Thurubaka Sand Reach Godavari River, Thurubaka Village, Dummugudem Mandal, Bhadradri Kothagudem District, Telangana State

Total Page:16

File Type:pdf, Size:1020Kb

Thurubaka Sand Reach Godavari River, Thurubaka Village, Dummugudem Mandal, Bhadradri Kothagudem District, Telangana State THURUBAKA SAND REACH GODAVARI RIVER, THURUBAKA VILLAGE, DUMMUGUDEM MANDAL, BHADRADRI KOTHAGUDEM DISTRICT, TELANGANA STATE PROPOSED SAND MINING AT GODAVARI RIVER - 24.2 ha SUBMITTED BY STUDIES AND DOCUMENTATION BY M/s. Telangana State Mineral Development TEAM Labs and Consultants Corporation Limited B-115, 116, 117 & 509, Annapurna Block, H. No. 6-2-915,4th Floor, Rear block, Aditya Enclave, Ameerpet, HMWSSB Premises, Khairathabad, Hyderabad-500 038 Hyderabad – 500 004 Phone: 040-23748 555/616, Telefax: 040-23748666 Email: [email protected] SUBMITTED TO STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, TELANGANA STATE GOVERNMENT OF INDIA Telangana State Mineral Development Corporation Limited Form-1 APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S. No. Item Details 1 Name of the Project/s Thurubaka Sand Reach, Godavari River by M/s. Telangana State Mineral Development Corporation Limited, Government of Telangana 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to Lease area is 24.20 Ha. be handled/command area/lease area/ (Sand mining – 242000 m3/annum). number of wells to be drilled Estimated cost of project Rs. 40 Lakhs 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc. -NA- 6 Category of Project i.e 'A' or 'B' B1 7 Does it attract the general condition? If yes, No please specify. 8 Does it attract the Specific condition? If yes, No please specify. 9 Location Plot/Survey/Khasra No. North Latitude East Longitude 17°45'44.77"N 80°52’47.04"E 17°45'41.74"N 80°52’38.33"E 17°45'16.04"N 80°52’52.86"E 17°45'20.07"N 80°53’01.26"E Village Thurubaka Village, Dummugudem Mandal, Tehsil Bhadradri Kothagudem District, Telangana District State State 10 Nearest railway station/airport along with Railway Station : Aswapuram-10.3 Km- distance in kms. NW Airport : Rajahmundry – 122 Km – SE. 11 Nearest Town, City, District Headquarters Town: Bhadrachalam-9.0km-SE along with distance in kms. District headquarter: Kothagudem- 34.5km-SW 12 Village Panchayats, Zilla Parishad, Municipal Village Panchayat: Thurubaka Corporation, Local body (complete postal Zilla Parishad: Bhadradri Kothagudem address with telephone nos. to be given) 13 Name of the Applicant M/s. Telangana State Mineral Development Corporation Limited 14 Registered Address H. No. 6-2-915, 4th Floor, Rear block, HMWSSB Premises, Khairathabad, F-1 Telangana State Mineral Development Corporation Limited Form-1 Hyderabad - 500004 15 Address for Correspondence: Name Smt. G. Deepthi Designation(Owner/Partner/CEO) General Manager (Sales & Marketing) Address M/s. Telangana State Mineral Development Corporation Limited H. No. 6-2-915,4th Floor, Rear block, HMWSSB Premises, Khairathabad, Hyderabad – 500 004 Pin Code 500 004 E-mail Email: [email protected] Telephone Number Phone: 040-23393184 Fax No. Fax: 040-23393184 16 Details of alternative Sites examined, if any. Village-District-State – Location of these sites should be shown on a -NA- Mining of mineral i.e. site specific. topo sheet. 17 Interlinked Projects -NA- 18 Whether separate application of interlinked No project has been submitted? 19 If yes, date of submission 20 If no, reason 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any Government Yes – In principle of sand reaches Order/Policy relevant/relating to the site? allotment order to M/s. TSMDC Ltd., by The Assistant Director of Mines and Geology, Bhadradri Kothagudem vide letter no. 1298/SAND/2016, dt. 23.07.2018. Mining Plan was approved by the Deputy Director of Mines and Geology, Warangal region vide lr. No. 117/MP- 2/KMM/2019, dt. 03.05.2019 23 Forest land involved (hectares) No 24 Whether there is any litigation pending No against the project and /or land in which the project is propose to be set up? (a) Name of the Court (b) Case No (c) Orders/directions of the Court, if any and its relevance with the proposed project. F-2 Telangana State Mineral Development Corporation Limited Form-1 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Yes/ Details thereof (with approximate No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in NO The applied quarry lease area is 24.20Ha land use, land cover or topography part of river bed covered with sand including increase in intensity of reaches. The quarrying shall be carried out land use (with respect to local land by suitable mechanized open excavation use plan) with manual method. 