Africa's Economic Renaissance Gathers Momentum

Total Page:16

File Type:pdf, Size:1020Kb

Africa's Economic Renaissance Gathers Momentum Paper 09GM0155 Africa’s Economic Renaissance Gathers Momentum Tom Hammons, and Pat Naidoo Working Group African Electricity Infrastructure 2009 IEEE PES General Meeting, July 26-30 2009, Calgary, Alberta, Canada Sponsored by: International Practices for Energy Development and Power Generation Chairs: Tom Hammons, University of Glasgow, Scotland, UK Pat Naidoo, Western Power Corridor (PTY) LTD. Track 1: Transmission Capacity Enhancements in the 21st Century INTRODUCTION Power System Control and Operations on a wide area scale such as Continental Africa. On behalf of the Energy Development and Power The power scheme being developed will Generation Committee, welcome to this Panel Session eventually overlap with Europe and the Middle East to on Africa’s Economic Renaissance; presenting for the create the World’s next generation power system with first time new and innovative simple engineering energy trading that will go beyond the present state of solutions for an otherwise complex development. the art. With primary energy source from the natural, Welcome to the Natural Renewable Energy renewable hydroelectric source of the Congo River, the Source of the Congo River; naturally the world’s power system expansion plans for Continental Africa benchmark for lowest cost electrical energy. gathers momentum. The river is the world’s number The Panelists and Titles of their Presentations two in capacity and capability and can deliver are: 100,000’s MW; virtually limitless given innovative methods of harnessing the energy flow of the river. Given large scale power production virtually in one 1. Lawrence Musaba (Southern African Power Pool, space geographically; large scale and innovative power Harare, Zimbabwe) and Pat Naidoo (Western transmission designs are being prepared to evacuate the Power Corridor Company, Gaborone, Botswana). bulk power. “Power Supply Challenges in Southern Africa” This project will evolve to become the world’s (Invited Panel Presentation Summary 09GM0847) biggest engineering assignment and it has all the 2 Dhevan Pillay and Herman Claassen (Eskom, complexities of global business, local and regional South Africa). Proposed Principles for the politics, local, regional and international financing, and Evaluation and Funding of DSM Projects project and country risks. Amongst all the thorns, (Invited Panel Presentation Summary 09GM891). simple and innovative engineering solutions continue to 3. Pat Naidoo (The Western Power Corridor pave the way forward and contribute to the Company (PTY) Ltd, Gaborone, Botswana), development of the project. “New Strategies for Harvesting Large Scale With a general background of the project, the Bulk Energy from the Congo River without a new and innovative engineering solutions are prepared Conventional Dam.” (Invited Panel Presentation for panel discussion and expert contributions. The field Summary 09GM1103) covers bulk hydro power generation without any 4. Li Wang, D. J. Lee, L. Y. Chen, J. Y Yu, S. R. damming of the river; world class environmental care Jan, S. J. Chen, W. J. Lee, Ming-Hua Tsai, Wei- and strategic assessments; HVAC and HVDC Taw Lin, Yuan-Chung Li and B. K. Blyden. A transmission technology including EHVDC at 800 kV Micro Hydro Power Generation System for and 1200 kV; HVAC versus HVDC choices; Power Sustainable Microgrid Development in Rural System Performance Management including self Electrification of Africa (Invited Panel healing for transient disturbances and concluding with Presentation Summary 09GM0 1424) 5. P. V. Preckel, F T Sparrow, Brian Bowen, Z. Yu Eskom, South Africa and D.J. Gotham (Purdue University, USA). Email: [email protected] ”Preserving Low Cost Electricity while Tel +27 (0) 21 855 5290 Improving The Riverine Environment; Part Fax: +27 (0) 86 662 2716 Two; Model Results” (Invited Panel Presentation Mobile : +27 (0) 82 898 7070 Summary 09GM1114 6. Invited Discussers. 