Traffic Report from 04/10/2020 to 04/17/2020

Total Page:16

File Type:pdf, Size:1020Kb

Traffic Report from 04/10/2020 to 04/17/2020 THIS DOCUMENT INCLUDES FDOT SCHEDULED CONSTRUCTION-RELATED LANE CLOSURES ON STATE ROADS, FOR CORRIDORS TO/FROM AND IN MIAMI BEACH. FRIDAY, 04/10/2020 TO FRIDAY, 04/17/2020 SR 9A/I-95 FROM NW 29 ST TO NW 131 ST FIN #: 429300-3-52-01 & 429300-3-52-02 CONTRACTOR HAS COMPLETED ALL MAJOR CONCRETE REPLACEMENT OPERATIONS AND IS CURRENTLY WORKING ON SMOOTHING OUT THE NEW PAVEMENT, PLACING PERMANENT STRIPING AND GENERAL PUNCH LIST ITEMS LANE CLOSURES: • FRIDAY, APRIL 10 THROUGH SUNDAY, APRIL 12 - Up to four southbound I-95 general-purpose lanes will be closed from NW 79 Street to NW 29 Street on Friday and Saturday between the hours of 9 p.m. and noon, and on Sunday between the hours of 8 p.m. and 8 a.m. Two lanes will be closed at 9 p.m. and the remaining lanes will be closed at 10 p.m. • FRIDAY, APRIL 10 THROUGH SUNDAY, APRIL 12 - Up to four northbound I-95 general-purpose lanes from NW 29 Street to NW 81 Street will be closed on Friday and Saturday between the hours of 9 p.m. and noon, and on Sunday between the hours of 8 p.m. and 8 a.m. • SUNDAY, APRIL 12 - The southbound 95 Express Lanes will be closed from the Golden Glades Interchange to SR 112 on Sunday between the hours of 8 p.m. and 8 a.m. • MONDAY, APRIL 13 THROUGH THURSDAY, APRIL 16 - The northbound 95 Express Lanes will be closed from SR 112 to the Golden Glades Interchange between the hours of 8 p.m. and 8 a.m. • MONDAY, APRIL 13 THROUGH THURSDAY, APRIL 16 - Up to two southbound I-95 general- purpose lanes will be closed from NW 79 Street to NW 29 Street between the hours of 8 p.m. and 8 a.m. • MONDAY, APRIL 13 THROUGH THURSDAY, APRIL 16 - The southbound 95 Express Lanes will be closed from the Golden Glades Interchange to SR 112 between the hours of 8 p.m. and 8 a.m. DETOURS: • FRIDAY, APRIL 10 - The northbound I-95 ramps to westbound SR 112 and eastbound I-195 will be closed on Friday between the hours of 9 p.m. and noon. DETOUR: - Continue north on I-95 and exit at NW 62 Street - Turn left at NW 62 Street, then go south on I-95 to access the ramps to SR 112 and I-195 • FRIDAY, APRIL 10 - The eastbound SR 112 and westbound I-195 ramps to southbound I-95 will be closed between the hours of 9 p.m. and noon. DETOUR: - Continue north on I-95 and exit at NW 62 Street - Turn left at NW 62 Street to access the southbound I-95 ramp I-395MIAMI.COM/MIAMIBEACHTRAFFICREPORT Page 1 of 6 • SATURDAY, APRIL 11 - The eastbound SR 112 and westbound I-195 ramps to northbound I-95 will be closed on Friday and Saturday between the hours of 9 p.m. and noon. DETOUR: - Go south on I-95, exit at NW 8 Street, then turn left on NW 8 Street - Turn left on NW 3 Avenue to access I-95 north • FRIDAY, APRIL 10 - The NW 79 Street/NW 81 Street ramp to southbound I-95 will be closed on Friday between the hours of 9 p.m. and noon. DETOUR: - Go south on NW 7 Avenue - Turn left on NW 62 Street to access the southbound I-95 ramp • SATURDAY, APRIL 11 - The northbound I-95 exit ramp to NW 79 Street will be closed between the hours of 9 p.m. and noon. DETOUR: - Exit at NW 95 Street, make a left at NW 95 Street - Turn left at NW 7 Avenue to connect with NW 79 Street • SATURDAY, APRIL 11 - The southbound I-95 ramps to westbound SR 112 and eastbound I-195 will be closed on Saturday between the hours of 9 p.m. and noon. DETOUR: - Go south on I-95, exit at NW 8 Street, then turn left on NW 8 Street - Turn left on NW 3 Avenue to access I-95 north - Continue north on I-95 to access the SR 112 and I-195 ramp (Exit 4) • TUESDAY, APRIL 14 - The northbound I-95 exit ramp to NW 79 Street/NW 81 Street will be intermittently closed between the hours of 8 p.m. and 8 a.m. DETOUR: - Exit at NW 95 Street, make a left at NW 95 Street - Turn left at NW 7 Avenue to connect with NW 79 Street • TUESDAY, APRIL 14 AND WEDNESDAY, APRIL 15 - The eastbound SR 112 and westbound I-195 ramps to northbound I-95 will be closed between the hours of 8 p.m. and 8 a.m. DETOUR: - Go south on I-95, exit at NW 8 Street, then turn left on NW 8 Street - Turn left on NW 3 Avenue to access I-95 north • WEDNESDAY, APRIL 15 - The northbound I-95 ramps to westbound SR 112 and eastbound I-195 will be closed between the hours of 8 p.m. and 8 a.m. DETOUR: - Continue north on I-95 and exit at NW 62 Street - Turn left at NW 62 Street, then go south on I-95 to access the ramps to SR 112 and I-195 • THURSDAY, APRIL 16 - The southbound I-95 ramps to westbound SR 112 and eastbound I-195 will be closed between the hours of 8 p.m. and 8 a.m. DETOUR: - Go south on I-95, exit at NW 8 Street, then turn left on NW 8 Street - Turn left on NW 3 Avenue to access I-95 north - Continue north on I-95 to access the SR 112 and I-195 ramp (Exit 4) • THURSDAY, APRIL 16 - The eastbound SR 112 and westbound I-195 ramps to southbound I-95 will be closed between the hours of 8 p.m. and 8 a.m. DETOUR: - Continue north on I-95 and exit at NW 62 Street I-395MIAMI.COM/MIAMIBEACHTRAFFICREPORT Page 2 of 6 - Turn left at NW 62 Street to access the southbound I-95 ramp SR A1A/MACARTHUR CAUSEWAY EAST BRIDGE (BRIDGE NUMBER 870077) FROM TERMINAL ISLE TO ALTON ROAD FIN #: 436522-1-52-01 LANE CLOSURES: • Two eastbound or two westbound lanes may be closed be between 7 a.m. to 7 p.m. for substructure repairs. SR A1A/MACARTHUR CAUSEWAY AT SR 907/ALTON ROAD FIN #: 431635-1-52-01 LANE CLOSURES: • A partial lane closure of the eastbound MacArthur Causeway right turn lane onto southbound Alton Road will be necessary for one day from 9 a.m. to 3:30 p.m. along eastbound MacArthur Causeway when approaching Alton Road. This closure will allow crews to finalize the work. An exact date for this operation is pending to be determined. • A flashing beacon has been installed along eastbound MacArthur Causeway when approaching Alton Road. The flashing beacon activates and alerts drivers when the traffic signal located at Alton Road is red for eastbound MacArthur Causeway traffic. SR A1A/SR A1A/MACARTHUR CAUSEWAY AT FOUNTAIN STREET FIN #: 431635-1-52-01 LANE CLOSURES: • A temporary single lane closure will be necessary for one day from 9 a.m. to 3:30 p.m. along MacArthur Causeway when approaching Fountain Street. This closure will allow crews to finalize the work. The exact date for this operation is pending to be determined. • Flashing beacons are being installed along eastbound and westbound MacArthur Causeway when approaching Fountain Street. Once the project is complete, the flashing beacons activate and alert drivers when the traffic signal located at Fountain Street is red for eastbound and westbound MacArthur Causeway traffic. INDIAN CREEK DRIVE FLOODING MITIGATION PROJECT LANE CLOSURE • Indian Creek Drive continues to be closed to general traffic between 41 Street and 31 Street while the contractor installs underground drainage and rebuilds the roadway. Southbound traffic is being routed to Collins Avenue in this area. Collins Avenue has been modified to provide one northbound and one southbound travel lane. This traffic pattern is expected to last about one year. • One southbound lane on Indian Creek Drive is closed during daytime hours between 28 Street and 26 Street while the contractor performs drainage and sidewalk work. One lane will remain open at all times. A pedestrian detour will be set up as needed during the work. This work is expected to last several weeks. I-395MIAMI.COM/MIAMIBEACHTRAFFICREPORT Page 3 of 6 SR 934/NORMANDY DRIVE AT RUE GRANVILLE & FROM RUE VERSAILLES TO BAY DRIVE FIN #: 437916-1-52-01 & 437916-2-52-01 DETOURS: • Starting TUESDAY, MARCH 31, 2020 THROUGH JUNE 2020, the Florida Department of Transportation (FDOT) will be continuously closing the U-turn movement from eastbound 71 Street to westbound SR 934/Normandy Drive in order to perform the reconstruction of the new raised median. DETOUR: Motorists traveling on eastbound 71 Street will be detoured north on Bay Drive, west on Marseille Drive and south on Rue Versailles in order to access westbound SR 934/Normandy Drive. I-395 RECONSTRUCTION PROJECT FIN #: 251688-1-52-01, 423126-1-52-01, 423126-2-52-01, 429300-2-52-01 LANE CLOSURES: • FRIDAY, APRIL 10 AND SUNDAY, APRIL 12 THROUGH FRIDAY, APRIL 17 - Up to four lanes on southbound I-95 from NW 29 Street to NW 17 Street will be closed between the hours of 8 p.m. and 8 a.m. At 6 a.m., two lanes will be opened, and the remaining lanes will be opened at 8 am. • FRIDAY, APRIL 10 AND SUNDAY, APRIL 12 THROUGH FRIDAY, APRIL 17 - Up to three lanes on northbound I-95 from NW 8 Street to NW 29 Street will be closed between the hours of 8 p.m.
