Resumé KEN DEVOS

Total Page:16

File Type:pdf, Size:1020Kb

Resumé KEN DEVOS Resumé KEN DEVOS Golder Associates Ltd. – Mississauga Education Principal / Senior Hydrogeochemist M.Sc. Applied Earth Sciences Hydrogeology Recognized companywide technical resource with 25 years of experience in the and Environmental field of mining geochemistry, mine water quality evaluation and hydrogeology. Geochemistry, University of Develops and manages large interdisciplinary teams to deliver mining related Waterloo, Ontario, 1995 environmental assessments, closure plans, feasibility studies, permitting and construction projects. Participates in project and panel reviews, public B.Sc. Applied Earth Sciences Geophysics, communication, consultation, and hearings for permitting of mining projects. University of Waterloo, Responsible for overall HSSE of large project teams, including construction Ontario, 1992 aspects, regulatory aspects, project risk evaluation and reporting. KEY RECENT PROJECT EXPERIENCE Baffinland Iron Mines Evaluate and respond to regulatory inquiries related to ongoing operations at 2017 - present Baffinland Iron Mines site on central Baffin Island. Baffin Island, Iqaluit Project Director and Geochemist responsible for updating the site waste rock management plan, considering geochemical and thermal implications, considering key risks and potential release mechanisms for solid and liquid waste on site and influence of permafrost on geochemical conditions. De Beers Canada - Senior Geochemist responsible for conducting, organizing, and/or reviewing Snap Lake Mine annual ARD/ML inspections and preparation and review of annual reports (Nov 1999 – Present) regarding ARD/ML required under the Type A water licence every year between Northwest Territories 2002 and 2016. Have been involved in all geochemical aspects of the project since 1999, including providing expert witness testimony on system modelling, source term assignment, underground and surface water quality and geochemical topics. Provide senior technical advice to engineering closure team on water quality and construction related requirements to prevent ARD/ML on site. Prepared chapters of Environmental Impact Statement for regulatory approval. Developed Water Licence Application / permit applications for aspects related to water quality and geochemistry; Evaluated influence of permafrost on mine water inflow quality, and on surface water and waste water release and quality. Participated in technical sessions and hearings, providing expert witness testimony on geochemistry, mine water quality, and site water quality aspects of the project at the MVEIRB public hearings; Water Board Hearings, and water licence renewal hearings. Provided and presented technical information in public information sessions and responded to inquiries and information requests related to geochemistry, mine water quality, and site water quality modelling aspects of the project. 1 Resumé KEN DEVOS PWGSC – Faro Mine – Primary Consultant responsible for updating the site adaptive management (2017 - present) framework and plan, considering all key risks and potential release mechanisms Yukon Territory for solid and liquid waste on site including, physical, groundwater seepage and migration, treatment effectiveness, and downstream impact. Facilitate workshop involving multiple project stakeholders, evaluating possible project risk factors to develop a summary of key events requiring an adaptive management strategy. Based on the workshop outcome develop event based thresholds, triggers and mitigation strategies. De Beers Canada - Principal Consultant - Senior Water Quality Specialist and Geochemist Gaucho Kué (May 2009 responsible for overall supervision and integration between information collected - 2015) prior to 2008 and the additional geochemical baseline assessment components. Northwest Territories This included supplemental characterization of processed kimberlite, mine rock, ore pads and construction material for acid generation potential, long and short term leachate potential, and source term water quality from these material through static and kinetic testing. Also included were: preparation of water quality and geochemistry baseline reports; preparation and review of site water quality model including accounting for permafrost and deep groundwater upwelling; preparation of chapters and appendices of EIS for regulatory approval. Development of monitoring program for ARD and geochemistry evaluation. Evaluated potential environmental risks and worked with engineering team to develop risk mitigation measures and strategies for mine waste disposal. Participated in technical sessions and hearings, providing expert witness testimony on geochemistry, mine water quality, and site water quality aspects of the project at public hearings and Water Board hearings. Provided and presented technical information in public information sessions and responded to inquiries and information requests related to geochemistry, mine water quality, and site water quality modelling aspects of the project. Diavik Diamond Mines Senior Geochemist, responsible for development of geochemical testing and water (2006-2009) quality estimates in support of feasibility evaluation of A419 pit. Includes Northwest Territories geochemical assessment of A419 waste rock and paste backfill materials 2 Resumé KEN DEVOS Fortune Minerals NICO Project Director and program manager – build appropriate engineering team and Project – Engineering supervise deliverables and project/program aspects related to: developing and and Environment conducting engineering trade off studies for site development, providing (2005 - Present) engineering support services for