YORKSHIRE CYCLING FEDERATION TI (2Nd Time)

Total Page:16

File Type:pdf, Size:1020Kb

YORKSHIRE CYCLING FEDERATION TI (2Nd Time) Course Details – V150: Allerton Park – A168 – Kirk Deighton – Boroughbridge South. th THE 88 ANDY WILSON MEMORIAL 50 MILE TIME TRIAL START at last post in lay by on east side of A168, approx. 0.25 miles north of left turn to A59. Proceed south on A168, via Walshford, and Bridge Hotel roundabouts, to Kirk Deighton TI (5.34 mls). Promoted for, and on behalf of, Cycling Time Trials, under its Rules & Regulations. Encircle island and proceed north on A168, via Bridge Hotel, and Walshford TIs, to Boroughbridge and on behalf of the Wilson Trustees by the (South) TI. (15.55 mls). Encircle island and proceed south on A168, via Walshford, and Bridge Hotel islands, to Kirk Deighton YORKSHIRE CYCLING FEDERATION TI (2nd time). (25.80 mls). Encircle island and repeat circuit via Boroughbridge (South) TI - 2nd time (36.0 mls) back to Kirk (This is a qualifying event for the CTT Best All-rounder Competition 2019) Deighton TI (3rd time) – (46.25 mls). Encircle island and proceed north on A168, via Bridge Hotel, and Walshford TIs, to Saturday July 20th 2019 – First Rider off at 14.01. – COURSE V150 FINISH (at paintmark) approx. 50 yds north of flyover to farm (50.0 mls). Timekeepers: George Barker, Pennine CC & John Hardy, Yorkshire RC Note: all of the course is on the A168 road. Event Secretary: Phil Hurt, 11, Greenside Terrace, LEEDS LS12 4SZ Course turns at Kirk Deighton TI three times, Boroughbridge South TI twice. Tel. 07887 622370 Finish Timekeeper to park opposite finish point, on east side of road – bushes/trees adjacent to finish. AWARDS * * * * * 1st Fastest Rider £40-00. 1st Fastest Lady £40-00. Riders must not stop at the finish - continue on A168 to next layby (approx. 1.5 mls) or continue back to 2nd Fastest Rider £30-00. 2nd Fastest Lady £20-00. HQ via A168, turning left into Moor Lane. 3rd Fastest Rider £25-00. 1st Lady on Std £20-00 * * * * * 4th Fastest Rider £20-00. One award per lady. There will be direction boards on the course, as well as marshals. Note: Marshals are only to indicate Veterans Age Categories your direction, and not to control traffic in your favour. At each junction it is your responsibility to ensure (A)40-49 yrs, (B)50-59 yrs, (C)60 years & over that it is safe to proceed. Keep your heads up, and keep to the left of the carriageway. 1st Fastest in each category. £20-00 Fastest 3 riders not eligible for Age Category Awards. * * * * * It is approx. 3 miles from the HQ to the start, so allow plenty of time to get there. From HQ turn left on Fastest Team of 3 riders (aggregate): £30:00. to Moor Lane then follow road, crossing A1(M), to junction with A168. Turn right and continue past Rabbit Hill, Waste Disposal site, and entrance to Allerton Castle. Start layby is just beyond this entrance. There may be some over-lapping of riders on the course – riders just starting may be passed by earlier starters completing their first lap. When you have FINISHED, please continue in single THE FASTEST RIDER WILL HOLD THE WILSON TROPHY FOR ONE YEAR. file back to layby/HQ as later starters on their last lap may want to pass you. There will be The Trophy will be presented at the Federation Luncheon at South Milford Hotel , on Sunday rd Observers out on the course. Any reports of accompanied riding may result in disqualification February 23 2020. of the riders involved, and possible further action by Yorkshire D.C. The onus lies with the overtaken rider to drop back in order to avoid accompanied riding. KEEP TO THE LEFT OF THE CARRIAGEWAY, KEEP YOUR HEAD UP, HAVE A SAFE RIDE IN THE