Format for Submission of Monthly Progress Report by the State of

Tamil Nadu

(Hon’ble NGT in the matter of OA No.673/2018 dated 06.12.2019)

November 2020

Sl. Progress report submitted by Enclosures No. department 1. Commissionerate of Municipal Enclosed vide Annexure –I Administration (CMA) 2. Director of Town Panchayat (DTP) Enclosed vide Annexure –II 3. Department of Panchayat Raj and Enclosed vide Annexure –III Rural Development (DRD&PR) 4. Public Works Department Enclosed vide Annexure –IV PWD&WRD 5. Pollution Control Board Enclosed vide Annexure –V

National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020) For the State of Tamil Nadu Month : November 2020 Overall status of the State: I. Total Population : 72.14 million Urban Population : 34.95 million Rural Population : 37.19 million II. a. Estimated Sewage Generation (MLD): 3673.3 MLD (STATE) b. Estimated Sewage Generation (MLD): 375.62 MLD (PRS) III. Details of Sewage Treatment Plant: S.No. Details of Sewage Treatment Plant State PRS 1 Existing No. of STPs and Treatment Capacity (in 69 & 12 & MLD) 1616.6 260.8 2 Capacity Utilization of existing STPs 918.9 116.8 3 MLD of sewage being treated through Alternate 737 1.56 technology 4 Gap in Treatment Capacity in MLD 1319.7 113.22 5 No. of Operational STPs 55 12 6 No. of Complying STPs 55 12 7 No. of Non-complying STPs - -

1. Details of each existing STP in the -CMWSSB

No. Location Existing Capacity Operational Compliance Status of STP STP Being Status Capacity Utilized of STP 1 Nesapakkam 23 10.66 Operational Complied STP Zone - IV Parameters Range 2 Koyambedu 34 30.02 Operational pH – 6.5 to 8.5 STP Zone - III BOD < 20 mg/l 3 Kodungaiyur 80 68.04 Operational COD < 250 mg/l STP Zone II TSS - < 30 mg/l 4 Kodungaiyur 80 69.66 Operational Faecal Coliform – 1000MPN/100 ml. STP Zone I 5 Perungudi STP 12 10.45 Operational Zone - V

1

Koyambedu 25.38 Operational 6 60 STP Zone - III Kodungaiyur 94.60 Operational 7 110 STP Zone I& II Nesapakkam 34.09 Operational 8 40 STP Zone - IV Perungudi STP 60.34 Operational 9 54 Zone - V Perungudi STP 46.24 Operational 10 60 Zone – V Nesapakkam 52.02 Operational 11 54 STP Zone - IV Koyambedu 60.62 Operational 12 120 STP Zone – III Sholinganallur 5 13 18 Operational STP Total 745 567.10 Details of each existing STP in the State & PRS -CMA

Capacity Existing being Compliance Capacity of Utilized Operational Status of S. No Location STP ( MLD) ( MLD) Status of STP STP 70.00 35.00 Operational Complied 1 60.00 5.00 Operational Complied 2 10.28 7.50 Operational Complied 3 13.65 3.00 Operational Complied 1 STP (4MLD) - Completed 36 MLD under To be 4 4.00 2.50 progress Complied

170.70 (45.70 + 5 38.00 Operational Complied 125.00)

6 28.05 14.15 Under Renovation Complied 7 15.00 7.50 Operational Complied 8 12.25 6.00 Operational Complied 9 14.50 13.50 Operational Complied Maraimalai 10 Nagar 2.20 1.80 Operational Complied (CMWSSB STP 11 Pallavapuram 115@Perungudi) Operational Complied

2

12 6.20 3.60 Operational Complied Chidambara 13 m 9.44 2.10 Operational Complied Thiruvannam 14 alai 8.70 4.50 Operational Complied - 15 2Nos 12.50 8.60 Operational Complied 16 11.04 2.00 Under trial Complied 17 Thirupathur 11.43 0.50 Under trial Complied Bodinayakka 18 nur 12.08 4.00 Operational Complied 19 3.99 3.72 Operational Complied 20 5.47 5.47 Operational Complied Ramanathpur 21 am 7.00 5.80 Operational Complied Theni- 22 Allinagaram 12.05 6.50 Operational Complied 23 4.86 3.50 Operational Complied 24 15.00 6.50 Operational Complied 25 12.34 7.80 Operational Complied 26 5.00 5.00 Operational Complied STP-1 9.63 4.50 Operational Complied Nagapattinam 27 STP-2 2.69 0.40 Operational Complied 28 Tiruvarur 6.92 4.10 Operational Complied 29 4.16 1.00 Operational Complied 30 10.62 4.00 Operational Complied 31 4.20 3.60 Operational Complied Udhagamand 32 alam 5.00 4.00 Operational Complied 33 Udumalaipet 7.81 3.50 Operational Complied 34 7.65 3.70 Operational Complied PRS (12 Nos) 35 58.00 58.00 Operational Complied Salem - Vellakuttai STP 13.00 7.00 Operational Complied Salem - 36 Anaimedu STP 6.00 3.00 Operational Complied Salem - Mankuttai STP 35.00 1.00 Operational Complied

3

Salem - Completed & Power 44.00 - connection to be - Vandipattai STP obtained 37 24.20 8.50 Operational Complied 38 50.55 18.50 Operational Complied STP-1 0.82 0.38 Operational Complied Mettur STP-2 0.92 0.19 Operational Complied 39 Mettur STP-3 5.45 2.40 Operational Complied 40 17.00 12.00 Operational Complied 41 5.85 5.85 Operational Complied Total 49 nos 857.20 344.26 2. Details of each existing STP in the State-DTP No. Location Existing STP Capacity Operational Compliance Capacity Being Status Status of STP (MLD) Utilized of STP (MLD) 1 Mamallapuram TP 2.34 1.00 Operational Complied

2 Orathanadu TP 2.30 1.30 Operational Complied

3 Thiruchendur TP 3.90 1.40 Operational Trial Run

4 Palanichettypatti TP 2.80 2.80 Operational Trial Run

5 Thirumazisai TP 3.00 1.00 Operational Complied

Septage Management 6 Karunguzhi 0.024 0.024 Operational 7 Periyanaikanpalayam 0.03 0.03 Operational Total 14.394 7.554 1. Details of under construction STPs in Chennai-CMWSSB No. Location Capacity of the Physical Status of I&D or Completion plant in MLD Progress in House sewer Timeline % connections 1 Sholinganallur 54 80 Dec 2020 STP 2 Thiruvottriyur 31 100 STP 3 Kodungaiyur STP 120 31 Feb 2022 Zone - I Kodungaiyur STP Feb 2022 4 120 33 Zone - II 5 Nesapakkam STP 50 28 Feb 2022

4

Zone - IV Perungudi STP Feb 2022 6 60 22 Zone - V Nesapakkam Mar 2021 7 10 65.57 TTUF 8 Perungudi TTUF 10 51.15 Mar 2021 9 CRRT – Modular STP’s at various 15 location Total 470 2. Details of under construction STPs in the State & PRS(CMA) Status of Capacity Physical I&D or of the S.No Location Progress House Completion Timeline plant in in % sewer MLD connections Alternate site to be identified & it will be 1 16.71 - - completed on Oct’22.

2 Avadi 36.00 80% - March-21 Coimbatore - Nanjudapuram 40.00 70% - Feb-21 3 Coimbatore – Kuruchi & 30.53 23% - Jan-22 4 16.00 70% - March-21 5 17.66 90% - Dec-20

6 11.25 83% - Dec-20 Work order issued & Design under scrutiny & it will be completed on 7 21.85 - - Dec’21. 8 Rameshwaram 4.08 35% - Dec’21 Collection system will be 9 6.96 100% - Completed on Dec’20

10 Saththur 4.65 67% - March-21 11 30.00 96% 3930 December’20 12 Tiruppur (3nos) 70.00 30% - March-22 13 Tuticorin 28.00 45% - March-21 March-21

14 Vellore 50.00 39% - PRS (4 Nos)

5

Status of Capacity Physical I&D or of the S.No Location Progress House Completion Timeline plant in in % sewer MLD connections

15 Trichirapalli-STP1 30.00 52% - July-21

Trichirapalli-STP2 37.00 35% - Aug-21 16 Sathiyamangalam 4.08 99% - Dec’20 17 Mettupalayam 8.65 82% - June- 21

Total (21 nos) 463.42

3. Details of under construction STPs in the State-DTP No. Location Capacity of Physical Status of I&D Completion the plant in Progress in % or House sewer Timeline MLD connections 1 Ulunderpettai TP 3.15 99% completed 6176 Dec-20

Work in 2 Sriperumbudur TP 8.50 80% completed 5028 progress

March-21 3 TP 2.33 100% completed 1355 Dec-20

4 Thiruporur TP 4.02 63% completed 3302 Mar-21 5 Ponneri TP 6.52 30% completed 1132 Mar-21

6 Manachanallur TP 3652 6.41 95% completed Dec-20 7 S.Kannanur TP 2320

8 Vallam TP 2.35 97% completed 2967 Jan-21

9 Perundurai TP 3.14 92% completed 3503 Jan-21

10 Melachokanathapuram TP 2.00 45% completed 1760 May-21

Total 38.42 31195 Septage Management 11 Mudukulathur TP 0.015 70 % completed - Dec-20 12 Jalakandapuram TP 0.015 75% completed - Dec-20 13 Pennagaram TP 0.015 20% completed - Dec-20

6

No. Location Capacity of Physical Status of I&D Completion the plant in Progress in % or House sewer Timeline MLD connections 14 Kaveripattinam TP 0.015 62% completed - Dec-20 15 Chengam TP 0.020 85% completed - Dec-20 16 Kurumbalur TP 0.010 50% completed - Dec-20 17 Pennadam TP 0.010 25% completed - Mar-21 18 Alangayam TP 0.015 50% completed - Jan-21 Total 0.115

1a.Details of proposed FSTPs in the State & PRS-CMA 49 Nos. of FSTPs are proposed & various stages of implementation. In which 5 Nos. of FSTPs falls under polluted river stretches (Cauvery- 1, Vasista -1, Sarabanga – 1 & Thamirabarani – 2.)

S.No Progress Number of FSTPs 1 Completed 5 2 Nearing completion 1 3 Intermediate / Advanced stage 20 4 Initial stage/ Preparatory Stage 19 5 Tendering stage DPR 4 Total 49

1b.Details of proposed 2 STPs in the State & PRS-CMA No. Location Capacity of the Status of Project (at Likely Date of STP proposed DPR Stage/ Under Completion in MLD Tendering/ Work to be Awarded) 1 Sathiyamangalam 1.13 DPR Prepared - 2 Tirunelveli 34.00 Under DPR stage -

2a. Details of proposed STPs in the State-DTP No. Location Capacity of Status of Project (at DPR Stage/ Under Likely Date the STP Tendering/ Work to be Awarded) of proposed in Completion MLD 1 Mangadu DPR stage-Comprehensive UGSS in cluster A with Mangadu Town Panchayat and 12 Village Town Panchayat

7

2 Chitlapakkam Detailed project Report prepared under TNUISFL for cluster basis with 13 local bodies(Fund assistance from Project Development Grant Fund) 3 Madampakkam Detailed project Report prepared under TNUISFL for Sembakkam cluster basis with 13 local bodies(Fund assistance from Project Development Grant Fund) 4 Peerkankaranai DPR is to be prepared through TNUISFL on cluster basis 5 Perungalathur DPR is to be prepared through TNUISFL on cluster basis 6 Thiruneermalai DPR is to be prepared through TNUISSL on cluster basis

2b. Details of proposed STPs/FSTPs in the PRS-(DTP)

Treatm ent Technol STP/ Status Status ogy Status of Designa FSTPs of of along S. Name of the STP/F DPR ted capaci DPR award with Remarks STP Preparatio nodal No ULB ty in appro of firm n Agency MLD val tender complet ion timeline s The DPR is under preparation 1 Musiri TP - - DPR Stage - - PWD - by WAPCOS/ PWD. Sirugamani PWD 2 - - DPR Stage - - - “ TP 3 Mohanur TP - - DPR Stage - - PWD - “ 4 Velur TP - - DPR Stage - - PWD - “ Punjai Pugalur PWD 5 - - DPR Stage - - - “ TP Bhavani sagar PWD 6 - - DPR Stage - - - “ TP 7 TP - - DPR Stage - - PWD - “ Madathukula PWD “ 8 - - DPR Stage - - - m TP 9 Omalur TP - - DPR Stage - - PWD - “

8

M/s. TWIC has been appointed as consultant Poallampatty for preparation 10 - - DPR Stage - - DTP - of DPR. The TP DPR will be expected to be ready by 31.12.2020 Pethanaickenp DTP “ 11 - - DPR Stage - - - alayam TP 12 Yethapur TP - - DPR Stage - - DTP - “ 13 Belur TP - - DPR Stage - - DTP - “ Srivaikundam DTP “ 14 - - DPR Stage - - - TP 15 Authoor TP - - DPR Stage - - DTP - “ 16 Eral TP - - DPR Stage - - DTP - “ Alwarthirunag DTP “ 17 - - DPR Stage - - - ari TP Then DTP “ 18 - - DPR Stage - - - Thiruperai TP Arumuganeri DTP “ 19 - - DPR Stage - - - TP 20 Mukkudal TP - - DPR Stage - - DTP - “ Gopalasamudr DTP “ 21 - - DPR Stage - - - am TP Kallidaikurich DTP “ 22 - - DPR Stage - - - i TP Cheranmahad DTP “ 23 - - DPR Stage - - - evi TP Veeravanallur DTP “ 24 - - DPR Stage - - - TP Patthamadai DTP “ 25 - - DPR Stage - - - TP Mela Seval DTP “ 26 - - DPR Stage - - - TP PWD The DPR is under 27 Kuthalam TP - - DPR Stage - - - preparation by WAPCOS/ PWD. Thirukattupall PWD “ 28 - - DPR Stage - - - i TP Thiruvaiyaru PWD “ 29 - - DPR Stage - - - TP IV. Details of Industrial Pollution-TNPCB: No. Details of Industries State PRS

