NOTICE INVITING TENDERS

Sealed Tenders based on item rates/percentage above or below on TS estimate rates are hereby invited for the works mentioned below from the Contractors/firms enlisted / renewed with

C&W department for the current financial year 2019-20 in the field of Survey & Mapping /

Topographic Survey & Soil Investigation of Highways works.

Tender documents can be obtained, from the date of uploading on PPRA Website, from any of the below mentioned offices, upon written request accompanied with attested copies of enlistment / upto date renewal letter, PEC license, Identity Card of Contractor / Managing Partner /

Director of the firm alongwith registered power of attorney and on payment of prescribed tender fee in the form of CDR / Bank Draft / Cashier’s Cheque of any scheduled bank:-

i. Chief Engineer (North), Punjab Highway Department Lahore. ii. Commissioner, Sargodha Division Sargodha. iii. Deputy Commissioner, . iv. Superintending Engineer, Highways Circle Sargodha. v. Executive Engineer, Highways Division Mianwali. vi. Assistant Commissioner Concerned.

Tendered rates and amounts should be filled in figures as well as in words and tenders should be signed as per general directions given in the tender document. No rebate on tendered rates will be acceptable.

Tenders documents will be issued from the date of publication upto 02.03.2020 and will be received on 04.03.2020 upto 02:00 PM and the same will be opened at 02:30 PM simultaneously in the office of Chief Engineer (North) Punjab Highway Department Lahore and Commissioner, Sargodha Division Sargodha on fixed date and time by the respective tenders opening committee at the above venues in the presence of intending contractors or their representatives.

Conditional tenders and tenders not accompanied with earnest money @ 2% of the estimated cost in shape of CDR / Bank Draft / Cashier’s Cheque of any scheduled Bank in favour of

Executive Engineer, Highways Division, Mianwali and attested copies of registered partnership deed and power of attorney in case of firms, will not be entertained.

PPRA Rules shall be followed for rejection of tender.

Page 1 of 7

Earnest Estimated Sr. Money @ Completion Name of works Cost T.S No & Date Tender Fee No. 2% Time Rs. in Million Rs. in Million DETAILED SURVEYING & 1 MAPPING OF THE FOLLOWING WORKS: C.E (N) W/I Of Road From Maharanwala To No.1669/Plg Ahmed Khan Wala City, Length: dated 3.96 Km In District Mianwali 07.10.2019 Construction Of Road From Main C.E (N) Ahmed Khan Wala Road Via No.1556/Plg Salihal Morr To Dera Mati Ullah dated Khan, Length: 4.00 Km In District Mianwali 04.10.2019 S.E Circle Sgd W/I Of Road From Shahbaz Khel No.1409/B Morr To Shahbaz Khel Pull, Length: dated 1.30 Km In District Mianwali 01.10.2019 Widening / Improvement Of Of C.E (N) Road From Rokhari Morr Main No.1627/Plg

Kalabagh Road To Rokhari City, dated Length: 3.25 Km 07.10.2019 W/I Of Road From Khwajabad C.E (N) No.1634/Plg To Mocch City, Length: 3.96 Km dated In District Mianwali 07.10.2019

W/i of road from Pai Khel station to

C.E (N) -

via Muhammad Yar Wala, No.1499/Plg

length: 7.00 km district Mianwali dated 26.09.2019 W/i of road from chapri to chashmia C.E (N) via nasri wala, zairi, length: 12.50 No.1507/Plg

km in district Mianwali dated 01 Month 01

26.09.2019 Rs.10,000/ Rs.0.037 (M) Rs.0.037

W/i of road from tari khel Rs.1.820(M) C.E (N) road to tari khel katcha, link road No.1492/Plg

dera riaz khan, length: 9.50 km in dated district Mianwali 26.09.2019 Widening / improvement of C.E (N) gernelay road portion from shahbaz No.1478/Plg

khel to dillay wali via rokhari tehsil dated mianwali, length: 16.04 km 26.09.2019 Construction of road from alif khel C.E to chapri via mohabbat khel, length: No.1577/Plg

