Paper on the Proposed Kwu Tung North and Fanling North
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
LC Paper No. CB(1)842/19-20(01)
。LC Paper No. CB(1)842/19-20(01) 商務及經濟發展局 COMMUNICATIONS AND CREATIVE lNDUSTRIES BRANCH 通訊及創意產業科 COMMERCE AND ECONOMIC 香港添馬添美道二號 DEVELOPMENT BUREAU 政府總部西翼二十一摟 21/F, West Wing Central Government Offices 2 Tim Mei Avenue Tamar, Hong Kong 本函檔號 OUR REF 來函檔號 YOUR REF 電語 TEL. NO. 2810 2708 傅真 FAXLINE· 2511 1458 電子郵件 E - mail Address: [email protected] By Email 3 July 2020 Clerk, Legislative Council Panel on Information Technology and Broadcasting Legislative Council Complex 1 Legislative Council Road Central, Hong Kong (Attn.: Mr Daniel SIN) Dear Mr SIN, Panel on Information Technology and Broadcasting Follow-up to Meeting on 8 June 2020 At the meeting of the Legislative Council Panel on Information Technology and Broadcasting on 8 June 2020, Members requested the Government to provide the following supplementary information on the Subsidy Scheme to Extend Fibre-based Networks to Villages in Remote Areas (Subsidy Scheme): Regarding the rolling out of fibre-based lead-in connections to a total of 235 villages as required under the Subsidy Scheme, selected fixed network operators (FNOs) have made additional service commitments for some of the villages, e.g. providing villagers with broadband services at a speed of 1 000 Mbps or above, installing Wi-Fi hotspots within the common area of villages for provision of free Wi-Fi services and/or providing broadband services to villagers at the prevailing market prices during the first three years upon project completion (see Annex A for details). The two selected FNOs are now undertaking various works /Cont'd .... - 2 - pla画ng and 唧lying for relevant statutory permits and approvals. -
List of Recognized Villages Under the New Territories Small House Policy
LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN, -
Explanatory Statement
KWU TUNG NORTH OUTLINE DEVELOPMENT PLAN No. D/KTN/1A EXPLANATORY STATEMENT ODP No. D/KTN/1 Approved by CPLD on 17.10.2013 ODP No. D/KTN/1A Agreed by NT DipCon on 12.5.2020 Fanling, Sheung Shui & Yuen Long East District Planning Office Planning Department Kwu Tung North Outline Development Plan No. D/KTN/1A Explanatory Statement CONTENTS Page 1. Background ………………………………………………………………..1 2. Objectives and Authority of the Plan ……………………………………...2 3. The Planning Scheme Area ………………………………………………..3 4. Population .………………………………………………………………...6 5. Planning Themes and Urban Design and Landscape Framework .……..…6 6. Land Use Proposals ………………………………………………………15 7. Transport ………………………………………………………………….33 8. Environmental Considerations …………...……………………………….37 9. Cultural Heritage ………………………………………………………….41 10. Utility Services ……………………………………………………………41 11. Implementation ……………………………………………………….......43 Plan 1 : Kwu Tung North New Development Area Location Plan Plan 2 : Urban Design and Landscape Framework Plan 3 : Pedestrian Connections Plan Plan 4 : Cycle Track Network Plan Plan 5 : Transport Network Plan Appendix 1: Schedule of Requirement and Provision of G/IC Facilities and Open Space in Kwu Tung North New Development Area Appendix 2: Development Parameters of Major Development Sites in Kwu Tung North New Development Area Kwu Tung North Outline Development Plan No. D/KTN/1A Explanatory Statement 1. Background 1.1 The Territorial Development Strategy Review in 1990s first identified that there was potential for strategic growth in the North East New Territories (NENT). The Planning and Development Study on NENT commissioned in 1998 identified Kwu Tung North (KTN), Fanling North (FLN) and Ping Che/Ta Kwu Ling (PC/TKL) as suitable for New Development Areas (NDAs) development. The Hong Kong 2030: Planning Vision and Strategy, promulgated in 2007, recommended to proceed with the KTN and FLN NDAs, among others, to address the long-term housing demand and provide employment opportunities. -