3. Pat Naidoo. The Western Power Corridor Company (PTY) Each Panelist will speak for approximately 20 LTD minutes. Each presentation will be discussed Private Bag 254 immediately following the respective presentation. There Gaborone Botswana will be a further opportunity for discussion of the E-mail: [email protected]; presentations following the final presentation. [email protected] The Panel Session has been organized by Tom Tel: +267 392 3534/392 3542 Hammons (Chair of International Practices for Energy Fax: +267 392 3549 Development and Power Generation IEEE, University of Glasgow, UK) and Pat Naidoo (Chief Executive, Western 4. Li Wang Power Corridor Company, Gaborone, Botswana). Dong-Jing Lee Tom Hammons and Pat Naidoo will moderate the Long-Yi Chen Panel Session. Jyun-Ying Yu Shen-Roug Jan Su-Jen Chen Department of Electrical Engineering (EE) PANELISTS: National Cheng Kung University (NCKU) Tainan 70101 1. Lawrence Musaba Taiwan Coordination Center Manager E-mail: [email protected] Southern African Power Pool PO Box GT897 Wei-Jen Lee Harare Energy Systems Research Center (ESRC) Zimbabwe The University of Texas at Arlington (UTA) E-mail: [email protected] Arlington Tel: +263-4-250560/2/3/9 TX 76013 Cell: +263-11-418637 USA Fax: +263-250565/6 E-mail: [email protected] Pat Naidoo Ming-Hua Tsai Chief Executive Wei-Taw Lin The Western Power Corridor Company (PTY) Yun-Chung Li LTD Department of Irrigation and Engineering Private Bag 254 Council of Agriculture (COA) Gaborone Botswana Executive Yuan E-mail: [email protected]; Taiwan. [email protected] Tel: +267 392 3534/392 3542 Bai K Blyden Fax: +267 392 3549 BBRM Group Elk Grove 2. Dhevan Pillay CA 95757 Strategic Key Customer Manager USA South Africa-Eskom (Tx Division) E-mail: [email protected] E-mail: [email protected] Tel (205) 992-5036 +27-(0) 12-421 4774 (t/n) Fax (205) 992-5465 +27-(0) 12-421 4721 (t/n) +27-(0) 866684921 (fax) 5. F. T Sparrow +27-(0) 12-421 4778 (fax) Brian Bowden Mobile: +27-(0) 82 4155 045 P. V. Preckel Z. Yu Herman Claassen D. J. Gotham Demand Side Management Energy Center at Discovery Park Distribution Division Purdue University 500 Central Drive West Lafayette Dr. Hammons is Chair of International Practices IN, 47907-2002 for Energy Development and Power Generation of USA IEEE, and Past Chair of United Kingdom and Republic E-mail: [email protected]. of Ireland (UKRI) Section IEEE. He received the IEEE Power Engineering Society 2003 Outstanding Large Chapter Award as Chair of the United Kingdom and PANEL SESSION CHAIRS Republic of Ireland Section Power Engineering Chapter (1994~2003) in 2004; and the IEEE Power Engineering Tom Hammons Society Energy Development and Power Generation Chair International Practices for Energy Development Award in Recognition of Distinguished Service to the and Power Generation Committee in 1996. He also received two higher University of Glasgow honorary Doctorates in Engineering. He is a Founder 11C Winton Drive Member of the International Universities Power Glasgow G12 0PZ Engineering Conference (UPEC) (Convener 1967). He UK is currently Permanent Secretary of UPEC. He is a E-mail: [email protected] registered European Engineer in the Federation of Tel: +44 141 339 7770 National Engineering Associations in Europe. Pat Naidoo Pat Naidoo (SM 06; Pr Eng; Co-Chair International Practices for Energy SMSAIEE RSA, MIET UK) is a Development and Power Generation registered professional engineer in Co-Chair IEEE Power and Energy Society South Africa, a graduate in POWERAFRICA Developments Electrical Engineering from the Chief Executive University of Durban Westville The Western Power Corridor Company (PTY) LTD (KwaZulu Natal) in South Africa, Private Bag 254 a postgraduate with an MBA from Gaborone Botswana Samford University, USA and a Tel: +267 392 3534/392 3542 PhD from the DaVinci Institute for Fax: +267 392 3549 Technology Management in association with Warwick E-mail [email protected]; University (UK). In 1994, Dr. Naidoo received the South [email protected] African Institute of Electrical Engineers Young Achievers Award. In 2006, he gained Senior Membership of his institute and he jointly co-chairs BIOGRAPHIES IEEE Power and Energy Society POWERAFRICA activities in Africa. Thomas James Hammons (F’96) Upon graduation in 1985, Dr Naidoo joined the received the degree of ACGI from Electricity Supply Commission of South Africa as an City and Guilds College, London, engineer in training. In 1988 he was registered as a U.K. and the B.Sc. degree in professional engineer and was appointed the Distribution Engineering (1st Class Honors), Regional Planning and Design Engineer. In 1989 he and the DIC, and Ph.D. degrees was appointed Senior Engineer to lead a newly created from Imperial College, London