Recommended publications
  • AMR BRDIGITAL Chinese.Pdf
    㽁㷐▙㥳 㢭㲂 300 BISCAYNE BOULEVARD WAY ⿿≐イ 㱱G&G Business Developments⤇㙶⵺➂ 㽁㷐▙㥳 㢭㲂 300 BISCAYNE BOULEVARD WAY ⿿≐イ 㱱G&G Business Developments⤇㙶⵺➂ ⶪ㟫⍙㗰⏥⶙㾗㢜⵺➂㔈☨㽜㐵⒪㗰㔦タᮣ㲣⫉㐟㽜㐵⒪㗰㔦タᱨ㎫⏸ⶌ〉㩩║␋㮾⭆㱱⵺➂㔈㦢⿼⭨⫊Ⓒ㾂㑉㝗⤅☨᮶⟐⿨⹽▕㷦⒴᮷☾Ⱞ㺲㚱㮔㎳☨㢶⮔ 㑆≜よ㗁㮥㺸㊹㢭ᱨ ╚㵒よ㗁㮥㺸㮿㗯 㸊㸡☨よ㱝㱸㋶☳㨲⼵㲓▅㑉㦢㔋☨⻲⼋ᮣ ょ㝢㚴⛞㮾㣐㎮㣐ⲳ☨➝㖷⟁⡙㽥㣄わ☨㔶 ⫆ᱨ㸆㨗➝㖷⫊㦄✚㯁⮑ᱨ⫊㥨㺤㑩㢔ᮣ㮥 㗑⛑㑉☨㖨㙼㨾㖥ᮢ㮥⏩⪮⨄☨㱘㊮ᮢ㮥Ⱞ ⡮㑉㺣㔪☨㴵⿓ᮢ㮥㋁㥑㖺㸈ㅶᮢ㮥╌Ⱐ㑉 ⽃⻸㠰➕☨⟇Ⳃ᮪᮪☕㣄わ㈀㲞よ☨ⰰ㾗㖫ᱨ 㣄わ☨⡮⤵⌧╋⛑⏥㺌⏥ⴇ㺲㣄わ➂㦆㖺ⰻ 㱸⼹㮥➌Ⳃ㦣⧧㯌㯏ᮣ よ㗁㱨⧽☨ᱨⳟ㦡㎣㽂㨲㫖ᮢ㍱㨲╚㵒よ☨ ⤀Ⰷ㮥㬥ᮣ 㚳わ☨⏯⪂ᮢ㝢➶⧧⼵⡮╚㵒⼗ㅗ㮾⤜⼋☨ ⷅ㖺ⲽ㊹ᮣ ║㋨☨☒㔶 㥺タ☨⛢⻮ⲽ㔭㲓⪬⪥☨⺈㖱㵒ⳟ⼗≐㙱 ⛻ᮤ⿷⛃㵀㋽⒝ⰻ⛢㮥㣐✠☨㊹㺬ᮣ 1913ㅰ1㴨15㑓ᱨ⿨⏘㝎ᮤ⊎⡁㝎 (Robert Bamford)⧧⹁≨ㅠ✝ᮤ⿷⛃(Lionel Martin)╚⊚Bamford and Martin⤇㙶ᮣ㵀 ⿡⛺Henniker Mews㮥⢔⮈⾴☨⒝⭺⹽ᱨ 㮥⢔ザ⏥⶙㬀☨⤦㖼㱱╱⵺㋶ᮣ 㚳わ㮾㣐⶙㝪㝔☨㔤⭜㲓ⓞ⹮≼䏡☨㩂ㅢ⏠ ⫉⼗▙㺼☨㦛㦣ᱨ100✂ㅰ⨍㑉わ⛶╱㑒゜ ⼁⏥㮻ᮢ㑥Ⓗ㑥㾍ᮣ1914ㅰ⤇㙶⢚ッ㢜≐ 㙱⛻ᮤ⿷⛃(Aston Martin)ᮣ㸆㮥ⴈ⛊㗖☡ ⹁≨ㅠ✝ᮤ⿷⛃㵀㱊⥖⊅ⱄ⧔⤈⵴≐㙱⛻㓹 㓹☼㋽⒝㑺ᱤAston Hill Climbᱥ㺲⫉㖞☨㋶➂ᱨ 㱱╱⢚ッᱨ㴿⧩㗄⏥⥙ᮣⳌ㸝㮥㺓⛞⽃㝀㵀㣄わ ☨㫖㮤⹽ᮣ㽴⤇㙶⵺╚㮾⹂≐㙱⛻ᮤ⿷⛃ 㮻⒱㢜㮥⢔⍖㺠㩂㊹㈊⒱㢜㔙⪂☨㗐⤀㺨㾗ᮢ 㣐㲓⿡⌴☨よᮢㅗ㮾㺥㨳☨㩂ㅢ㲓⥖⭠㑺㖼 㑗㲦☨■ッ╰ᮣ ≐㙱⛻ᮤ⿷⛃☨ⲽ㚠 ⶄⶄ㣄わ☨㋽⒝ᱨㆀⳟㅢ㝛⪹☡㣄わ☨ⲽ㚠ᮣ ょ㮥⶜☨⭳㖵㝛㬕⛞㑁ㆀ㱨㔶ㅗ㠰ᮣ ㍿Ⲵᮢ㸕➼✚ⲽ㐵ᮢ㱨⧽㫱㺤㎒ⲽ㥨ᱷ㣄わ☨㋽⒝ 㑘⧩⍖㺠㩂☨㔤⭜ᮢ㽟㴣☨⤀㮿㲓㣐⶙㊧☴ ☨㾖⤀ᱨ⤎㟠▘㵒ㅗ㠰☨㎩⡮㝛㬕ᮣ 㽗㎳㠞よ ≐㙱⛻⿷⛃㑉㢜㣄わ☨㋽⒝㽂㑩⼗㔶 ツ⻲ᱨ㣄わ㮾╱㽴⧚ᱨ⌢⡮㸕➼ᮣ㵀▘ 㵒㐩㖺ⰻ㾎㱭よ㋽⒝☨⤎㟠㨳ㅴ☨㯧☠ 㥲ᱨ㣄わ⏥⛱㍰㨾ᮣ ょ⼊㋽⒝☨☒㔶⛞㑘㑩⼗㣄わ⛢㝎☨⭅ 㝛⭒ㅢᮢⳕⲿⶌ㬕☨⤀㮿㲓㥸ⱌ☨⭒㗯ᮣ 㣄わ☨㟹⛵㺤⻲㲂▘㋈⭞⛊☨㠞よ⍖㽜ᱨ ♂㵒⫆⻲㙼㔠㎒Ⓦ〄よ⡮☨ⲽ㽜⤀㮿ᮣ 㸆㺸㺖㽥ᱨ〉㔩㮜ⴊ㣐ⱊ㱸ᮣ ⺈㖱㱮ⳕᱨ㴿╚㢦⹂ Ⳬ㖺㣐㙣☨㔵㠯ᮢ㣐㲓⿡⌴☨⤀㮿ᮢ⤆⢙⮏㨾 ☨⍖㽜ᮣ㮥⢔✂㖺⭣㮾⹂ᱨ≐㙱⛻⿷⛃☨ッ 㽶㮻⒱㢜㋽⒝㔤⭜ⰻ⡽⒔☨■ッ╰ᱨ㮜㗁㐩㖺 ⰻ㾎⳱⍖㺠㩂⧧⍒㖰⛪☨ッ㊮ᮣょ㮥⼊㋽⒝ⴋ 㢜⛊㺨㔶␤☨╥㗐⤀㺨㾗ᱨ㷧㦄㱝㱸㸃☨⢔㩂ᮣ 㢜⼗㖯㦆⛶⿿≐イ㺲㨲300 Biscayne Boulevard Way☨㴞Ⳃᱨ≐㙱⛻⿷⛃㲓㻚 ッ☨⵺➂㔈G&G Business Developments ⤇㙶⧩㾗ᱨ⯿㚵☨║㖺㔤⭜㽊⪇㢜⛢㮥㣐✠☨ ➟␤㦞ㅅᮣ㮥㾙■⍙㽥⛇⭸㔙⪂㔶⫆ᮢ⛢㮥㣐 ✠☨⧚⪂▙㥳⯿≼☼✚㋲ᮣ ⤀㮿Ⰷ㨲⛢㴱 ᮰㵀㣄わ㸆☾㮥⢔㽁㷐⵺➂㦞ㅅ⹽ᱨ㽐㩌 ㅠ㗈㗖☡≐㙱⛻⿷⛃☨㋶➂ᱨ⏌ⶌ⿑⼗⿿≐ イ☨㑆▞㋺⨌ᮣ㣄わ☨㔤⭜⹻ㅴ⫑㲂よ㫓⭆ 㱭㺬㱫⏮ᱨ⮈☉ᮢ╥ⰴᮢ☧㝛✚㱭㫱ᮣょ㮥 ⢔㥨Ⱞ⧧⤀㮿⛞㔴㟬㽥≐㙱⛻⿷⛃☨ DNAᱨⲳ㦄㗠㗄≠㯇ᮣ㸆⛒⯼㻠㗁㢜㨮㔉 ㊹㺬⧧⤀㮿☨㑉ᮢ㢜㑆≜㱨⧽㖼㣡☨㑉✚▘ 㵒ᮣ᮱ MAREK REICHMAN 㺖㨾⡏㽼⏭⭼㗑㥟╚㯌⤵ ≐㙱⛻ᮤ⿷⛃ 㱨⧽☨㦏㝫ᱨ ⨄㢢☨㴞Ⳃ ⲽよ☨㔤⭜⛞㴚㲂㾎⮈☉☨ ㍦⌶⤐⪅ᱨ㚞㺐✚⹂☨⏯㗁㴤
    [Show full text]
  • ROAD CLOSURE ADVISORY SUNDAY, JANUARY 29Th, 2017 6 Am
