Office of the Town Municipal Administration (Infrastructure).Korangi Town Karachi

Office of the Town Municipal Administration (Infrastructure).Korangi Town Karachi

OFFICE OF THE TOWN MUNICIPAL ADMINISTRATION (INFRASTRUCTURE).KORANGI TOWN KARACHI. No: T.O.(Infra)/KT / No. 002 / 2008 Dated:28/11.2008 NOTICE INVITED TENDERS According to PPRA Rule 2004 the sealed Tender for the following works are invited from all the interested contactors / Firms/ Parties.. Estimated Earnest time limit S.NO Name of work Tender Fee cost Money Providing laying C.C. flooring 1 in U.C.1 Sector 8/F Bilal 4, 99,912/- 10000/- colony.K.T 2 months 2500/- P/L C.C flooring U.C.1Bilal 2 4, 99,912/- 10000/- colony K.T 2 months 2500/- P/L R.C.C pipe drain in U.C 3 1.Bilal colony K.T 5, 00,000/- 10000/- 2 months 2500/- Imp of streets / road in Bilal 4 5,00,000/- 10000/- 3 months 2500/- Colony in U.C.1 K.T Imp of road Qayyumabad 5 15, 26, 246 30,600/- 3 months 7500/ Sector D Street no.1.U.C.2 K.T Patch work in Qayyamabad 6 A+B+C Area U.C.2 6, 50,160/- 13,100/- 2 months 3000/- P/L R..C.C pipe drain in U.C 2 7 5, 00,000/- 10,000/- 2 months 2500/- Nasir colony Imp of Street U.C.2,& 6 8 Regarding Muramal Haram 5,00,000/- 10,000/- 3 months 2500/- K.T Imp of road / street in U.C.3 5, 00,000/- 9 10,000/- 2 months 2500/- K.T P/L C.C. flooring street of Jamia Masjid Mohamd Bin 10 38532/- 800/- 2 months 500/- Qasim Sector 48/D New Noorani Colony U.C.3 K.T P/L Pvc Pipe 3’ dia from 16000 11 road upto Abdullah shah 333150/- 6,700/- 2 months 1500/- Noorani U.C.3 K.T P/L R.C.C. pipe drain in U.C.3 Sector 48/A 12 659765/- 13,200/- 2 months 2500/- Abdullah shah noorani colony K.T P/L C.C. flooring in U.C.3 13 Noorani Basti 109476/ 21,200/- 3 months 1000/- Gali No.9 Sector 40/C. P/L R.C.C pipe drain in U.C.3 14 5,00,000/-/- 10,000/- 2 months 2500/- K.T P/L R.C.C pipe drain / R.C.C 900/- 15 main hole Top slab main road 44,777/-+O/Rate 2 months 1000/- +O/Rate Chakra Goth U.C.3 K.T Imp of road street No-6 ferance 16 town sector 3, 68,155/ 7,400/- 2 months 1500/- 48/F U.C.3 K.T P/L R.C.C pipe drain in sector 9000/- 17 4, 48,797/- O/Rate 2 months 5000/- 48/D and 41/A U.C.4 K.T +O/Rate Imp of road in sector 41/B 18 4, 90,103/- 9,900/- 2 months 2500/- U.C.4 K.T P/L C.C. flooring in various 19 4, 99,912/- 10,000/- 2 months 2500/- streets in U.C 4. K.T P/L C.C flooring in U.C. 4 20 4, 99,912/- 10,000/- 2 months 2500/- Mustafa Taj K.T P/L R..C.C. pipe drain from 21 16000 road to 48/B 32,069/- 700/- 2 months 500/- N area U.C.4 K.T P/L R.C.C pipe drain in U.C.4 22 5, 00,000/- 10,000/- 2 months 2500/- K.T P/fixing M.S pipe for 23 protection near T.Area O/Rate O/Rate 2 months 2500/- Park U.C.4 K.T Imp of road in U.C.5 24 (Regarding Eid Miladun Nabi) 5,00,000/- 10000/- 3 months 2500/- Imp / recondition of road from 25 9,99,883/- 20,000/- 3 months 5000/- 9000 to11000 road U.C.5 K .T Const of road and Sewerage R.C.C. Pipe drain in front 26 5, 21,740/- 10,500/- 2 months 2500/-- H.No-110 Meo Colony U.C.5 K.T P/L C.C. flooring in sector 27 4, 99,912/- 10,000/- 2 months 2500/- 50/B U.C.5 K.T P/L C.C flooring in U.C 5 K.T 28 4, 99,912/- 10,000/- 2 months 2500/- P/L R.C.C drain from 29 Cambridge school Upto 32/B 5, 25,376/- 10,600/- 2 months 2500/- Nallah U.C.6K.T P/L R.C.C drain in near Johar 30 5, 00,000/- 10,000/- 2 months 2500/- park U.C.6 P/L R.C.C pipe drain sector 31 10,000/ 2 months 2500/- 32/B U.C.6 5, 00,000/ P/L R.C.C drain in sector 32/A 32 5, 00,000/ 10,000/ 2 months 2500/- U.C.6 P/L R.C.C drain in sector 32/C 33 5, 00,000/ 10,000/ 2 months 2500/- U.C.6 K.T 2 Const of C.C. flooring Zia 34 colony regarding Muramal 5, 00,000/ 10,000/ 2 months 2500/- Haram U.C.6 K.T P/L R..C.C pipe drain along 2, 43,475/- 35 7000 road up to 4,900/- 2 months 1500/- 32/B Nallah U.C.7 K.T Const of C.C flooring P/Q area 36 7, 00,000/- 14,000/- 2 months 3000/- U.C.7.K.T Const of C.C flooring sector 37 7, 00,000/- 14,000/- 2 months 3000/- 33/C U.C.7. 