portfolio of Quality of Supply in the Regional University. He is a member of the Engineering Department. In, 1990 he was promoted to teaching faculty of the Faculty of Principle Engineer of Regional Engineering. In 1991 he Engineering, University of was transferred to the newly created national group of Glasgow, Scotland, U.K. Prior to this he was employed Transmission and later appointed as Chief Engineer in as an Engineer in the Systems Engineering Department the Operating and Maintenance Division. Here his work of Associated Electrical Industries, Manchester, UK. He covered the hands on operating and maintenance of the was Professor of Electrical and Computer Engineering at 22 000 km Eskom National Grid having voltages 765 McMaster University, Hamilton, Ontario, Canada in kV, 400 kV, 275 kV and 533 kV DC. In 1995, he was 1978-1979. He was a Visiting Professor at the Silesian promoted to Senior Manager in charge of the Operating Polytechnic University, Poland in 1978, a Visiting and Maintenance of the Kwa -Zulu Natal and Free State Professor at the Czechoslovakian Academy of Sciences, Area of the Eskom National Grid. Sterling business Prague in 1982, 1985 and 1988, and a Visiting Professor results were the order of the day. Some of the key at the Polytechnic University of Grenoble, France in customers included the deep underground gold mines, 1984.
Recommended publications
  • Regional Integration in Southern Africa: a Platform for Electricity
    Regional Integration in Southern Africa: A Platform for Electricity Sustainability Gaylor Montmasson-Clair1 ([email protected]) and Bhavna Deonarain2 ([email protected]) Trade & Industrial Policy Strategies (TIPS) Draft version submitted to the 3rd Annual Competition & Economic Regulation (ACER) Conference Dar es Salaam, Tanzania, 14-15 July 2017 RESEARCH CONDUCTED FOR THE UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT (UNCTAD) NOT FOR CITATION OR CIRCULATION 1 Gaylor Montmasson-Clair is a Senior Economist at Trade & Industrial Policy Strategies (TIPS), leading the institution’s work on Sustainable Growth. He holds a Master’s degree in International Affairs from the Institut d’Etudes Politiques (Sciences Po) of Grenoble, France as well as a Master’s degree in Energy and Environment Economics from the Grenoble Faculty of Economics, France. 2 Bhavna Deonarain is a Researcher in the Sustainable Growth team at Trade & Industrial Policy Strategies (TIPS). She holds a Master’s degree in Development and Governance from the University of Duisburg-Essen in Germany. Abstract The energy landscape in Southern Africa has been rapidly evolving over the last decades. An economy-wide transition to sustainability is underway, with energy at its core. In addition, a progressive movement of regional integration with numerous energy-related initiatives is taking place, principally through the Southern African Power Pool (SAPP). At the same time, electricity supply industries in the region are restructuring, with the emergence of independent power producers and increased individualism. These dynamics call for a renewed approach to regional electricity integration in support of sustainable energy development and a critical analysis of regional electricity dynamics with the aim of improving regional sustainability.
    [Show full text]
  • Africa's Power Infrastructure
    DIRECTIONS IN DEVELOPMENT Infrastructure Africa’s Power Infrastructure Investment, Integration, Efficiency Anton Eberhard Orvika Rosnes Maria Shkaratan Haakon Vennemo Africa’s Power Infrastructure Africa’s Power Infrastructure Investment, Integration, Efficiency Anton Eberhard Orvika Rosnes Maria Shkaratan Haakon Vennemo Vivien Foster and Cecilia Briceño-Garmendia, Series Editors © 2011 The International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org All rights reserved 1 2 3 4 14 13 12 11 This volume is a product of the staff of the International Bank for Reconstruction and Development/The World Bank. The findings, interpretations, and conclusions expressed in this volume do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The bound- aries, colors, denominations, and other information shown on any map in this work do not imply any judgement on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center Inc., 222 Rosewood Drive, Danvers, MA 01923, USA; telephone: 978-750-8400; fax: 978-750-4470; Internet: www.copyright.com.