mine waste management; integrating Northwest Territories engineering and ESIA components of the project. Senior Water Quality Specialist and Geochemist responsible for: senior review of geochemical testing and water quality baseline data collection in support of ESIA and feasibility evaluation. Includes geochemical assessment of waste rock, tailings, plant materials, prediction of mine water quality, prediction of site discharge water quality, risk evaluation, development and evaluation of mitigation strategies and prediction of downstream water quality. Provided expert witness testimony for Environmental Assessment and Water licence hearings. Participated in community information sessions in Yellowknife and nearby First Nations communities. Supported development of water licence applications and presented at water licence hearings. Developed and reviewed monitoring programs. Services performed in Canada’s North. Kupol – DSTSF Project Director – Lead team in development of integrated mine waste Expansion Project engineering studies Environmental Impact Statement for translation and (April 2014 – ultimately regulatory approval. Senior director and manager responsible for Prese2017) (Kinross integration of environment and engineering teams with owners representatives to Gold) – determine feasibility and effectiveness of updated mine waste plan to expand life Chukotka, Russia of mine while maintaining closure and environmental objectives; preparation of ESIA documents for changed conditions using international standards and local Russian standards. Project site is located in Chukotka Autonomous Okrug in Far North Eastern Russia, above the Arctic Circle. Harsh climatic conditions and permafrost was included in all assessments. Water quality predictions, engineering aspects and treatment requirements were evaluated under changing site conditions, including influence of permafrost on ARD formation and water quality. Water quality source terms and site water quality estimates were develop based on geochemical assessment of waste rock, tailings, plant materials, engineering design, prediction of mine water quality and prediction of mine water quantity 3 Resumé KEN DEVOS Hammond Reef (May Principal Consultant / Project Director – Develop and lead an integrated 2010 - Present) engineering and environment team for development of a complete Environmental (Osisko / Canadian Impact Statement for regulatory approval and all aspects of environmental Malartic) – development/permitting on the project including: Development of water license Northwestern Ontario applications and permit approvals; Development of Fisheries Act Authorization applications and compensation plans; Conducting water quality modelling and supervising air quality and noise modelling; conducting a cumulative effects assessment for a $500m plus project value; develop risk register and mitigation strategies, develop for approval and environmental monitoring program; responding to government information requests from expert reviewers and stakeholders; participation and leading of technical review sessions with government and public stakeholders. In addition to overall project management and team coordination/ review, was responsible for specific technical aspects related to water quality, geochemistry and hydrogeology including site-wide water quality predictions and impact assessment. Water quality source terms were develop based on a comprehensive geochemical assessment of waste rock, tailings, plant materials, prediction of mine water quality, prediction of mine water quantity, prediction of site water quality. Provided expert support for permitting. Lead engineering team contributions for project feasibility study related to waste and environmental evaluation, including closure aspects and costs. PROFESSIONAL AFFILIATIONS Member, The Association of Professional Engineers, Geologists, and Geophysicists of
Recommended publications
  • Socio-Economic Assessment Toolbox (SEAT) Report for the Period 1 January to 31 December 2013 B SEAT REPORT 2013
    Snap Lake Mine Socio-Economic Assessment Toolbox (SEAT) Report for the period 1 January to 31 December 2013 B SEAT REPORT 2013 CONTENTS Foreword . 1 Training in 2013 . 37 Executive Summary . 2 Opportunities for Students . 38 Introduction . 4 Scholarships and Summer Students . 38 Background . 4 NWT Post-secondary Scholarships Report Structure . 4 Awarded in 2013 . 39 Acknowledgements . 4 Shelby Skinner Puts Her Learning to Work at Snap Lake . 40 1 THE SEAT PROCESS 5 Keelan Mooney: De Beers Sponsorship . 41 Health and Wellness . 42 SEAT Objectives . 6 Fitness Centre . 42 Approach . 7 Fit for Purpose . 42 Stakeholder Engagement and the SEAT Process . 7 The Power of the Spoon . 43 Community Conversations . 8 Snap Lake Mine Family Visit . 44 NWT Business Policy . 45 2 SNAP LAKE MINE AND ITS COMMUNITIES OF INTEREST 11 Partnering with Northern Business . 45 Profile of Snap Lake Mine . 10 Partners in Business . 46 Employment . 12 Corporate Social Investment . 47 Mine Operations . 12 A Million Good Reasons to Invest . 47 Capital Investment . 12 Committed to Addressing the Social Life of Mine . 12 and Economic Impacts of the Mine . 48 Communities near Snap Lake . 13 Charity Golf Classic . 49 Tłįcho Communities . 14 Stanton Diamond Fundraiser . 49 Yellowknives Dene First Nations Communities . 22 Lutsel K’e Dene First Nation Community . 24 4 SOCIAL MANAGEMENT PLAN 51 North Slave Métis Alliance . 26 Plan for Success . 52 Yellowknife . 26 A Million Good Reasons to Invest . 47 3 SOCIAL MANAGEMENT AND INVESTMENT 29 APPENDIX 1 - 2013 EMPLOYMENT DATA 57 Employment . 30 Employment by the Numbers . 30 APPENDIX 2 - GLOSSARY AND CONTACT DETAILS 69 Women in Mining .