INTERESTS OF YOUR OWN SAFETY, CYCLING TIME TRIALS, & THE EVENT PROMOTERS STRONGLY ADVISE YOU TO WEAR A HARD SHELL HELMET THAT MEETS AN INTERNATIONALLY ACCEPTED SAFETY STANDARD. HARD SHELL HELMET COMPULSORY FOR RIDERS AGED UNDER 18 YEARS & JUNIORS. CTT recommends that a working rear light, either flashing or constant, is fitted to the machine in a position clearly visible to following road users, and is active whilst the machine is in use ORDER OF START HEADQUARTERS and PARKING – is at Arkendale Village Hall, Rains Moor Lane, HG5 0RF. No Rider Club Cat Off Numbers and signing-on, signing-out will be located here. 1 Gary Purchon Otley Cycle Club B 14.01 2 Nik Blesic Bronte Wheelers A Parking is limited, and it may be easier to park further away – there are several lay-bys along the A168 3 Mike Cole Huddersfield Road Club C – and ride to the HQ. 4 Ala Whitehead Rockingham CC W A 5 Mark Morris Harrogate Nova CC A 14.05 Please note that the Village Hall Car Park is located over the road from the Hall. The car park 6 Paul Page East Bradford CC A surrounding the Village Hall is a private car park for the use of customers of the Blue Bell Pub. 7 Lez Young (TRIKE) Lincoln Wheelers CC C There is a space behind the Hall for anyone with mobility problems. 8 Michael Cox North Lancashire Road Club C 9 Susan Sanders Drighlington BC W A SHOE-PLATES ARE NOT TO BE WORN IN MAIN HALL 10 Neil Cleminshaw Vive Le Velo A 14.10 11 Liam Golton Selby CC S There is limited parking in the lay-by at the start, and no parking for other than Officials at the 12 Ian Garbett Holmfirth CC A finish. Finish Timekeeper will be parked opposite the finish point – there is vegetation etc up 13 James Hewitt Halifax Imperial Wheelers S the edge of the carriageway on that side. 14 Sandra Burrows Vive Le Velo W B 15 Steven Guymer Squadra RT S 14.15 Don’t forget to return number and SIGN OUT after your ride – REG. 17(b). Failure to do so will 16 Andy Whitehead Rockingham CC B result in rider being recorded as a DNF. 17 Stephen I’anson Buxton CC/Sett Valley Cycles C This is the 8th counting event in the YCF Points Competition 2019. 18 Simon Diggins North Lancashire Road Club A Current leading positions: 19 Helen Goldthorpe Otley CC W A 20 Ian Cox Fogartys Insurance Tri Team A 14.20 MEN 21 Martin Gargett Halifax Imperial Wheelers A Pos Rider Club Rides Total 22 Fiona Sharp Team Swift W A 1 Neil Cleminshaw Vive Le Velo 6 671 23 Robert Noble Prima Team Racing A 2 Steve Burrows Vive Le Velo 6 654 24 Kevin Melia VC Bradford B 3 Daniel Shaw Halifax Imperial 6 650 25 Anthony Ashworth Wetherby Wheelers B 14.25 4 David Taylor Ravensthorpe CC 6 597 26 Robert Cooke Rockingham CC A 5 Darren Yarwood Vive Le Velo 5 594 27 Derek McMillan SVTTA B 6 Ian Garbett Holmfirth CC 5 576 28 Lee Mitchell Jackpot Racing A 7 Sean Sanders Drighlington BC 5 574 29 Rich Banks Calder Clarion B 8 Guy Lewis Holmfirth CC 6 556 30 Russell Brown Yorkshire Road Club A 14.30 31 Sean Sanders Drighlington BC A 9 Chris Harris Holmfirth CC 5 502 32 Gary Simpson Yorkshire Road Club B 10 Stephen Ayres Bronte Whs 4 477 33 Mark Burtonshaw Team Swift C WOMEN 34 Nikola Matthews Halifax Imperial Wheelers W S Pos Rider Club Rides Total 35 Richard Dean Rockingham CC A 14.35 1 Sandra Burrows Vive Le Velo 6 708 36 Peter Watson Harrogate Nova CC S 2 Susan Sanders Drighlington BC 5 581 37 Peter Howarth Stretford Wheelers B 3 Ala Whitehead Rockingham CC 5 568 38 Tom Asher Ilkley CC S 4 Rebecca Bland York Cycleworks 3 352 39 Chris Harris Holmfirth CC C 5 Harriet Breakey Holmfirth CC 3 348 40 Richard Sharp Team Swift S 14.40 41 Ian Mitchelson Halifax Imperial Wheelers A ` 42 Steve Burrows Vive Le Velo C Remaining Events: 43 Paul Targett Holcombe Harriers B Date Event Course 44 Patrick Bielby Velo Club Long Eaton B Sun 8th Sept Seacroft Whs 10 V511 45 Philip Graves Velo Club York S 14.45 Sat 21st Sept Harrogate Nova 10 V212 46 Dan Small Teesdale CRC S Sun 6th October YCF Team 25 (YCF Clubs) V232 47 Darren Yarwood Vive Le Velo A 14:47 .