    [Show full text]
  • The Inga Hydropower Projects and Related Electrification of African Households
    The Inga Hydropower Projects and related Electrification of African Households Baruti B. Amisi School of Built Environment and Development Studies University of KwaZulu-Natal, Durban, South Africa 3 March 2015 – University of Illinois at Urbana-Champaign Main Argument • Inga 1 and 2, and by extension IPHs, have the potential to improve the standard of living of Congolese households if managed professionally. However, in their current forms, they further impoverish and under-develop the same people that they were initially intended to assist in theory. This misappropriation of benefits reinforces the differences between the actual winners (local socio-economic and political elites and their allies) and the actual losers (the affected clans, ordinary Congolese citizens and SMMEs). 2 Outline of the presentation • Historical background of the Inga Hydropower Projects (IHPs) • Lessons from Inga 1 and 2 • Interpretations of IHPs from various stakeholders • Grand Inga and the development of Africa • Implications of Inga 1 and 2 experiences for the Power Africa Initiative 3 I. Historical background Geographic locations of IHPs 4 I. Historical background • Initial justification of IHPs – Supplying hydroelectricity to local households – Creating direct and indirect employment – Supporting local SMMEs and industrialisation – Development the DRC • IHPs – Inga 1 and 2 – Further developments of the Inga Falls as Grand Inga or Inga 4 through different phases • SICAI (Société Italo-Congolaise de Développement Industriel) recommendations suggest that: – Inga 1 and 2 should prioritise local market to industrialise the DRC; and thereafter explore the export market. 5 I. Historical background In practice, Inga 1 and 2 supply electricity to the SADC region and Mining in Katanga without transparency around the revenues.
    [Show full text]
  • Solar Thermal Generation: a Sustainable Intervention to Improve Sapp's Diminishing Generation Surplus Capacity
    SOLAR THERMAL GENERATION: A SUSTAINABLE INTERVENTION TO IMPROVE SAPP'S DIMINISHING GENERATION SURPLUS CAPACITY CS Kiravu1 and M Mpaesele-Motsumi2 1University of Botswana, Gaborone Botswana and 2Tshwane University of Technology Pretoria, South Africa ABSTRACT The threat of diminishing electricity generation surplus integrates electricity conservation through energy capacity within the Southern African Power Pool efficiency measures and Demand-Side Management (SAPP) is explained. The global discourse on the long- (DSM) programmes in their generation expansion term environmental impact and sustainability of portfolio. However, the choice for a suitable primary conventional energy sources is highlighted against the source of energy to generate electricity is not arbitrary. backdrop of the prospect and potential of Solar Thermal Power Generation (STG). The latter is In a carbon-constrained world, the primary energy source illustrated in terms of both a detailed discussion of for use in electricity generation is no longer dictated by various STG technologies suitable for the SAPP region economics alone. A choice of sustainable energy and an analysis of their attendant levelized costs of alternative ought to balance environmental, economic as energy (COE). Implications and conclusions are then well as technological concerns. This paper argues that drawn for the SAPP region. there is sufficient evidence in terms of proven and mature STG technology diffusion, acceptable economic indices, 1. INTRODUCTION and environmental correctness to warrant solar as the sustainable energy source of choice in circumventing The Southern African Power Pool (SAPP) is a consortium SAPP's diminishing generation surplus. In this paper of countries in Southern Africa represented by their electricity, a sub sector of the energy sector shall be used National Power Utility Companies, with a regional interchangeably to connote "energy" and vice versa.