4.50 km in thsil esa khel, district dated Mianwali 04.10.2019 W/i of road from rikhi mor to nawan C.E (N) thamay wali cia choi kalri dhok No.1485/Plg

budhay khel length 15.50 km district dated Mianwali 26.09.2019 W/i of road from to C.E (N) dhoke miani via dhok ali khan No.1606/Plg dhibba dhurnakka dhoke ayub, dated length: 8.00 km in district Mianwali 07.10.2019 Widening / improvement of road C.E (N) from ban hafiz jee to city, No.1655/Plg

length: 6.00 km in district Mianwali dated 07.10.2019 Page 2 of 7 Re-construction of road from Lahore Sargodha Mianwali Bannu C.E (N) No.1648/Plg road km no. 336 to bank chowk , length: 2.05 km tehsil & dated district Mianwali 07.10.2019

Construction of road from C.E (N) shakardara road km no. 10 to lunda No.1563/Plg baghi khel, length: 2.5 km in tehsil isa khel district Mianwali dated 17.10.2019 W/i of road from mochh city (pull) to C.E (N) boys high school mochh, length: No.1662/Plg

2.13 km district Mianwali dated 07.10.2019 Widening / improvement of road C.E (N) from nlc station talagang road to No.1584/Plg bori khel length: 8.50 km in district dated Mianwali 07.10.2019 Widening / improvement of road C.E (N) from kot bailian bridge to utra kalan No.1598/Plg via basti shah gul muhammad wali , dated length: 12.00 km in district Mianwali 07.10.2019 W/I of road from kalabagh to C.E (N) chughlan, length: 4.21 km tehsil No.1727/Plg essa khel district Mianwali dated 07.10.2019 Re-construction / construction of C.E (N) road from kallur to miana wala via No.1684/Plg kamrian wala, length: 11.70 km in dated tehsil isa khel, district Mianwali 07.10.2019

Widening / improvement of road C.E (N) from to tolla mangali No.1691/Plg via afghan camp, length: 8.00 km dated district Mianwali 07.10.2019 Widening / improvement of road C.E (N) from chashmia chowk to gulla khel, No.1720/Plg length: 4.25 km tehsil isa khel, dated district Mianwali 07.10.2019 W/I of road Art:12 PAF gate C.E (N) Talagang road to Ahmed Khan wala No.1591/Plg and Aheeranwla to Ghundi via masti wala length 14.84 Km. dated 07.10.2019 Widening / Improvement Of Road From Art-2 to PAF Road Via Degree College University Campus Under Process Mianwali Length 6.55 Km In District Mianwali Construction Of Road From Under Process Gulmari To Head Pacca Length 4.21 Km District Mianwali

Construction / Rehabilitation Of Under Process Road From Head Pacca To Ali Wali Along Escap Channel Length 5.55 Km In District Mianwali

Page 3 of 7 DETAILED SURVEYING & 2 MAPPING OF THE FOLLOWING WORKS:

W/I of road from Samand Wala C.E (N) Morr to Bharauanwala length 5.50 No.1641/Plg Km District Mianwali dated 07.10.2019 W/I of road from Dillewali Adda to Dille wali length 2.50 Km District S.E Circle SGD Mianwali. No.1417/B dated 01.10.2019

W/I of road from Main Kalabagh road to Mari City length 1.65 Km S.E Circle SGD District Mianwali. No.1425/B dated 01.10.2019

W/I of road from main Kalabagh road to Pai Khel city length 2.00 Km S.E Circle SGD District Mianwali. No.1413/B dated 01.10.2019

W/I of road from Swance Dera C.E (N) Khalas Khelanwala to ghundi to No.1613/Plg Musa Khel (road) length 7.38 Km dated District Mianwali. 07.10.2019 W/I of road from main Kalabagh C.E (N) road tari khel Ghundi to Swance via No.1620/Plg chah Khalil wala length 5.85 KM dated District Mianwali. 07.10.2019

W/I of road from Bhore Sharif to

C.E (N)