Recommended publications
  • London to Scotland East Route Strategy March 2017 Contents 1
    London to Scotland East Route Strategy March 2017 Contents 1. Introduction 1 Purpose of Route Strategies 2 Strategic themes 2 Stakeholder engagement 3 Transport Focus 3 2. The route 5 Route Strategy overview map 7 3. Current constraints and challenges 9 A safe and serviceable network 9 More free-flowing network 9 Supporting economic growth 9 An improved environment 10 A more accessible and integrated network 10 Diversionary routes 17 Maintaining the strategic road network 18 4. Current investment plans and growth potential 19 Economic context 19 Innovation 19 Investment plans 19 5. Future challenges and opportunities 25 6. Next steps 37 i R Lon ou don to Scotla te nd East London Or bital and M23 to Gatwick str Lon ategies don to Scotland West London to Wales The division of rou tes for the F progra elixstowe to Midlands mme of route strategies on t he Solent to Midlands Strategic Road Network M25 to Solent (A3 and M3) Kent Corridor to M25 (M2 and M20) South Coast Central Birmingham to Exeter A1 South West Peninsula London to Leeds (East) East of England South Pennines A19 A69 North Pen Newccaastlstlee upon Tyne nines Carlisle A1 Sunderland Midlands to Wales and Gloucest M6 ershire North and East Midlands A66 A1(M) A595 South Midlands Middlesbrougugh A66 A174 A590 A19 A1 A64 A585 M6 York Irish S Lee ea M55 ds M65 M1 Preston M606 M621 A56 M62 A63 Kingston upon Hull M62 M61 M58 A1 M1 Liver Manchest A628 A180 North Sea pool er M18 M180 Grimsby M57 A616 A1(M) M53 M62 M60 Sheffield A556 M56 M6 A46 A55 A1 Lincoln A500 Stoke-on-Trent A38 M1 Nottingham
    [Show full text]
  • Tackling High Risk Regional Roads Safer Roads Fund Full
    Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION The Royal Automobile Club Foundation for Motoring Ltd is a transport policy and research organisation which explores the economic, mobility, safety and environmental issues relating to roads and their users. The Foundation publishes independent and authoritative research with which it promotes informed debate and advocates policy in the interest of the responsible motorist. RAC Foundation 89–91 Pall Mall London SW1Y 5HS Tel no: 020 7747 3445 www.racfoundation.org Registered Charity No. 1002705 October 2018 © Copyright Royal Automobile Club Foundation for Motoring Ltd Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION About the Road Safety Foundation The Road Safety Foundation is a UK charity advocating road casualty reduction through simultaneous action on all three components of the safe road system: roads, vehicles and behaviour. The charity has enabled work across each of these components and has published several reports which have provided the basis of new legislation, government policy or practice. For the last decade, the charity has focused on developing the Safe Systems approach, and in particular leading the establishment of the European Road Assessment Programme (EuroRAP) in the UK and, through EuroRAP, the global UK-based charity International Road Assessment Programme (iRAP). Since the inception of EuroRAP in 1999, the Foundation has been the UK member responsible for managing the programme in the UK (and, more recently, Ireland), ensuring that these countries provide a global model of what can be achieved.