1.2 Clearance of existing land, vegetation YES The area applied for quarry lease is a sand and buildings? reach of river bed. Clearance from Ground water department is obtained. 1.3 Creation of new land uses? NO 1.4 Pre-construction investigations e.g. NO The applied area is sand reach part of river bore houses, soil testing? bed, no major construction involves. 1.5 Construction works? NO 1.6 Demolition works? NO 1.7 Temporary sites used for construction NO No major construction involves. works or housing of construction Temporary toilets, rest shelters shall be workers? provided to the workers. 1.8 Above ground buildings, structures or NO The proposed mining is for ordinary sand, earthworks including linear Reclamation of the excavated sand is a structures, cut and fill or excavations natural process as the flowing water during rainy days will fill the mined out pits. 1.9 Underground works including mining NO The quarrying shall be carried out by or tunneling? suitable mechanized open excavation manual method. 1.10 Reclamation works? NO The reclamation of the excavated sand will be a natural process as the flowing water during rainy days will fill the mined out pits. 1.11 Dredging? NO 1.12 Offshore structures? NO 1.13 Production and manufacturing YES Mining will be by manual opencast processes? method using suitable machinery. (Annexure I). 1.14 Facilities for storage of goods or No The mined out mineral will be transported materials? after mining. Hence, no storage of goods/material will be necessary. 1.15 Facilities for treatment or disposal of NO Proposed mining shall be carried out by solid waste or liquid effluents? suitable manual open excavation method. Ordinary sand produced from the mine F-3 Telangana State Mineral Development Corporation Limited Form-1 will be transported through tractors no solid waste is generated. 1.16 Facilities for long term housing of NO Local villagers shall be employed. operational workers? 1.17 New road, rail or sea traffic during NO The ordinary sand scooped from the sand construction or operation? reach will be transported through tractors by road to the user agency. 1.18 New road, rail, air waterborne or NO other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing NO transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or NO pipelines? 1.21 Impoundment, damming, culverting, NO realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? NO The proposed sand reach in part of Godavari River. 1.23 Abstraction or transfers of water form NO Water shall be drawn from local villages ground or surface waters? for the purpose of domestic use. 1.24 Changes in water bodies or the land NO surface affecting drainage or run-off? 1.25 Transport of personnel or materials YES Local villagers shall be employed for for construction, operation or mining. No Construction material/workers decommissioning? required. 1.26 Long-term dismantling or NO decommissioning or restoration works? 1.27 Ongoing activity during NO decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either NO temporarily or permanently? 1.29 Introduction of alien species? NO 1.30 Loss of native species or genetic NO diversity? 1.31 Any other actions? NO F-4 Telangana State Mineral Development Corporation Limited Form-1 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information/checklist Yes/No Details thereof (with approximate Confirmation quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or NO The applied area is a sand reach agricultural land (ha) located in the Godavari River. 2.2 Water (expected source & YES Total water required for the proposed competing users) unit: KLD quarry will be 12.2 KLD, which shall be drawn from local village RWS through tankers. (Annexure). 2.3 Minerals (MT) NO 2.4 Construction material– stone, NA aggregates, sand/soil(expected source- MT) 2.5 Forests and timber (source – MT) NO 2.6 Energy including electricity and NO The quarrying shall be carried out by fuels (source, competing users) suitable mechanized open excavation Unit: fuel (MT), energy (MW) manual method, energy like electricity and fuel is not required. 2.7 Any other natural resources (use NO appropriate standard units) 3. Use, storage, transport handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist confirmation Yes/ Details thereof (with approximate No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which NO There is no usage of Hazardous are hazardous (as per MSIHC rules) to substances or materials to human human health or the environment health or the environment.