1. No. of industries in the State: 46,401 7381 2. No. of water polluting industries in the 11,445 1770

9

State: 3. Quantity of effluent generated from the 2835.7 452.696 industries in MLD: 4. Quantity of Hazardous Sludge 929250 MT/A (2019- - generated from the Industries in TPD: 20) 5. No. of industrial units having ETPs: 11,445 1770 6. No. of industrial units connected to 1497 Nil CETP: 7. No. and total capacity of ETPs (details - - of existing/ under construction / proposed) 8. Compliance status of the ETPs: 11,445 Industrial 1770 Industrial units having units having ZLD and ZLD and there is no there is no discharge discharge into the water into the water bodies bodies 9. Number and total capacity of CETPs Existing – 36, (details of existing/ under construction Capacity -87350 KLD / proposed) Proposed – 10 Proposed – 10, Capacity 41 MLD Capacity 41 MLD 10 Status of compliance and operation of Details furnished below the CETPs 10a. Status of compliance and operation of the CETPs in the State-TNPCB S.No. Town No. of No. of Industrial Status of ETPs Status of CETPs industries industrial Discharge (existing, under units (KLD) construction & connected to proposed) CETP. 1 Trichy 1 7 201.4 Complied - 2 Dindigul 1 49 1517 Complied - 3 Perundurai 1 14 1000 Complied - 4 Ambur 1 49 1150 Complied - 5 Ambur 1 17 330 Complied - 6 Peranambut 1 36 600 Complied - 7 1 110 2000 Complied - 8 1 82 3600 Complied -

10

9 Ranipet 1 79 1875 Complied - 10 Ranipet 1 40 700 Complied - 11 1 36 600 Complied - 12 1 15 400 Complied - 13 1 144 3000 Not Complied - 14 Sivagangai 1 48 49.6 Not Complied - 15 Ambattur 1 211 200 Not Complied - 16 Tiruppur 1 75 7000 Complied - 17 Tiruppur 1 6 180 Complied - 18 Tiruppur 1 29 3555 Complied - 19 Tiruppur 1 12 3520 Complied - 20 Tiruppur 1 18 2750 Complied - 21 Tiruppur 1 60 4785 Complied - 22 Tiruppur 1 28 3748 Complied - 23 Tiruppur 1 69 10758 Complied - 24 Tiruppur 1 4 2250 Complied - 25 Tiruppur 1 17 4950 Complied - 26 Tiruppur 1 23 4500 Complied - 27 Tiruppur 1 12 2700 Complied - 28 Tiruppur 1 8 165 Complied - 29 Tiruppur 1 15 2750 Complied - 30 Tiruppur 1 15 2485 Complied - 31 Tiruppur 1 19 4500 Complied - 32 Tiruppur 1 25 3150 Complied - 33 Tiruppur 1 9 1350 Complied - 34 Perundurai 1 14 2681 Complied - 35 Kanchipuram 1 62 1500 Not Complied - Under closure 36 1 40 850 Complied - Total 36 1497 87350

11

10b. Details of CETP under construction/tendering/proposed in the PRS-TNPCB

S.No. Town Name of CETPs CETP Whether CETP Status (DPR/ Capacity Complyi Proposed, if tendering/ (MLD) ng or not any under construction etc.) 01. Perundurai Sree Bhavani Dyeing Cluster 4 - Proposed CTE issued upto Development Limited, 31.03.2024 Perundurai Taluk, Erode District 02. Perundurai Kadayampatti Common Effluent 6.25 - Proposed CTE issued upto Treatment Plant Bhavani Private 31.03.2024 Limited, Perundurai Taluk, Erode District 03. Perundurai Kadayampatti Common Reject 1.75 - Proposed CTE issued upto Management Systems Private 31.03.2024 Limited (CRMS), Perundurai Taluk, Erode District 04. Erode Gangapuram Common Effluent 4.5 - Proposed CTE issued upto Treatment Plant Private Limited, 31.03.2024 Erode Taluk, Erode District 05. Erode Villarasampatti Common Effluent 4.5 - Proposed CTE issued upto Treatment Plant Private Limited, 31.03.2024 Erode Taluk, Erode District 06. Erode M/s. Suriyampalayam Common 4.2 - Proposed CTE issued upto Effluent Treatment Plant Private 31.03.2024 Limited, Erode 07. Erode M/s. Green Kalingarayan 5.8 - Proposed CTE issued for a Common Effluent Treatment period upto Plant Private Limited 31.03.2024 08. Erode M/s. Erode Common Effluent 2.0 - Proposed CTE issued upto Treatment Plant Private Limited 31.03.2024 (CRMS) 09 Kumarapalayam M/s. Kumarapalayam Green 5.0 - Proposed DPR approved Cauvery Dyeing Cluster, Kumarapalayam 10 Kumarapalayam M/s. Green Environmental 3.0 - Proposed DPR approved Association, & Kumarapalayam (CRMS) TOTAL - 10 CETP 41

12

V. Solid Waste Management: No. Solid Waste Management State PRS 1. Total number of Urban Local Bodies 13,188 48 and their Population 2. Current Municipal Solid Waste 15666 1430.43 Generation TPD 3. Number, installed capacity and Facilities No. 3229 Nos. 454 utilization of existing MSW processing 1298 Installed Capacity.7859.2 facilities in TPD (bifurcated by type of 1001 TPD processing eg- Waste to Energy (Tonnage and Power Output), Compost Utilization Capacity: 6166.2 Plants (Windrow, Vermi, decentralized pit TPD composting), biomethanation, MRF etc 4. Action plan to bridge gap between Incinerators are proposed to Incinerators are proposed Installed Capacity and Current install for processing non- to install for processing Utilization of processing facilities (if recyclable dry waste in non-recyclable dry waste Gap > 20%) cluster basis in cluster basis 5. No. and capacity of C&D waste Nil Nil processing plants in TPD (existing, proposed and under construction) 6. Total no. of wards, 25145 1165 No. of wards having door to door 24699 1143 collection service, No. of wards practicing segregation at 23658 1061 source 7. Details of MSW treatment facilities Proposed-349 Nos. -- proposed and under construction (No., Technology: Micro capacity, and technology) Compositing, Organic Compositing, Recovery & Resource and Material Under Construction – 20

Resource Facility. Nos. Under Construction-58 Nos., Capacity 158 TPD Capacity 900 TPD

13

8. No. and area (in acres) of uncontrolled Nil Nil garbage dumpsites and Sanitary Landfills. 9. No. and area (in acres) of legacy waste CMA -1 No.(Erode), 19 CMA -1 No.(Erode) , 19 within 1km buffer of both side of the acres – Bio mining Work is acres – Bio mining Work rivers under progress. is under progress. 10. No. of drains falling into rivers and no. Nil Nil of drains having floating racks/screens installed to prevent solid waste from falling into the rivers

Status of ULB wise Management of Solid Waste-CMA & DTP ULB Total MSW Total MSW Existing Utilization Proposed MSW generation in being processed MSW Capacity of the Facilities & TPD in TPD Facilities existing MSW Completion Timeline TPD facilities TPD CMA-135 Nos. 6526 4352.2 4352.2 4352.2 936 TPD & 31.01.2021 DTP-528 Nos. 2100 1814 1814 1814 51 TPD

VI . Bio-medical Waste Management: No. Bio-medical Waste State PRS Management 1. Total Bio-medical 70 T/D 13.82 T/D generation: 2. No. of Hospitals and Health 25,006 5571 Care Facilities: 3. Status of Treatment Facility/ Total -12 Nos. Facility 1: M/s. Medicare CBMWTF: 8 Nos. are operation Enviro Systems, Thanjavur is in 1 No. -Ready for Operation operation covering the districts of 3 Nos.-Issued Closure Orders Than javur, , Trichy, by TNPCB for non- Nagapattinam, Pudukottai, compliance. Perambalur, Ariyalur & 3 Nos. of CBMWTFs are Sivangangai.

14

under establishment. Facility 2: M/s.Ramky Energy and (Gummidipoondi, & Environment Ltd, Salem is in Tiruppur). operation covering the districts of Salem, Namakkal, Erode, Karur Dharmapuri & krishnagiri.

VII. Hazardous Waste Management: No. Hazardous Waste Management State 1. Total Hazardous Waste generation Total : 9.64 lakhs ton/Yr Recyclable waste :1.20 lakhs ton/Yr Utilizable waste :7.43 lakhs ton/Yr Land fillable waste :0.77 lakhs ton/Yr Incinerablee waste : 0.24 lakhs ton/Yr 2. No. of Industries generating 3961 units Hazardous waste 3. Treatment Capacity of all TSDFs 2 Nos. of M/s Tamil Nadu Waste Management Limited (TNWML) Facility : 1. a.TSDF Gummidipoondi 2. Permitted land fillable hazardous waste in SLF- 1,00,000 T/A Permitted for Incineration of hazardous waste with incinerator of capacity-1.5 T/Hr. 3. b.TSDF Viruthunagar 4. Permitted land fillable hazardous waste in SLF- 2,40,000 T/A 4. Avg. Quantity of Hazardous waste Land fillable hazardous waste- 90,296 T/A reaching the TSDFs and Treated Incinerable hazardous waste- 7312 T/A 5. Details of on-going or proposed TSDF A common TSDF is proposed by M/s.Tamilnadu Waste Management Limited (TNWML Unit-3) at Plot No. 141A, etc. of Balethottam Village, Pochampalli Taluk, Krishnagiri District for which CTE was granted under Water & Air Acts for direct landfillable Hazardous waste-83 TPD & landfillable hazardous waste after treatment -166 TPD.

15

VIII. Plastic Waste Management: Plastic Waste Management STATE PRS

Total Plastic Waste generation 637 124 (TPD)

Treatment/ Measures adopted for  Recyclable/ Saleable  Recyclable/ Saleable reduction or management of plastics are sold to plastics are sold to plastic waste authorized vendors. authorized vendors.

 Non-saleable plastics are  Non-saleable plastics sent to cement factories are sent to cement for co-processing and also factories for co- used as a component for processing and also laying roads. used as a component for laying roads.  Incinerators are proposed to install for processing  Incinerators are non-recyclable dry waste proposed to install for in cluster basis. processing non- recyclable dry waste in cluster basis.

IX. Details of Alternate Treatment Technology being adopted by the State/UT:.

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment:

No. of location Name of the Remarks Sl.No. Name of the ULB joining into river major canal/river

1 Cauvery 5 Interception & Diversion (I&D) Work. DPR is under preparation 2 Cauvery Pallipalayam 7 I&D Work. DPR is under preparation

3. Cauvery 3 I&D Work. DPR is under preparation

4 Cauvery Bhavani 6 I&D Work. DPR is under preparation

16

5 Tamirabarani 6 I&D Work. DPR is under preparation

6 Tamirabarani Vickaramasingapuram 12 I&D Work. DPR is under preparation

7 Vasista 3 I&D Work. DPR is under preparation

8 Vasista Narasingapuram 3 I&D Work. DPR is under preparation

9 Sarabanga Idappadi 22 I&D Work. DPR is under preparation Total 67 (Source:CMA)

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: Nil XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river; Latest water quality of the polluted river stretches

Sl.No. Name of the No of Status of River –November 2020 River Monitoring Locations

1 Sarabanga 2 No flow

2 Thirumanimutharu 2 BOD 21 mg/l

Faecal Coliform 310 MPN/100 ml . 3 Vasista 2 BOD 9 mg/l Faecal Coliform 2300 MPN/100 ml 4 Cauvery 19 BOD <2 mg/l Faecal Coliform range between 12-260 MPN/100 ml 5 Bhavani 7 BOD < 2 mg/l Faecal Coliform range between 17-38 MPN/100 ml 6 Thamirabarani 12 BOD < 2 mg/l Faecal Coliform range between 1.8-70 MPN/100 ml Standards a.BOD (mg/l) <3 mg/l b. Faecal Coliform <500 MPN/100 ml Source : TNPCB

17

Ground water regulation-PWD

Name of the Ground water regulation River Sarabanga Thirumanimutharu For effective management of Ground Water, action is being initiated against illegally Vasista operating water drawing companies as Per Honorable Madras High Court order passed under WP No.16299 / 2018. Totally 683 packaged drinking water firms who were Cauvery illegally operating have been sealed and closed.

Bhavani A Comprehensive Groundwater (Management and Development) Act., to regulate and Thamirabarani Manage the extraction of Groundwater is under active consideration of the Government of Tamil Nadu.