    ROAD CLOSURE ADVISORY SUNDAY, JANUARY 29th, 2017 6 a.m. – 2 p.m. MIAMI, FL – The following road closures will take place around the city on Sunday, January 29th, 2017 for the 15th Annual Miami Marathon and Half Marathon produced by Life Time Fitness Athletic Events. The race will begin at 6:00 a.m. at the American Airlines Arena downtown and will proceed to Miami Beach via the MacArthur Causeway, up Ocean Drive, over the Venetian Causeway and as far south as Coconut Grove. All participants are completely off the of the course by 2:00 PM for the reopening of the roads, however, most of the roadways will be clear before then due to the rolling reopening procedures. Roads will be closed and managed by the City of Miami, Miami Beach and Miami Dade Police Departments. It is recommended that the Julia Tuttle Causeway be utilized for access to and from Miami Beach until 10:00 a.m. Street Direction From To Close Open Biscayne Blvd (Sat 1/28 - Sun 1/29) Northbound SE 4th Street E Flagler Street 8:00 AM 4:00 PM Biscayne Blvd (Sun 1/29) Northbound NE 5th Street NE 11th Terrace 12:00 AM 9:00 AM MacArthur Causeway Eastbound Biscayne Blvd Alton Rd/5th Street 5:00 AM 8:10 AM Alton Rd/5th/South Pointe Drive NB/SB 5th Street South Point Drive 5:00 AM 8:25 AM Ocean Drive NB/SB South Point Drive 15th Street 5:55 AM 8:25 AM Washington Ave NB/SB 7th Street 17th Street 6:00 AM 8:50 AM Pennsylvania Ave NB/SB 7th Street 8th Street 6:10 AM 9:00 AM 17th St Westbound Washington Ave Dade Blvd 6:10 AM 9:30 AM Dade Blvd Westbound West Ave Bridge Venetian Causeway
    [Show full text]
  • SMART Plan Rapid Transit Corridors Projects Update
