Brooklyn Bridge Park Opening New Vistas

Total Page:16

File Type:pdf, Size:1020Kb

Brooklyn Bridge Park Opening New Vistas Brooklyn Bridge Park Opening New Vistas By LISA W. FODERARO JULY 26, 2015 New York Times The view from Pier 6, near Atlantic Avenue, at the 1.3-mile Brooklyn Bridge Park. The pier, now bearing a multicolored carpet of flowers, is scheduled to open in August, along with a series of riverfront paths and a plaza at the other end, near the Manhattan Bridge. Credit Hilary Swift/The New York Times On a sultry afternoon recently, Regina Myer, president of the Brooklyn Bridge Park Corporation, walked past profusions of swamp milkweed, rose mallows and cardinal flowers. Interspersed with lawns, the red and purple flora carpeted a new area of the park, which stretches for 1.3 miles along the East River. Until recently, Pier 6 near Atlantic Avenue had been largely barren. Now it evoked a Vermont meadow in midsummer. “Pier 6 is a space where people can really relax and enjoy natural beauty, but atop a concrete deck in the middle of the East River,” Ms. Myer said. “It provides a landscape that you can almost get lost in.” In recent months, Brooklyn Bridge Park has faced its share of travails, which at times seemed to eclipse the actual parkland. In May, the park corporation, which oversees the development of both the park’s public spaces and commercial real estate, settled a lawsuit brought by a community group, People for Green Space Foundation, over the development of two new residential towers that will include affordable housing. Other groups have complained about blocked views and increased traffic, and the park’s high-design Squibb Park Bridge has been closed for almost a year. In August, however, attention will return to the innovative landscapes that have made the park, which is built on a series of piers, one of the most popular and publicized spaces in New York. Two new sections — at opposite ends — are set to open, filling in gaps with new lawns, flower gardens, winding waterfront paths and education centers. At one end is the Pier 6 meadow, at the other is a new area of riverfront paths offering views of the Brooklyn, Manhattan and Williamsburg Bridges; a small plaza with granite benches; and a tidal inlet with original concrete-and-steel footings from the Arbuckle Brothers coffee buildings that once stood on the site. The Pier 6 portion, in particular, offers a different experience for parkgoers, since many of the features that have opened so far have been designed for active recreation. Pier 6 was intended by the park’s landscape architect, Michael Van Valkenburgh Associates, specifically for passive use. Thirty-five different plants, encircling a string of small lawns, will bloom at different times from spring to fall. Regina Myer, president of the Brooklyn Bridge Park Corporation. Credit Hilary Swift/The New York Times “When you take a walk through Central Park or Prospect Park,” Ms. Myer said, “you get these wonderful long views, and we’re excited to have that same kind of experience out on our pier.” The section at the northern end, near the Manhattan Bridge, by contrast, plays up its urban, industrial past. At the foot of Jay Street, landscape designers decided to preserve the old train tracks, embedding them in a plaza that serves as the park’s northern entrance. “There was so much manufacturing in this area, and the trains brought goods to the docks,” Ms. Myer said, over the din of the B, D, N and Q trains running on the outside of the Manhattan Bridge. “Having that historic vestige here seemed like the right thing to do.” The Environmental Education Center at the Brooklyn Bridge Park in Dumbo will also provide a free public restroom. Credit Hilary Swift/The New York Times This area of the park will also include an annex of the Brooklyn Children’s Museum; an Environmental Education Center, to be run by the Brooklyn Bridge Park Conservancy; new bathrooms; a rebuilt dog run; a refurbished lawn; and new flower gardens. The Environmental Education Center will be housed in a refurbished park building, at 99 Plymouth Street, that previously belonged to the city’s Department of Environmental Protection. The outpost of the Brooklyn Children’s Museum will have a small space on the ground floor of a 12-story condominium building at 1 John Street, one of the park’s real estate projects. The space was donated by the developer as part of the original agreement with the park corporation. This bridge in Brooklyn Bridge Park is intended to show visitors how the tides come in and out through the day. Credit Hilary Swift/The New York Times Closer to the Brooklyn Bridge, the park’s main shopping draw, called Empire Stores, is now under construction. The retail and office complex will occupy a former coffee warehouse. The 330,000-square-foot structure consists of several contiguous brick buildings, and will house a satellite space of the Brooklyn Historical Society. Ms. Myer said that the home furnishing company West Elm would anchor the project, expected to open in the spring. Next door is the Tobacco Warehouse, another historic structure, which this fall will become the new home of St. Ann’s Warehouse, a Brooklyn performing arts organization. The warehouse structure was the focus of lawsuits brought by neighborhood groups that had challenged a city, state and federal decision to turn it over to St. Ann’s. In 2012, the lawsuits were settled, paving the way for the theater’s move while adding city-owned land beneath the Manhattan Bridge to the park. The park was conceived with an unusual financial model, in which commercial development pays for its costly operations and maintenance. Local residents appeared eager for the new parkland near Jay Street to open. On the recent afternoon, people were taking pictures of the northernmost section through a chain-link fence. “This is the first time,” Ms. Myer explained, “that there is public access and park development in this area.” A version of this article appears in print on July 27, 2015, on page A15 of the New York edition with the headline: Brooklyn Bridge Park Opening New Vistas. .