XIV. Good irrigation practices being adopted by the State-PWD: Name of the River Good irrigation practices being adopted by the State

Sarabanga

Thirumanimutharu Awareness meeting are conducted under TNIAMP, ADB & State Funds. In some Vasista parts of the reach DRIP irrigation is practiced. Cauvery

Bhavani

Thamirabarani Village level awareness campaign are conducted periodically by PWD officials to adopt the crop rotation to have a good irrigation practices. Rehabilitation and modernization of Tanks, Anicuts and Supply channels are being carried out in TNIAMP project vide GO Ms No: 140 PW (WR 1) Dept Dt: 21.06.2017 for an amount of Rs.107.09 crores.

XV. Rain Water Harvesting-PWD: Name of the River Existing Ongoing Proposed Works Structure Works

Sarabanga 5 2 10-Recharge Wells

18

Thirumanimutharu 6 - 14-Recharge Wells

Vasista 16 - -

Cauvery 44 10 29

Bhavani 13 3 17

Thamirabarani 7 2 230

(Barrages 3 Nos at a cost of Rs. 230 Crores.

Check dam 2 Nos at cost of Rs. 76 Crores,

Artificial Recharge well 221 Nos and

Recharge shaft 4 Nos at a cost of Rs. 88.496 Crores.)

TOTAL 91 17 300

XVI. Demarcation of Flood plain and removal of illegal encroachments - PWD: Name of the Demarcation of Floodplain and removal of illegal River encroachments

Sarabanga Drone Survey is to be conducted by WAPCOS during December 2020. DPR is under preparation under Nadanthai Vaazhi Cauvery for conducting the above

Thirumanimutharu survey for identification of flood plain zones and area for afforestation to maintain Bio Diversity. The tentative cost of the DPR is Rs 2 crores. The DPR will be completed in December 2020. Encroachment if any identified during the survey will be evicted and other management works will be completed by March 2022 after rehabilitation and resettlement.

Vasista No Flood plains zones have been identified. No Encroachment has also been identified in the stretch. In case of any encroachments is reported in future by Revenue department, action will be taken for immediate eviction.

Cauvery Drone Survey is to be conducted by WAPCOS during December 2020. DPR is under preparation under Nadanthai Vaazhi Cauvery for conducting the above survey for identification of flood plain zones and area for afforestation to maintain Bio Diversity. The tentative cost of the DPR is Rs.20 crores. The DPR will be completed in December 2020. Encroachment if any identified during the survey will be evicted and other management works will be completed by March 2022

19

after rehabilitation and resettlement.

Bhavani Drone Survey is to be conducted by WAPCOS during December 2020. DPR is under preparation under Nadanthai Vaazhi Cauvery for conducting the above survey for identification of flood plain zones and area for afforastation to maintain Bio Diversity. The tentative cost of the DPR is Rs.2 crores. The DPR will be completed in December 2020. 55 Nos of encroachments are to be removed which belong to fishing community. Recommendations for alternate land has been sent to Secretary to Government, Revenue department by Commissioner for Revenue administration vide letter No F.2/41632/2005/Dt.15.2.2006. Thamirabarani To prepare comprehensive flood protection plan for Thamirabarani River Rs. 4.00 Lakhs has been alloted vide GO Ms. No. 37 Revenue (DMII) Department 9.02.2017. Estimate has been prepared for Rs. 4.00 Lakhs for the demarcation of Flood plain zone and steps are being taken for the protection and management of Flood plain Zones of Thamirabarani River. Moreover, in Tirunelveli Corporation, ProsopisJuliflora on the river stretches for a length of 10km from Vilagam to Naranammalpuram river bridge were removed at a cost of 140.00 lakhs vide GO(2D) No. 14 PW (P2) Dept Dated 8.03.2019 to restore the River course for a free flow of flood water.

XVII. Maintaining minimum e-flow of river-PWD: Name of the Maintaining minimum e-flow of river River

Sarabanga This river is only a flood carrier. The sewage water enters in to the river in Edapaddi Municipality, Omalur Town Panchayat and Poolampatti Town Panchayat. The above treatment plants are proposed under Nadanthai Vaazhi Cauvery. DPR preparation is likely to the completed by December 2020. E flow will be maintained in this river after completion sewage treatment plants by March 2021. The treated water will flow as environmental flow.

Thirumanimutharu This river is only a flood carrier. The sewage water enters in to the river in Salem Corporation. Treatment plants have been proposed under NadanthaiVaazhi Cauvery. DPR preparation is to be completed by December 2020. E flow will be maintained in this river after completion of sewage treatment plants by March 2021, the treated water will flow as environmental flow.

Vasista This river is only a flood carrier. But the sewage water enters in to the river in Attur and Narasingapuram Municipality. After completion of sewage treatment plants in the above location, the treated water will flow as environment flow.

20

th th Cauvery Mettur dam is opened for irrigation from June 12 to January 28 based on availability of water every year. It is opened for drinking purpose in the remaining days. Usually a monthly minimum average E flow of 0.10 TMC is maintained. The E flow is maintained for more than 8 months. During the month of November an E Flow of 648 mcm was maintained.

Bhavani An E flow of 81504 cusecs (including Irrigation purpose) was maintained in the river Bhavani during the Month of November 2020.

3 Thamirabarani Environmental flow (outflow) of Papanasam Reservoir is 1122 mm for the month of November 2020.

XVIII. Plantation activities along the rivers-PWD: Name of the Plantation activities along the Rivers River

Sarabanga It is proposed to plant around 32,400 saplings under Nadanthai Vaazhi Cauvery for which DPR is under preparation. Plantation work will be completed in March 2021.

Thirumanimutharu It is proposed to plant around 42,000 saplings under NadanthaiVaazhi Cauvery for which DPR is under preparation. DPR preparation is likely to the completed by December2020. Plantation work will be completed in March 2021.

Vasista There is no proposal at present.

Cauvery It is proposed to plant around 1,44,500 saplings under NadanthaiVaazhi Cauvery for which DPR is under preparation. DPR preparation is likely to the completed by December 2020. Plantation work will be completed in March 2021.

Bhavani It is proposed to plant around 86,500 saplings under NadanthaiVaazhi Cauvery for which DPR is under preparation. DPR preparation is likely to the completed by December 2020. Plantation work will be completed in March 2021.

Thamirabarani At present there is no proposal on plantation on the River Banks and investigation works are being taken to implement it by Forest Department.

XIX. Development of biodiversity park - PWD: Name of the River Development of Biodiversity park

Sarabanga This is proposed to be taken up under Nadanthai Vaazhi Cauvery for which DPR is under preparation. Drone Survey is proposed to be conducted by

Thirumanimutharu WAPCOS during December 2020. DPR preparation is likely to the completed

21

by December 2020. This work will be completed in March 2022

Vasista There is no proposal at present.

Cauvery This is proposed to be taken up under NadanthaiVaazhi Cauvery for which DPR is under preparation. Drone Survey is proposed to be conducted by

Bhavani WAPCOS during December 2020. DPR preparation is likely to the completed by December 2020. This work will be completed in March 2022.

Thamirabarani At present there is no proposal on biodiversity parks on the encroached River stretches and investigation works are being taken to implement it.

XX. Reuse of Treated Water - CMA: The policy for promotion of use of Treated Waste Water is prepared with a vision to maximize the collection & treatment of sewage generated and reuse of treated waste water on a sustainable basis, thereby reducing dependency on fresh water resources. Further, the policy promotes use of treated waste water as an economic resource. In this regard, Tamil Nadu Government has launched waste water reuse policy during December 2019. At present Memorandum of Understanding (MoU) has been executed between the ULB and the user agency for the re-use of secondary treated effluent water (STEW).

Quantity (in S. No. Name of the ULB Usage/ Purpose MLD)

1 Nagapattinam 2.00 M/s KVK Power for cooling purpose

2 Dindugul 5.00 To maintain the TDS level of Tanners for Agro- forestry. 3 Tirunelveli 24.00 Nanguneri Special Economic Zone (SEZ) for Industries 4 Perambalur 3.00 MRF Industrial use

5 3.00 NTC Infra

6 Coimbatore 15.00 Agricultural use to farmers association

7 Pollachi 11.50 Agricultural use to farmers association

8 Chinnamannur 3.00 Agricultural use

9 Karur 7.00 Agricultural use

10 Arakkonam 7.00 MRF Industrial use Total 80.5

22

XXI. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: River Bhavani XXII. Status of Preparation of Action Plan by the 13 Coastal States: As per G.O.MS No.64 Environment and Forests (EC.2) Department dated 03.10.2020, action plan for the coastal and marine pollution will be prepared by the Department of Environment, Government of Tamil Nadu.

XXIII. Regulation of Mining Activities in the State/UT: -- XXIV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring: Nil ------

23

National Mission for Clean Ganga Format for submission of Monthly Progress Reportin the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

For the State of Tamil Nadu (Chennai) in November 2020

Overall status of the State: I. Total Population:Urban Population& Rural Population separately

II. Estimated Sewage Generation (MLD): 530

III. Details of Sewage Treatment Plant: S.No. Details of Sewage Treatment Plant State PRS 1 Existing no. of STPs and Treatment Capacity (in MLD) 745 2 Capacity Utilization of existing STPs (in MLD) 567.10 3 MLD of sewage being treated through Alternate - technology 4 Gap in Treatment Capacity in MLD Nil 5 No. of Operational STPs 13 6 No. of Complying STPs 13 7 No. of Non-complying STPs Nil

Details of each existing STP in the State& PRS – November 2020 No. Location Existing Capacity Operational Compliance Status of STP STP Being Status Capacity Utilized of STP 1 Nesapakkam 23 10.66 Operational Complied

STP Zone - IV Parameters Range 2 Koyambedu 34 30.02 Operational pH – 6.5 to 8.5 STP Zone - III BOD - < 20 mg/l 3 Kodungaiyur 80 68.04 Operational COD – < 250 mg/l TSS - < 30 mg/l STP Zone II Faecal Coliform – 1000MPN/100 4 Kodungaiyur 80 69.66 Operational ml

STP Zone I 5 Perungudi STP 12 10.45 Operational Zone - V 6 Koyambedu 60 25.38 Operational

1

STP Zone - III 7 Kodungaiyur 94.60 Operational 110 STP Zone I& II 8 Nesapakkam 34.09 Operational 40 STP Zone - IV 9 Perungudi STP 60.34 Operational 54 Zone - V 10 Perungudi STP 46.24 Operational 60 Zone – V 11 Nesapakkam 52.02 Operational 54 STP Zone - IV 12 Koyambedu 60.62 Operational 120 STP Zone – III 13 Sholinganallur 5 18 Operational STP Total 745 567.10

Details of under construction STPs in the State& PRS No. Location Capacity of the Physical Status of I&D or Completion plant in MLD Progress in House sewer Timeline % connections 1 Sholinganallur 80 Dec 2020 54 STP 2 Thiruvottriyur 100 31 STP 3 Kodungaiyur 31 Feb 2022 120 STP Zone - I 4 Kodungaiyur 33 Feb 2022 120 STP Zone - II 5 Nesapakkam 28 Feb 2022 50 STP Zone - IV 6 Perungudi STP 22 Feb 2022 60 Zone - V 7 Nesapakkam 65.57 Mar 2021 10 TTUF 8 Perungudi 51.15 Mar 2021 10 TTUF 9 CRRT – 15

2

Modular STP’s at various location Total 470

Details of proposed STPs in the State& PRS No. Location Capacity of the Status of Project (at DPR Likely Date of STP proposed Stage/ Under Tendering/ Completion in MLD Work to be Awarded)

Total

Details of proposed STPs in the State No. Location Capacity of the Status of Project (at DPR Likely Date of STP proposed Stage/ Under Tendering/ Completion in MLD Work to be Awarded)

Total

IV. Details of Industrial Pollution:  No. of industries in the State& PRS:  No. of water polluting industries in the State& PRS:  Quantity of effluent generated from the industries in MLD:  Quantity of Hazardous Sludge generated from the Industries in TPD:  Number of industrial units having ETPs in State & PRS:  Number of industrial units connected to CETP:  Number and total capacity of ETPs (details of existing/ under construction / proposed)  Compliance status of the ETPs:  Number and total capacity of CETPs (details of existing/ under construction / proposed)  Status of compliance and operation of the CETPs

Town No. of Industrial Status of ETPs Status of CETPs industries discharge (existing, under construction & proposed)

3

V. Solid Waste Management:  Total number of Urban Local Bodies and their Population  Current Municipal Solid Waste Generation(State & PRS)  Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc(State & PRS)  Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%)(State & PRS)  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction)(State & PRS)  Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source (State & PRS)  Details of MSW treatment facilities proposed and under construction (no., capacity, and technology)(State & PRS)  No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills.  No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers  No. of drains falling into rivers and no. of drains having floating racks/screens installed to prevent solid waste from falling into the rivers. Status of ULB wise Management of Solid Waste ULB Total MSW Total MSW Existing Utilization Proposed MSW generation in being processed MSW Capacity of the Facilities & TPD in TPD facilities existing MSW Completion facilities Timeline

Total

VI. Bio-medical Waste Management:  Total Bio-medical generation (State & PRS):  No. of Hospitals and Health Care Facilities:  Status of Treatment Facility/ CBMWTF:

4

VII. Hazardous Waste Management:  Total Hazardous Waste generation(State & PRS):  No. of Industries generating Hazardous waste  Treatment Capacity of all TSDFs  Avg. Quantity of Hazardous waste reaching the TSDFs and Treated  Details of on-going or proposed TSDF VIII. Plastic Waste Management:  Total Plastic Waste generation (State & PRS):  Treatment/ Measures adopted for reduction or management of plastic waste:

IX. Details of Alternate Treatment Technology being adopted by the State/UT

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment:

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

XIV. Ground water regulation: XV. Good irrigation practices being adopted by the State: XVI. Rain Water Harvesting: XVII. Demarcation of Floodplain and removal of illegal encroachments: XVIII. Maintaining minimum e-flow of river: XIX. Plantation activities along the rivers: XX. Development of biodiversity park: XXI. Reuse of Treated Water: XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: XXIII. Status of Preparation of Action Plan by the 13 Coastal States: XXIV. Regulation of Mining Activities in the State/UT: XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring

5

National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020) For the State of Tamilnadu

Overall status of the CMA: I. Total Population : 1,67,05,001 II. Estimated Sewage Generation (MLD) : 1523.98

III. Details of Sewage Treatment Plant: S.No. Details of Sewage Treatment Plant State PRS 1 Existing no. of STPs and Treatment Capacity (in MLD) 49 Nos & 12Nos & 857.20 260.79 2 Capacity Utilization of existing STPs 344.26 116.82 3 MLD of sewage being treated through Alternate Nil technology 4 Gap in Treatment Capacity in MLD 666.78 114.82 5 No. of Operational STPs 37 nos 12 nos 6 No. of Complying STPs 37 nos 12 nos 7 No. of Non-complying STPs Nil

Details of each existing STP in the State & PRS Existing Capacity Capacity being of STP (in Utilized Operational Compliance S. No Location MLD) (in MLD) Status of STP Status of STP 70.00 35.00 Operational Comply 1 Coimbatore 60.00 5.00 Operational Comply 2 Vellore 10.28 7.50 Operational Comply 3 Dindigul 13.65 3.00 Operational Comply 1 STP (4mld) - Completed 36 MLD under 4 Avadi 4.00 2.50 progress Comply

1

170.70 MLD

(45.70 + 125.00) 5 Madurai MLD 38.00 Operational Comply Under 6 Thanjavur 28.05 14.15 Renovation Comply 7 Tiruppur 15.00 7.50 Operational Comply 8 Cuddalore 12.25 6.00 Operational Comply 9 Kanchipuram 14.50 13.50 Operational Comply 10 2.20 1.80 Operational Comply (CMWSSB STP 11 Pallavapuram 115@Perungudi) Operational Comply 12 Tiruvallur 6.20 3.60 Operational Comply 13 9.44 2.10 Operational Comply 14 Thiruvannamalai 8.70 4.50 Operational Comply 15 Viluppuram - 2Nos 12.50 8.60 Operational Comply Under Trial 16 Arakkonam 11.04 2.00 run Comply Under Trial 17 Thirupathur 11.43 0.50 run Comply 18 12.08 4.00 Operational Comply 19 Chinnamanur 3.99 3.72 Operational Comply 20 Periyakulam 5.47 5.47 Operational Comply 21 Ramanathpuram 7.00 5.80 Operational Comply 22 Theni-Allinagaram 12.05 6.50 Operational Comply 23 Dharmapuri 4.86 3.50 Operational Comply 24 Karur 15.00 6.50 Operational Comply 25 Krishnagiri 12.34 7.80 Operational Comply 26 Namakkal 5.00 5.00 Operational Comply Nagapattinam STP-1 9.63 4.50 Operational Comply Nagapattinam 27 STP-2 2.69 0.40 Operational Comply 28 Tiruvarur 6.92 4.10 Operational Comply 29 Ariyalur 4.16 1.00 Operational Comply 30 Pudukkottai 10.62 4.00 Operational Comply 31 Perambalur 4.20 3.60 Operational Comply

2

32 Udhagamandalam 5.00 4.00 Operational Comply 33 Udumalaipet 7.81 3.50 Operational Comply 34 Virudhunagar 7.65 3.70 Operational Comply PRS (12 Nos) 35 Tiruchirappalli 58.00 58.00 Operational Comply Salem - Vellakuttai STP 13.00 7.00 Operational Comply Salem - Anaimedu STP 6.00 3.00 Operational Comply Salem - Mankuttai 36 STP 35.00 1.00 Operational Comply Completed & Power Salem - Vandipattai connection to STP 44.00 - be obtained - 37 Tirunelveli 24.20 8.50 Operational Comply 38 Erode 50.55 18.50 Operational Comply Mettur STP-1 0.82 0.38 Opertional Comply Mettur STP-2 0.92 0.19 Opertional Comply 39 Mettur STP-3 5.45 2.40 Opertional Comply 40 Kumbakonam 17.00 12.00 Operational Comply 41 Mayiladuthurai 5.85 5.85 Operational Comply Total 49 nos 857.20 344.26

Details of under construction STPs in the State & PRS

Status of Capacity Physical I&D or of the S.No Location Progress House Completion Timeline plant in in % sewer MLD connections Alternate site to be identified & it will be 1 Ambur 16.71 - - completed on Oct’22. 2 Avadi 36.00 80% - March-21 Coimbatore - Nanjudapuram 40.00 70% - Feb-21 3 Coimbatore – Kuruchi & kuniyamuthur 30.53 23% - Jan-22

3

Status of Capacity Physical I&D or of the S.No Location Progress House Completion Timeline plant in in % sewer MLD connections 4 Karaikudi 16.00 70% - March-21 5 Nagercoil 17.66 90% - Dec-20 6 Pollachi 11.25 83% - Dec-20 WO order issued & Design under scrutiny & it will be completed 7 Rajapalayam 21.85 - - on Dec’21. 8 Rameshwaram 4.08 35% - Dec’21 Collection system will be Completed on 9 Rasipuram 6.96 100% - Dec’20 10 Saththur 4.65 67% - March-21 11 Tambaram 30.00 96% 3930 December’20 12 Tiruppur (3nos) 70.00 30% - March-22 13 Tuticorin 28.00 45% - March-21 14 Vellore 50.00 39% - March-21 PRS (4 Nos) Trichirapalli- 15 STP1 30.00 52% - July-21 Trichirapalli- STP2 37.00 35% - Aug-21 16 Sathiyamangalam 4.08 99% - Dec’20 17 Mettupalayam 8.65 82% - June- 21

Total (21 nos) 463.42

In addition to above, 49 no. of FSTPs are proposed & various of implementation. In which 5 no of FSTPs falls under polluted river stretches(Cauvery- 1no, Vasista -1 no, Sarabanga – 1 no & Thamirabarani – 2 nos.) S.No Progress Number of FSTPs 1 Completed 5 2 Nearing completion 1 3 Intermediate / Advanced stage 20 4 Initial stage/ Preparatory Stage 19 5 Tendering stage DPR 4 Total 49

4

Details of proposed STPs in the State (2 Nos) & PRS(2 Nos)

No. Location Capacity of the Status of Project (at DPR Likely Date of STP proposed in Stage/ Under Tendering/ Completion MLD Work to be Awarded) 1 Sathiyamangalam 1.13 DPR Prepared - 2 Tirunelveli 34.00 Under DPR stage -

IV. Solid Waste Management: (For Polluted River Stretches ULBs)  Total number of Urban Local Bodies and their Population: 135 ULBs &Population - 1,67,05,001  Current Municipal Solid Waste Generation:6526 TPD& 1296 TPD  Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc : Enclosed  Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if Gap > 20%) Nil  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction) : Nil  Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation at source : Enclosed

 Details of MSW treatment facilities proposed and under construction (no., capacity, and technology) : Enclosed  No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills.Nil  No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers- 1 no.(Erode)&19 acres – Biomining Work is under progress  No. of drains falling into rivers and no. of drains having floating racks/screens installed to prevent solid waste from falling into the rivers – Nil.

5

Status of ULB wise Management of Solid Waste ULB Total MSW Total MSW Existing Utilization Proposed MSW generation in being processed MSW Capacity of the Facilities & TPD in TPD facilities existing MSW Completion facilities Timeline Enclosed X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment:

SI. Name of the Name of the ULB No. of Remarks No River location joining into major canal/ river

1 Cauvery Komarapalayam 5 I&D Work DPR under preparation

2 Cauvery Pallipalayam 7 I&D Work DPR under preparation

3 Cauvery Kulithalai 3 I&D Work DPR under preparation

4 Cauvery Bhavani 6 I&D Work DPR under preparation

5 Tamirabarani Ambasamudram 6 I&D Work DPR under preparation

6 Tamirabarani Vickaramasingapuram 12 I&D Work DPR under preparation

7 Vassista Attur 3 I&D Work DPR under preparation

8 Vassista Narasingapuram 3 I&D Work DPR under preparation

9 Sarabanga Idappadi 22 I&D Work DPR under preparation

XXI. Reuse of Treated Water: The policy for promotion of use of Treated Waste Water is prepared with a vision to maximise the collection & treatment of sewage generated and reuse of treated waste water on a sustainable basis, thereby reducing dependency on fresh water resources. Further, the policy promotes use of treated waste water as an economic resource. In this regard, Tamil Nadu Government has launched waste water reuse policy on December 2019. At present Memorandum of Understanding (MoU) has been executed between the ULB and the user agency for the re-use of secondary treated effluent water (STEW) .