    SMART Plan Rapid Transit Corridors Projects Update Prepared for: Miami Downtown Development Authority October 23, 2020 SMART Plan The SMART Plan will expand the existing fixed guideway system, comprised of a 25-mile Metrorail and downtown Metromover, with six rapid transit corridors that add over 70 miles of rapid transit network and link major local and regional activity centers A bold infrastructure program of projects • Significantly improve transportation mobility • Promote economic growth and job creation • Increase region’s international competitiveness TPO’s SMART Plan video: https://youtu.be/Sw8xKaHd4XI 2 In 2002, the County passed the referendum to collect a half-cent sales tax for transportation improvements Subsequently the County conducted corridor studies in order to pursue Federal and State Funding Due to the economic crisis in the late 2000s, the County paused studies to reconsider how to successfully implement rapid transit solutions In 2016, the Miami-Dade Transportation Planning Organization adopted the Strategic Miami Area Rapid Transit (SMART) Plan and initiated another round of studies for the six rapid transit corridors with cost-effectiveness as a factor to be evaluated Rapid Transit 6 Corridors Beach Corridor East-West Corridor Kendall Corridor North Corridor Northeast Corridor South Corridor South Corridor - Selection of Transit Mode • Bus Rapid Transit • Chosen as Locally Preferred Alternative by TPO on August 30, 2018 5 South Corridor - Timeline FTA Timeline ✓ July 2017 – FTA Class of Action ✓ BRT: NEPA Cleared ✓ August 2018 – TPO Selected BRT as the LPA ✓ October 2018 – Entered into FTA Small Starts Project Development ✓ August 2019 – Submitted FTA Small Starts Application requesting $99,999,999 ✓ February 2020 – Received Overall High Rating from FTA ✓ May 2020 – FTA Announced Funding Award ✓ Sept 2020 –FTA Grant Agreement Execution Procurement and Implementation Timeline ✓ Jun.
