Blyth Offshore Demonstrator presentations and Q&A sessions To provide full details of the new wind farm and to answer any questions from members of the local public, EDF Energy Renewables is hosting two presentation events. Blyth Workspace, Commissioners Quay Blyth Offshore Tuesday, 20th June, 5.00pm - 6.30pm Thursday, 29th June, 5.00pm - 6.30pm Demonstrator The available capacity for the above events is limited and anyone interested in attending is asked to ring 0191 233 1300 or e mail
[email protected] in advance of the events to confirm their attendance. Wind Farm ORE Catapult, Charles Parsons Technology Centre, High Quay, Blyth Thursday, 22nd June , 5.00pm - 6.30pm Additional future presentations may be arranged if local interest exceeds the available capacity of the venue. Blyth Offshore Demonstrator fact file: Turbines Weight Connection l Blyth will produce l Approximately l Blyth will save l Blyth will be enough green 36% of the approximately the first time electricity to l Blyth will install construction l Each Gravity 57,600 tonnes l Blyth will be a “float and power 8.0MW wind cost to be spent Based of CO2 emissions the first offshore submerge” approximately turbines with a in the UK Foundation will each year2 wind project to Gravity Based 34,000 UK power mode weigh over connect using Foundation is households1 uprating them 15,000 tonnes 66kV rated used for offshore to 8.3MW when fully export cables wind turbines installed Generation Investment Low Carbon Innovation 1 41.5MW installed x 0.369 offshore average load factor* x 8760 hours, divided by 3.938MWh annual domestic energy consumption per home** 2 41.5MW installed x 0.369 offshore average load factor* x 8760 hours x 430 grammes of CO2 saved per kilowatt hour***, divided by 1000 to correct for units *Digest of United Kingdom energy statistics 2016, DBEIS, July 2016.