38 P/L R.C.C drain U.C.7 K.T 5, 00,000/- 10,000/- 2 months 2500/- Const of Foot path along 39 4, 39,979/- 8,800/- 2 months 2500/- 11000 road U.C.8 K.T Const of C.C flooring in 40 surrounding farhat 8, 45,717/- 17,000/- 2 months 3000/- Banglows U.C.8 K.T Const of Central Island on 11000 road From 10,000 upto 41 7, 79,051/- 15,600/- 2 months 3000/- Batul Hamad Masjid U.C.8 K.T Const of C.C flooring i/c pipe 42 drain infront of Baldia school 5, 74,846/- 11,500/- 2 months 2500/- sector 34/2 . U.C.8K.T Cosnt of cricket pitch for net 1,200/- 43 55,918/- + O/Rate 2 months 1000/- practice U.C.8 K.T +O/Rate P/L C.C. flooring in U.C.9 K.T 44 4, 99,912/- 10,000/- 2 months 2500/- P/L C.C. flooring in various 45 4, 99912/- 10,000/- 2 months 2500/- streets in U.C.9 P/L R.C.C pipe drain in Rajput 46 colony U.C.9 5, 02,455/- 10,100/- 2 months 2500/- Const of Retaining Wall U.C.9 47 2, 37,194/- 4,800/- 2 months 1500/- K.T S/Laying Base course material 48 main bazaar Road Bilal colony 5,00,000/- 10,000/- 3 months 5200/- Industrial Area K.T Imp of road in U.C. 4 &5. 49 Regarding Marumaul 10, 93,322/- 21,900/- 3 months 5000/- HaramK.T Const of ring slab main hole, 50 Covers in K.T 9, 00,000/- 18,000/- 3 months 5000/- Const of Room i/c Installation of motors Sector 48/A Abdul 5, 10,000/- + 10,200/- 51 3 months 5000/- shah Noorani and New O/Rate +O/Rate Noorani colony U.C.3 K.T. Const of Boundary wall at 25,600/- 52 12,78,140/+O/Rate 3 months 10000/- U.C.1 sector 8/E K.T +O/Rate 3 Imp: of U.C.office Park 53 Qayyumabad and C.I land O/Rate O/Rate 2 months 5000/- Nasir colony U.C.2 K.T Const of ghus Park at sector 18,05,095/+ 36,200/- + 54 48/E U.C.3 K.T 3 months 15000/- O/Rate O/Rate Const of Park sector 48/C 18,15,928/- 36.400/- 55 3 months 15000/- U.C.4K.T +O/Rate +O/Rate Const of Boundary wall at 12,78,140/- 56 U.C.5 Karim Memorial Ground 25,600/- 3 months 10000/- +O/Rate K.T +O/Rate Imp : and Const of Muhajir 5,41,157/-+ 10,900/- 57 3 months 5000/- Park sector 32/B U.C.6 K.T O/Rate +O/Rate Supplying Plants for tree 58 Plantation at different road side O/Rate O/ Rate 2 months 2500/- of T.M.A K.T Imp/const of Johar Park U.C 6 6,83,590/-+ 13.700/- 59 2 months 5000/- K.T O/Rate +O/Rate Const of Boundary wall at 60 sector 33/D along Baldia 7,75,105/-+O/Rate 15,600/- 3 months 5000/- School U.C.7K.T +O/Rate Imp of Park at sector 33/D 6,93,148/-+ 13,900/- + 61 2 months 5000/- along Masjid-e-Bilal U.C.7 K.T O/Rate O/Rate Imp : of Rani Park & ovais 6,90,710/-+ 13,900/- + 62 Shaheed Park At U.C.8 K.T 2 months 5000/- O/Rate O/Rate Repair & Maintenance of Azad 7,100/- + 63 3,52,792/- O/Rate 3 months 3500/- Foot Ball club at U.C.9 K.T O/Rate Const of Cluster B/Wall of 64 Shah Latif Bhati Primary school 3,36,037/- O/Rate 6,800/- + 3 months 3500/- sector 51/B K.T O/Rate Const of Cluster with grass at 1,17,439/- + 65 Govt:B:S School K.T.S.No.1-D 2,400/- 2 months 1500/- O/Rate area K.T +O/Rate Complete engine overhauling,PTO gear assly,body repairing 66 O/Rate 2 % O/Rate 2 months 1500/- denting/painting and other works in vehicle No- 3601398ISUZU FTE dumper Complete engine overhauling ,hyd tanker with fitting 67 new.body repairing, painting O/Rate 2 % O/Rate 2 months 1500/- and other works in vehicle No- 3600529 ISUZU FTR dumper.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us