    [Show full text]
  • 2018 Socio-Economic Agreement Report for Diamond Mines Operating in the Northwest Territories
    TD 432-18(3) TABLED ON MAY 28, 2019 2018 Socio-Economic Agreement Report For diamond mines operating in the Northwest Territories Rapport de 2018 sur les accords socioéconomiques Mines de diamants des Territoires du Nord-Ouest Le present document contient la traduction française du résumé et du message du ministre If you would like this information in another official language, call us. English Si vous voulez ces informations dans une autre langue officielle, contactez-nous. French Kīspin ki nitawihtīn ē nīhīyawihk ōma ācimōwin, tipwāsinān. Cree Tłı̨chǫ yatı k’ę̀ę̀. Dı wegodı newǫ dè, gots’o gonede. Tłı̨chǫ Ɂerıhtł’ıś Dëne Sųłıné yatı t’a huts’elkër xa beyáyatı theɂą ɂat’e, nuwe ts’ën yółtı. Chipewyan Edı gondı dehgáh got’ı̨e zhatıé k’ę́ę́ edatł’éh enahddhę nıde naxets’ę́ edahłı.́ South Slavey K’áhshó got’ı̨ne xǝdǝ k’é hederı ɂedı̨htl’é yerınıwę nı ́dé dúle. North Slavey Jii gwandak izhii ginjìk vat’atr’ijąhch’uu zhit yinohthan jì’, diits’àt ginohkhìi. Gwich’in Uvanittuaq ilitchurisukupku Inuvialuktun, ququaqluta. Inuvialuktun ᑖᒃᑯᐊ ᑎᑎᕐᒃᑲᐃᑦ ᐱᔪᒪᒍᕕᒋᑦ ᐃᓄᒃᑎᑐᓕᕐᒃᓯᒪᓗᑎᒃ, ᐅᕙᑦᑎᓐᓄᑦ ᐅᖄᓚᔪᓐᓇᖅᑐᑎᑦ. Inuktitut Hapkua titiqqat pijumagupkit Inuinnaqtun, uvaptinnut hivajarlutit. Inuinnaqtun Indigenous Languages Secretariat: 867-767-9346 ext. 71037 Francophone Affairs Secretariat: 867-767-9343 II Contents MINISTER’S MESSAGE ......................................................................................................................................................IV MESSAGE DU MINISTRE ....................................................................................................................................................V
    [Show full text]
  • Proquest Dissertations
    Participants' Views on Constraints and Opportunities in the Development of Diamond Tourism in Yellowknife, Northwest Territories By Jamie L. Noakes THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE DEGREE OF MASTER OF ENVIRONMENTAL STUDIES In the School of Outdoor Recreation, Parks and Tourism Jamie Noakes Lakehead University August 2009 Library and Archives Biblioth&que et 1*1 Canada Archives Canada Published Heritage Direction du Branch Patrimoine de l'6dition 395 Wellington Street 395, rue Wellington Ottawa ON K1A0N4 Ottawa ON K1A 0N4 Canada Canada Your file Votre reference ISBN: 978-0-494-63547-6 Our file Notre reference ISBN: 978-0-494-63547-6 NOTICE: AVIS: The author has granted a non- L'auteur a accords une licence non exclusive exclusive license allowing Library and permettant a la Bibliotheque et Archives Archives Canada to reproduce, Canada de reproduce, publier, archiver, publish, archive, preserve, conserve, sauvegarder, conserver, transmettre au public communicate to the public by par telecommunication ou par Nnternet, preter, telecommunication or on the Internet, distribuer et vendre des theses partout dans le loan, distribute and sell theses monde, a des fins commerciales ou autres, sur worldwide, for commercial or non- support microforme, papier, electronique et/ou commercial purposes, in microform, autres formats. paper, electronic and/or any other formats. The author retains copyright L'auteur conserve la propriety du droit d'auteur ownership and moral rights in this et des droits moraux qui protege cette these. Ni thesis. Neither the thesis nor la these ni des extraits substantiels de celle-ci substantial extracts from it may be ne doivent etre imprimes ou autrement printed or otherwise reproduced reproduits sans son autorisation.