Recommended publications
  • Brooklyn Bridge Park Corporation D/B/A Brooklyn Bridge Park Meeting of the Directors Held at 334 Furman Street Brooklyn, NY
    Brooklyn Bridge Park Corporation d/b/a Brooklyn Bridge Park Meeting of the Directors Held at 334 Furman Street Brooklyn, NY December 5, 2018 MINUTES The following members of the Board of Directors were present: Alicia Glen – Chair Joanne Witty – Vice Chair Margaret Anadu Peter Aschkenasy Martin Connor Henry B. Gutman James Katz Stephen Levin* Stephen Merkel Rebecca Miller Tucker Reed Susannah Pasquantonio Andrea Phillips Mitchell Silver William Vinicombe Edna Wells Handy * Director Levin not present at all times Also present was the staff of Brooklyn Bridge Park Corporation (“BBP”), the Mayor’s Office and members of the press and public. Chair Glen called the meeting to order at approximately 11:00 am. Suma Mandel, Secretary and General Counsel of BBP, served as secretary of the duly constituted meeting and confirmed that a quorum was present. Prior to proceeding with the agenda items, Chair Glen welcomed the Board, BBP Staff and members of the public. She also welcomed new Director Andrea Phillips. 1. Approval of Minutes Upon motion duly made and seconded, the minutes of the October 10, 2018 Board of Directors meeting were unanimously1 approved. 2. Presentation of the President’s Report (Non-Voting Item) 1 Director Levin was not present for this vote 1 Eric Landau, BBP’s President, updated the Board on the Park’s progress, including: (i) the Pier 6 development sites; (ii) the upcoming preventative maritime maintenance RFP; (iii) Pier 2 Uplands construction; (iv) the ongoing planning process for the Brooklyn Bridge Plaza and Squibb Park Pool; and (v) the anticipated installation of an outdoor public squash court on Pier 5 by Public Squash.
    [Show full text]
  • FY 2016 Executive Budget
    Register of Community Board Budget Requests For The Executive Budget Fiscal Year 2017 Bronx The City of New York Bill de Blasio, Mayor FY 2017 Executive Budget Register of Community Board Budget Priorities The Register of Community Board Budget Requests for the In July, OMB publishes the Register of Community Board Executive Budget reports the FY 2017 executive budget status Budget Requests for the Adopted Budget which informs the of each of the projects and programs requested by the City’s 59 boards of the final disposition of their original bud get priorities. community boards. The Adopted Register contains responses that reflect the changes made to the Executive Budget by the City Council. The FY 2017 Register is the charter mandated product of a dynamic and cyclical budget process for the 59 community Capital project requests from community boards are site boards. The community boards consult with agencies on the specific, and primarily for infrastructure or public facility capital and expense needs of the district. After consulting, each improvements. community board develops and votes separate priorities for up to 40 capital and 25 expense budget requests which the For more specific information about programs important to the agencies review and respond to in the Register of Community community boards, refer to each agency’s section in the Board Requests for the Preliminary Budget in January. Message of the Mayor for the Executive Capital and Expense Budgets. The Mayor’s Office of Management and Budget (OMB) reviews these same budget requests and updates the responses for the Call 212-788-5943 for more information about the commu nity Executive Budget.