Preliminary Concepts for the New Territories North Development
Preliminary Concepts for the New Territories North Development 02 OverviewOOvveveerrvieeww 04 ExistingEExExixisxixisssttitinng CConditionsonondddiittioonnsns 07 OpportunitiesOOppppppoortunnittiiieeses & CoCConstraintsoonnssstttrraaiainntnntss 08 OverallOOvveveerall PPlanninglananniiinnngg ApAApproachespppprrooaoacaachchchehhesess 16 OverallOOvveeraall PPlPlanninglalaannnnnniiinnngg & DesignDDeesessign FrameworkFrarammeeewwoworrkk 20 BroadBBrBroroooaadd LandLaLandnd UUsUseses CoCConceptsoonnccecepeptptss 28 NextNNeexexxt StepStStept p Overview Background 1.4 The Study adopts a comprehensive and integrated approach to formulate the optimal scale of development 1.1 According to the latest population projection, Hong in the NTN. It has explored the potential of building new Kong’s population would continue to grow, from 7.24 communities and vibrant employment and business million in 2014 to 8.22 million by 2043. There is a nodes in the area to contribute to the long-term social continuous demand for land for economic development and economic development of Hong Kong. to sustain our competitiveness. There are also increasing community aspirations for a better living environment. 1.5 The Study is a preliminary feasibility study which has examined the baseline conditions of the NTN covering 1.2 To maintain a steady land supply, the Government is about 5,300 hectares (ha) of land (Plan 1) to identify looking into various initiatives, including exploring further potential development areas (PDAs) and formulate an development opportunities in the -
North East New Territories New Development Areas Project Profile
North East New Territories New Development Areas November 2007 Project Profile North East New Territories New Development Areas Project Profile (prepared in accordance with the Environmental Impact Assessment Ordinance (Cap. 499)) November 2007 Civil Engineering and Development Department NENT NDA_Project Profile_Rev.2 i Civil Engineering and Development Department North East New Territories New Development Areas November 2007 Project Profile Project Profile Table of Contents 1. BASIC INFORMATION..................................................................................................1 1.1 Project Title.........................................................................................................1 1.2 Purpose and Nature of Project..........................................................................1 1.3 Name of Project Proponent ...............................................................................1 1.4 Location and Scale of Project and History of Site ...........................................1 1.5 Number and Types of Designated Projects to be Covered by the Project Profile...............................................................................................3 1.6 Name and Telephone Number of Contact Person............................................3 2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME............................4 2.1 Project Implementation......................................................................................4 2.2 Project Time Table .............................................................................................4 -
(I) Villages with Public Sewerage Installed