    [Show full text]
  • 2015 NWT Mineral Exploration Overview (February 2016) 1
    2015 Northwest Territories Mineral Exploration Overview: Updated February 2016 H. Falck and K. Gochnauer H. Falck and K. Gochnauer Northwest Territories Geological Survey Yellowknife, NT 2015 Northwest Territories Mineral Exploration Overview: Updated February 2016 H. Falck and K. Gochnauer Northwest Territories Geological Survey Department of Industry, Tourism and Investment Government of the Northwest Territories 4601-B 52 Avenue P.O. Box 1320 Yellowknife, NT, X1A 2L9 Canada 867-767-9211 www.nwtgeoscience.ca This document contains information provided to the Northwest Territories Geological Survey (NTGS) by third parties. All information is provided "as is" without warranty of any kind. The Government of the Northwest Territories (GNWT) and its agents do not accept any responsibility or liability for the accuracy, timeliness, completeness, or reliability of the information contained in this document. Mineral exploration and extraction are inherently risky ventures and the GNWT and its agents will not be held liable for any loss or damage resulting directly or indirectly from reliance on any information or representations contained in this document. Recommended citation: Falck, H., and Gochnauer, K. 2016. 2015 Northwest Territories Mineral Exploration Overview: Updated February 2016; Northwest Territories Geological Survey. 34 p. Cover photo: Kennady Diamonds Inc. summer 2015 Kelvin Camp. Photo courtesy of Karen Gochnauer. © Copyright 2016 All Rights Reserved Table of Contents Executive Summary .....................................................................................................................
    [Show full text]
  • In This Issue
    Newsletter Where the world comes to find out about diamonds November 2013 Volume 3 Number 11 In this Issue We feature Union Diamonds, What is the Ideal Cut Dia- mond? Diamond Mines and Miners around the world. Plus much more and all our regular features! Price of Diamonds Where the world comes to find out about diamonds Newsletter of the Price of Diamonds website Price of Diamonds Newsletter November 2013 Edition Editor in Chief ~ Editorial ~ Michael Moore Advertising Technical Author Services Pty Ltd The PRICE OF DIAMONDS NEWSLETTER Is the Newsletter of the Price of Diamonds website and is available by subscription only. Dear Reader, This Newsletter is provided subject to the condition that it shall not be circulated in any form without the This month we feature Union Diamonds as the publisher’s cover and acknowledgement of the mate- Diamond Dealer of the month. rial contained herein and is not to be sold, hired or otherwise disposed of for any fee or consideration Also what is the Ideal Cut Diamond? Diamond other than by prior arrangement. It may be distributed online and passed along only in its current form and Mines and Miners around the world plus much with the above proviso. Comments and articles pub- more and all our regular features! lished in the Price of Diamonds Newsletter are not necessarily the opinions of the Publishers or Editors Do have a great month and happy reading! and are offered solely for information purposes only. This publication is designed to provide accurate and Michael informative information only in regard to the subject Price of Diamonds matter covered.