    [Show full text]
  • D/B/A Brooklyn Bridge Park) (A Component Unit of the City of New York
    BROOKLYN BRIDGE PARK CORPORATION (D/B/A BROOKLYN BRIDGE PARK) (A COMPONENT UNIT OF THE CITY OF NEW YORK) Financial Statements (Together with Independent Auditors’ Report) Years Ended June 30, 2014 and 2013 BROOKLYN BRIDGE PARK CORPORATION (D/B/A BROOKLYN BRIDGE PARK) (A COMPONENT UNIT OF THE CITY OF NEW YORK) FINANCIAL STATEMENTS (Together with Independent Auditors’ Report) YEARS ENDED JUNE 30, 2014 AND 2013 CONTENTS Page Independent Auditors' Report .........................................................................................................................................1-2 Management’s Discussion and Analysis........................................................................................................................3-7 Basic Financial Statements: Statements of Net Position............................................................................................................................................. 8 Statements of Revenues, Expenses, and Changes in Net Position ............................................................................. 9 Statements of Cash Flows ........................................................................................................................................... 10 Notes to Financial Statements................................................................................................................................11-21 INDEPENDENT AUDITORS’ REPORT To the Board of Directors of Brooklyn Bridge Park Corporation (d/b/a Brooklyn Bridge Park) We have audited
    [Show full text]
  • Community Boards Register by Borough
    Register of Community Board Budget Requests For The Adopted Budget Fiscal Year 2017 Bronx The City of New York Bill de Blasio, Mayor FY 2017 Adopted Budget Register of Community Board Budget Priorities The Register of Community Board Budget Requests for the In June, OMB publishes the Register of Community Board Adopted Budget reports the FY 2017 adopted budget status of Budget Requests for the Adopted Budget which informs the each of the projects and programs requested by the City’s 59 boards of the final disposition of their original budget pr iorities. community boards. The Adopted Register contains responses that reflect the changes made to the Executive Budget by the City Council. The FY 2017 Register is the charter mandated product of a dynamic and cyclical budget process for the 59 community Capital project requests from community boards are site boards. The community boards consult with agencies on the specific, and primarily for infrastructure or public facility capital and expense needs of the district. After consulting, each improvements. community board develops and votes separate priorities for up to 40 capital and 25 expense budget requests which the For more specific information about programs important to the agencies review and respond to in the Register of Community community boards, refer to each agency’s section in the Board Requests for the Preliminary Budget in January. Message of the Mayor for the Executive Capital and Expense Budgets. The Mayor’s Office of Management and Budget (OMB) reviews these same budget requests and updates the responses for the Call 212-788-5943 for more information about the community Executive Budget.
    [Show full text]
  • February 26, 2015
    Brooklyn Bridge Park Corporation d/b/a Brooklyn Bridge Park Meeting of the Directors Held at Brooklyn Borough Hall 209 Joralemon Street Brooklyn, NY February 26, 2015 MINUTES The following members of the Board of Directors were present: Alicia Glen – Chair Margaret Anadu Peter Aschkenasy Steven Cohen Henry Gutman Shari Hyman Kyle Kimball Stephen Levin Stephen Merkel David Offensend Zeeshan Ott Joanne Witty Also present was the staff of Brooklyn Bridge Park (“BBP”), the Mayor’s Office, the New York City Department of Parks and Recreation, the New York City Economic Development Corporation, the New York City Law Department and members of the press and public. Chair Glen called the meeting to order at approximately 11:10am. Suma Mandel, Secretary and General Counsel of BBP, served as secretary of the duly constituted meeting and confirmed that a quorum was present. Prior to proceeding with the agenda items, Chair Glen introduced and welcomed Ptahra Jeppe, who was expected to be appointed to the Board to replace outgoing Director Strahle. 1. Approval of Minutes Upon motion duly made and seconded, the minutes of the November 11, 2014 Board of Directors meeting were unanimously approved. 2. Authorization to Enter into Agreements relating to Park Construction Patricia Kirshner, BBP’s Vice President of Capital Operations, presented the item. In response to questions regarding repairs to Squibb Park Bridge, Ms. Kirshner and Ms. Myer stated that the Park was focused on safely restoring an important and vital connection to the Park as soon as possible and that BBP was continuing to investigate what caused the misalignment and intended 1 to pursue recovery of these costs from any responsible parties.