Annex Details of villages where public sewerage works installed / under construction / under planning (i) Villages with public sewerage installed District Village name No. of (Number of Houses villages) (About) Islands (19) Yung Shue Wan Main Street, Yung Shue Wan Back 1 530 Street (Part 1), Po Wah Yuen (Part 1), Sha Po Old Village (Part 1), Sha Po New Village (Part 1), Tai Yuen New Village, Kam Shan Terrace, Ko Long (Part 1), Chung Mei, Sok Kwu Wan, Ngong Ping Village, Central Cheung Chau Old Town, Peng Chau (Part), Chung Hau, Tung Wan Tau, Tai O town centre, Ma Wan New Village, Tei Po New Village, Chek Lap Kok New Village North (33) Kan Lung Tsuen, San Wai, San Uk Tsuen, Ma Mei 2 800 Ha, Ma Mei Ha Leng Tsui, Tung Kok Wai, Lo Wai, Tsz Tong Tsuen, Wing Ning Tsuen, Wing Ning Wai, Ma Wat Wai, Tai Tau Leng, Tsung Pak Long, Yin Kong, Fan Leng Lau, Kai Leng, Ng Uk Tsuen, Heung Yuen Wai, Ha Hueng Yuen, Tsung Yuen Ha, Chuk Yuen (North), Chuk Yuen (South), Kaw Liu, Ta Kwu Ling, Kan Tau Wai, Tong Fong, Ping Yeung, Tai Po Tin, Ping Che, Pak Hok Shan, Tai Tong Wu, Leng Tsai, Hung Leng (Part) Sai Kung Tan Cheung, Po Lo Che, Tui Min Hoi, Fui Yiu Ha, 1 440 (20) Sai Kung Old Town, Tai Wan, Sha Ha, Silverstrand, Wo Tong Kong (Mang Kung Uk), Yu Uk Village (Part), Hung Uk, Wai Sum Village, O Mun Village, O Pui Village (Part), Heng Mei Deng Tsuen, Chan Uk Tsuen, Mau Ping New Village (Part), Wong Chuk Shan San Tsuen (Part), Pak Kong Au (Part), Sha Kok Mei (Part) Annex District Village name No. -
North East New Territories New Development Areas Planning & Engineering Study
Enclosure 2 North East New Territories New Development Areas Planning & Engineering Study Stage One Public Engagement Digest Topical Notes Topical Note 1 – Strategic Roles of NDAs Topical Note 2 – People-Oriented Communities Topical Note 3 – Sustainable Living Environment Topical Note 4 – Implementation Mechanism November 2008 North East New Territories Stage One New Development Areas Public Engagement Digest Planning & Engineering Study November 2008 Topical Note 1 – Strategic Roles of NDAs Purpose of the Topical Note The main purpose of the Stage 1 Public Engagement of the “North East New Territories New Development Areas Planning and Engineering Study” is to enable the public to appreciate the Study objectives and key issues relating to the development of the Kwu Tung North, Fanling North and Ping Che/Ta Kwu Ling New Development Areas (NDAs), and to express their visions for the NDAs. It is the intention to solicit public views through discussion on four topics, namely, strategic roles of NDAs, people-oriented communities, sustainable living environment and implementation mechanism. This topical note is prepared to provide background information on strategic roles of NDAs with a view to facilitating public discussion on this topic. 1 Background “The Planning and Development Study on North East New Territories” (the NENT Study) commissioned in the late 1990’s, identified Kwu Tung North (KTN), Fanling North (FLN) and Ping Che/Ta Kwu Ling (PC/TKL) as suitable New Development Areas (NDAs). It recommended that KTN, FLN and PC/TKL could proceed as one scheme (Three-In-One Scheme), i.e. an integral whole with shared community facilities, infrastructure and reprovisioning arrangements. -
Technical Report No.1A on Baseline Update and Review of Key Issues Executive Summary
Civil Engineering and Development Department Agreement No. CE61/2007(CE) and Planning Department North East New Territories New Development Areas Planning and Engineering Study – Investigation Technical Report No.1A on Baseline Update and Review of Key Issues Executive Summary INTRODUCTION Purposes of this Technical Report The purposes of this Technical Report are to provide an overall understanding of the Study Area, to form an inventory of baseline conditions of the Study Area, to stock-take the key changes in circumstances since the completion of the previous Planning