 2 PE Process……………………………………………………….…………………………………………………6 2.1 Pre-PE Events .......................................................................................... 6 2.2 PE Events ................................................................................................. 8 2.3 Information Dissemination ..................................................................
    [Show full text]
  • Annex III-1 of TPB Paper No
    Annex III-1 of TPB Paper No. 9748 Summary of Representations in Group 4 and PlanD’s Responses Supporting Representations: The representations (R1-4 of KTN OZP and R1-3 of FLN OZP) in Group 4 are mainly submitted to support the proposed development of the NDAs. Their grounds of representations/concerns and proposals as well as the PlanD’s responses are summarised below: Representation Points PlanD's Responses Grounds of Representations/Concerns S-1 The NENT NDAs’ plan is necessary The NENT NDAs’ plan is necessary (1) Support noted. It is necessary to proceed as it would offer long-term benefits with the development of the NDAs to and conserve the ecology. supply land for accommodating various land uses to meet Hong Kong’s medium- to long-term housing, economic and social needs. S-2 Provision of residential development and employment opportunities As there are lots of low-income (1) The KTN and FLN NDAs together will people living in subdivided flats and provide a total of about 60,000 new flats the queue for public rental flats including 36,600 subsidised housing becomes longer, the Government units and 23,300 private housing units should provide more public housing to accommodate a new population of to improve the living environment about 173,000. The ratio of subsidised for those in need. The Country Park and private housing is about 60:40. currently accounts for 40% of the land area in Hong Kong, so there are (2) In addition to providing housing land, not many remaining land available the NDAs development will also for development.
    [Show full text]