    [Show full text]
  • The Epic Story of the Building of the Brooklyn Bridge Kindle
    THE GREAT BRIDGE: THE EPIC STORY OF THE BUILDING OF THE BROOKLYN BRIDGE PDF, EPUB, EBOOK David McCullough | 636 pages | 12 Jan 1983 | SIMON & SCHUSTER | 9780671457112 | English | New York, United States The Great Bridge: The Epic Story of the Building of the Brooklyn Bridge PDF Book With two main spans of feet each, the bridge will connect a small, paved park at the north end of the historic Brooklyn Heights Promenade with the acclaimed new Brooklyn Bridge Park, an acre waterfront park designed by Michael Van Valkenburgh Associates featuring sweeping views of New York Harbor and the Manhattan skyline. John Roebling severely injured his foot in a freak accident as he was surveying the spot where the Brooklyn tower would be built. Be sure, too, to look out for the historical plaques and bronze panoramas installed along the bridge route to help enlighten your surroundings along the way. The once-favored suspension bridge recently gave way to cable-stayed, because cable-stayed bridges can cover longer spans for less money. Read the historical markers on the Brooklyn Bridge to learn more about its construction and history. If you're planning to walk the bridge , give yourself enough time to take photos and to enjoy the spectacular view of the Manhattan skyline. Workers had been shoring up the creaky structure since , reinforcing rusting steel supports and patching the crumbling concrete. The massive under-girding. It's the best option for a bridge built over the Hudson, because it allows only the vertical weight of the bridge to extend to the riverbed.
    [Show full text]
  • Procurement Report for Local Development Corporations
    Procurement Report for Local Development Corporations Authority Name Fiscal Year End Date Franklin County Local Development Corporation 12/31/2012 Franklin County Local Development Corporation 12/31/2013 White Plains Center Local Development Corporation 12/31/2017 White Plains Center Local Development Corporation 12/31/2018 White Plains Center Local Development Corporation 12/31/2019 Griffiss Utility Services Corporation 12/31/2018 Griffiss Utility Services Corporation 12/31/2018 Griffiss Utility Services Corporation 12/31/2018 Griffiss Utility Services Corporation 12/31/2018 ATC of Buffalo and Erie County, Inc. 12/31/2011 ATC of Buffalo and Erie County, Inc. 12/31/2011 ATC of Buffalo and Erie County, Inc. 12/31/2011 ATC of Buffalo and Erie County, Inc. 12/31/2011 ATC of Buffalo and Erie County, Inc. 12/31/2011 ATC of Buffalo and Erie County, Inc. 12/31/2011 ATC of Buffalo and Erie County, Inc. 12/31/2011 ATC of Buffalo and Erie County, Inc. 12/31/2011 Albany CSO Pool Communities Corporation 09/30/2016 Page 1 of 1728 09/24/2021 Procurement Report for Local Development Corporations Procurements Vendor Name Vendor City No No No No No Grainger PALATINE Griffith Energy ROME Guardian PHILADELPHIA IETS LIMA Adelmann Palmisano Architects, Inc. BUFFALO Gerster Sales & Services BUFFALO Industrial Power & Lighting Corp. BUFFALO L&D Johnson Plumbing & Heating BUFFALO Lehigh Construction Group, Inc. ORCHARD PARK National Fuel WILLIAMSVILLE National Grid SYRACUSE Westwood Landscaping BUFFALO COOL Insuring Agency GLENS FALLS Page 2 of 1728 09/24/2021 Procurement Report for Local Development Corporations Vendor State Vendor Postal Code Vendor Province/Region IL 60038 NY 13442 PA 19182 NY 14485 NY 14203 NY 14221 NY 14210 NY 14213 NY 14127 NY 14221 NY 13252 NY 14213 NY 12801 Page 3 of 1728 09/24/2021 Procurement Report for Local Development Corporations Vendor Country Procurement Description United States Parts United States Propane Fuel United States Insurance United States Parts United States Design for ECIDA facility separation.
    [Show full text]
  • Brooklyn Bridge Park Corporation D/B/A Brooklyn Bridge Park Meeting of the Directors Held at Brooklyn Public Library, Brooklyn Heights Branch Brooklyn, NY
    Brooklyn Bridge Park Corporation d/b/a Brooklyn Bridge Park Meeting of the Directors Held at Brooklyn Public Library, Brooklyn Heights Branch Brooklyn, NY June 14, 2011 MINUTES The following members of the Board of Directors were present at the meeting: Robert Steel – Chairman Peter Aschkenasy Adrian Benepe Martin Connor Anita Contini Peter Davidson Juny Francois Henry B. Gutman David G. Offensend Seth Pinsky John Raskin Daniel E. Simmons Nanette Smith Anne Strahle Mathew Wambua Also present were staff of Brooklyn Bridge Park (hereafter “BBP”), the Mayor’s Office, the New York City Department of Parks and Recreation, the New York City Economic Development Corporation and members of the press and public. Robert Steel, Chairman of the Board of Directors, called the meeting to order at approximately 1:15 P.M. Jennifer Klein, Director of Capital Improvements and Secretary of BBP, served as secretary of the duly constituted meeting and confirmed that a quorum was present. The Chairman welcomed Anne Strahle, a new Board member nominated by Assemblywoman Joan Millman and thereby appointed by Mayor Bloomberg. The Chairman also noted there would be a Committee on Alternatives to Housing meeting directly after the board meeting. The first order of business was the approval of the minutes of the April 14, 2011 meeting of the Board of Directors. Chairman Steel asked if there were any changes or corrections. There being none, Chairman Steel requested a motion to approve the resolution. Upon the motion being duly made and seconded, the following resolution was unanimously adopted: 1 June 14, 2011 APPROVAL OF MINUTES TAKEN AT THE APRIL 14, 2011 MEETING OF THE DIRECTORS OF THE BROOKLYN BRIDGE PARK CORPORATION RESOLVED, that the Board of Directors hereby approves the minutes of the Board of Directors meeting held on April 14, 2011.