Recommended publications
  • GRMB Annual Report 2018-19 | 59
    Government of India Ministry of Jal Shakti Department of Water Resources, River Development & Ganga Rejuvenation Godavari River Management Board GODAVARI RIVER Origin Brahmagiri near Trimbakeshwar, Nashik Dist., Maharashtra Geographical Area 9.50 % of Total Geographical Area of India Location Latitude – 16°19’ to 22°34’ North Longitude – 73°24’ to 83° 40’ East Boundaries West: Western Ghats North: Satmala hills, Ajanta range and the Mahadeo hills East: Eastern Ghats & Bay of Bengal South: Balaghat & Mahadeo ranges, stretching from eastern flank of Western Ghats & Anantgiri and other ranges of the hills. Ridges separate the Godavari basin from Krishna basin. Catchment Area 3,12,812 Sq.km. Length of the River 1465 km States Maharashtra, Madhya Pradesh, Chhattisgarh, Odisha, Karnataka, Telangana, Andhra Pradesh and Puducherry (Yanam). Length in AP & TS 772 km Major Tributaries Pravara, Manjira, Manair – Right side of River Purna, Pranhita, Indravati, Sabari – Left side of River Sub- basins Twelve (G1- G12) Select Dams/ Head works Gangapur Dam, Jayakwadi Dam, Srirama Sagar, Sripada across Main Godavari Yellampally, Kaleshwaram Projects (Medigadda, Annaram & Sundilla barrages), Dummugudem Anicut, Polavaram Dam (under construction), Dowleswaram Barrage. Hydro power stations Upper Indravati 600 MW Machkund 120 MW Balimela 510 MW Upper Sileru 240 MW Lower Sileru 460 MW Upper Kolab 320 MW Pench 160 MW Ghatghar pumped storage 250 MW Polavaram (under 960 MW construction) ANNUAL REPORT 2018-19 GODAVARI RIVER MANAGEMENT BOARD 5th Floor, Jalasoudha,
    [Show full text]
  • Chapter-3 Inter State Aspects
    Chapter-3 Inter State aspects 3.0 General The Godavari (Janampet) - Cauvery (Grand Anicut) link project is proposed to transfer unutilised waters of Indravati sub basin in Chhattisgarh, available at the proposed Janampet barrage across river Godavari to the water short areas in Godavari, Krishna, Gundlakamma, Pennar, Palar, Cauvery and other intermediate basins for augmentation of irrigation, domestic and industrial needs in Telangana, Andhra Pradesh. Tamil Nadu directly and Karnataka by substitution. The Godavari, Krishna, Pennar and Cauvery being inter-State rivers, it is necessary to look into the inter-State aspects of the link project in detail. State-wise breakup of the catchment areas of Godavari, Krishna, Pennar, Palar and Cauvery basins is given in Table 3.1. Table 3.1 State-wise break up of catchment area of Various basins. Sl. Basins State wise catchment area (Sq.km) No Maha Kar AP & Chhatti MP Odi Tamil Kera Pudu Total rashtra nataka Telan sgarh sha Nadu la cherr gana y 1. Godavari Basin (i) Whole basin 152199 4406 73201 33434 31821 17752 - - - 312813 (ii) Upto Sri Ram 72183 4406 15162 - - - - - - 91751 Sagar dam site (iii) Upto Incham 152199 4406 49092 29700 26168 7435 - - - 269000 palli dam site 2. Krishna Basin (i) Whole basin 69425 113271 76252 - - - - - - 258948 (ii) Upto 69425 113271 38009 - - - - - - 220705 Nagarjunasagar dam site 3. Pennar basin - (i) Whole basin - 6937 48276 - - - - - - 55213 (ii) Up to Somasila - 6937 43556 - - - - - - 50493 78 Detailed Project Report of Godavari (Janampet) – Cauvery Grand Anicut) link project dam site 4. Cauvery basin (i) Whole basin - 34273 - - - - 43867 2866 149 81155 (ii) Up to Grand - 34273 - - - - 36008 2866 - 73147 Anicut site Source: Water balance studies of NWDA 3.1 Godavari basin Godavari is the largest river in South India and the second largest in India.