and Development Study on North East New Territories (NENT Study) that may have implications on the New Development Areas (NDAs) developments, to identify the key issues relating to the NDA proposals and to broadly review the issues identified in the NENT Study so as to facilitate the subsequent planning and engineering tasks of the current Study. The baseline profile of the Study Area will be updated in respect of the current land use, planning, urban design, social economic, transport, infrastructure, environment, ecology, geotechnical, cultural heritage, landscape and land holding aspects. PREVIOUS PLANNING AND DEVELOPMENT STUDY ON NORTH EAST NEW TERRITORIES AND THE CHANGING CIRCUMSTANCES Previous Recommendations Under the previous NENT Study, the following parameters were proposed for each NDA: Kwu Tung North Fanling North Ping Che/ Ta Kwu Ling N/A (no residential Population Approx. 100,000 Approx. 80,000 development proposed) Employment Approx. 16,000 Approx. 2,500 2,300 Max. Plot 6.5 6.5 - Ratio Max. Building 46-storey and above 46-storey and above - Height No. of Flats Approx. -
New Urban Development Areas West Kowloon Cultural District (WKCD)
The 10 Major Infrastructure Projects - New Urban Development Areas West Kowloon Cultural District (WKCD) Background • The Chief Executive of HKSAR announced in October 1998 the planning for a state-of-the-art performance venue on the West Kowloon Reclamation. • In April 2001, the government launched an open concept competition to invite proposals for the WKCD development. • Result was announced in February 2002 and the 1st prize was awarded to Foster and Partners. • The development represents a major investment in cultural and arts infrastructure. It is also a strategic plan to promote long-term development of arts and culture, supporting Hong Kong as a creative economy and Asia's world city. The integrated arts and cultural district will offer a mix of world-class arts and cultural facilities, talented artists, quality programmes and distinctive architecture to attract people in Hong Kong as well as from the Mainland and the rest of the world. • Preliminary cost estimate is about HK$24 billion (excluding land value). • Land area of WKCD is about 25 hectares with building area 725,000 sq m. Current status – • Five organizations were interested and submitted initial proposal in the development, three were shortlisted afterward, they were: World City Culture Park Ltd. (香港薈萃有限公司) Sunny Development Ltd. (藝林國際有限公司) Dynamic Star International Ltd. (活力星國際有限公司) • Due to strong opposing views, finalization of the scheme pending on further public consultation. • Public consultation was carried out from 2005 and onward. • Final master plan is under negotiation with various body under the coordination of the WKCD Authority. A final scheme is expected to be drawn in 2008-09 for the kicking off for final implementation. -
Permanent Secretary, Chief Executive's Office Session No
Index Page Replies to initial written questions raised by Finance Committee Members in examining the Estimates of Expenditure 2017-18 Controlling Officer : Permanent Secretary, Chief Executive's Office Session No. : 10 File Name : CEO-2-e1.docx Reply Question Serial Serial No. No. Name of Member Head Programme CEO001 0122 CHAN Tanya 21 (1) Chief Executive's Office CEO002 0123 CHAN Tanya 21 (1) Chief Executive's Office CEO003 0126 CHAN Tanya 21 (1) Chief Executive's Office CEO004 0128 CHAN Tanya 21 (1) Chief Executive's Office CEO005 0129 CHAN Tanya 21 (2) Executive Council CEO006 0130 CHAN Tanya 21 (1) Chief Executive's Office CEO007 0131 CHAN Tanya 21 (1) Chief Executive's Office CEO008 2257 CHU Hoi-dick 21 (1) Chief Executive's Office CEO009 2259 CHU Hoi-dick 21 (1) Chief