6

S. Name of the Quantity (in Usage/ Purpose No ULB MLD)

1 Nagapattinam 2.00 M/s KVK Power for cooling purpose

2 Dindugul 5.00 To maintain the TDS level of Tanners as well for Agro- forestry.

3 Tirunelveli 24.00 Nanguneri SEZ for Industries

4 Perambalur 3.00 MRF Industrial use

5 Ramanathapuram 3.00 NTC Infra

6 Coimbatore 15.00 Agricultural use to farmers association

7 Pollachi 11.50 Agricultural use to farmers association

8 Chinnamannur 3.00 Agricultural use

9 Karur 7.00 Agricultural use

10 Arakkonam 7.00 MRF Industrial use

7

Commissionerate of Municipal Administration,Chennai Solid Waste Management Status Report SWM Processing facilities No of wards No of wards Total Waste Total No. in D2D practicing Organic Windrow Biomethanation S.No Name of ULB's Generated Vermi Compost MCC OCC RRC / MRF of Wards Collection segregation Waste (MT) Compost plant (MT) Service at source Capacity in Capacity in Capacity Capacity Capacity No. No. No. No No. No. (MT) (MT) in (MT) in MT in (MT) 12 3456789101112131415161718 VELLORE REGION 1 Ambur 36 36 30 40 24 1 15 0 0 0 0 2 8 2 4.00 1 2 Arakkonam 36 36 34 28 13 0 0 0 0 0 0 4 16 4 1.00 1 3 Arcot 30 30 26 19 13 0 0 0 0 1 3 3 9 7 3.50 1 4 36 36 34 26 15 0 0 0 0 0 0 2 8 9 4.500 1 5 Ranipet 30 30 25 17 10 0 0 0 0 0 0 3 10 3 1.50 2 6 Thirupathur 36 36 30 30 18 0 0 0 0 0 0 6 20 12 6.00 0 7 Vaniyambadi 36 36 32 33 14 0 0 0 0 0 0 6 24 8 7.50 2 8 24 24 20 14 9 0 0 0 0 0 0 3 8 6 3.00 1 9 Jolarpet 18 18 16 10 9 0 0 0 0 0 0 1 4 1 3.00 1 10 Melvisharam 21 21 18 18 11 0 0 0 0 0 0 3 12 0 0.00 1 11 21 21 17 15 12 0 0 0 0 0 0 0 0 4 0.00 1 12 Thiruvannamalai 39 39 35 55 31 0 0 0 0 1 5 12 36 18 2.00 1 13 Arani 33 33 26 27 19 0 0 0 0 0 0 5 20 3 1.50 1 14 Thiruvathipuram 27 27 22 13 11 0 0 0 0 0 0 3 12 3 1.50 1 15 24 24 19 12 8 0 0 0 0 0 0 3 12.5 1 0.50 1 16 Villupuram 42 42 38 63 38 0 0 0 0 0 0 9 45 8 4.00 2 17 33 33 30 23 15 0 0 0 0 0 0 4 16 4 2.00 1 18 21 21 18 20 14 0 0 0 0 0 0 3 12 12 6.00 1 TOTAL 543 543 471 463 282 1 15 0 0 2 8 72 273 105 52 20 MADURAI REGION 19 Tirumangalam 27 27 25 24 14 0 0 0 0 0 0 3 12 14 2.00 0 20 27 27 24 17 10 0 0 0 0 0 0 1 4 6 2.00 0 21 24 24 15 10 6 0 0 0 0 0 0 1 5 0 0.00 1 22 33 33 30 33 18 1 8 1 2 0 0 2 8 9 2.00 1 23 Bodinayakanur 33 33 31 31 20 0 0 0 0 0 0 4 20 16 3.00 1 24 Chinnamanur 27 27 24 13 8 1 1 0 0 0 0 2 7 5 1.00 1 25 Cumbum 33 33 31 18 11 1 1.5 0 0 0 0 2 6 5 0.50 1 26 Gudalur 30 30 26 12 8 0 0 0 0 0 0 1 3 0 0.00 1 27 Periyakulam 21 21 16 16 10 1 6 1 2 0 0 0 0 3 0.36 1 28 Kodaikanal 27 22 18 11 9 1 1 0 0 0 0 0 0 4 0.23 0 29 36 36 31 41 19 1 4 0 0 1 5 1 10 5 2.00 1 00 0 000 1 2.0 30 27 27 22 15 11 9 0.50 1 00 0 000 3 7.5 31 Sivagangai 33 33 26 18 9 0 0 0 0 0 0 3 9 7 0.35 1 11 0 000 24 32 Karaikudi 36 36 34 48 28 22 4.00 2 00 0 000416 33 21 21 19 15 16 0 0 0 0 0 0 4 12 7 1.50 0 34 Ramanathapuram 21 21 20 20 17 1 4 0 0 0 0 1 4 5 1.00 1 35 33 33 31 35 21 0 0 0 0 1 1 3 15 20 6.14 1 36 24 24 22 13 8 1 5.5 1 1 1 1 1 3 3 3.00 1 37 Keelakarai 18 18 15 18 11 1 0.20 0 0 0 0 1 5 2 1.00 0 TOTAL 531 526 458 408 254 10 32 3 5 3 7 40 153 142 31 15 TIRUPPUR REGION 38 Pollachi 36 36 31 32 25 0 0.00 1 1.00 1 5 5 21 13 6.5 2.0 SWM Processing facilities No of wards No of wards Total Waste Total No. in D2D practicing Organic Windrow Biomethanation S.No Name of ULB's Generated Vermi Compost MCC OCC RRC / MRF of Wards Collection segregation Waste (MT) Compost plant (MT) Service at source Capacity in Capacity in Capacity Capacity Capacity No. No. No. No No. No. (MT) (MT) in (MT) in MT in (MT) 39 Mettupalayam 33 31 29 22 12 0 0.00 0 0.00 1 3 2 8 3 1.5 2.0 40 21 20 16 4 3 1 1.20 0 0.00 0 0 0 0 1 0.5 0.0 41 Udumalpet 33 31 27 19 12 0 0.00 0 0.00 0 0 3 12 13 6.5 2.0 42 30 30 26 17 11 1 5.00 0 0.00 0 0 2 6 4 2.0 2.0 43 18 18 15 11 7 1 4.50 0 0.00 0 0 1 2 1 0.5 2.0 44 21 21 18 11 8 0 0.00 0 0.00 0 0 2 7.5 1 0.5 1.0 45 18 18 16 13 7 1 2.35 0 0.00 0 0 2 4 1 0.5 1.0 46 30 30 26 18 12 1 9.00 0 0.00 1 3 2 7 7 3.5 1.0 47 27 27 23 10 7 1 0.83 0 0.00 0 0 2 5 1 0.5 2.0 48 Bhavani 27 27 23 9 9 0 0.00 0 0.00 0 0 2 10 - - 1.0 49 Punjaipuliampatti 18 18 16 6 6 0 0.00 0 0.00 0 0 1 3 5 2.5 2.0 50 Udhagamandalam 36 34 29 32 25 0 0.00 0 0.00 1 5 6 15 - - 1.0 51 30 29 26 11 9 6 2.40 0 0.00 0 0 1 4 4 2.0 1.0 52 Gudalur 21 21 18 14 9 1 3.00 0 0.00 0 0 1 5 - - 1.0 53 21 17 17 3 3 1 2.50 0 0.00 0 0 0 0 - - 1.0 TOTAL 420 408 354 232 163 14 31 1 1 4 16 32 110 54 27 22.0 REGION 54 Chengalpattu 33 28 25 65 11 0 0 0 0 0 0 2 7 7 2.85 1 55 Kancheepuram 51 43 43 22 33 0 0 0 0 15 4 20 25 12.50 2 56 Madurantakam 24 22 19 7 3 0 0 0 0 00 1 5 1 1.00 1 57 Pallavapuram 42 38 30 104 52 0 0 0 0 15 7 27 21 19.00 2 58 Tambaram 39 35 27 90 49 0 0 0 0 00 8 32 19 10.00 2 59 18 18 18 13 7 0 0 0 0 00 2 8 2 1.00 3 60 Maraimalainagar 21 17 14 23 11 0 0 0 0 00 4 20.00 2 1.00 1 61 21 21 15 31 16 0 0 0 0 00 6 20 4 2.00 1 62 Sembakkam 15 15 15 24 12 0 0 0 0 00 2 10 7 6.00 1 63 Tiruvallur 27 27 19 24 11 0 0 0 0 00 2 9 17 6.50 3 64 Poonamallee 21 19 16 21 11 0 0 0 0 15 8 18.10 0 0.00 1 65 Tiruthani 21 18 18 12 6 0 0 0 0 15 2 6 0 0.00 1 66 18 18 11 15 11 0 0 0 0 00 7 26.85 10 1.50 1 67 Chidambaram 33 31 25 17 7 0 0 0 0 00 4 14.00 3 2.50 1 68 Cuddalore 45 37 31 33 24 0 0 0 0 00 3 20 10 3.80 1 69 30 22 22 13 6 0 0 0 0 00 1 2 8 4.00 1 70 33 28 21 17 9 0 0 0 0 00 2 8.00 4 3.00 2 71 33 30 24 24 10 0 0 0 0 00 2 7 6 4.00 1 TOTAL 525 466 393 553 287 0 0 0 0 4 20 67 260 146 81 26 THANJAVUR REGION 72 Kumbakonam 45 45 41 70 41 0 0.00 0 0.00 1 5 5 20 34 16.5 2 73 Pattukkotai 33 33 28 30 17 0 0.00 0 0.00 0 0 5 10 12 4 2 74 Nagappattinam 36 36 31 32 19 0 0.00 0 0.00 1 5 3 14 13 6.0 2 75 Mayiladuthurai 36 36 29 32 18 0 0.00 0 0.00 0 0 3 15 5 2.5 1 76 Sirkali 24 24 17 14 9 1 3.00 0 0.00 0 0 2 6 5 2 1 SWM Processing facilities No of wards No of wards Total Waste Total No. in D2D practicing Organic Windrow Biomethanation S.No Name of ULB's Generated Vermi Compost MCC OCC RRC / MRF of Wards Collection segregation Waste (MT) Compost plant (MT) Service at source Capacity in Capacity in Capacity Capacity Capacity No. No. No. No No. No. (MT) (MT) in (MT) in MT in (MT) 77 21 21 19 12 6 0 0.00 0 0.00 0 0 2 6 0 0 0 78 Tiruvarur 30 30 21 22 13 0 0.00 0 0.00 0 0 1 3 5 2.5 1 79 33 33 28 22 15 1 5.00 0 0.00 0 0 3 11 8 4 1 80 24 24 20 8 5 0 0.00 0 0.00 0 0 1 5 1 0.5 0 81 24 24 19 7 5 1 1.00 1 1.00 0 0 1 2 4 2.0 1 82 Pudukkottai 42 42 38 70 42 0 0.00 1 2.00 0 0 5 16 21 10.75 1 83 27 27 27 14 9 1 0.50 1 2.00 0 0 2 4 2 1 2 84 27 27 22 16 7 0 0.00 0 0.00 0 0 1 4 5 2.0 1 85 24 24 24 15 10 0 0.00 0 0.00 0 0 3 12 4 2 2 86 21 21 17 8 7 0 0.00 0 0.00 0 0 0 0 8 8.5 1 87 Perambalur 21 21 17 18 7 0 0.00 0 0.00 1 3 2 6 1 0.5 2 88 Ariyalur 18 18 16 14 8 0 0.00 0 0.00 0 0 1 5 5 2.5 1 89 21 21 18 11 9 0 0.00 0 0.00 0 0 1 2 2 0.5 1 TOTAL 507 507 432 415 245 4 10 3 5 3 13 41 141 135 68 22 TIRUNELVELI REGION 90 33 33 30 15 16 0 0.0 0.0 0.0 0 0 4 14 7 3.5 3 91 30 30 28 14 13 1 3.0 0.0 0.0 0 0 4 13 2 1.0 5 92 33 33 28 26 21 1 1.0 1.0 1.0 0 0 5 16 3 2.5 3 93 Puliangudi 33 33 26 18 11 1 2.2 0.0 0.0 0 0 4 12 1 0.5 3 94 24 24 22 6 8 1 0.5 1.0 1.0 0 0 3 6 2 0.5 1 95 Ambasamudram 21 21 19 9 9 0 0.0 0.0 0.0 0 0 3 9 5 1.0 2 96 V.K.Puram 21 21 20 14 13 1 3.0 0.0 0.0 0 0 4 11 0 0.0 1 97 36 36 34 26 21 0 0.0 0.0 0.0 0 0 5 18 6 4.0 3 98 Kayalpattinam 18 18 17 12 10 1 0.5 0.0 0.0 1 5 2 6 0 0.0 1 99 Kuzhithurai 21 21 19 7 4 0 0.0 0.0 0.0 0 0 1 4 1 0.5 1 100 24 24 22 8 5 0 0.0 0.0 0.0 1 1 1 3 3 2.0 1 101 P.Puram 21 21 17 7 4 0 0.0 0.0 0.0 0 0 1 4 1 0.5 1 102 Virudhunager 36 36 27 18 20 0 0.0 0.0 0.0 0 0 5 20 2 1.0 1 103 Rajapalayam 42 42 38 49 28 1 3.0 0.0 0.0 1 5 2 7 4 6.0 2 104 33 33 24 30 26 0 0.0 0.0 0.0 0 0 5 15 5 7.5 1 105 33 33 24 20 14 0 0.0 0.0 0.0 0 0 2 8 0 0.0 2 106 Aruppukottai 36 36 27 25 21 0 0.0 0.0 0.0 0 0 5 16 3 1.8 3 107 24 24 18 10 7 1 2.0 0.0 0.0 0 0 1 3 2 0.5 1 108 21 21 17 15 10 0 0.0 0.0 0.0 0 0 1 3 0 0.0 1 Total 540 540 455 330 259 8 15 2 2 3 11 58 188 473336 SALEM REGION 109 Attur 33 33 33 12 10 0 0 0 0 0 0 4 12 4 0.388 1 110 Mettur 30 30 30 15 9 00 0 0 1 5 3 9 1 0.150 1 111 Idappadi 30 30 30 14 9000 0 00 5 15 2 0.200 1 112 Narasingapuram 18 18 18 7.05 4000 0 00 3 10 1 0.100 1 113 Namakkal 39 39 39 35 21 0 0 0 0 1 5 4 16 7 1.000 1 114 33 33 33 29 20 00 0 0 1 5 5 14 2 0.200 3 115 Rasipuram 27 27 27 14 10 0 0 0 0 00 1 5 3 0.300 1 116 2 51 Komarapalayam 33 33 33 15 14 0 00 0 00 1 0.150 SWM Processing facilities No of wards No of wards Total Waste Total No. in D2D practicing Organic Windrow Biomethanation S.No Name of ULB's Generated Vermi Compost MCC OCC RRC / MRF of Wards Collection segregation Waste (MT) Compost plant (MT) Service at source Capacity in Capacity in Capacity Capacity Capacity No. No. No. No No. No. (MT) (MT) in (MT) in MT in (MT) 117 Pallipalayam 21 21 21 12 7000 0 15 1 2 0 0.000 1 118 11 1 Dhamapuri33 33 33 22 15 0 0 0 0 0 3 0.270 0 416 119 Krishnagiri 33 33 33 17 13 0 0 0 0 00 4 16 3 0.270 1 120 Karur 48 48 48 71 45 0 0 0 0 15 12 46 2 0.175 4 121 Kulithalai 24 24 24 7 4 1 2.40 1 1.60 00 1 2 1 0.118 2 Total 402 402 402 270 181 1 2 1 1.60 5 25 50 169 30 12 19 Region Total 3468 3392 2965 2671 1670 38 105 10 15 24 100 360 1292 659 302 160 Corporations 122 Coimbatore 100 78 60 915 417 1 80 4 6 25 102 25 12.00 5 123 Madurai 100 100 70 630 336 1 4 20 100 24 11.00 0 124 Salem 60 60 54 350 203 0 0 0028 26 130 20 7.00 4 125 Erode 60 57 54 158 86 0 0 2 11 24 75 23 11.00 1 126 Tirunelveli 55 52 47 170 74 2 7 41 97 4 8.00 3 127 Dindigul 48 48 35 92 57 1 10 2 7 8 40 16 8.00 0 128 Vellore 60 60 54 230 97 0 0 0 0 1 1 51 163 18 1.00 42 129 Thanjavur 51 48 48 106 56 2 7 6 30 14 7.00 0 130 Trichy 65 65 62 351 222 0 0 2 7 34 170 22 8.00 0 131 Tiruppur 60 54 42 410 234 2 12 28 140 25 10.00 6 132 Thoothkudi 60 60 60 175 80 16 85 12 6.00 0 133 Nagercoil 52 52 37 106 66 0 0 0 0 1 5 11 55 10 5.00 0 134 Hosur 45 45 45 72 43 0 0 0 0 110 11 43 14 5.00 1 135 Avadi 48 47 41 90 45 0 0 0 0 1 5 17 65 21 10.00 1 Total 864 826 709 3855 2016 1 10 1 80 23 89 318 1295 248 109.00 63 Grant Total 4332 4218 3674 6526 3686 39 115 11 95 47 189 678 2587 907 411.23 223 Solid Waste management facility under construction Solid Waste management facility proposed Whether DPR prepared Funding Tendering Process S.No Region/Corporatio Treatment Work Waste type Name of the ULBs Quantity of Quantity of Treatment Sanctioned Completed Order Remarks n Components % of progressive Target date of waste to be Status waste to be Components with capacity completion completion Yes/No Status Yes/No Status Yes/No Status Yes/No treated (TPD) treated (TPD) with capacity TPD Foundation work in Wet Waste Panruti 6 6 Progress 25% 31.01.2020 - - - - progress 1 Chengalpattu Dry Waste Anakaputhur 5 5 Progress 90% 31.12.2020 - - - - Nearing Completion Wet Waste 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dry Waste Idappadi Roof work in 610 85 31.12.2020 0 0 0 0 0 0 0 0 0 progress 2 Salem 1 MCC Under Wet Waste 0 0 60 31.12.2020 0 0 0 0 0 0 0 0 0 Construction Karur Tender Evaluation Dry Waste 0 0 0 0 0 25 25 Yes Yes 0 No 0 No stage 2 MCC Under Wet Waste 6 6 75% 31.12.2020 ------Tiruvarur Construction Dry Waste ------MCC Under 1 MCC 80% Wet Waste Pudukottai 5 5 31.01.2020 ------Construction 1 MCC LITIGATION 3 Thanjavur 1 MCC Under Court Case & 1 Wet Waste 4.5 6 50% 31.01.2021 ------Jayanklondam MCC Under Construction Dry Waste ------Wet Waste - - - - - 4 MCC-4 No ------Proposal to be submit Melur Dry Waste ------Tub work under progress & Wet Waste Theni Allinagaram 8 MCC -8 Flooring work 70 31.12.2020 ------under progress Wet Waste 3 MCC -3 Ciel level work 20 31.12.2020 ------Cumbum Dry Waste ------civil work Wet Waste 5 MCC -5 95 31.01.2020 ------Gudalur completed 4 Maduarai Dry Waste - - - - - 4 RCC- 4 No ------Proposal to be submit Finishing work Wet Waste 2 MCC-2 95 31.12.2020 ------under progress Kodaikanal Basement level Dry Waste 3 RCC-3 30 31.12.2020 ------under progress Wet Waste 4 MCC-4 To be commencedCourt case ------Karaikudi Roof level work Dry Waste 3 RCC-3 70 31.12.2020 ------under progress Work under Wet Waste 12 MCC-12 60 31.12.2020 ------Ramanathapuram progress Dry Waste ------Wet Waste ------Roof truss Mettupalayam erectionComplete Incinerator of 10TPD Dry Waste 4.5 10.0 20% 31.01.2021 ------d flooring Capacity concrete progress

