Office of the Town Municipal Administration (Infrastructure).Korangi Town Karachi
Total Page:16
File Type:pdf, Size:1020Kb
OFFICE OF THE TOWN MUNICIPAL ADMINISTRATION (INFRASTRUCTURE).KORANGI TOWN KARACHI. No: T.O.(Infra)/KT / No. 002 / 2008 Dated:28/11.2008 NOTICE INVITED TENDERS According to PPRA Rule 2004 the sealed Tender for the following works are invited from all the interested contactors / Firms/ Parties.. Estimated Earnest time limit S.NO Name of work Tender Fee cost Money Providing laying C.C. flooring 1 in U.C.1 Sector 8/F Bilal 4, 99,912/- 10000/- colony.K.T 2 months 2500/- P/L C.C flooring U.C.1Bilal 2 4, 99,912/- 10000/- colony K.T 2 months 2500/- P/L R.C.C pipe drain in U.C 3 1.Bilal colony K.T 5, 00,000/- 10000/- 2 months 2500/- Imp of streets / road in Bilal 4 5,00,000/- 10000/- 3 months 2500/- Colony in U.C.1 K.T Imp of road Qayyumabad 5 15, 26, 246 30,600/- 3 months 7500/ Sector D Street no.1.U.C.2 K.T Patch work in Qayyamabad 6 A+B+C Area U.C.2 6, 50,160/- 13,100/- 2 months 3000/- P/L R..C.C pipe drain in U.C 2 7 5, 00,000/- 10,000/- 2 months 2500/- Nasir colony Imp of Street U.C.2,& 6 8 Regarding Muramal Haram 5,00,000/- 10,000/- 3 months 2500/- K.T Imp of road / street in U.C.3 5, 00,000/- 9 10,000/- 2 months 2500/- K.T P/L C.C. flooring street of Jamia Masjid Mohamd Bin 10 38532/- 800/- 2 months 500/- Qasim Sector 48/D New Noorani Colony U.C.3 K.T P/L Pvc Pipe 3’ dia from 16000 11 road upto Abdullah shah 333150/- 6,700/- 2 months 1500/- Noorani U.C.3 K.T P/L R.C.C. pipe drain in U.C.3 Sector 48/A 12 659765/- 13,200/- 2 months 2500/- Abdullah shah noorani colony K.T P/L C.C. flooring in U.C.3 13 Noorani Basti 109476/ 21,200/- 3 months 1000/- Gali No.9 Sector 40/C. P/L R.C.C pipe drain in U.C.3 14 5,00,000/-/- 10,000/- 2 months 2500/- K.T P/L R.C.C pipe drain / R.C.C 900/- 15 main hole Top slab main road 44,777/-+O/Rate 2 months 1000/- +O/Rate Chakra Goth U.C.3 K.T Imp of road street No-6 ferance 16 town sector 3, 68,155/ 7,400/- 2 months 1500/- 48/F U.C.3 K.T P/L R.C.C pipe drain in sector 9000/- 17 4, 48,797/- O/Rate 2 months 5000/- 48/D and 41/A U.C.4 K.T +O/Rate Imp of road in sector 41/B 18 4, 90,103/- 9,900/- 2 months 2500/- U.C.4 K.T P/L C.C. flooring in various 19 4, 99,912/- 10,000/- 2 months 2500/- streets in U.C 4. K.T P/L C.C flooring in U.C. 4 20 4, 99,912/- 10,000/- 2 months 2500/- Mustafa Taj K.T P/L R..C.C. pipe drain from 21 16000 road to 48/B 32,069/- 700/- 2 months 500/- N area U.C.4 K.T P/L R.C.C pipe drain in U.C.4 22 5, 00,000/- 10,000/- 2 months 2500/- K.T P/fixing M.S pipe for 23 protection near T.Area O/Rate O/Rate 2 months 2500/- Park U.C.4 K.T Imp of road in U.C.5 24 (Regarding Eid Miladun Nabi) 5,00,000/- 10000/- 3 months 2500/- Imp / recondition of road from 25 9,99,883/- 20,000/- 3 months 5000/- 9000 to11000 road U.C.5 K .T Const of road and Sewerage R.C.C. Pipe drain in front 26 5, 21,740/- 10,500/- 2 months 2500/-- H.No-110 Meo Colony U.C.5 K.T P/L C.C. flooring in sector 27 4, 99,912/- 10,000/- 2 months 2500/- 50/B U.C.5 K.T P/L C.C flooring in U.C 5 K.T 28 4, 99,912/- 10,000/- 2 months 2500/- P/L R.C.C drain from 29 Cambridge school Upto 32/B 5, 25,376/- 10,600/- 2 months 2500/- Nallah U.C.6K.T P/L R.C.C drain in near Johar 30 5, 00,000/- 10,000/- 2 months 2500/- park U.C.6 P/L R.C.C pipe drain sector 31 10,000/ 2 months 2500/- 32/B U.C.6 5, 00,000/ P/L R.C.C drain in sector 32/A 32 5, 00,000/ 10,000/ 2 months 2500/- U.C.6 P/L R.C.C drain in sector 32/C 33 5, 00,000/ 10,000/ 2 months 2500/- U.C.6 K.T 2 Const of C.C. flooring Zia 34 colony regarding Muramal 5, 00,000/ 10,000/ 2 months 2500/- Haram U.C.6 K.T P/L R..C.C pipe drain along 2, 43,475/- 35 7000 road up to 4,900/- 2 months 1500/- 32/B Nallah U.C.7 K.T Const of C.C flooring P/Q area 36 7, 00,000/- 14,000/- 2 months 3000/- U.C.7.K.T Const of C.C flooring sector 37 7, 00,000/- 14,000/- 2 months 3000/- 33/C U.C.7. 