Executive's Office CEO010 2275 CHU Hoi-dick 21 (1) Chief Executive's Office CEO011 1092 IP LAU Suk-yee, Regina 21 (1) Chief Executive's Office CEO012 2546 KWOK Ka-ki 21 (1) Chief Executive's Office CEO013 0740 KWOK Wing-hang, Dennis 21 (1) Chief Executive's Office CEO014 0741 KWOK Wing-hang, Dennis 21 (1) Chief Executive's Office CEO015 0742 KWOK Wing-hang, Dennis 21 (1) Chief Executive's Office CEO016 0743 KWOK Wing-hang, Dennis 21 (1) Chief Executive's Office CEO017 0744 KWOK Wing-hang, Dennis 21 (1) Chief Executive's Office CEO018 2687 LEUNG Kenneth 21 (1) Chief Executive's Office CEO019 2688 LEUNG Kenneth 21 (1) Chief Executive's Office CEO020 2689 LEUNG Kenneth 21 (1) Chief Executive's Office CEO021 2691 LEUNG Kenneth 21 (1) Chief Executive's Office CEO022 2846 -
OFFICIAL RECORD of PROCEEDINGS Thursday, 11 July
LEGISLATIVE COUNCIL ─ 11 July 2013 15169 OFFICIAL RECORD OF PROCEEDINGS Thursday, 11 July 2013 The Council met at half-past Nine o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE JASPER TSANG YOK-SING, G.B.S., J.P. THE HONOURABLE ALBERT HO CHUN-YAN THE HONOURABLE LEE CHEUK-YAN THE HONOURABLE JAMES TO KUN-SUN THE HONOURABLE CHAN KAM-LAM, S.B.S., J.P. THE HONOURABLE LEUNG YIU-CHUNG THE HONOURABLE EMILY LAU WAI-HING, J.P. THE HONOURABLE TAM YIU-CHUNG, G.B.S., J.P. THE HONOURABLE TOMMY CHEUNG YU-YAN, S.B.S., J.P. THE HONOURABLE FREDERICK FUNG KIN-KEE, S.B.S., J.P. THE HONOURABLE VINCENT FANG KANG, S.B.S., J.P. THE HONOURABLE WONG KWOK-HING, B.B.S., M.H. DR THE HONOURABLE JOSEPH LEE KOK-LONG, S.B.S., J.P. THE HONOURABLE JEFFREY LAM KIN-FUNG, G.B.S., J.P. 15170 LEGISLATIVE COUNCIL ─ 11 July 2013 THE HONOURABLE ANDREW LEUNG KWAN-YUEN, G.B.S., J.P. THE HONOURABLE WONG TING-KWONG, S.B.S., J.P. THE HONOURABLE RONNY TONG KA-WAH, S.C. THE HONOURABLE CYD HO SAU-LAN THE HONOURABLE STARRY LEE WAI-KING, J.P. DR THE HONOURABLE LAM TAI-FAI, S.B.S., J.P. THE HONOURABLE CHAN HAK-KAN, J.P. THE HONOURABLE CHAN KIN-POR, B.B.S., J.P. DR THE HONOURABLE PRISCILLA LEUNG MEI-FUN, S.B.S., J.P. THE HONOURABLE CHEUNG KWOK-CHE THE HONOURABLE WONG KWOK-KIN, B.B.S. THE HONOURABLE IP KWOK-HIM, G.B.S., J.P. -
Sheung Shui Kwu Tung North NDA Notes Enlarge Plan B Enlarge Plan
PO 3.5 5.3 5.2 WONG MAU HANG 5.7 Leachate SHAN TS Treatment Works W 6.5 8.6 Filter Bed TS 5.5 SHR W¤_ 9.5 5.9 5.5 6.0 CUL TS TS 6.9 Sheung Pak Tsuen TS TS 7.1 PO TUNG FUNG 3.6 5.1 TS TS TS 6.9 TS TS PO 5.5 AU 6.5 SHR PO 5.9 9.0 TS 3.1 TS 6.9 6.6 PO PO TS TS 3.8 5.6 7.2 TS 5.5 TS TS 5.7 9.4 P 6.9 6.7 ESS TS TS TS 7.1 PO TS TS TS 7.7 CUL 8.6 PO TS 6.3 TS 5.5 8.1 TS TS W 5.0 PO TS W⁄ PO 4.5 W⁄⁄m¶˜† TS TS 3.7 6.3 5.6 TS Long Valley 7.6 7.5 6.6 WO KENG SHAN Sheung Shui Heung CUL TS PO TS TS SHEUNG SHUI HEUNG Sitting-out Area No.3 7.5 5.4 5.0 CUL W⁄⁄C TS PO TS 8.5 7.6 Sheung Shui Playground CUL 3.1 6.2 W 5.4 7.6 5.2 PO 8.6 TS CUL 6.8 W⁄⁄m¶˜† 5.4 TS 7.4 PO TS 7.4 7.2 TS Sheung Shui Heung PO SEUNG MA Tak Yuet 5.5 5.8 PO Liu Pok PO 5.2 Sitting-out Area No.6 LEI YUE Lau 7.7 Lo Wu 6.6 Ta Kwu Ling Farm 3.8 3.2 10.7 TS PO PO MIU KENG TS TS KONG NGA 7.1 Sheung Shui 9.6 TS 8.0 TS PO CHEUNG SHAN 5.2 6.7 6.6 Tin Ping Road Garden 8.2 PO TS 5.8 TS TS 7.4 CUL TS TS 8.3 TS TS TS TS Shun Yee TS TAI SHEK MO 6.9 ¥·V…ˆƒ PO TS San Tsuen SHAN TONG TS 8.9 TS 3.6 3.3 Heung TSFiring Range 3.6 TS TS TS j¤¸ TS PAK HOK SHEK WU HUI TS Tse Koo PO SHAN CUL PO Hang Ma Tso Lung TS SEWAGE TREATMENT WORKS 4.8 10.2 CHEUNG PO TAU CHAM SHAN 6.5 TS San Tsuen Ngam Pin 4.2 5.0 6.0 TS TAI HOM TUK 3.5 4.8 CUL Lo Wu 300m Range 6.0 6.9 9.7 4.5 6.5 7.7 TS Tai Yuen 7.5 TS PAI TAU LO PRINCESS HILL ‡” 5.4 Tsuen 14.2 WaterTS Treatment 6.6 Works 6.2 TS 7.7 TS 8.7 TS TS 3.5 3.0 Wai Loi Tsuen TS 6.0 6.2 8.9 CUL 6.2 8.0 Lo Wu TS 6.6 CAT HILL WANG LENG 7.2 Firing Correctional Institution TS Range