Brick work in Wet Waste 3.0 3.0 70% 10.01.2021 ------1 MCC Work Valparai progress

5 Tiruppur Dry Waste ------0 1 RRC Work - Stopped Dry Waste Palladam - - - - - 2.0 5.0 No - Yes - - - - due to Court Case 1 MCC Work - Proposed Wet Waste - - - - - 0.5 3.0 No - Yes - No - No shifting of Site due to court case Dry Waste ------1 MCC Work & Compost Wet Waste 1.50 5.00 - - 1.5 5.0 - - Yes - - - - Gudalur Yard Work Dry Waste ------Wet Waste Tenkasi Incineration sanctioned Dry Waste 1.70 Incineration Yes Tender stage yes No No in cluster basis Wet Waste 1 MCC 3.00 3.00 Construction 90% 31.12.2020 Kadayanallur work in progress Dry Waste Wet Waste Dry Waste Puliangudi Incineration sanctioned 3.16 Incineration Yes yes Yes LOA Issued No in cluster basis Wet Waste Dry Waste Ambasamudram Incineration sanctioned 0.80 Incineration Yes yes Yes LOA Issued No in cluster basis Wet Waste Dry Waste Vickramasingapuram Incineration sanctioned 3.43 Incineration Yes yes Yes LOA Issued No in cluster basis Wet Waste 2 nos of MCC 2 OCC and 1 6 Tirunelveli 7.00 7 MT MCC 10% 31.12.2020 5.48 Yes Yes No Land issue Rajapalayam under court case MCC Dry Waste Wet Waste 1 no of MCC 2.50 3 MT MCC 90% 15.12.2020 Sivakasi under court case Dry Waste Wet Waste 2 nos of MCC 6.32 7 MT MCC under 15% 31.12.2020 Srivilliputhur construction Dry Waste Wet Waste 1 MCC Under Court Case & 1 3.30 6 MT MCC 10% 31.12.2020 Sattur MCC Under Construction Dry Waste Wet Waste 3 nos of MCC 7.28 9 MT MCC 20% 31.12.2020 Thiruthangal under court case Dry Waste Under Wet Waste 9.00 12.00 80% 31.12.2020 Construction 7 Vellore region Pernampet Under Dry Waste 5.70 6.00 70% 31.12.2020 Construction Wet Waste 20 20 Under Construction 65% 31.3.2021 8 Salem Corporation Salem Corporation Dry Waste 147 25 Under Construction 55% 31.12.2020

Wet Waste 25 MCC Work in progress 75% 31.12.2020 Tirunelveli 9 Tirunelveli Corporation Corporation Dry Waste 10 Incinerator - - Yes - Yes LOA Issued No -

Wet Waste 20 20 4mcc in progress 15% 31.12.2020 10Trichy Corporation Trichy Corporation Dry Waste 23 23 RRC in progress 99% Completed Erode 11 Dry Waste Erode 35 35 Fabrication 2% 31.12.2020 25 DPR under preparation MCC - 21 nos, MCC - 60%, OCC- 12 Madurai Wet Waste Madurai 130 Under Construction 31.01.2021 OCC-25 nos 45% 13 Coimbatore Wet WasteCoimbatore Under Construction 25% 31.01.2021 250 182 TPD 14 Incineration - Dindigul Dry WasteDindigul 10 Under Construction 35% 31.01.2021 10 TPD 15 Thanjavur Wet Waste Thanjavur Under Construction 35% 31.01.2021 63 MCC - 20 TPD Commissionerate of Municipal Administration,Chennai Solid Waste Management Status Report SWM Processing facilities No of wards No of wards Total Waste Total No. in D2D practicing Organic Windrow Biomethanation S.No Name of ULB's Generated Vermi Compost MCC OCC RRC / MRF of Wards Collection segregation Waste (MT) Compost plant (MT) Service at source Capacity in Capacity in Capacity Capacity Capacity No. No. No. No No. No. (MT) (MT) in (MT) in MT in (MT) 12 3456789101112131415161718 TIRUPPUR REGION 1 Mettupalayam 33 31 29 22 12 0 0.00 0 0.00 1 3 2 8 3 1.5 1 2 Gobichettipalayam 30 30 26 18 12 1 9.00 0 0.00 1 3 2 7 7 3.5 1 3 Sathyamangalam 27 27 23 10 7 1 0.83 0 0.00 0 0 2 5 1 0.5 1 4 Bhavani 27 27 23 9 9 0 0.00 0 0.00 0 0 2 10 - - 1 THANJAVUR REGION 5 Kumbakonam 45 45 41 70 41 0 0.00 0 0.00 1 5 5 20 34 16.5 2 6 Mayiladuthurai 36 36 29 32 18 0 0.00 0 0.00 0 0 3 15 5 2.5 1 TIRUNELVELI REGION 7 Ambasamudram 21 21 19 9 9 0 0.00 0 0.00 0 0 3 9 5 1.000 1 8 V.K.Puram 21 21 20 14 13 1 3.00 0 0.00 0 0 4 11 0 0.000 1 SALEM REGION 9 Attur 33 33 33 12 10 0 0 0 0 0 0 4 12 4 0.388 1 10 Mettur 30 30 30 15 9 00 0 0 1 5 3 9 1 0.150 1 11 Idappadi 30 30 30 14 9000 0 00 5 15 2 0.200 1 12 Narasingapuram 18 18 18 7.05 4000 0 00 3 10 1 0.100 1 13 Komarapalayam 33 33 33 15 14 0 0 0 0 0 0 2 5 1 0.15 1 14 Pallipalayam 21 21 21 12 7000 0 15 1 2 0 0.000 1 15 Kulithalai 24 24 24 7 4 1 2.40 1 1.60 00 1 2 1 0.118 2 Corporations 16 Salem 60 60 54 350 203 0 0 0028 26 130 20 7.00 4 17 Erode 60 57 54 158 86 0 0 2 11 24 75 23 11.00 1 18 Tirunelveli 55 52 47 170 74 2 7 41 97 4 8.00 3 19 Trichy 65 65 62 351 222 0 0 2 7 34 170 22 8.00 0 Grant Total 669 661 616 1296 763 4 15 1 2 13 54 167 612 134 61 25 National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

Directorate of Town panchayats

November month MPR - For the State of Tamil Nadu

Overall status of the State: I. Total Population: 8074608 II. Estimated Sewage Generation (MLD):452.18 MLD

III. Details of Sewage Treatment Plant:  Existing no. of STPs and Treatment Capacity (in MLD): 5 Nos (14.394 MLD)  Capacity Utilization of existing STPs: 7.554 MLD  MLD of sewage being treated through Alternate technology: 3 MLD (in situ treatment, FSTP)  Gap in Treatment Capacity in MLD: 437.786 MLD  No. of Operational STPs: 5  No. of Complying STPs: 3 (Mamallapuram, orathanadu ,Thirumazisai )  No. of Non-complying STPs: 2 (Thiruchendur, Palanichettipatti ) Details of each existing STP in the State

No. Location Existing Capacity Operational Status Compliance Status STP Being of STP of STP Capacity Utilized 1 Mamallapuram TP 2.34 1.00 Operational Complied

2 Orathanadu TP 2.30 1.30 Operational Complied

3 Thiruchendur TP 3.90 1.40 Operational Non- Complied

4 Palanichettypatti TP 2.80 2.80 Operational Non Complied

5 Thirumazisai TP 3.00 1.00 Operational Complied

Septage Management 6 Karunguzhi 0.024 0.024 Operational 7 Periyanaikanpalayam 0.03 0.03 Operational Total 14.394 7.554

1

Details of under construction STPs in the State

No. Location Capacity of Physical Status of I&D or Completion the plant in Progress in % House sewer Timeline MLD connections 1 Ulunderpettai TP 99% 3.15 6176 Dec-20 completed 2 Work in Sriperumbudur TP 80% 8.50 5028 progress completed March-21 3 Velankanni TP 100% 2.33 1355 Dec-20 completed 4 63% Thiruporur TP 4.02 3302 Mar-21 completed 5 Ponneri TP 30% 6.52 1132 Mar-21 completed 6 Manachanallur TP 95% 3652 6.41 Dec-20 7 S.Kannanur TP completed 2320

8 Vallam TP 97% 2.35 2967 Jan-21 completed 9 Perundurai TP 92% 3.14 3503 Jan-21 completed 10 Melachokanathapuram TP 45% 2.00 1760 May-21 completed

Total 38.42 31195 Septage Management 11 70% Mudukulathur TP 0.015 - Jan-21 completed 12 75% Jalakandapuram TP 0.015 - Feb-21 completed 13 20% Pennagaram TP 0.015 - Mar-21 completed 14 62% Kaveripattinam TP 0.015 - Mar-21 completed 15 85% Chengam TP 0.020 - Feb-21 completed 16 50% Kurumbalur TP 0.010 - Jan-21 completed 17 25% Pennadam TP 0.010 - Mar-21 completed 18 50% Alangayam TP 0.015 - Mar-21 completed Total 0.115

2

Details of proposed STPs in the State

No. Location Capacity of the Status of Project (at DPR Stage/ Under Likely Date of STP proposed Tendering/ Work to be Awarded) Completion in MLD 1 Mangadu DPR stage-Comprehensive UGSS in Opp to SWM, Poonamallee cluster A with Mangadu Town Panchayat and 12 Village Town at pattur road Panchayat 2 Chitlapakkam Detailed project Report prepared under TNUISFL for Sembakkam cluster basis with 13 local bodies(Fund assistance from Project Development Grant Fund) 3 Madampakkam Detailed project Report prepared under TNUISFL for Sembakkam cluster basis with 13 local bodies(Fund assistance from Project Development Grant Fund) 4 Peerkankaranai DPR has to be prepared through TNUISFL on cluster basis 5 Perungalathur DPR has to be prepared through TNUISFL on cluster basis 6 Thiruneermalai DPR as to be prepared through TNUISSL by cluster basis

Treatment STP/F Status Desig Technolog STPs Status of Status STP/ of nated y along S. Name of the capac DPR of DPR FSTP award nodal with firm Remarks No ULB ity in Preparati approv s of Agenc completio MLD/ on al tender y n KLD timelines DPR DPR is under 1 Musiri TP - - - - PWD - preparation by Stage WAPCOS/ PWD. DPR PWD 2 Sirugamani TP - - - - - “ Stage DPR PWD 3 Mohanur TP - - - - - “ Stage DPR PWD 4 Velur TP - - - - - “ Stage Punjai Pugalur DPR PWD 5 - - - - - “ TP Stage Bhavani sagar DPR PWD 6 - - - - - “ TP Stage DPR PWD 7 Sirumugai TP - - - - - “ Stage Madathukulam DPR PWD “ 8 - - - - - TP Stage DPR PWD “ 9 Omalur TP - - - - - Stage