38 P/L R.C.C drain U.C.7 K.T 5, 00,000/- 10,000/- 2 months 2500/- Const of Foot path along 39 4, 39,979/- 8,800/- 2 months 2500/- 11000 road U.C.8 K.T Const of C.C flooring in 40 surrounding farhat 8, 45,717/- 17,000/- 2 months 3000/- Banglows U.C.8 K.T Const of Central Island on 11000 road From 10,000 upto 41 7, 79,051/- 15,600/- 2 months 3000/- Batul Hamad Masjid U.C.8 K.T Const of C.C flooring i/c pipe 42 drain infront of Baldia school 5, 74,846/- 11,500/- 2 months 2500/- sector 34/2 . U.C.8K.T Cosnt of cricket pitch for net 1,200/- 43 55,918/- + O/Rate 2 months 1000/- practice U.C.8 K.T +O/Rate P/L C.C. flooring in U.C.9 K.T 44 4, 99,912/- 10,000/- 2 months 2500/- P/L C.C. flooring in various 45 4, 99912/- 10,000/- 2 months 2500/- streets in U.C.9 P/L R.C.C pipe drain in Rajput 46 colony U.C.9 5, 02,455/- 10,100/- 2 months 2500/- Const of Retaining Wall U.C.9 47 2, 37,194/- 4,800/- 2 months 1500/- K.T S/Laying Base course material 48 main bazaar Road Bilal colony 5,00,000/- 10,000/- 3 months 5200/- Industrial Area K.T Imp of road in U.C. 4 &5. 49 Regarding Marumaul 10, 93,322/- 21,900/- 3 months 5000/- HaramK.T Const of ring slab main hole, 50 Covers in K.T 9, 00,000/- 18,000/- 3 months 5000/- Const of Room i/c Installation of motors Sector 48/A Abdul 5, 10,000/- + 10,200/- 51 3 months 5000/- shah Noorani and New O/Rate +O/Rate Noorani colony U.C.3 K.T. Const of Boundary wall at 25,600/- 52 12,78,140/+O/Rate 3 months 10000/- U.C.1 sector 8/E K.T +O/Rate 3 Imp: of U.C.office Park 53 Qayyumabad and C.I land O/Rate O/Rate 2 months 5000/- Nasir colony U.C.2 K.T Const of ghus Park at sector 18,05,095/+ 36,200/- + 54 48/E U.C.3 K.T 3 months 15000/- O/Rate O/Rate Const of Park sector 48/C 18,15,928/- 36.400/- 55 3 months 15000/- U.C.4K.T +O/Rate +O/Rate Const of Boundary wall at 12,78,140/- 56 U.C.5 Karim Memorial Ground 25,600/- 3 months 10000/- +O/Rate K.T +O/Rate Imp : and Const of Muhajir 5,41,157/-+ 10,900/- 57 3 months 5000/- Park sector 32/B U.C.6 K.T O/Rate +O/Rate Supplying Plants for tree 58 Plantation at different road side O/Rate O/ Rate 2 months 2500/- of T.M.A K.T Imp/const of Johar Park U.C 6 6,83,590/-+ 13.700/- 59 2 months 5000/- K.T O/Rate +O/Rate Const of Boundary wall at 60 sector 33/D along Baldia 7,75,105/-+O/Rate 15,600/- 3 months 5000/- School U.C.7K.T +O/Rate Imp of Park at sector 33/D 6,93,148/-+ 13,900/- + 61 2 months 5000/- along Masjid-e-Bilal U.C.7 K.T O/Rate O/Rate Imp : of Rani Park & ovais 6,90,710/-+ 13,900/- + 62 Shaheed Park At U.C.8 K.T 2 months 5000/- O/Rate O/Rate Repair & Maintenance of Azad 7,100/- + 63 3,52,792/- O/Rate 3 months 3500/- Foot Ball club at U.C.9 K.T O/Rate Const of Cluster B/Wall of 64 Shah Latif Bhati Primary school 3,36,037/- O/Rate 6,800/- + 3 months 3500/- sector 51/B K.T O/Rate Const of Cluster with grass at 1,17,439/- + 65 Govt:B:S School K.T.S.No.1-D 2,400/- 2 months 1500/- O/Rate area K.T +O/Rate Complete engine overhauling,PTO gear assly,body repairing 66 O/Rate 2 % O/Rate 2 months 1500/- denting/painting and other works in vehicle No- 3601398ISUZU FTE dumper Complete engine overhauling ,hyd tanker with fitting 67 new.body repairing, painting O/Rate 2 % O/Rate 2 months 1500/- and other works in vehicle No- 3600529 ISUZU FTR dumper.