    [Show full text]
  • Report of Environmental Assessment and Reasons for Decision on the De Beers Canada Mining Inc
    Report of Environmental Assessment and Reasons for Decision on the De Beers Canada Mining Inc. Mackenzie Valley Snap Lake Diamond Project Environmental Impact Review Board July 24, 2003 GordonWray,Chair DeBeersSnapLake DiamondProjectEA CharlieSnowshoe FrankPope JohnStevenson DannyBayha MackenzieValleyEnvironmentalImpactReviewBoard P.O.Box938,Yellowknife,NT.X1A2N7 Phone:(867)766-7050 Fax:(867)766-7074 E-mail:[email protected] Web: www.mveirb.nt.ca Streetlocation:Suite200ScotiaCentre, 5102-52ndAvenue,Yellowknife,NT. CoverPhotocredits :GNWT-RWED-caribou,motherandchild DeBeersCanadaMiningInc.-VisualsoftheproposedSnapLakeminesite HeidiKlein,GartnerLeeLtd.-Heathboulderfield Report of Environmental Assessment and Reasons for Decision on the De Beers Canada Mining Inc. Snap Lake Diamond Project July 24, 2003 Report of EA and Reasons for Decision on the De Beers Snap Lake Diamond Project Summary: Report of Environmental Assessment Introduction De Beers Canada Mining Inc. (De Beers) submitted applications for a Class A Land Use Permit and a Class A Water License for the proposed Snap Lake Diamond Project (SLDP) to the Mackenzie Valley Land and Water Board, for the development of a 3,000 tonne per day underground diamond mine with an operating life of 22 years. The proposed SLDP is approximately 220 kilometres northeast of Yellowknife, NWT and is situated on Snap Lake at the headwaters of the Lockhart River drainage system (Figure A). The mine footprint will house up to 350 people and will have infrastructure including a camp complex, mining related buildings such as a process plant, a paste plant, an explosives factory, various storage buildings, a water treatment plant, waste disposal systems, power plant and airstrip. Outside of the mine footprint are winter roads for access to the site and an esker south of the mine site that will be used for quarrying purposes.
    [Show full text]
  • Socio-Economic Agreement Report Rapport Sur Les Accords
    2019 1 2019 SOCIO-ECONOMIC AGREEMENT REPORT SOCIO-ECONOMIC AGREEMENT REPORT For mines operating in the Northwest Territories RAPPORT SUR LES ACCORDS SOCIOÉCONOMIQUES Mines de diamants des Territoires du Nord-Ouest Le present document contient la traduction française du résumé et du message du ministre If you would like this information in another official language, call us. English Si vous voulez ces informations dans une autre langue officielle, contactez-nous. French Kīspin ki nitawihtīn ē nīhīyawihk ōma ācimōwin, tipwāsinān. Cree Tłı̨chǫ yatı k’ę̀ę̀. Dı wegodı newǫ dè, gots’o gonede. Tłı̨chǫ Ɂerıhtł’ıś Dëne Sųłıné yatı t’a huts’elkër xa beyáyatı theɂą ɂat’e, nuwe ts’ën yółtı. Chipewyan Edı gondı dehgáh got’ı̨e zhatıé k’ę́ę́ edatł’éh enahddhę nıde naxets’ę́ edahłı.́ South Slavey K’áhshó got’ı̨ne xǝdǝ k’é hederı ɂedı̨htl’é yerınıwę nı ́dé dúle. North Slavey Jii gwandak izhii ginjìk vat’atr’ijąhch’uu zhit yinohthan jì’, diits’àt ginohkhìi. Gwich’in Uvanittuaq ilitchurisukupku Inuvialuktun, ququaqluta. Inuvialuktun ᑖᒃᑯᐊ ᑎᑎᕐᒃᑲᐃᑦ ᐱᔪᒪᒍᕕᒋᑦ ᐃᓄᒃᑎᑐᓕᕐᒃᓯᒪᓗᑎᒃ, ᐅᕙᑦᑎᓐᓄᑦ ᐅᖄᓚᔪᓐᓇᖅᑐᑎᑦ. Inuktitut Hapkua titiqqat pijumagupkit Inuinnaqtun, uvaptinnut hivajarlutit. Inuinnaqtun Indigenous Languages and Education Secretariat: 867-767-9346 ext. 71037 Francophone Affairs Secretariat: 867-767-9343 billbradenphoto Contents INTRODUCTION ..................................................................................................................................................................... 6 ECONOMIC OVERVIEW AND CURRENT NWT ECONOMY ....................................................................................................11
    [Show full text]
  • 2012 NWT Mineral Exploration Overview, March 2013 3