    [Show full text]
  • Design and Phasing Presentation
    BROOKLYN BRIDGE PARK BROOKLYN BRIDGE PARK A. projEct OVERVIEW B. PARK DESIGN c. BUILDING tHE PARK BROOKLYNBRIDGEPARKNYc.ORG SUMMER 2007 PARK cOMPLEtION PIER 1 jANUARY 2008 PIER 1 FEBUARY 2008 PIER 3 jANUARY 2008 PIER 3 FEBUARY 2008 SUMMER ’08 @ PIER 1 BROOKLYN BRIDGE PARK PROjEct OVERVIEW BROOKLYNBRIDGEPARKNYc.ORG BROOKLYN BRIDGE PARK SItE cHALLENGES • LIMItED WEIGHt ON PIERS • LIMItED ENtRANcES tO PARK • WINDY • NOISY BROOKLYNBRIDGEPARKNYc.ORG BROOKLYN BRIDGE PARK EcONOMIc SELF-SUFFIcIENcY maintenancE and operations At Brooklyn bridge park will BE FUNDED by SItE-GENERAtED REVENUES. BROOKLYNBRIDGEPARKNYc.ORG BROOKLYN BRIDGE PARK PARK DESIGN 1. GEttING AROUND 2. REcREAtION 3. SUStAINABILItY BROOKLYNBRIDGEPARKNYc.ORG BROOKLYN BRIDGE PARK PARK DESIGN 1. GEttING AROUND 2. REcREAtION 3. SUStAINABILItY BROOKLYNBRIDGEPARKNYc.ORG D8E?8KK8E9I@;>< 9IFFBCPE9I@;>< 8=6<AB@33B ;/7<AB@33B A7B3 ENtRY POINtS 17BG>/@9 3 0@==9:G< 3 0@7253>:/H/ Af_eJki\\k 3 3 Pedestrian Entrances 3 Gcpdflk_Jki\\kAXpJki\\k DX`eJki\\k NXj_`e^kfeJki\\k Squibb Park Bridge 3 3 3 3 NXk\iJki\\k 3 >73@ Fc[=lckfeJki\\k :fcldY`X?\`^_kj <8JKI@M<I 3 9H< >73@ 3 >73@! 1=:C;07/63756BA/113AA >73@" D7/A?C700>/@90@7253 9iffbcpe?\`^_kjGifd\eX[\ 3 :flikJki\\k DfekX^l\Jki\\k >73@# =lidXeJki\\k AfiXc\dfe 3 Jki\\k >73@$ 3 N 3 8kcXek`Z8m\el\ 0 400' 800' D8E?8KK8E9I@;>< 9IFFBCPE9I@;>< 8=6<AB@33B ;/7<AB@33B A7B3 SUBWAY & BUSES 17BG>/@9 3 0@==9:G< 3 0@7253>:/H/ Af_eJki\\k 3 3 Pedestrian Entrances 3 Gcpdflk_Jki\\kAXpJki\\k DX`eJki\\k NXj_`e^kfeJki\\k Squibb Park Bridge 3 3 3 NXk\iJki\\k Bus Stops 3
    [Show full text]
  • 04-Brooklyn-Bridge-Park-1.Pdf
    Silver Medal Winner Brooklyn Bridge Park Brooklyn, New York SILVER MEDAL WINNER BROOKLYN BRIDGE PARK Julienne Schaer Movies at the Park 42 2011 RUDY BRUNER AWARD Project At-A-Glance WHAT IS BROOKLYN BRIDGE PARK? PROJECT GOALS N An 85 acre/1.3 mile linear park along the East River N Transform a “derelict and inaccessible vestige of New York’s waterfront in Brooklyn, NY. industrial past” into beautiful, accessible, useable green N A civic project that reuses a post-industrial site and reclaims recreation space. the waterfront for public use. N Return a part of the Brooklyn waterfront to public use. N An urban green space designed to be financially & N Create a “democratic and multi-use civic space”. ecologically sustainable. N Adhere to “community-identified principles for redevelopment N A park designed for passive and active recreational activity, and connectivity with the adjacent neighborhoods”. that also adds greenery and open space to a dense downtown N “Incorporate sustainable practices in every aspect of the with a growing residential population. park’s planning, design, construction and operation”. 43 SILVER MEDAL WINNER BROOKLYN BRIDGE PARK Project Chronology 1997 State allocates $1 million for master plan of the Park. February 1997 Economic Viability Study for the Park is released, recommending that the park include a pool, marina, conference 1984-85 Port Authority of New York and New Jersey (PANYNJ) center, hotel, and ice-skating facility. announces the close of cargo operations and intention to sell piers for commercial development. Neighborhood-based grassroots December 1997 Brooklyn Waterfront Local Development groups emerge to advocate for park.