3

Tamilnadu Water Investment Company (M/s. TWIC) has been Poallampatty DPR appointed as 10 - - - - DTP - TP Stage consultant for preparation of DPR. The DPR will be expected to be ready by 31.12.2020 Pethanaickenp DPR DTP “ 11 - - - - - alayam TP Stage DPR DTP “ 12 Yethapur TP - - - - - Stage DPR DTP “ 13 Belur TP - - - - - Stage Srivaikundam DPR DTP “ 14 - - - - - TP Stage DPR DTP “ 15 Authoor TP - - - - - Stage DPR DTP “ 16 Eral TP - - - - - Stage Alwarthirunaga DPR DTP “ 17 - - - - - ri TP Stage Then DPR DTP “ 18 - - - - - Thiruperai TP Stage Arumuganeri DPR DTP “ 19 - - - - - TP Stage DPR DTP “ 20 Mukkudal TP - - - - - Stage Gopalasamudr DPR DTP “ 21 - - - - - am TP Stage Kallidaikurichi DPR DTP “ 22 - - - - - TP Stage Cheranmahade DPR DTP “ 23 - - - - - vi TP Stage Veeravanallur DPR DTP “ 24 - - - - - TP Stage Patthamadai DPR DTP “ 25 - - - - - TP Stage DPR DTP “ 26 Mela Seval TP - - - - - Stage DPR PWD DPR is under 27 Kuthalam TP - - - - - preparation by Stage WAPCOS/ PWD. Thirukattupalli DPR PWD “ 28 - - - - - TP Stage Thiruvaiyaru DPR PWD “ 29 - - - - - TP Stage

4

IV. Details of Industrial Pollution:

 No. of industries in the State:  No. of water polluting industries in the State:  Quantity of effluent generated from the industries in MLD:  Quantity of Hazardous Sludge generated from the Industries in TPD:  Number of industrial units having ETPs:  Number of industrial units connected to CETP:  Number and total capacity of ETPs (details of existing/ under construction / proposed)  Compliance status of the ETPs:  Number and total capacity of CETPs (details of existing/ under construction / proposed)  Status of compliance and operation of the CETPs

Town No. of Industrial Status of ETPs Status of CETPs industries discharge (existing, under construction & proposed)

V. Solid Waste Management:

 Total number of Urban Local Bodies and their Population - 528  Current Municipal Solid Waste Generation – 2100 MT  Number, installed capacity and utilization of existing MSW processing facilities in TPD (bifurcated by type of processing eg- Waste to Energy (Tonnage and Power Output), Compost Plants (Windrow, Vermi, decentralized pit composting), biomethanation, MRF etc

Total MSW generated - 2100 TPD Total MSW processed - 1819.21 TPD Gap in processing - 280.79 TPD

5

No Description Nos Installed Capacity (MT) Utilization Capacity (TPD) 1 Windrow & Vermi 735 2630 1026 Composting 2 De-Centralised 42 118 118 3 Bio-Gas / Bio- 20 167 167 Methanation 4 RRC 527 592 503

 Action plan to bridge gap between Installed Capacity and Current Utilization of processing facilities (if

Gap > 20%)

Incinerators are proposed to install for processing non-recyclable dry waste in cluster basis

 No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction)

 Total no. of wards, no. of wards having door to door collection service, no. of wards practicing segregation

at source

Total no. of wards - 8288

Door to Door collection – 7956

Source segregation - 7459

 Details of MSW treatment facilities proposed and under construction (no., capacity, and technology)

So far 4 Incinerators has been completed remaining 6 Nos are under progress.

So far 2 Pyrolysis plant has been completed remaining 8 Nos are under progress.

For remaining Town Panchayats Incinerators & Pyrolysis are been proposed to install for

processing non-recyclable dry waste in cluster basis.

 No. and area (in acres) of uncontrolled garbage dumpsites and Sanitary Landfills.

 No. and area (in acres) of legacy waste within 1km buffer of both side of the rivers

 No. of drains falling into rivers and no. of drains having floating racks/screens installed to prevent solid

waste from falling into the rivers

6

Status of ULB wise Management of Solid Waste

ULB Total Total Existing Plant Capacity of the Proposed MSW MSW MSW MSW existing MSW facilities Facilities & generation being Facilities Completion in TPD processed Timeline in TPD 2630 MT 1.Windrow & Vermi Incinerators are composting proposed to 2.Decentralized 118 MT install for Composting 3. Biogas 167 MT processing non-

Under construction recyclable dry 4.Incinerator will be completed waste in cluster 528 2100 1819 before March 2021 basis Under construction 5.Pyrolysis will be completed before March 2021

VI. Bio-medical Waste Management:  Total Bio-medical generation:  No. of Hospitals and Health Care Facilities:  Status of Treatment Facility/ CBMWTF:

VII. Hazardous Waste Management:  Total Hazardous Waste generation:  No. of Industries generating Hazardous waste  Treatment Capacity of all TSDFs  Avg. Quantity of Hazardous waste reaching the TSDFs and Treated  Details of on-going or proposed TSDF

VIII. Plastic Waste Management  Total Plastic Waste generation: 120 TPD  Treatment/ Measures adopted for reduction or management of plastic waste: Recyclable/ Saleable plastics are been sold to authorized vendors Non- saleable plastics are been sent to cement factories and are used as a component for laying roads Incinerators are proposed to install for processing non-recyclable dry waste in cluster basis

7

IX. Details of Alternate Treatment Technology being adopted by the State/UT

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment:

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;

XIV. Ground water regulation: XV. Good irrigation practices being adopted by the State: XVI. Rain Water Harvesting: XVII. Demarcation of Floodplain and removal of illegal encroachments: XVIII. Maintaining minimum e-flow of river: XIX. Plantation activities along the rivers: XX. Development of biodiversity park: XXI. Reuse of Treated Water: XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: XXIII. Status of Preparation of Action Plan by the 13 Coastal States: XXIV. Regulation of Mining Activities in the State/UT: XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring

8

Scanned by TapScanner Scanned by TapScanner Name of SPCB/PCC: TAMILNADU POLLUTION CONTROL BOARD Year: 2019-20 A1 Details on Hazardous Waste Generation *Quantity of Hazardous Waste generated as per Authorized Quantity of Hazardous Waste (Metric Tonne) Annual Return within the State/UT (Metric Details on Import and Export of Hazardous Waste Tonne) Number of Number of Total Number of Units HW Units Number of Units exempted submitted Quantity of HW TNPCB District Total Quantity of HW S.No HW possessing from annual Total Quantity imported during office Landfillable Incinerable Recyclable UtilizableQuantity Landfillable Incinerable Recyclable Utilizable Type of HW exported during the Type of HW Generating authorisati obtaining returns the year (Metric year (Metric Tonne) Industry on Authorisatio Tonne) n

12345 6 7 8 9 10111213

1 Ambattur 262.0 262.0 0.0 262.0 10137.3 976.9 18584.5 17372.7 47071.4 5340.0 878.1 2612.0 3872.5 12702.6 0.0 0.00 0.0 0.0 2 Ariyalur 24.0 24.0 0.0 20.0 130.0 35.0 843.6 938090.0 939098.6 171.6 20.3 357.0 90376.2 90925.0 0.0 0.0 0.0 0.0 3 Chennai 123.0 123.0 0.0 105.0 325.0 42.1 785.5 29.0 1181.6 328.4 88.5 954.0 0.0 1370.8 0.0 0.0 0.0 0.0 4 Coimbatore (N) 154.0 154.0 0.0 154.0 5254.9 1759.0 28065.6 66980.0 102059.5 3153.0 1178.5 20207.2 5207.0 29745.7 0.0 0.0 0.0 0.0 5 Coimbatore (S) 146.0 146.0 0.0 146.0 1621.0 1813.0 32750.6 183320.0 219504.5 249.7 672.9 1479.0 11756.2 14157.7 0.0 0.0 0.0 0.0 6 Cuddalore 54.0 54.0 0.0 15.0 5260.3 2045.3 15887.1 2696.6 25889.2 4930.0 250.4 0.0 0.0 5180.4 0.0 0.0 0.0 0.0 7 Dharmapuri 14.0 14.0 0.0 14.0 0.1 0.0 51.3 0.0 51.4 0.0 0.0 37.1 0.0 37.2 0.0 0.0 0.0 0.0 8 Dindigul 46.0 48.0 0.0 48.0 1266.9 773.5 452.6 161250.0 163791.1 16.7 251.8 70.5 105943.0 106282.1 0.0 0.0 0.0 0.0 9 Erode 263.0 263.0 0.0 161.0 3129.5 0.0 6779.3 84.0 9992.8 2423.0 0.0 403.8 0.0 2826.8 0.0 0.0 0.0 0.0 10 Gummidipoondi 121.0 116.0 0.0 116.0 10602.4 685.4 46093.0 1042265.0 1099645.7 1763.4 715.0 21205.7 9672.0 33356.1 19548.8 A-1160 0.0 0.0 11 Hosur 163.0 163.0 0.0 163.0 5236.0 3119.0 26205.0 0.0 34560.0 5236.0 3119.0 0.5 0.0 8355.5 0.0 0.0 0.0 0.0 12 Karur 82.0 84.0 0.0 84.0 3576.0 3.0 97063.0 378362.6 479004.6 1556.3 0.0 370.0 79840.8 81767.1 0.0 0.0 0.0 0.0 13 Kumarapalayam 122.0 122.0 0.0 107.0 1545.2 0.0 870.9 0.0 2416.1 351.2 0.0 0.0 559.6 910.7 0.0 0.0 0.0 0.0 14 Madurai 93.0 93.0 0.0 78.0 961.6 782.0 1373.7 0.0 3117.2 795.8 710.0 0.0 0.0 1505.8 0.0 0.0 0.0 0.0 15 MM Nager 302.0 302.0 0.0 289.0 10903.2 6606.9 22021.7 54424.5 93956.3 6285.4 3056.4 3503.0 31617.8 44462.6 0.0 0.0 0.0 0.0 16 Nagapatinam 34.0 34.0 0.0 34.0 1789.8 1.3 798.6 19570.0 22159.7 163.3 0.5 0.0 0.0 163.8 0.0 0.0 0.0 0.0 17 Nagerkoil 21.0 21.0 0.0 21.0 2.6 0.0 110.8 0.0 113.3 2.6 0.0 110.8 0.0 113.3 0.0 0.0 0.0 0.0 18 Nammakkal 18.0 13.0 0.0 13.0 18.3 0.0 1256.1 58457.0 59731.5 5.8 0.0 0.0 21827.5 21833.4 0.0 0.0 0.0 0.0 19 16.0 16.0 0.0 16.0 300.1 16.0 58.9 0.0 375.0 111.2 15.7 17.6 0.0 144.5 0.0 0.0 0.0 0.0 20 Perundurai 174.0 174.0 0.0 174.0 16682.8 0.0 138325.0 379973.0 534980.8 7132.1 0.0 31324.8 38005.0 76461.9 31318.9 B1020 0.0 0.0 21 Pudukottai 39.0 39.0 0.0 39.0 282.2 108.5 2588.2 0.0 2978.9 100.3 54.0 166.7 0.0 321.0 0.0 0.0 0.0 0.0 22 Ramanathapuram 18.0 18.0 0.0 18.0 0.7 0.0 58.8 0.1 59.6 0.1 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 23 Salem 106.0 106.0 0.0 106.0 13554.1 2172.9 633.7 1288.6 17649.3 3283.4 1466.2 633.7 1288.6 6671.9 0.0 0.0 0.0 0.0 24 Sivagangai 24.0 20.0 0.0 21.0 17.0 0.0 20.8 154.3 192.0 18.2 0.0 11.7 114.6 144.5 0.0 0.0 0.0 0.0 25 Sriperumbudur 321.0 297.0 0.0 287.0 20145.1 20233.1 22300.5 0.0 62678.7 5423.4 10166.4 10036.0 10166.0 35791.7 10034.0 A1160 0.0 0.0 26 Thanjavur 30.0 29.0 0.0 29.0 4.3 50.8 139.2 0.0 194.3 3.5 84.0 0.0 0.0 87.5 0.0 0.0 0.0 0.0 27 Theni 13.0 13.0 0.0 13.0 55.0 0.0 32.8 634.5 722.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 28 51.0 47.0 0.0 11.0 118139.5 5.0 57655.0 32850.0 208649.5 1952.2 2.9 16568.4 25050.0 43573.4 0.0 0.0 0.0 0.0 29 Tirunelveli 39.0 39.0 0.0 39.0 91.6 56.9 24782.7 1316851.2 1341782.4 69.4 16.3 788.4 130016.4 130890.5 0.0 0.0 0.0 0.0 30 Tiruppur (N) 383.0 383.0 0.0 250.0 438.7 1063.9 10254.5 16560.0 28317.1 359.8 851.1 836.4 23046.9 25094.2 0.0 0.0 0.0 0.0 31 Tiruppur (S) 66.0 66.0 0.0 66.0 62.7 368.0 9264.3 98980.0 108675.0 55.2 413.8 0.0 24452.0 24921.0 0.0 0.0 0.0 0.0 32 Tiruvallur 104.0 104.0 0.0 104.0 2055.2 825.6 16398.5 7880.0 27159.3 1630.8 401.7 6056.0 6457.8 14546.3 920.2 B1020 0.0 0.0

33 26.0 24.0 0.0 24.0 191.4 381.6 947.1 180.0 1700.1 48.3 50.6 10.1 10.1 119.1 0.0 0.0 0.0 0.0