    [Show full text]
  • Study on Backwater Effect Due to Polavaram Dam Project Under Different Return Periods
    water Article Study on Backwater Effect Due to Polavaram Dam Project under Different Return Periods Amarnath C R 1 and Shashidhar Thatikonda 2,* 1 Research Scholar, Department of Civil Engineering, Indian Institute of Technology Hyderabad, Kandi, Telangana 502285, India; [email protected] 2 Faculty, Department of Civil Engineering, Indian Institute of Technology Hyderabad, Kandi, Telangana 502285, India * Correspondence: [email protected] Received: 29 December 2019; Accepted: 18 February 2020; Published: 20 February 2020 Abstract: In this study, we present a scenario to evaluate the backwater impacts on upstream of the Polavaram dam during floods. For this purpose, annual peak discharges across the different gauge stations in river stretch considered for flood frequency analysis. Statistical analysis is carried out for discharge data to estimate probable flood discharge values for 1000 and 10,000 years return period along with 0.1 and 0.14 million m3/s discharge. Furthermore, the resulting flood discharge values are converted to water level forecasts using a steady and unsteady flow hydraulic model, such as HEC-RAS. The water surface elevation at Bhadrachalam river stations with and without dam was estimated for 1000 and 10,000 years discharge. Unsteady 2D flow simulations with and without the dam with full closure and partial closure modes of gate operation were analysed. The results showed that with half of the gates as open and all gates closed, water surface elevation of 62.34 m and 72.34 m was obtained at Bhadrachalam for 1000 and 10,000 years. The 2D unsteady flow simulations revealed that at improper gate operations, even with a flow of 0.1 million m3/s, water levels at Bhadrachalam town will be high enough to submerge built-up areas and nearby villages.
    [Show full text]
  • Division, Dummugudem Range
    PART – II (To be filled by the concerned Deputy Conservator of Forests) State Serial No. of proposal _FP/TG/WATER/18951/2016 7. Location of the Project / Scheme:- BCM (N) Division, Dummugudem Range. i. State / Union Territory : Telangana ii. District : Khammam iii. Forest Division/Range : Bhadrachalam (North) Division / Dummugudem Range. iv. Area of Forest land proposed for diversion (in Ha.): 3.111 Ha Stretch Width Sl. Length of Compt. Division Range Section Beat RF Extent No. in Mtrs stretch No. To From in cms 1 2 3 4 5 6 7 8 9 10 Dummugud Pedamdis 66 0.244 1 Danavaipeta Chintaguppa 3482.929 0.70 Bhadrachalam Tegada Tegada em ileru Chinthagup Dummugud Pedamdis 66 0.109 2 Bodanalli 1560.987 0.70 Bhadrachalam Tegada Tegada pa em ileru Dummugud Pedamdis 65 0.196 Bodanal 3 Bodanalli Karkatapadu 2798.404 0.70 Bhadrachalam em Bodanalli li ileru Bakkachintha Dummugud Parnasal Devarapa Pedamdis 65 0.234 4 Devarapalli 3343.518 0.70 Bhadrachalam lapadu em a lli ileru Dummugud 65 0.103 Bakkachintha Parnasal Devarapa Pedamdis 5 Devarapalli 1473.505 0.70 Bhadrachalam lapadu em a lly ileru Dummugud 65 0.125 Parnasal Devarapa Pedamdis 6 Sump -- -- -- Bhadrachalam em a lly ileru Dummugud 61 0.221 Mulkanapall Parnasal Mulkanap Mulkanap 7 Puligundala 3153.570 0.70 Bhadrachalam i em a alli alli Dummugud 60 0.020 Pedabandir Parnasal Mulkanap 8 Mulkanapalli 280.506 0.70 Bhadrachalam Parnasala ev em a alli Dummugud 60 0.125 Parnasal Mulkanap 9 Sump -- -- -- Bhadrachalam Parnasala em a alli Dummugud 64 0.148 Bodanal Pedamdis 10 Puligundala Kondavai 2116.770