    [Show full text]
  • U.S. Coast Guard Units in FLORIDA
    U.S. Coast Guard Units in the State of Florida Seventh Coast Guard District Headquarters Office Tel: (305) 415-6670 909 S.E. First Avenue, Suite 944 Miami, FL Coast Guard Air Station Miami Tel: (305) 953-2100 14750 N.W. 44th Court Opa Locka Airport Opa Locka, FL 33054 Coast Guard Air Station Clearwater Tel: (727) 535-1437 15100 Rescue Way Clearwater, FL 33762-1437 Coast Guard Marine Safety Office / Marine Safety Unit Tampa Tel: (813) 228-2191 155 Columbia Drive Tampa, FL 33606-3598 Coast Guard Civil Engineering Unit Miami Tel: (305) 278-6700 15608 S.W. 117th Avenue Miami, FL 33177-1630 Coast Guard Helicopter Interdiction Tactical Squadron (HITRON) Jacksonville Tel: (904) 594-6800 6213 Aviation Avenue, Bldg. 1846 Jacksonville, FL 32221-8120 Coast Guard Station St. Petersburg Tel: (727) 824-7670 600 8th Avenue SE St. Petersburg, FL 33701-5099 Coast Guard Station Ft. Myers Beach Tel: (941) 463-5754 719 San Carlos Drive Fort Myers Beach, FL 33931-2221 1 S Coast Guard tation Ft. Pierce Tel: (561) 464-6100 900 Seaway Drive Fort Pierce, FL 34949-3039 Coast Guard Station Islamorada Tel: (305) 664-4404 183 Palermo Drive Islamorada, FL 33036-3317 Coast Guard Station Lake Worth Inlet Tel: (561) 840-8503 3300 Lakeshore Drive Riviera Beach, FL 33404-2406 Coast Guard Station Marathon Tel: (305) 743-1945 1800 Overseas Highway Marathon, FL 33050-2199 Coast Guard Station Ft. Lauderdale Tel: (954) 927-1611 P.O. BOX 537 Broward County Park 7000 N. Ocean Drive Dania, FL 33004-3079 Coast Guard Station Ponce De Leon Inlet Tel: (386) 428-9085 2999 North Peninsula Avenue New Smyrna Beach, FL 32169-2041 Coast Guard Station Port Canaveral Tel: (321) 853-7601 9235 Grouper Road Cape Canaveral, FL 32920-4402 Coast Guard Station Sand Key Tel: (727) 596-8540 1375 Gulf Boulevard Clearwater, FL 33767-2899 Coast Guard Station Key West Tel: (305) 292-8862 Building 101, Trumbo Point Key West, FL 33040-6695 2 Coast Guard Station Yankeetown Tel: (352) 447-6900 P.O.
    [Show full text]
  • Beach Corridor Preliminary Engineering Report
    Preliminary Engineering Report First Draft For the Beach Corridor Rapid Transit Project Project Development and Environment (PD&E) Study Prepared for: MIAMI-DADE DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Prepared by: Parsons Corporation January 2020 DRAFT Preliminary Engineering Report Beach Corridor Rapid Transit Project Table of Contents PROJECT SUMMARY ................................................................................ 7 1.1. INTRODUCTION ............................................................................................................................... 7 1.2. STUDY AREA .................................................................................................................................... 7 1.3. PURPOSE & NEED ........................................................................................................................... 8 1.4. PROJECT CORRIDOR AND SUB-AREAS ..................................................................................... 10 1.5. PROJECT HISTORY ....................................................................................................................... 10 1.6. COMMITMENTS .............................................................................................................................. 11 1.7. LIST OF TECHNICAL DOCUMENTS ............................................................................................. 12 EXISTING CONDITIONS & ENVIRONMENTAL CONSIDERATIONS .... 14 2.1. INTRODUCTION ............................................................................................................................
    [Show full text]
  • Metromover System Expansion Study Final Report
    Metromover System Expansion Study Final Report Work Order #GPC V-16 Metromover System Expansion Study Final Report Work Order #GPC V-16 Metromover System Expansion Study Final Report Work Order #GPC V-16 Metromover System Expansion Study Final Report Prepared for: Miami-Dade County Metropolitan Planning Organization Prepared by: Work Order # GPC V-16 September 2014 This Page Intentionally Left Blank Miami-Dade MPO Metromover System Expansion Study Table of Contents Table of Contents .................................................................................................................................................................................................i List of Figures ..................................................................................................................................................................................................... iv List of Tables ........................................................................................................................................................................................................ v List of Appendices ............................................................................................................................................................................................ vi 1.0 Introduction ............................................................................................................................................................................................. 1 1.1 Study Need ..................................................................................................................................................................................
    [Show full text]
  • Port Miami Tunnel
    PPG IdeaScapes ® Profiles PORTMIAMI TUNNEL MIAMI, FLORIDA Owner: Florida Department of Transportation Architect: AECOM, Miami Design Architect: ArquitectonicaGEO, Miami Contractor: Bouygues Civil Works Florida, Miami Structural Engineer: Wheaton and Sprague Engineering, Inc., Stow, Ohio PPG IdeaScapes Products: Duranar ® XL coatings and Duracron ® coatings Metal Fabricator: Metalwërks, Kennett Square, Pennsylvania Duranar XL and Duracron coatings by PPG were specified for use in the PortMiami Tunnel, South Florida’s newest landmark, because they combine bright color with exceptional resistance to abrasion, salt, humidity, car exhaust and fading. PROJECT BACKGROUND With an expected lifespan of 150 years, the PortMiami MacArthur Causeway on Watson Island, as well as Tunnel is designed not just to look good, but to do so for interstates 95 and 395. a long time. With the help of Duranar XL and Duracron While the project incorporates concrete entrance portals, coatings by PPG, the architect for this new South Florida U-walls, flood gates and landscaping, its signature design landmark believes it is destined to achieve both goals. element is a series of murals inside the tunnel that depict Opened in August 2014, the PortMiami Tunnel pairs the ocean life, including sea grass, turtles and sharks, that two 4,200-foot-long passageways that travel under resides just outside its walls. A network of 4,000 solid- Miami’s Biscayne Bay, connecting the port on Dodge aluminum plate panels painted with Duranar XL Crystal Island — known as both the “cruise capital of the world” Blue coatings provides the backdrop. and the “cargo gateway of the Americas” — to the PPG IdeaScapes ® Profiles PortMiami Tunnel Photos by Robin Hill © Christine Zavesky, an associate with ArquitectonicaGEO, said Duranar XL coatings, which are typically reserved for high-end storefronts and other monumental architectural applications, were chosen for this project, not just for their range of colors, but also for their proven track record of durability.