    [Show full text]
  • Energy Security Master Plan : Electricity, 2007-2025
    ENERGY SECURITY MASTER PLAN - ELECTRICITY 2007- 2025 Department Of Minerals And Energy Energy Security Master Plan - Electricity Table of Contents EXECUTIVE SUMMARY SYNOPSIS .........................................................................................................3 1. INTRODUCTION ..............................................................................................................................6 2. GOVERNMENT POLICY AND OBJECTIVES..................................................................................6 3. HISTORICAL CONTEXT..................................................................................................................7 4. GOALS OF THE ELECTRICITY MASTERPLAN .............................................................................8 5. UNCERTAINTY AND THE VALUE OF FLEXIBILITY ......................................................................8 6. PLANNING ASSUMPTIONS ............................................................................................................9 7. ANALYSIS OF CURRENT SITUATION .........................................................................................13 7.1 ECONOMIC OUTLOOK........................................................................................................................ 13 7.2 GENERATION OUTLOOK.................................................................................................................... 14 7.3 TRANSMISSION OUTLOOK...............................................................................................................
    [Show full text]
  • Keith Gottschalk Is a Decisions and Choices
    THE JOURNAL OF THE HELEN SUZMAN FOUNDATION | ISSUE 77 | NOVEMBER 2015 The Case for Non- nuclear Power Options Intelligent persons, such as liberals supporting the Helen Suzman Foundation, often hold a range of views on complex issues, especially where more than one criterion is involved, and where some criteria may not be easily quantified. Newspaper editorials have criticized the Government’s abuse of secrecy – what democracy classifies its future electricity plans as secret? – as it proceeds with its programme to build six to nine extra atomic power reactors totalling 9600 MW of electricity. The reason for secrecy is defensive: these plans cannot stand up to scrutiny for economic rationality. This is one requirement for the constitutionality of state Keith Gottschalk is a decisions and choices. political scientist at the University of the Western Joseph Schumpeter’s famous phrase about capitalism and entrepreneurship acting as Cape. “perennial gales of creative destruction” reminds us that the cost-effective blend of power generation varies during each decade. From the 1990s, imported hydropower would have been South Africa’s cheapest electricity source. From the 2000s, imported gas could vie with imported hydropower. During the 2010s, solar power, both photovoltaic and concentrated solar power with storage, could start to be added to the cost-optimal mix. The tell-tale give-away of economic irrationality in the Government’s grim determination to rebuild PW Botha’s atomic industry is that it is utterly price inelastic: 9600 MW regardless of the supply-side revolution noted above. Gaps and Silences Public debate on security of electricity shows extraordinary gaps and silences.
    [Show full text]
  • Investigations Into the Upgrading of Transmission Lines from Hvac to Hvdc
    INVESTIGATIONS INTO THE UPGRADING OF TRANSMISSION LINES FROM HVAC TO HVDC by Pathmanathan Naidoo (BEng Electrical, MBA, PrEng SMIEEE, SMSAIEE, MIET) Student Registration Number: 861864146 A thesis submitted in fulfillment ofthe requirements for the degree of Master of Science in Electrical Engineering in the School ofElectrical, Electronic and Computer Engineering Faculty ofEngineering University ofKwaZulu-Natal South Africa Date ofSubmission: September 2007 Supervisors Professor N. M. Ijumba (PhD, PrEng, CEng) Or. D. Muftic (PrEng) The University of Kwa Zulu-Natal Abstract Emanating from the proceedings of CIGRE 2004, a new idea for higher power transmission by recycling and up rating high voltage alternating current transmission lines for high voltage direct current application was presented at the HYDC working group session. To date, there is no known application ofthe idea. Globally, transmission congestion, power transfer bottlenecks with restricted and limited power transfers and unobtainable servitudes challenge electric power utilities. The literature review shows that since the early sixties, several authors have studied this proposal. However, no applications were done. Admittedly, early HYDC technology was troubled by problems with multi-terminal designs, external insulation breakdown in the presence of DC stress and mercury valve rectifiers struggled with arc backs. To date, power electronic and external insulation technology has grown and matured for confident application both in point to point and multi-terminal application. The economic costs of introducing the DC technology are also more affordable given reducing prices due to higher volume of purchases. With promising developments in insulation and power electronic technology and driven by South Africa's surging growth in the consumption of electrical energy; the subject of upgrading HYAC transmission for HYDC application is revisited.