    [Show full text]
  • Bhadradri Kothagudem
    BHADRADRI KOTHAGUDEM The Kothagudem district is formed from erstwhile Khammam district. The district boundaries with Bhoopalapalle, Mahabubabad and Khammam districts and the states of AP and Chattisgarh. The district comprises 23 mandals and 2 Revenue divisions Kothagudem and Bhadrachalam. The District headquarters is located at Kothagudem town. Bhadrachalam, a key town of pilgrimage importance, is located in Kothagudem district. The temple town of Bhadrachalam is situated on the banks of Godavari River. The town shares its historical significance with Ramayana Era. The name Bhadrachalam is derived from the word Bhadragiri (The Mountain Abode of Bhadra, the child of Meru and Menaka). The famous temple at Bhadrachalam is home to the Archa Murthys of Rama, Sita and Lakshmana and their idols are believed to be swayambhu i.e. self-manifested ones. We acknowledge the content from https://kothagudem.telangana.gov.in › district-profile As per Provisional population figures of 2011 Census, Demographic Label Value Area 7483 Sq Km Total Population 10,69,261 Literacy Rate 66.40% No. of Mandals 23 Revenue Villages 377 No. of Municipalities 4 Colleges / Universities Abdul Kalam Institute of Technological Sciences Vepalagadda, khammam, Kothagudem, Telangana 507131 Website Link : http://www.akits.ac.in/ Government Polytechnic College Rudrampur , Kothagudem, Kothagudem, Telangana 507119 Website Link : http://polytechnicts.cgg.gov.in/kothagudem.edu Kakatiya University, University College of Engineering University College of Engineering ,Kakatiya University
    [Show full text]
  • Flood Forecasting Appraisal Report G O D a V a R I Basin-201 8
    FOR OFFICIAL USE ONLY भारत सरकार / Government of India कᴂ द्रीय जल आयोग /Central Water Commission Rajahmundry Railway Bridge on river Godavari बा褼 पू셍ाानुमान मूल्ा車कन रिपो셍ा गोदा셍िी बेसिन-2018 Flood Forecasting Appraisal Report G o d a v a r i Basin-201 8 ननचली गोदा셍िी म車डल/ Lower Godavari Division गोदा셍िी परिम車डल/ Godavari Circle हैदिाबाद/ Hyderabad Index FOREWORD .......................................................................................................................................... i Chapter-1 ............................................................................................................................................... 1 River Godavari and its Flood Problem ................................................................................................ 1 1.1 Godavari River System ......................................................................................................... 1 1.2 Physiography of the Basin ................................................................................................... 2 1.3 Rainfall Pattern ..................................................................................................................... 3 1.4 Flood problem: ...................................................................................................................... 4 1.5 Importance of Flood Forecasting in Godavari Basin ......................................................... 5 Chapter-2 ..............................................................................................................................................