    [Show full text]
  • PRESS RELEASE Tonya Daniels, E-Mail: [email protected] Melissa Berthier, E-Mail: [email protected]
    City of Miami Beach, 1700 Convention Center Drive, Miami Beach, FL 33139, www.miamibeachfl.gov OFFICE OF MARKETING & COMMUNICATIONS, Tel: 305.673.7575 PRESS RELEASE Tonya Daniels, E-mail: [email protected] Melissa Berthier, E-mail: [email protected] FOR IMMEDIATE RELEASE March 21, 2021 City of Miami Beach Updates State of Emergency Relating to the High Impact Period – Eastbound Causeway Closures Move to 10 p.m. and Delivery Services May Continue Past Midnight – Miami Beach, FL – In response to the State of Emergency for the High Impact Period in the City of Miami Beach’s entertainment district, the Interim City Manager has implemented the following updated emergency measures, effective tonight through Monday, March 22 at 6 a.m. • Eastbound lanes on the MacArthur Causeway and Julia Tuttle Causeway shall be completely CLOSED to traffic from 10 p.m. through 6 a.m., except to City residents, guests of hotels in the City, and employees of business establishments in the City. • Eastbound lanes on the Venetian Causeway shall be completely CLOSED to traffic from 10 p.m. through 6 a.m., except to City residents. • Effective from 8 p.m. through 6 a.m. a curfew shall be imposed ONLY in the area bounded by 5 Street on the south, 16 Street on the north, Pennsylvania Avenue on the west, and Ocean Drive on the east (the “High Impact Zone”). Restaurants within the High Impact Zone shall be permitted to continue to operate for delivery services only. Pursuant to Section 26-33(a)(1) of the City Code, the curfew shall not apply to the provision of designated essential services, such as fire, police and hospital services, including the transportation of patients thereto, utility emergency repairs, emergency calls by physicians, and individuals making deliveries from restaurants.
    [Show full text]
  • November 23, 2020 888 Macarthur Causeway Miami, Fl 33132 Subject
    TRANSPORTATION AND PUBLIC WORKS Office of the Director Overtown Transit Village 701 N.W. 1st Court • 15th Floor miamidade.gov Miami, Florida 33136 Tel: 786-469-5675 Fax: 786-469-5587 November 23, 2020 Mr. Mert Oygut Via email: [email protected] Island Gardens Marina 888 MacArthur Causeway Miami, Fl 33132 Subject: Navigation Impacts to Island Gardens Marina Beach Corridor Rapid Transit Project – Bay Crossing CIP 153 Beach Corridor Phase III (SMART Plan) Miami-Dade County, Florida Dear Mr. Oygut: The Miami-Dade County Department of Transportation and Public Works (DTPW) is in the process of acquiring environmental permits for the Beach Corridor Rapid Transit Project – Bay Crossing. The project is part of the Strategic Miami Area Rapid Transit (SMART) Plan and proposes premium rapid transit service from Miami to Miami Beach. The purpose of this letter is to inform you of the proposed project and initiate discussion regarding impacts to the Island Gardens Marina during construction. The project consists of a separate, elevated transit guideway bridge approximately 10 to 15 feet south of the existing MacArthur Causeway west bridge over the Intracoastal Waterway. At the west bridge, 14 guideway bridge columns that align with the existing MacArthur Causeway bridge columns are proposed. Also, the fenders on the navigation channel will be extended southward to pass under the transit guideway bridge. There will be no impacts to the present available air draft as the clear vertical clearance from mean high water (MHW) to the bottom of the proposed bridge will meet US Coast Guard bridge criteria and, at a minimum, match the vertical clearances of the existing structure.