    [Show full text]
  • Litter Strategy Our Approach
    Litter Strategy Our approach Introduction If people didn’t drop litter, it wouldn’t have to The Department for Environment, Food and Rural be picked up. Litter on our network is not only Affairs (Defra) Code of Practice 2006 on litter and unsightly, it’s hazardous too. It can obstruct refuse (available at www.defra.gov.uk) defines litter: drivers and is a public health concern for our road workers during the clearing process, and that ‘to include materials often associated with time and money could be better spent on other smoking, eating and drinking, that are priorities. As well as economic impacts it also improperly discarded and left by members of has wider, adverse environmental concerns. the public; or spilt during business operations as well as waste management operations.’ We remain committed to delivering a high level of service for customers and communities We developed this strategy in consultation educating and informing those who drop litter with external partners such as government on our network of the consequences as we play departments, local authorities, suppliers and our part in reducing this cost to the public. other related associations to present a focused, holistic, approach to managing litter on the Our aspiration is that this strategy will help network. The strategy presents our vision, and it change the behaviours of those who drop is an approach we share openly and publicly. litter and we will continue to work with our stakeholders, suppliers and staff to achieve this. Purpose The purpose of this litter strategy is to outline how Background we can better manage litter on the network.
    [Show full text]
  • The Road Traffic (Permitted Parking Area and Special Parking Area) (County of North Yorkshire) (Borough of Harrogate) Order 2002
    Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format. STATUTORY INSTRUMENTS 2002 No. 1621 ROAD TRAFFIC The Road Traffic (Permitted Parking Area and Special Parking Area) (County of North Yorkshire) (Borough of Harrogate) Order 2002 Made - - - - 24th June 2002 Laid before Parliament 24th June 2002 Coming into force - - 15th July 2002 Whereas North Yorkshire County Council has applied to the Secretary of State for an order to be made under paragraphs 1(1) and 2(1) of Schedule 3 to the Road Traffic Act 1991(1) with respect to part of their area and the Secretary of State has consulted the Chief Constable of the North Yorkshire Police in accordance with the requirements of paragraphs 1(3) and 2(3) of that Schedule and the Council on Tribunals in accordance with the requirements of section 8 of the Tribunals and Inquiries Act 1992(2); NOW, the Secretary of State for Transport, in exercise of the powers conferred by paragraphs 1(1), 2(1) and 3(3) of Schedule 3 to the Road Traffic Act 1991 and of all other powers enabling him in that behalf, hereby makes the following Order:— Citation and commencement 1. This Order may be cited as the Road Traffic (Permitted Parking Area and Special Parking Area) (County of North Yorkshire) (Borough of Harrogate) Order 2002 and shall come into force on 15th July 2002. Interpretation 2. In this Order— “the 1984 Act” means the Road Traffic Regulation Act 1984(3); (1) 1991 c.