34 Trichy 72.0 72.0 0.0 72.0 15538.7 256.1 4357.4 900.0 21052.3 8991.8 42.3 1517.4 325.1 10876.6 0.0 0.0 0.0 0.0

35 Vaniyambadi 206.0 206.0 0.0 206.0 23446.4 1.2 306.6 10770.2 34524.4 2362.9 0.0 0.0 6612.0 8974.9 0.0 0.0 0.0 0.0

Vellore 146.0 146.0 0.0 146.0 15691.9 510.6 17594.7 44468.6 78265.7 12867.6 176.7 1159.9 18978.5 33182.7 0.0 0.0 0.0 36 0.0 Villupuram 37.0 37.0 0.0 37.0 917.5 5321.2 64392.0 7041.4 77672.1 118.8 8.6 0.0 3561.6 3689.0 0.0 0.0 0.0 37 0.0

38 Viruthunagar 48.0 47.0 0.0 48.0 3174.2 0.0 456.5 222320.1 225950.8 30.0 0.0 0.0 93593.7 93623.7 0.0 0.0 0.0 0.0

TOTAL 3961.0 3919.0 0.0 3536.0 292549.3 50013.6 670559.9 5063753.4 6076924.1 77331.1 24691.0 120437.6 742351.0 964810.7 61821.9 0.0 0.0 0.0

*-The captive utlizing units mentioned in Format C has obtained Authorization only for imported waste and about 67041T of utilisable waste has been collected indigenously. ( for Dindigul District) #-out of 23046 T, captivie utilizable waste generation is 7500 TPA only. Remaining ETP sludge a qty of 15546 T (23046T-7500T= 15546 T) has been sent for co processing in cement plants.(already mentioned in A3 column No 20) ( for Tiruppur North) **- 10166 T of ETP sludge generated is sent to cement plant (already mentioned in A3 column No 20) ( for Sriperubmbudur District) No. Sl. Sl. 1 Standard limit for DO 5.0 mg/l forDO5.0 limit Standard MPN/100ml <500 coliform forFecal limit Standard forBOD<3 mg/L limit Standard Thulukkanur Thulukkanur Name of of Name (River) station Statio Code Code 3023 No. River Vasista - Polluted river stretches fromManivilundhanriver -Polluted toThiyaganurRiver stretches KM- Vasista Priority-I- 10 n Nil D.O mg/L Jul-20 500 BOD at 270 C mg/L 17000 Water Quality Water Riverof Polluted Status Stretches TAMIL NADU CONTROL BOARD POLLUTION

Fecal coliform MPN/100 ml Guindy,Mount 032. 76, Salai, - 600 Chennai 0.4 D.O mg/L Aug-20 15 BOD at 270 C mg/L 14000 Fecal coliform MPN/100 ml Nil D.O mg/L Sep-20 30 BOD at 270 C mg/L 11000 Fecal coliform MPN/100 ml 2.1 D.O mg/L Oct-20 7.5 BOD at 270 C mg/L 2200 Fecal coliform MPN/100 ml 3.9 D.O mg/L Nov-20

9 BOD at 270 C mg/L 2300 Fecal coliform MPN/100 ml No. Sl. Sl. 1 Standard limit for DO 5.0 mg/l forDO5.0 limit Standard MPN/100ml <500 coliform forFecal limit Standard forBOD<3 mg/L limit Standard Edappadi Edappadi Name of of Name (River) station River Sarabanga - Polluted river stretches fromThathayampattiriver -Polluted KM-River stretches Priority-I -15 to T.Konagapadi Sarabanga Station Station Code Code 3024 No.

D.O mg/L No Flow No Jul-20

0 BOD at 27 C mg/L Quality Water Riverof Polluted Status Stretches TAMIL NADU CONTROL BOARD POLLUTION 76, Mount Salai, Guindy,Mount 032. 76, Salai, - 600 Chennai Fecal coliform MPN/100 ml

D.O mg/L No Flow No Aug-20

BOD at 270 C mg/L

Fecal coliform MPN/100 ml

D.O mg/L No Flow No Sep-20

BOD at 270 C mg/L

Fecal coliform MPN/100 ml

D.O mg/L No Flow No Oct-20

BOD at 270 C mg/L

Fecal coliform MPN/100 ml

D.O mg/L No Flow No Nov-20

BOD at 270 C mg/L

Fecal coliform MPN/100 ml No. Sl. Sl. 1 Standard limit for Fecal coliform <500 MPN/100ml <500 coliform forFecal limit Standard forBOD<3 mg/L limit Standard Standard limit for DO 5.0 mg/l forDO5.0 limit Standard Uthamasolapuram Uthamasolapuram Name of station of Name (River) River Thirumanimutharu - Polluted river stretches from Salem to Papparapatti - 15 KM- Priority-I -15 to Papparapatti fromSalem Riverriver -Polluted stretches Thirumanimutharu Station Station Code Code 3022 No. 5.1 D.O mg/L Jul-20 3.2 0 Quality Water Riverof Polluted Status Stretches

BOD at 27 C mg/L TAMIL NADU CONTROL BOARD POLLUTION 76, Mount Salai, Guindy,Mount 032. 76, Salai, - 600 Chennai

1400 Fecal coliform MPN/100 ml 5.9 D.O mg/L Aug-20 <2 BOD at 270 C mg/L

310 Fecal coliform MPN/100 ml 0.8 D.O mg/L Sep-20 12 BOD at 270 C mg/L

310 Fecal coliform MPN/100 ml 1.1 D.O mg/L Oct-20 9.6 BOD at 270 C mg/L

320 Fecal coliform MPN/100 ml Nil D.O mg/L Nov-20 21 BOD at 270 C mg/L

310 Fecal coliform MPN/100 ml Sl.No. 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Standard limit forBOD mg/L <3 Standard limit GrandAnaicut TrichyDownstream TrichyUpstream Thirumukkudalur Mohanur Velur P. Vairapalayam PudurR.N. Mayiladuthurai Kumbakonam Pettavaithalai Pugalur Seerampalayam Urachikottai Komarapalayam Ferry Musiri Gate Borewell Musiri Pallipalayam Mettur Name of station of Name Station Station Code 3016 3045 3014 3013 3012 1203 1325 1202 1451 1324 1323 1320 1322 3018 3017 No. 31 32 51 50 RiverCauvery river -Polluted stretches Metturfrom -toMayiladuthurai200- I - Priority KM 7.5 7.6 7.4 7.0 5.8 6.3 6.1 7.0 5.2 7.0 7.2 6.9 7.3 6.9 6.5 7.2 5.9 4.8 D.O mg/L NoFlow Jul-20

2.2 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 3 3 4 2 3 2 2 BOD at 27 C mg/L 170 140 120 170 260 NA NA NA NA NA NA NA 84 79 26 84 63 32 Fecal coliform WaterRiverQualityStatus Polluted of Stretches

MPN/100 ml TAMILNADU POLLUTIONCONTROL BOARD 76, Mount Salai, Guindy, Chennai-600 Guindy, 032. Salai, 76,Mount 5.5 5.6 6.4 6.0 6.0 6.0 6.5 6.5 5.2 6.5 6.1 5.8 6.4 5.4 6.4 5.9 6.0 D.O mg/L NoFlow NoFlow Aug-20

<2 <2 <2 <2 <2 <2 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 BOD at 27 C mg/L 210 130 110 120 110 140 170 38 23 33 63 70 22 32 43 46 31 Fecal coliform MPN/100 ml 6.5 6.5 6.5 6.9 6.7 6.3 6.4 6.4 6.0 6.5 6.4 7.0 6.0 6.4 5.4 6.5 6.3 6.8 D.O mg/L NoFlow Sep-20 2.0 2.2

<2 <2 <2 <2 <2 <2 <2 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 BOD at 27 C mg/L 120 230 150 110 140 210 26 14 32 26 31 38 33 17 32 70 84 26 Fecal coliform MPN/100 ml 6.3 6.7 6.5 6.3 6.8 6.7 6.4 6.3 6.7 6.8 6.4 6.6 6.7 6.2 6.5 6.3 6.9 6.0 D.O mg/L NoFlow Oct-20 2.3 2.9 2.4 3.5

<2 <2 <2 <2 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 BOD at 27 C mg/L 210 170 170 170 31 63 27 23 63 32 33 27 12 43 31 31 79 31 Fecal coliform MPN/100 ml 6.6 5.6 6.6 6.4 6.9 6.9 6.0 6.1 5.9 6.8 6.3 6.0 6.2 6.0 5.2 6.0 6.2 6 D.O mg/L 2.6 Nov-20 3.4

<2 <2 <2 <2 <2 0 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 3 BOD at 27 C mg/L 230 210 230 260 110 33 70 23 43 63 31 23 21 12 22 33 26 26 Fecal coliform MPN/100 ml Standard limit for Fecal coliform <500 MPN/100ml Standard limit for DO 5.0 mg/l No. Sl. Sl. 7 6 5 4 3 2 1 Standard limit for Fecal coliform <500 MPN/100ml <500 coliform forFecal limit Standard forBOD<3 mg/L limit Standard (B10) Kalingarayan Canal (B5) Kalingarayan Canal Sathyamangalam Bhavani Bhavanisagar Sirumugai koil Badrakaliamman Name of station of Name River toKalingarayan KM- fromSirumugai BhavaniPriority-IVriver -60 Polluted stretches Station Station Code Code 3021 3020 3019 1205 1321 1204 1201 No. 6.5 6.0 6.9 6.8 6.7 6.7 7.0

D.O mg/L Quality Water Riverof Polluted Status Stretches TAMIL NADU CONTROL BOARD POLLUTION 76, Mount Salai, Guindy,Mount 032. 76, Salai, - 600 Chennai Jul-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 170 14 21 63 46 22 17 Fecal coliform MPN/100 ml 6.5 6.0 6.3 6.4 6.2 6.2 6.4 D.O mg/L Aug-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 11 13 22 21 21 70 21 Fecal coliform MPN/100 ml 6.3 6.8 6.4 6.6 6.6 6.8 6.2 D.O mg/L Sep-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 170 17 46 22 38 17 26 Fecal coliform MPN/100 ml 6.2 6.8 6.3 6.2 6.1 6.5 6.1 D.O mg/L Oct-20 <2 <2 <2 <2 <2 <2 <2 BOD at 270 C mg/L 21 17 46 33 14 93 21 Fecal coliform MPN/100 ml 6.7 6.6 6.3 6.0 6.2 6.3 6.2 D.O mg/L Nov-20 2.6 2.1 <2 <2 <2 <2 <2 BOD at 270 C mg/L 21 22 38 33 17 27 17 Fecal coliform MPN/100 ml Standard limit for DO 5.0 mg/l No. Sl. Sl. 12 11 10 9 8 7 6 5 4 3 2 1 Standard limit for Fecal coliform <500 MPN/100ml <500 coliform forFecal limit Standard forBOD<3 mg/L limit Standard Seevalaperi Vellakovil Srivaikuntam Kallidaikurichi Eral Authoor Ambasamudram Thiruvidaimarudur Murapanadu Kokirakulam Cheranmadevi Papanasam Name of station of Name River Thamirabarani Polluted river stretches from Pappankulam to ArumuganeriPappankulam from KM-river Priority-V - 80 Polluted stretches River Thamirabarani Station Station Code Code 3029 3028 3027 3026 3025 1330 1329 1328 1162 1161 1160 1159 No. 6.1 5.9 5.3 7.1 5.8 7.1 7.0 7.2 7.4 6.2 6.5 6.8 D.O mg/L Jul-20

2.5 2.5 3.9 2.6 4.5 5.1 2.5 2.5 2.5 2.4 2.5 2.3 BOD at 270 C Water Quality Water Riverof Polluted Status Stretches

mg/L TAMIL NADU CONTROL BOARD POLLUTION 76, Mount Salai, Guindy,Mount 032. 76, Salai, - 600 Chennai <1.8 31 23 31 34 84 17 26 42 21

6 2 Fecal coliform MPN/100 ml 6.5 6.5 6.0 7.4 6.7 7.3 7.4 7.2 7.4 6.8 7.0 7.6 D.O mg/L Aug-20

2.6 2.4 3.2 3.4 2.4 2.5 2.2 0 <2 <2

3 2 2 BOD at 27 C mg/L <1.8 <1.8 13 17 21

9 7 2 2 9 9 4 Fecal coliform MPN/100 ml 6.5 6.5 6.6 6.9 7.2 7.0 6.6 6.3 7.1 6.6 6.1 7.5 D.O mg/L Sep-20

2.5 2.9 2.2 2.9 3.2 3.3 2.2 2.7 2.3 2.5 0 <2

3 BOD at 27 C mg/L 120 40 58 47 21 48 33 13

7 4 8 4 Fecal coliform MPN/100 ml 6.0 5.6 7.6 7.5 6.0 6.8 7.3 6.0 6.5 7.1 7.4 D.O mg/L Oct-20 2.45 2.35 2.15 2.35 2.35

2.8 2.4 3.1 2.8 0 <2 <2

2 BOD at 27 C mg/L <1.8 <1.8 <1.8 25 17 47 60 94 39 22

2 4 Fecal coliform MPN/100 ml 6.3 6.7 6.0 7.4 6.2 5.9 7.4 7.6 6.2 6.1 7.3 7.5 D.O mg/L Nov-20

2.55 2.55 2.55 2.85 2.05 0 <2 <2 <2 <2 <2 <2 <2 BOD at 27 C mg/L <1.8 <1.8 <1.8 21 14 25 43 70 32 11

2 7 Fecal coliform MPN/100 ml Standard limit for DO 5.0 mg/l