    [Show full text]
  • Biscayne Bay Aquatic Preserves Management Plan
    Biscayne Bay Aquatic Preserves Management Plan Biscayne Bay Aquatic Preserves 1277 NE 79th Street Causeway • Miami, FL 33138 305.795.3486 • www.dep.state.fl.us/coastal/sites/biscayne/ Florida Department of Environmental Protection Coastal and Aquatic Managed Areas 3900 Commonwealth Blvd., MS #235, Tallahassee, FL 32399 www.aquaticpreserves.org This publication funded in part through a grant agreement from the Florida Department of Environmental Protection, Florida Coastal Management Program by a grant provided by the Office of Ocean and Coastal Resource Management under the Coastal Zone Management Act of 1972, as amended, National Oceanic and Atmospheric Administration Award No. NA07NOS4190071- CZ823 NA11NOS4190077-CM227. The views, statements, finding, conclusions, and recommendations expressed herein are those of the author(s) and do not necessarily reflect the views of the State of Florida, National Oceanic and Atmospheric Administration, or any of its sub-agencies. February 2013 This tiny dwarf seahorse, no bigger than the size of the tip of a finger, is seen here effectively blending into his environment, along a bed of Laurencia sp., a macroalgae, and holding onto a blade of manatee grass. Biscayne Bay Aquatic Preserves Management Plan Includes: • Biscayne Bay Aquatic Preserve • Biscayne Bay - Cape Florida to Monroe County Line Aquatic Preserve Biscayne Bay Aquatic Preserves 1277 NE 79th Street Causeway • Miami, FL 33138 305.795.3486 • www.dep.state.fl.us/coastal/sites/biscayne/ Florida Department of Environmental Protection Coastal and Aquatic Managed Areas 3900 Commonwealth Blvd., MS #235, Tallahassee, FL 32399 www.aquaticpreserves.org The backdrop of the pristine and protected Bill Sadowski Critical Wildlife Area is the downtown Miami skyline.
    [Show full text]
  • 2030 Transportation Plan Brochure
    Miami-Dade Metropolitan Planning Transportation Plan Organization To The Year 2030 GET INVOLVED. Summer 2004 North Planning Our Transportation Future NN NORTH TRANSPORTATION PLANNING AREA Updating the Plan as BOUNDARIES AND CORRIDORS Miami-Dade County Grows The North Transportation The Miami-Dade County Metropolitan Planning Planning Area includes the Organization (MPO) is currently updating its portion of Miami-Dade Transportation Plan to the Year 2030. Proposed County south of the Broward/ highway, transit, bicycle, and pedestrian Miami-Dade County Line, improvements to meet the future travel demand east of NW 52nd Avenue and in Miami-Dade County are identified in the NW 37th Avenue (connected by Gratigny Parkway), Miami-Dade Transportation Plan. This Plan guides north of NW North River Drive/MacArthur Causeway, investments to upgrade the transportation system and west of Biscayne Bay. This area includes major to meet the projected travel demand for the next sections of the cities of Miami Gardens, Opa-Locka, twenty-five years. Miami, North Miami, North Miami Beach, Miami Shores, the Town of El Portal, and major neighbor- The county’s population is expected to exceed 3.0 hoods including Carol City, Norland, and Biscayne million and its employment base to surpass 1.5 Gardens. The North Area is traversed by several million by 2030. The resulting transportation needs are important corridors including I-95, Florida’s Turnpike, numerous. Travel demand is expected to increase SR-826/Palmetto Expressway, SR-9/27th Avenue, significantly over the next 26 years. The traffic that is US-1 Biscayne Boulevard, SR-934/79th Street, associated with this growth, as measured in total trips, SR-112/Airport Expressway, I-195/Julia Tuttle is projected to grow 32% in the North Transportation Causeway, Venetian Causeway, and I-395/US 41 Planning Area and 43% Countywide.
    [Show full text]
  • Sr-836/I-395/I-95
    community | safety | mobility | maintainability Bridge Package Related ATCs Related Bridge Package Signature and Approved APTEs, Approved Package, 2: Volume Aesthetic SR-836 I-95 I-95 SR-836/I-395 Southbound to SR-836 Westbound Southbound SR-836 to Reconstruction Pavement from West of NW 17th Avenue to Midtown Interchange (SR-836/I-395/I-95) Interchange Midtown to of NW 17th Avenue West from from West of I-95 to MacArthur of I-95 to Bridge Causeway West from Approved Signature Bridge Signature Approved FDOT DISTRICT 6 SR-836/I-395/I-95 Aesthetic Financial Projects Number(s): I-395 Reconstruction 251688-1-52-01 (F.A.P. 3951-501-1) I-95 Pavement Reconstruction 429300-2-52-01 (F.A.P. 0951-685-1) Volume 2: I-95 SB to SR-836 WB Connector 423126-2-52-01 MDX 423126-1-52-01 Approved Miami Dade Water & Sewer 251688-1-56-02 MDX Work Program Number: 83611 Signature Bridge Contract Number: E-6J53 Package, Approved APTEs, and Approved Signature Bridge Package Related ATCs Copy OPTION A - FOUNTAIN: spaced two feet apart along the entire length of each cable. These luminaires will have the effect of turning the volume of space within the arch into a field of interconnected, dynamic pixels.These pixels will allow for the creation of dynamic The Fountain concept was inspired by Miami’s world renowned status as the center of the Americas. Miami has been lighting effects that play across the plane of the hanger cables. Utilizing color, motion, white light and shadow, the cable influenced in its development and growth by various regions throughout the United States, the Carribean, as well as array lighting will create an illuminated visual plane across the cable array.
    [Show full text]