    [Show full text]
  • Africa Clean Energy Corridor: Analysis of Infrastructure for Renewable Power in Eastern and Southern Africa
    Analysis of Infrastructure for Renewable Power in Eastern and Southern Africa 1 Copyright © IRENA 2015 Unless otherwise indicated, material in this publication may be used freely, shared or reprinted, so long as IRENA is acknowledged as the source. About IRENA The International Renewable Energy Agency (IRENA) is an intergovernmental organisation that supports countries in their transition to a sustainable energy future, and serves as the principal platform for international cooperation, a centre of excellence, and a repository of policy, technology, resource and financial knowledge on renewable energy. IRENA promotes the widespread adoption and sustainable use of all forms of renewable energy, including bioenergy, geothermal, hydropower, ocean, solar and wind energy, in the pursuit of sustainable development, energy access, energy security and low-carbon economic growth and prosperity. www.irena.org Acknowledgement This study was financed and supervised by the International Renewable Energy Agency (IRENA). The support and active participation of stakeholders in the region is gratefully acknowledged, especially the secretariats of the Eastern Africa Power Pool (EAPP) and the Southern African Power Pool (SAPP) as well as the EAPP Independent Regulatory Board (IRB) and the Regional Electricity Regulators Association of Southern Africa (RERA). These organisations, along with government and utility officials in eastern and southern Africa, provided the bulk of the statistical information. For the review of this report, we would like to acknowledge Lawrence Musaba from the Southern African Power Pool, Crescent Mushwana from ESKOM South Africa, Sergio Moreno from CNELEC Mozambique, Lucky Nhlanhla Ngidi from National Energy Regulator of South Africa, Rojas Manyame and Foibe L. Namene from the Electricity Control Board of Namibia.
    [Show full text]
  • Infrastructure Investment Opportunities in Angola American Council of Engineering Companies Annual Conference
    Infrastructure Investment Opportunities in Angola American Council of Engineering Companies Annual Conference By: Hamilton Costa ANIP USA Resident Representative Washington DC - USA April 30th 2014 2 ANIP - Angolan National Private Investment Agency • ANIP is the only government entity responsible for the execution of the national policy on private investment, its promotion, coordination, evaluation, approval and supervision. • Founded in 2003 by Decree No. 44/03 of 4 July 2003. 3 Angola Geographical location data : West Coast of Southern Africa Area: 1,246,700 km² Maritime Frontier: 1,650 km (Atlantic Ocean) Land Frontier: 4,837 km (Democratic Republic of Congo, Zambia and Namibia) Climate: Tropical Average Temperature : 30ºC (max) 17ºC (min) Inhabitants: 20,900,000 (projection) Capital: Luanda (more than 5,000,000 inhabitants) Administrative Division: 18 Provinces Main Ports: Lobito, Luanda and Namibe 4 Angolan Economy: GDP Growth Rates • Between 2000-2010 GDP grew at an average of 11.25%. • Since 1994, per capita GDP has risen by 7x from US$ 591 to US$ 4,422 in 2010. 5 Macroeconomic Indicators 2010 2011 2012 2013 Premises of the Economic Policy: ° Annual oil production (million/bbl.) 696 605.9 657.3 673.5 ° Oil Price (USD/bbl.) 77.9 110.1 103.8 96 Goals of the Situation: ° General rate of growth of GDP % 3.4 3.9 8.1 5.6 ° Non- Petroleum GVA growth rate % 7.8 9.7 9.1 6.6 ° Petroleum GVA growth rate % -3 5.6 4.3 7.3% ° Annual inflation rate % 15.3 11.4 9.02 9% Fiscal (Percentage of GDP): ° Revenue 43.7 42.2 43.3 38.2 ° Expenditure 36.5
    [Show full text]
  • The Fantasy of the Grand Inga Hydroelectric Project on the River Congo
    water Article The Fantasy of the Grand Inga Hydroelectric Project on the River Congo Jeroen Warner *, Sarunas Jomantas, Eliot Jones, Md. Sazzad Ansari and Lotje de Vries Sociology of Development and Change, Social Sciences Group, Wageningen University, 6706KN Wageningen, The Netherlands; [email protected] (S.J.); [email protected] (E.J.); [email protected] (M.S.A.); [email protected] (L.d.V.) * Correspondence: [email protected] or [email protected] Received: 5 May 2018; Accepted: 3 January 2019; Published: 26 February 2019 Abstract: The Congo River is the deepest in the world and second-longest in Africa. Harnessing its full hydropower potential has been an ongoing development dream of the Democratic Republic of Congo (DRC) and its more powerful regional allies. If completed, the Grand Inga complex near Kinshasa, the capital of the DRC, will be the largest dam project in the world. Its eight separate dams (Inga 1–8) are envisioned to be “lighting up and powering Africa”. Opponents claim, however, that the rewards will be outsourced to corporate mining interests rather than meeting the needs of the local population, and that the project is flawed economically, socially and environmentally. The planned construction of the Inga dams and associated infrastructure has been stuck in limbo since it was mooted in the 1960s; a fantasy rather than a reality. This article attempts to analyse the rivalry underlying the Grand Inga scheme beyond the “pro” and “contra” reports. Embracing Lacanian psychoanalysis and triangulating multiple sources, we seek to unmask Grand Inga as a potent fantasy. Whilst exhibiting its purpose to serve as a screen to protect both proponents of and opponents to the dam from encountering their own self-deception, we conclude the scheme to be at its most powerful whilst the dream remains unfulfilled.