Graveyard sahaba karam via -

No.1698/Plg Ghulam Hussain wala wazir abad dated gagan wala wandha ayub wala 07.10.2019 imam din wala length 7.00 Km. Rehabilitation / Widening / C.E (N) Improvement of road from Nasri No.1677/Plg

wala to length 01 Month

0.742(M) dated Rs.10,000/ 15.00 Km. (M) 0.015 07.10.2019 W/I of road from Isa Khel to C.E (N) Khaglanwala road length 4.00 Km. No.1713/Plg dated 07.10.2019 Re-construction / construction of C.E (N) road from Kamar Mushani to daraz No.1706/Plg Khel length 7.70 Km. dated 07.10.2019 W/I of road trug to C.E (N) length 3.00 KM No.1734/Plg dated 07.10.2019 Re-construction / Construction of S.E Circle SGD road from Khaji Morr to Khursan No.1437/B length 3.50 Km. dated 01.10.2019 Construction of road from Sultan C.E (N) Khel to Wandha Bheki Khel via No.1570/Plg Heedaran wala lengh 3.00 Km. dated 04.10.2019 W/I of road from Isa Khel to S.E Circle SGD road length 1.00 Km No.1441/B tehsil Isa Khel district Mianwali. dated 01.10.2019

Page 4 of 7 W/I of road from Isa Khel to S.E Circle SGD Khaglanwala road to Nang Shah No.1445/B

length 1.50 Km Tehsil Isa Khel dated District Mianwali. 01.10.2019 W/I of road from Kamar Mushani to S.E Circle SGD Katcha Morr Mohallah Tani Khel No.1429/B length 1.75 Km in Town Committee dated Kamar Mushani District Mianwali. 01.10.2019 W/I of road from Kamar Mushani to S.E Circle SGD Nasri Wala length 1.00 Km in Town No.1433/B

Committee Kamar Mushani District dated Mianwali. 01.10.2019 Construction of new road main Kalabagh road Agha shah clinic to S.E Circle SGD Dare Arqam School i/c Link to dera No.1421/B dated saif ullah length 1.25 Km District 01.10.2019 Mianwali.

SOIL INVESTIGATION OF BRIDGES ON FOLLOWING ROADS:-

Sub Soil Investigation for C.E (N) Construction of Bridge Over Than No.1485/Plg 3 Canal (W/I of road from Morr 0.469 (M) 0.009 (M) dated 235/- to Main Kalabagh to Rokhri city 26.09.2019 length 3.25 Km District Mianwali). Sub Soil Investigation for C.E (N) Construction of Pile Foundation No.1492/Plg Bridge Over Thal Canal (Widening / dated 4 Improvement of road from Tari Khel 0.469 (M) 0.009 (M) 26.09.2019 235/- Kalabagh road to Tari Khel Katcha including link dera Riaz Khan, Length 9.50 Km District Mianwali. Sub Soil Investigation for C.E (N) Construction of Pile Foundation No.1499/Plg Bridge over Thal Canal (Widening / dated Improvement of road from Pai Khel 0.469 (M) 26.09.2019 5 Station to Mocch Via Muhammad 0.009 (M) 235/-

Yar Wala, Length 7.00 Km, District

Mianwali. (2 Boreholes 120 Ft Deep Each). Sub Soil Investigation for C.E (N) Construction of Pile Foundation No.1634/Plg

Bridge over Thal canal (Widening / dated 01 Month 6 Improvement of road from Khawaja 0.469 (M) 0.009 (M) 07.10.2019 235/- Abad to Moch City length 4.00 Km District Mianwali. (2 Boreholes 120 Ft Deep Each). Sub Soil Investigation for C.E (N) Construction of Bridge Over Thal No.1662/Plg Canal (Widening / Improvement of dated 7 road from Moch City (Pull) to Boys 0.469 (M) 0.009 (M) 07.10.2019 235/- High School Moch, length 2.50 Km District Mianwali (2 Boreholes 120 Ft Deep Each). Sub Soil Investigation for C.E (N) Construction of Bridge over Adhi No.ADP/4002/ Canal (Dualization of Sargodha 2019- Mianwali Road (Phase-I) from Km 0.307 (M) 8 0.006 (M) 20/SGD/1915- 154/- 267.37 to 300.18 Length 32.81 Km 20/Plg dated District Mianwali (1 Boreholes 120 13.11.2019 Ft Deep).