    2012 Northwest Territories Mineral Exploration Overview March 2013 H. Falck and K. Gochnauer, Northwest Territories Geoscience Office, Yellowknife, NT This publication may be obtained from: Northwest Territories Geoscience Office 4601-B 52 Avenue P.O. Box 1500 Yellowknife, NT, X1A 2R3 Canada 867-669-2636 www.nwtgeoscience.ca In referring to this publication, please use the following citation: Falck, H., and Gochnauer, K., 2013. 2012 Northwest Territories Mineral Exploration Overview; Northwest Territories Geoscience Office, March 2013, 39 p. Cover Illustration: An overview of the Prairie Creek Minesite looking south, downstream along Prairie Creek. Photo courtesy of Hendrik Falck. © Copyright 2013 All Rights Reserved TABLE OF CONTENTS INTRODUCTION…………………………………………………………………………………...4 NORTHWEST TERRITORIES MINING HIGHLIGHTS FOR 2012 ................................................... 8 NORTHWEST TERRITORIES MINERAL EXPLORATION HIGHLIGHTS FOR 2012 ...................... 13 DIAMOND EXPLORATION ............................................................................................................ 13 METAL EXPLORATION ................................................................................................................. 18 FURTHER INFORMATION .......................................................................................................... 39 FIGURES AND TABLES Figure 1: Location and areal coverage of claims, leases and permits for 2012 in the Northwest Territories. …….……………………………………………………………………7 Figure 2: Location of
    [Show full text]
  • Socio-Economic Agreement Report Rapport Sur Les
    2019 TD 218-19(2) TABLED ON NOVEMBER1 3, 2020 2019 SOCIO-ECONOMIC AGREEMENT REPORT SOCIO-ECONOMIC AGREEMENT REPORT For mines operating in the Northwest Territories RAPPORT SUR LES ACCORDS SOCIOÉCONOMIQUES Mines de diamants des Territoires du Nord-Ouest Le present document contient la traduction française du résumé et du message du ministre If you would like this information in another official language, call us. English Si vous voulez ces informations dans une autre langue officielle, contactez-nous. French Kīspin ki nitawihtīn ē nīhīyawihk ōma ācimōwin, tipwāsinān. Cree Tłı̨chǫ yatı k’ę̀ę̀. Dı wegodı newǫ dè, gots’o gonede. Tłı̨chǫ Ɂerıhtł’ıś Dëne Sųłıné yatı t’a huts’elkër xa beyáyatı theɂą ɂat’e, nuwe ts’ën yółtı. Chipewyan Edı gondı dehgáh got’ı̨e zhatıé k’ę́ę́ edatł’éh enahddhę nıde naxets’ę́ edahłı.́ South Slavey K’áhshó got’ı̨ne xǝdǝ k’é hederı ɂedı̨htl’é yerınıwę nı ́dé dúle. North Slavey Jii gwandak izhii ginjìk vat’atr’ijąhch’uu zhit yinohthan jì’, diits’àt ginohkhìi. Gwich’in Uvanittuaq ilitchurisukupku Inuvialuktun, ququaqluta. Inuvialuktun ᑖᒃᑯᐊ ᑎᑎᕐᒃᑲᐃᑦ ᐱᔪᒪᒍᕕᒋᑦ ᐃᓄᒃᑎᑐᓕᕐᒃᓯᒪᓗᑎᒃ, ᐅᕙᑦᑎᓐᓄᑦ ᐅᖄᓚᔪᓐᓇᖅᑐᑎᑦ. Inuktitut Hapkua titiqqat pijumagupkit Inuinnaqtun, uvaptinnut hivajarlutit. Inuinnaqtun Indigenous Languages and Education Secretariat: 867-767-9346 ext. 71037 Francophone Affairs Secretariat: 867-767-9343 billbradenphoto Contents INTRODUCTION ..................................................................................................................................................................... 6 ECONOMIC OVERVIEW AND
    [Show full text]
  • Dominion Diamond Corporation Elliot Holland
    Dominion Diamond Corporation Elliot Holland – Vice President of Projects and Business Development Elliot Holland joined Dominion Diamond in December 2014 as Vice President of Projects and Business Development, and is currently leading the development of the Jay Project. Prior to joining Dominion, Mr. Holland was elected as a partner of McKinsey & Company where he served mining clients, including diamond mines, on operations, strategy and capital projects. Mr. Holland holds a BSE in civil and environmental engineering from Princeton University and an MBA from Stanford University. Claudine Lee - Superintendent-Environment Claudine Lee is a Professional Geologist with over 15 years of experience working in northern Canada. Ms. Lee began her career as a student working on diamond exploration programs, her experience ranges from, consulting, site liability and environmental assessment, environmental risk, environmental management and permitting, and compliance. Ms. Lee started at the Ekati Diamond Mine in 2011 as the Advisor - Operations and was promoted to Superintendent – Environment Operations in 2012. Currently, Claudine is the Superintendent – Environment and has responsibilities that include Operations, Permitting and Reclamation and Closure. Kirsten Berg – Superintendent-Procurement Kirsten Berg has lived in Yellowknife since 1997, and began working at the Ekati Diamond Mine in 2006. Ms Berg has held various Finance and Supply Chain roles at Ekati, and was promoted to a Superintendent in 2009. Ms. Berg is currently the Superintendent – Procurement, where her responsibilities include strategic sourcing, contractor and supplier management, operational purchasing, and inventory planning and performance. Ms. Berg has a BAH in Psychology from the University of Guelph and a Post-Baccalaureate Diploma in Management (PBDM) from Athabasca University.