    [Show full text]
  • 2002 No. 1621 ROAD TRAFFIC the Road Traffic
    STATUTORY INSTRUMENTS 2002 No. 1621 ROAD TRAFFIC The Road Traffic (Permitted Parking Area and Special Parking Area) (County of North Yorkshire) (Borough of Harrogate) Order 2002 Made ----- 24th June 2002 Laid before Parliament 24th June 2002 Coming into force - - 15th July 2002 Whereas North Yorkshire County Council has applied to the Secretary of State for an order to be made under paragraphs 1(1) and 2(1) of Schedule 3 to the Road Traffic Act 1991(a) with respect to part of their area and the Secretary of State has consulted the Chief Constable of the North Yorkshire Police in accordance with the requirements of paragraphs 1(3) and 2(3) of that Schedule and the Council on Tribunals in accordance with the requirements of section 8 of the Tribunals and Inquiries Act 1992(b); NOW, the Secretary of State for Transport, in exercise of the powers conferred by paragraphs 1(1), 2(1) and 3(3) of Schedule 3 to the Road Traffic Act 1991 and of all other powers enabling him in that behalf, hereby makes the following Order:— Citation and commencement 1. This Order may be cited as the Road Traffic (Permitted Parking Area and Special Parking Area) (County of North Yorkshire) (Borough of Harrogate) Order 2002 and shall come into force on 15th July 2002. Interpretation 2. In this Order— “the 1984 Act” means the Road Traffic Regulation Act 1984(c); “the 1991 Act” means the Road Traffic Act 1991; and “the parking area” means the area designated as a permitted parking area and as a special parking area by article 4 of this Order.
    [Show full text]
  • Planning Statement
    PROPOSED DEVELOPMENT OF THE VALE OF YORK MOTORWAY SERVICE AREA (MSA) BETWEEN JUNCTIONS 48 AND 49 OF THE A1(M), HARROGATE PLANNING STATEMENT JULY 2017 Chester Office | Well House Barns | Chester Road | B r e t t o n | C h e s t e r | C H 4 0 D H South Manchester Office | Camellia House | 76 Water Lane | W i l m s l o w | S K 9 5 B B t 0844 8700 007 | e [email protected] CONTENTS 1.0 INTRODUCTION ............................................................................................... 2 1.1 Introduction ........................................................................................................ 2 1.2 The Site and its Surroundings ............................................................................ 2 1.3 The Proposal ..................................................................................................... 4 1.4 The Applicant ..................................................................................................... 6 1.5 Structure of the Planning Statement................................................................... 6 2.0 NEED ................................................................................................................. 8 2.1 Introduction ........................................................................................................ 8 2.2 MSAs National Context ...................................................................................... 8 2.3 The Need for a New MSA of the A1 (M) North of Wetherby MSA ..................... 10 2.4 Meeting the Need............................................................................................
    [Show full text]
  • Highways Agency Asset Maintenance and Operational Requirements Area 2 Specifi C Requirements
    Highways Agency Asset Maintenance and Operational Requirements Area 2 Specifi c Requirements Version 1.7 July 2011 Page intentionally left blank. Asset Maintenance and Operational Requirements Contents Preface Document Control Preface Defi ned Terms Preface Abbreviations Part 0 General Part 1 Watchman Operational Requirement Part 2 Managing Network Occupancy Operational Requirement Part 3 Incident Response Operational Requirement Part 4 Severe Weather Operational Requirement Part 5 Drainage Maintenance Requirement Part 6 Fences, Screens and Environmental Barriers Maintenance Requirement Part 7 Geotechnical Assets Maintenance Requirement Part 8 Lighting Maintenance Requirement