Page 5 of 7 Sub Soil Investigation for C.E (N) Construction of Bridge Over Muhajir No.ADP/4002/ Canal (Dualization of Sargodha 2019- 9 Mianwali road (Phase-I) from Km 0.469 (M) 0.009 (M) 235/- 20/SGD/1915- No.267.37 to 300.18 length 32.81 20/Plg dated Km District Mianwali. (2 Boreholes 13.11.2019 120 Ft Deep Each) Sub Soil Investigation for C.E (N) Construction of Bridge over Bhonki No.ADP/4002/ Distrubtory (Dualization of 2019- 10 Sargodha Mianwali road (Phase-I) 0.307 (M) 0.006 (M) 154/- 20/SGD/1915- from Km No.267.37 to 300.18 20/Plg dated length 32.81 Km District Mianwali. 13.11.2019 (1 Borehole 120 FT Deep). Sub Soil Investigation for Re- C.E (N) construction / construction of road No.1507/Plg from Kamar Mushani to daraz Khel 11 0.900 (M) 0.018 (M) dated 10000/- length 7.70 Km. Tehsil Isa Khel 26.09.2019 District Mianwali. (2 Boreholes 140 Ft Deep Each). Sub Soil Investigation for C.E Construction of Bridge over Saim No.1577/Plg Nullah (Construction Of Road From dated 12 Alif Khel To Chappri Via Mohabbat 0.900 (M) 0.018 (M) 04.10.2019 10000/- Khel Length 3.98 Km Tehsil Isa Khel District Mianwali. (2 Boreholes 140 FT Deep Each). 13 DETAIL TOPOGRAPHIC SURVEY OF FOLLOWING WORKS i. Topographic survey for C.E (N) Construction of Bridge on No.1706/Plg Reconstruction / Construction dated Of Road From Kamar Mushani 07.10.2019 To Daraz Khel Length 7.70 Km Tehsil Isa Khel District Mianwali C.E (N) ii. Topographic survey of Bridge No.1507/Plg chapri on (W/i of road from dated chapri to chashmia via nasri 26.09.2019 wala, zairi, length: 12.50 km in

district mianwali),

area:1300'x1300' = 310.38 kanal iii. Topographic survey of tari khel C.E (N) bridge on (w/i of road from tari No.1492/Plg khel kalabagh road to tari khel dated katcha, link road dera riaz khan, 26.09.2019 length: 9.50 km in district mianwali), area:1300'x1300' = Rs.0.015 01 0.768 (M) 10000/- 310.38 kanal (M) C.E (N) Month iv. Topographic survey of rokhri No.1627/Plg bridge on (widening / dated improvement of of road from 07.10.2019 rokhari morr main kalabagh road to rokhari city, length: 3.25 km), area:1300'x1300' = 310.38 kanal C.E (N) v. Topographic survey of moch No.1662/Plg bridge on (W/I Of Road From dated Mochh City (Pull) To Boys High 07.10.2019 School Mochh, Length: 2.50 Km

district mianwali),

area:1600'x1100' = 323.23 kanal vi. Topographic survey of C.E (N) bridge on (w/i of road from Pai No.1499/Plg Khel Station To Mochh Via dated Muhammad Yar Wala, Length: 26.09.2019 Page 6 of 7 7.00 Km District mianwali), area:1400'x1400' = 359.96 kanal vii. Topographic survey of C.E (N) khwajabad bridge on (w/i of No.1634/Plg road from khwajabad to mocch dated city, length: 3.96 km in district 07.10.2019 mianwali), area:1300'x1300' = 359.96 kanal DETAILED SURVEYING & C.E (N) MAPPING for Dualization Of No.ADP/4002/ Sargodha Mianwali Road 2019- 01 14 0.368 (M) 0.007 (M) 184/- (Phase-I) From Km 267.37 To 20/SGD/1915- Month 298.00, Length: 30.63 Km In 20/Plg dated 13.11.2019 District Mianwali

TOPOGRAPHIC SURVEY OF:-

i. Nagni Mor Bridge RD 574+74 Sargodha Mianwali Road, Area 3000’ x 1600’ = 881.54 Kanal. ii. Railway Phattak RD 349+00 Sargodha Mianwali road C.E (N) Area 4300’ x 1000’ = 789.72 No.ADP/4002/ 2019- 01 15 Kanal. 1.408 (M) 0.028 (M) 10000/- iii. Jahaz Chowk Sargodha 20/SGD/1915- Month Mianwali road Along Bhonki 20/Plg dated Minor Area 2500’ x 3500’ = 13.11.2019 1607 Kanal. iv. Sargodha Morr Chowk, Area3500’x600’ = 385.67 Kanal. v. Bridge Adhi Kot Disty Bridge at Road RD 18+61 Mianwali Area 1400’ x 1400’ =359.96 Kanal.

Executive Engineer Highways Division, Mianwali

Page 7 of 7