    [Show full text]
  • 1. Salient Features of East Godavari District
    District Survey Report - 2018 1. Salient Features of East Godavari District East Godavari District which is one of the largest and the most populous district in the state of Andhra Pradesh, was successively ruled by Mauryas, Sathavahanas, Vishnu Kundins, Eastern Chalukyas, Cholas, Kakatiyas, Musunuri Chieftains, Kondaveeti Reddy Kings, Gajapathis, Kutubshahis and then by the British. It was under the Raj. On April 15, 1925, East Godavari District was formed as per G.O.No.502. East Godavari is the richest district of the state, in terms of GDP. It is both the cultural and tourist hub of the state. East Godavari is a district in Coastal Andhra region of Andhra Pradesh, India. Its district headquarters is at Kakinada. As of Census 2011, it became the most populous district of the state. Rajahmundry and Kakinada are the two large cities in the Godavari districts in terms of population. The district of Rajahmundry (present name Rajamahendravaram) was reorganised in 1859 into two districts of Godavari and Krishna. Godavari District was further bifurcated into East and West Godavari districts in 1925. After Nov 1956, Andhra Pradesh was formed by combining parts of Naizam, Ceded and Circars. In 1959, the Bhadrachalam revenue division, consisting of Bhadrachalam and Naguru Taluqs (2 Taluqas in 1959 but later subdivided into Wajedu, Venkatapruram, Charla, Dummugudem, Bhadrachalam, Nellipaka, Chinturu, Kunavaram, and Vara Rama Chandra Puram mandals) of East Godavari district were merged into the Khammam district. After June 2014's reorganisation and division of Andhra Pradesh, the Mandals of Bhadrachalam (with the exception of Bhadrachalam Temple), Nellipaka, Chinturu, Kunavaram and Vara Rama Chandra Puram were re-added to East Godavari District.
    [Show full text]
  • Form-I Sita Rama Lift Irrigation Project, Phase-I, Telangana
    FORM-I SITA RAMA LIFT IRRIGATION PROJECT, PHASE-I, TELANGANA (I) Basic Information 1. Name of the project/s Sita Rama Lift Irrigation Project, Phase-I The present scheme proposes to withdraw water from Godavari River U/S of existing Dummugudem Anicut. The Dummugudem Anicut is located at Dummugudem Mandal in Bhadradri Kothagudem district at 17°52′26″ N and 80°53′6″ E. Project Background Prior to bifurcation of Andhra Pradesh, two project namely (i) Rajiv Dummugudem Lift Irrigation Scheme (ii) Indira Sagar Rudramakota Lift Irrigation Scheme were proposed in order to harness the irrigation potential of left out ayacut from existing irrigation schemes, which is about 6.5 Lakh Acres out of which about 2 Lakh Acres was proposed to be covered by Rajiv Dummugudem Lift Irrigation Scheme and 1.25 Lakh Acres was proposed to be covered by Indira Sagar Lift Irrigation Scheme. Even after execution of this scheme, about 2.55 Lakh Acres would still here remained to be covered by any future irrigation schemes. After bifurcation of Andhra Pradesh 7 Mandals of Khammam District were transferred to Andhra Pradesh and it was amalgamated in West Godavari District of Andhra Pradesh. In this process the intake structure of proposed Indira Sagar Lift Irrigation Scheme went into administrative boundary of Andhra Pradesh. Thus, there was a need for revision of the Indira Sagar Scheme in order to avoid administrative difficulties of O&M between the states of Andhra Pradesh and Telangana. In view of above, present Telangana Government decided not only to integrate earlier proposed Indira Sagar and Rajiv Sagar Lift Irrigation Scheme into one lift irrigation scheme but also cover the Gap Ayacut which was not covered under any present or future irrigation schemes.
    [Show full text]
  • Pola Avar Ram Dam M
    Polavaram Dam A Critical View On Ecological Governance Displace ment, Env ironmental Imp acts, For est R ights A n d A lte rnat ives 177 Nebsarai, IGNOU Road Environics Trust Near Shokeen Market, New Delhi – 110068 [email protected] Table of Contents PROLOGUE ............................................................................................................................................................ 1 PREFACE ................................................................................................................................................................ 2 EXECUTIVE SUMMARY ...................................................................................................................................... 3 I Godavari River and the Polavaram Dam ............................................................................................ 5 II. Godavari River Water Dispute and the Bachawat Award ........................................................... 10 III The Challenge of the Forest Clearance .............................................................................................. 14 IV. The Challenge of the Environmental Clearance ............................................................................. 18 V. Forest Rights Act ...................................................................................................................................... 22 VI. Safety of Dam and Alternatives ..........................................................................................................