    [Show full text]
  • Dear US Newnham Alumnae, I Firstly Want to Say Thank You for Providing
    Dear US Newnham Alumnae, I firstly want to say thank you for providing me with this incredible opportunity to spend my summer in the US. I am in the midst of a PhD addressing how responsible bridge construction and management can improve the lives of people around the world. Asset owners require better monitoring systems than currently exist, and further exploration within this field is essential. This trip to the US has given me some incredible opportunities to understand advances in this field, new methods being deployed in the US as well as exchange ideas and build collaborations for the remainder of my PhD research. As a bit of background about my research: it examines advances in satellite measurement technologies and understand their relevance, utilisation, and limitations to bridge and infrastructure monitoring. These data sets can be used in comparison with traditional measurement techniques from sensors installed on bridges. They can also be complemented with traditional measurement techniques to provide a more effective strategy for interpreting data to provide useful information and value to asset owners. New York City, NY I landed in New York JFK airport on a warm summer evening and bundled myself into the classic NYC big yellow cab. On arrival, I was warmly met at the start of my journey by Newnham alumna Margaret Campbell, who kindly hosted me during my time in New York. My hosts had already clipped out an interesting article about the Squibb Park Bridge, a $4.1 million footbridge that connects Brooklyn Heights and Brooklyn Bridge Park, which has been closed to the public since August 2014.
    [Show full text]
  • Onenyc 2019 Progress Report
    Vibrant Democracy VD.1 Empower all New Yorkers to participate in our democracy Initiative / Lead Initiative / Milestones to complete 2018 Milestone Milestones to complete Milestones to complete Supporting Initiative Agencies Funding Status Progress Since April 2018 by December 31, 2018 Status by December 31, 2020 by December 31, 2021 VD.1.4.1.1D Extending NYC Completed NYC Service selected an additional five regions to Collect volunteer numbers Completed civic engagement by Service continue the Neighborhood Volunteer from CBOs and City promoting volunteer Collaborative pilot in Fall, with four of five agencies, and publish 2017 opportunities, building boroughs participating in the end (Manhattan was Volunteers Count Report volunteer capacity in postponed). All FY19 Service Year members have Conduct a cycle of the Completed nonprofits and City been trained in the Commodity Distribution Point neighborhood initiative in agencies, and engaging a (CDP) plan and are ready for activation during all five boroughs (one cycle diverse cross section of emergencies. The annual Volunteers Count report per borough) – a human- city residents as was published in April 2018, documenting centered design session, a volunteers and service 560,692 volunteers from 457 organizations, as daylong volunteer capacity- year members to address well as 444,130 students engaged in service. This building session, a citywide the city’s greatest needs, was a 15% increase in the number of volunteers volunteer summit, and a including linking reported the previous year. In addition, the neighborhood volunteer volunteers with Mayoral Service Recognition program honored promotion canvass emergency preparedness 4,691 residents for volunteering 100+ hours (with and response (4.1.1D) 168 serving 1,000+ hours) in 2017, and 38 Conduct post- Reconsidered companies were honored for engaging 20 percent implementation surveys/ or more of their employees in volunteerism.
    [Show full text]