Part 9 Paved Areas Maintenance Requirement Part 10 Road Markings and Road Studs Maintenance Requirement Part 11 Road Restraint Systems Maintenance Requirement Part 12 Road Traffi c Signs Maintenance Requirement Part 13 Soft Estate Maintenance Requirement Part 14 Structures Maintenance Requirement Part 15 Sweeping and Cleaning Maintenance Requirement Part 16 Tunnels Maintenance Requirement Area 2 • AMOR Version 1.7 Page 1 July 2011 Asset Maintenance and Operational Requirements Appendices Appendix 1 Intentionally Blank Appendix 2 Managing Network Occupancy Operational Requirement Appendix 3 Incident Response Operational Requirement Appendix 4 Severe Weather Operational Requirement Appendix 5 Intentionally Blank Appendix 6 Intentionally Blank Appendix 7 Intentionally Blank Appendix 8 Intentionally Blank Appendix 9 Intentionally Blank Appendix 10 Intentionally Blank Appendix
    [Show full text]
  • Environmental Statement Volume 3 Appendix 2.1 Scoping Report
    PROPOSED DEVELOPMENT OF THE KIRBY HILL MOTORWAY SERVICE AREA (MSA) ON LAND ADJACENT TO THE A1(M), NEAR KIRBY HILL, NORTH YORKSHIRE ENVIRONMENTAL STATEMENT SCOPING REPORT APRIL 2017 Chester Office | Well House Barns | Chester Road | B r e t t o n | C h e s t e r | C H 4 0 D H South Manchester Office | Camellia House | 76 Water Lane | W i l m s l o w | S K 9 5 B B t 0844 8700 007 | e [email protected] CONTENTS 1.0 INTRODUCTION AND BACKGROUND ............................................................ 1 1.1 Introduction ........................................................................................................ 1 1.2 The EIA team ..................................................................................................... 2 1.3 The Applicant ..................................................................................................... 2 1.4 Purpose of Scoping ............................................................................................ 3 1.5 Requirement for EIA .......................................................................................... 4 1.6 This Document ................................................................................................... 5 2.0 THE SITE .......................................................................................................... 6 2.1 Site Location and Context .................................................................................. 6 3.0 THE PROPOSED DEVELOPMENT..................................................................
    [Show full text]
  • Vacancy in the Parish of the Thorntons & Otteringtons And
    VACANCY IN THE PARISH OF THE THORNTONS & OTTERINGTONS AND POLICE CHAPLAIN FOR NORTH YORKSHIRE POLICE FORCE St. Andrew’s Church, South Otterington St. Michael’s Church, North Otterington St. Leonard’s Church, Thornton le Street 1 | P a g e Contents 1. Introduction 3 2. Our Vision & Mission 3 3. Where we are today: Our Worshipping Community 4 4. Weekly Rotas of Services 5 5. Church Finances 5 6. South Otterington C of E School 6 7. The Qualities and Attributes of Our New Incumbent 7 8. Pastoral Care & Support for the Incumbent 7 9. Vicarage 8 10. Chaplaincy 9 11. Churches and local amenities 10 11.1 Where are we? 10 11.2 South Otterington 12 11.3 Thornton le Street 14 11.4 North Otterington 15 11.5 Thornton le Moor 16 11.6 Thornton le Beans 17 2 | P a g e Introduction The vacancy is for a composite post comprising an incumbent in the parish of the Thorntons and Otteringtons, (half time post) and the Chaplain to the North Yorkshire Yorkshire Police Force (half time post) currently based in Newby Wiske Hall, Newby Wiske. The Thorntons & Otteringtons is a rural parish in North Yorkshire that serves the villages of South Otterington, North Otterington, Newby Wiske, Thornton le Street, Thornton le Moor and Thornton le Beans. There are three churches, St. Andrews, the parish church, at South Otterington, St Michael and All Angels at North Otterington and St Leonard’s at Thornton le Street. The three churches, each with their own individual personality, are united in one parish.