    [Show full text]
  • Sita Rama Lift Irrigation Project, Phase-I, Telangana
    COMPREHENSIVE ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR SITA RAMA LIFT IRRIGATION PROJECT, PHASE-I, TELANGANA VOLUME-II DRAFT SIA REPORT WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector 18, Gurgaon - 122015, Haryana, INDIA Tel. 0124 2397396, Fax. 0124 2397392 Email: [email protected] JULY 2018 CONTENTS Irrigation and CAD Department, SIA Study for Sita Rama Lift Irrigation Project, Govt. of Telangana Phase-I, Telangana CONTENTS CHAPTER - 1 PROJECT DESCRIPTION 1.1 INTRODUCTION 1-1 1.2 LAND REQUIREMENT 1-3 1.3 PROJECT COST 1-4 1.4 OUTLINE OF THE REPORT 1-4 CHAPTER – 2 SOCIO-ECONOMIC BASELINE STATUS 2.1 GENERAL 2-1 2.2 PROFILE OF PAVs 2-1 CHAPTER – 3 IMPACTS DUE TO LAND ACQUISITION 3.1 GENERAL 3-1 3.2 IMPOVERISHMENT RISK ASSESSMENT (IRA) 3-1 CHAPTER – 4 IMPACTS DUE TO COMMAND AREA DEVELOPMENT 4.1 KEY IMPACTS 4-1 4.2 OTHER IMPACTS 4-2 CHAPTER-5 RESETTLEMENT AND REHABILITATION PLAN 5.1 INTRODUCTION 5-1 5.2 RESETTLEMENT AND REHABILITATION PLAN 5-4 5.3 MEASURES FOR REHABILITATION 5-5 CHAPTER-6 LOCAL AREA DEVELOPMENT PLAN 6.1 INTRODUCTION 6-1 6.2 LOCAL AREA DEVELOPMENT PLAN 6-1 6.3 BUDGET FOR LADP 6-4 CHAPTER-7 MONITORING AND EVALUATION 7.1 INTRODUCTION 7-1 i Irrigation and CAD Department, SIA Study for Sita Rama Lift Irrigation Project, Govt. of Telangana Phase-I, Telangana 7.2 INSTITUTIONAL/ADMINISTRATIVE ARRANGEMENT FOR IMPLEMENTATION OF R&R MEASURES 7-1 7.3 MONITORING AND EVALUATION 7-2 7.4 BUDGET 7-7 CHAPTER-8 COST ESTIMATES 8.1 COST FOR IMPLEMENTING MANAGEMENT PLAN FOR 8-1 SOCIAL ASPECTS ii CHAPTER-1 PROJECT DESCRIPTION Irrigation and CAD Department, SIA Study for Sita Rama Lift Irrigation Project, Govt.
    [Show full text]
  • Sita Rama Lift Irrigation Project, Phase-I
    SITA RAMA LIFT IRRIGATION PROJECT, PHASE-I WAPCOS LIMITED (International Consultant in water Resources Power and Infrastructure, Development) 76-C, Sector – 18, Institutional Area, Gurgaon, Haryana, India, Tele-fax : + 91-124-2399427 E-mail: [email protected] CONTENTS DETAILED PROJECT REPORT SITA RAMA LIFT IRRIGATION PROJECT (PHASE- I) SITA RAMA LIFT IRRIGATION PROJECT (DETAILED PROJECT REPORT) CONTENTS CHECK LIST SALIENT FEATURES CHAPTER 1 INTRODUCTION CHAPTER 2 PHYSICAL FEATURES CHAPTER 3 INTERSTATE ASPECTS CHAPTER 4 SURVEY AND INVESTIGATIONS CHAPTER 5 HYDROLOGY CHAPTER 6 HYDRO-GEOLOGY CHAPTER 7 DESIGN FEATURES & CRITERIA CHAPTER 8 RESERVOIR SIMULATION & DIVERSION CAPACITY CHAPTER 9 IRRIGATION PLANNING AND D&I REQUIREMENTS CHAPTER 10 COMMAND AREA CHAPTER 11 FLOOD CONTROL Contents ~ 1 ~ WAPCOS Limited DETAILED PROJECT REPORT SITA RAMA LIFT IRRIGATION PROJECT (PHASE- I) CHAPTER 12 DRAINAGE CHAPTER 13 POWER CHAPTER 14 NAVIGATION CONSTRUCTION PROGRAMME, MAN POWER & PLANT CHAPTER 15 PLANNING CHAPTER 16 FOREIGN EXCHANGE ELEMENT ENVIRONMENT & ECOLOGY AND SOCIO-ECONOMIC CHAPTER 17 ASPECTS CHAPTER 18 COST ESTIMATE CHAPTER 19 FINANCIAL RESOURCES BENEFIT COST RATIO, FINANCIAL RETURN & CHAPTER 20 INTERNAL RATE OF RETURN CHAPTER 21 REVENUES CHAPTER 22 FUTURE UTILIZATION OF BUILDINGS Contents ~ 2 ~ WAPCOS Limited SALIENT FEATURES DETAILED PROJECT REPORT SITA RAMA LIFT IRRIGATION PROJECT (PHASE-I) SALIENT FEATURES Sl. No. Particulars Details 1 Project Name Sita Rama Lift Irrigation Project (Phase – I), Telangana 2 Districts Benefitted Khammam, Bhadradri Kothagudem & Mahabubabad 3 State Telangana 4 Location Latitude 16° 45’ N - 18° 37’ N Longitude 79° 49’ E - 81° 48’ E 5 River Godavari River 6 Average Rainfall of the Project Area 1045 mm 7 Dummugudem Anicut a) River Godavari b) Village Dummugudem c) Tehsil/Block Dummugudem d) District Bhadradri- Kothagudem e) Location 17° 52′ 26″ N, 80° 53′ 6″ E.
    [Show full text]
  • Bhadradri Kothagudem District, Telangana State by Telangana State Mineral Development Corporation Limited, Government of Telangana
    NARSAPURAM SAND REACH GODAVARI RIVER, NARSAPURAM VILLAGE, DUMMUGUDEM MANDAL, BHADRADRI KOTHAGUDEM DISTRICT, TELANGANA STATE BY TELANGANA STATE MINERAL DEVELOPMENT CORPORATION LIMITED, GOVERNMENT OF TELANGANA EXECUTIVE SUMMARY Studies and Documentation By Submitted By TEAM Labs and Consultants M/s. Telangana State Mineral Development B-115 to 117 & 509, Annapurna Block, Corporation Limited House No. 6-2-915, 4th Floor, Rear block, Aditya Enclave, Ameerpet, HMWSSB premises, Khairathabad, Hyderabad-500 038 Hyderabad - 500004. Phone: 040-23748 555/616, 040-23323150 Telefax: 040-23748666 Email: [email protected] Email: [email protected] SUBMITTED TO TELANGANA STATE POLLUTION CONTROL BOARD, REGIONAL OFFICE, KOTHAGUDEM Narsapuram Sand Reach Summary and conclusion Chapter 11.0 SUMMARY AND CONCLUSION 11.1 Introduction Telangana State Mineral Development Corporation Limited obtained a mining lease for Narsapuram sand reach to extract ordinary sand mining by manual method over an extent of 24.20 Ha in Godavari river bed at Narsapuram Village, Dummugudem Mandal, Bhadradri Kothagudem District, Telangana State. Sand is considered as minor mineral and is mainly used for construction projects. In principle of sand reach, allotment order was obtained by M/s. TSMDC Ltd., by The Assistant Director of Mines and Geology, Bhadradri Kothagudem vide letter no. 1298/SAND/2016, dt. 16.08.2018. The mining plan was approved by the deputy director of mines and geology (DDMG), Warangal, Government of Telangana state, vide Letter No. 563/MP‐2/KMM/2020, dt. 04.03.2020 (Old mine Plan: 117/MP- 2/KMM/2019, dt. 27.03.2019) for a production capacity of Sand mining – 242000 m3/Annum. The Ministry of Environment, Forest and Climate Change (MoEFCC), Government of India (GOI) issued notifications vide SO 1533, dt.
    [Show full text]