    [Show full text]
  • Resumé JOHN W. FAITHFUL
    Resumé JOHN W. FAITHFUL Education Golder Associates Ltd. – Calgary and Yellowknife B.Sc. (Hons), James Cook University, 1986 Principal, Senior Water Quality Specialist John is a Principal and senior water quality specialist in the Calgary and Yellowknife offices. He has over 25 years of experience undertaking and managing surface water quality and limnological assessments of river and lake, and inshore marine environments. John has been with Golder for over 11 years. Prior to joining Golder, John spent the majority of his professional career working on the east coast of northern Australia at the Australian Centre for Tropical Freshwater Research at James Cook University, Townsville, Queensland. While at the Centre, John managed the consulting component of the business, as well as its analytical service laboratory, and collaborated on a number of research projects that focused on freshwater and marine environments. Relevant work John undertook while at the Centre included the assessment of effects of mining and refinery operations to freshwater and inshore marine receiving environments, and the assessment of effects of agricultural runoff to coastal rivers and nearshore environments. Since joining Golder, John has worked as a component lead, project manager, senior technical advisor, technical director, and project director for projects involving water quality baseline and assessment studies and environmental impact assessments. These projects have focused on mining and municipal business sectors. Although John’s background is water quality, John's work at Golder has predominantly been associated with leading baseline and environmental impact assessments for mining projects in north-western Canada; the key mining projects John has been involved with include the environmental assessment, permitting processes, and annual environmental monitoring for the De Beers Gahcho Kué Diamond Mine, the Fortune NICO, and Dominion Diamond Mine Jay projects, as well as the annual aquatic effects monitoring program for the operational De Beers Snap Lake Diamond Mine.
    [Show full text]
  • Tax and Economic Contribution Report 2016
    TAX AND ECONOMIC CONTRIBUTION REPORT 2016 DELIVERING CHANGE BUILDING RESILIENCE CONTRIBUTING THROUGH THE CYCLE ABOUT THIS REPORT ABOUT THIS REPORT Anglo American has for many years disclosed details TOTAL TAXES BORNE AND COLLECTED FOR THE PERIOD of its tax and broader economic contributions in our 2012–2016(1) Annual Report and Sustainability Report. The objective of this report is to provide our stakeholders with $20,638 m additional detailed information in this area in an TOTAL TAX AND ECONOMIC accessible single source. CONTRIBUTION IN 2016 Contents We published our first dedicated Tax and Economic $20,825 m 02 Chief Executive’s statement Contribution Report in 2015, which covered the year to 03 Total tax and economic contribution at a glance 31 December 2014. This is our third dedicated report, which 05 Our business model covers the year to 31 December 2016, and presents the total TOTAL TAXES AND OTHER 07 Tax tax and economic contribution that we made in each of our PAYMENTS TO GOVERNMENTS 10 Tax contribution through major operating jurisdictions. IN 2016 the life cycle of a mine 11 Transfer pricing This approach continues to recognise the calls for greater 13 Socio-economic transparency and is designed to complement the various development $4,119 m 17 Country highlights statutory disclosures and regulations which we are required 29 Assurance report to comply with as a Group. 31 Basis of report preparation PERCENTAGE OF TOTAL TAXES 32 Glossary of key terms In addition to this report, we have published on our website a AND OTHER PAYMENTS TO summary of our tax contribution on a project-by-project basis.(2) GOVERNMENT IN 2016 RELATING The report continues to set out our approach to tax and TO DEVELOPING COUNTRIES governance, with specific reference to matters of current interest and debate.
    [Show full text]