    [Show full text]
  • Republic of the Philippines
    Department of Energy and Water The Republic of Angola FINAL REPORT OF THE PREPARATORY SURVEY ON RURAL ELECTRIFICAITON DEVELOPMENT WORKS IN THE REPUBLIC OF ANGOLA December 2011 JAPAN INTERNATIONAL COOPERATION AGENCY NEWJEC Inc. A F D CR (3) 11-013 Final Report CONCLUSION AND RECOMMENDATION The Preparatory Survey on Rural Electrification Development Works in the Republic of Angola Conclusion and Recommendation Final Report CONCLUSION AND RECOMMENDATION This preparatory survey is planned from August 2010 to January 2012. This preparatory survey is The Preparatory Survey on Rural Electrification Development Works including Feasibility Study (FS) of Cutato HPS (Hydro Power Station). As the result of survey, Cutato HPS can be feasible to be executed from viewpoints of technology, economy and environment. Conclusion and Recommendation are shown below. Conclusion 1. Necessity and Expected Result of the Project (1) Necessity of the Project Maximum electricity supply has been increased more than 10% after termination of the civil war in 2002. In the year of 2008, installed capacity was 1,258 MW and maximum electricity supply was 4,050 GWh. The yearly electricity production, in 2008 has been rapidly increased by 23% from 2007. The average yearly electricity production from 2010 to 2016 is estimated 13%/year. Electric supply in Angola is almost restricted to urban areas. Rural electrification rate of villages is very low, 30.4% and more rural electrification is to be expanded. However, besides governmental electricity company of Angola (ENE: National Electricity Company), consumers have generation facilities by themselves around 900 MW to 1,200 MW and all of them are diesel generation facilities.
    [Show full text]
  • Dual Plenary Session I Electricity Access in Emerging and Developing Countries
    Dual Plenary Session I Electricity Access in Emerging and Developing Countries The case of Mozambique Monday, June 19th 11:15 a.m. - 12:30 p.m ELECTRICIDADE DE MOÇAMBIQUE, E.P. 1 com energia construimos futuro Rationale for Universal Access Mozambique has accepted the challenge to reach Universal Access in 2030 EDM has incorporated this challenge as one Key Strategic Objective No development can occur without electricity! Access was defined as “having electricity service of any kind” “The future is electric” ELECTRICIDADE DE MOÇAMBIQUE, E.P. 2 com energia construimos futuro Contents of the Presentation • Introducing Mozambique and EDM • Statistics of access • Challenges and Opportunities Question: can EDM, as an utility, meet the goal of sustainable access to all by 2030? ELECTRICIDADE DE MOÇAMBIQUE, E.P. 3 com energia construimos futuro Universal Access by 2030 Electrification of Districts finished in 2015 15 Districts Electrified 1977 2005 2007 2009 2010 2015 2012 154 district capitals, of which 147 connected Residential access in 2016: 26% 147 Districts Electrified To achieve universal access by 2030, EDM will need to connect between 300 and 400 thousand households per year, at a cost of approximately 500 USD per connection. EDM is targeting to reach 3.7 million new connections on-grid and 1 million new connections off-grid, through mobilization of development funding and through partnerships with the private sector for innovative supply solutions. ELECTRICIDADE DE MOÇAMBIQUE, E.P. 4 com energia construimos futuro Power Corridors link
    [Show full text]