    [Show full text]
  • AGENDA ITEM NO: HAMBLETON DISTRICT COUNCIL Report To
    AGENDA ITEM NO: 5 HAMBLETON DISTRICT COUNCIL Report To: Cabinet 16 July 2013 Subject: TRAVELLERS’ AND SHOWMEN’S SITES PROVISION STRATEGY All Wards Portfolio Holder for Housing, Planning and Waste Management: Councillor B Phillips 1.0 PURPOSE AND BACKGROUND: 1.1 This report is to consider the sites recently submitted by private landowners and a strategy of action to meet the established needs in the District by further assessment of possible suitable sites through planning applications. 1.2 The need for Showmen’s plots is approximately 10 at one main yard in Hambleton up to 2019 (North Yorkshire Accommodation Requirements of Showmen, Dec 2009). For Travellers’ pitches (HDC Traveller Housing Needs Study, Sep 2012) it is 11 for the next 5 years, with a further need for 7 by 2022, and 8 more by 2027 (Total 26). Planning permission has since been granted (20 June 2013) for a single Traveller’s family pitch at Sowerby, to the south of Bankside Close, reducing the requirement to 10 for the next 5 years and 25 overall. 1.3 There are no known vacant plots/pitches in the District and no current planning permissions outstanding or possible permissions pending for either type of site provision (other than an outstanding appeal for a pitch at Hailstones Moor, Northallerton). Furthermore there is no Council or other public land available for developing new pitches and plots and no plans for the Council to acquire and develop land for public sites, nor any interest from Registered Providers to develop sites. There is therefore a lack of a supply of specific deliverable sites for the next 5 years and broad locations for developable sites in the next 5-10 and 10-15 years (as required by national policy).
    [Show full text]
  • Highways England's Litter Strategy
    Litter strategy Our approach Introduction Litter is a serious issue. It harms the environment, upsets our customers and damages our reputation. It also puts our people at risk when they have to collect it and it diverts time and money that’s better spent on improving the road network. Our vision is for ‘a network predominantly free from litter, without compromising safety and delivered affordably’. This strategy describes how we will achieve this by discouraging littering, improving how we collect litter, being more responsive to customer feedback and by working with our partners. It has been developed in consultation with government departments, local authorities, suppliers and other organisations. It forms part of the wider government strategy on litter as set out in Defra’s Litter Strategy for England. Our responsibilities We are responsible for litter collection on motorways and some trunk roads. Local authorities manage litter collection on the rest of the roads in England. Our network is shown in the map on the following page. Responsibility for clearing litter Motorways and trunk roads for which responsibility for clearing litter lies with from motorways and trunk roads Highways England Trunk roads for which responsibility for clearing litter lies with local authorities A1 A19 A69 Newcastle upon Tyne Carlisle A1 Sunderland M6 A1(M) A66 Middlesbrough A595 A174 A66 A66 A19 A590 A1(M) A64 A585 M6 Yo r k Leeds M1 Irish Sea M55 M65 M606 M621 Kingston upon Hull M62 A63 Preston A56 M62 A1 M61 A180 North Sea M58 M1 Grimsby A628 M18 Manchester
    [Show full text]
  • Harrogate Borough Council Planning Committee – Agenda Item 6: List of Plans
    HARROGATE BOROUGH COUNCIL PLANNING COMMITTEE – AGENDA ITEM 6: LIST OF PLANS. DATE: 5 July 2016 PLAN: 01 CASE NUMBER: 15/05489/OUTMAJ GRID REF: EAST 437635 NORTH 472941 APPLICATION NO. 6.26.261.OUTMAJ DATE MADE VALID: 22.12.2015 TARGET DATE: 22.03.2016 REVISED TARGET: 25.05.2016 CASE OFFICER: Mr Andrew Siddall WARD: Wathvale VIEW PLANS AT: http://uniformonline.harrogate.gov.uk/online- applications/applicationDetails.do?activeTab=summary&keyVal=NZ7ES7HYHUH00 APPLICANT: Mr T Swires AGENT: Dh Land Strategy PROPOSAL: Outline application for the erection of up to 28 dwellings with access considered (Site Area 2.2Ha) LOCATION: Land Comprising OS Field 0003 Dishforth North Yorkshire REPORT SITE AND PROPOSAL Outline planning permission is sought for the erection of up to 28 dwellings with access to the site considered, on approximately 2.2 hectares of arable land split into two fields bisected by a native hedge, adjacent to the existing built up area of Dishforth. The site is currently in agricultural use and has a gentle falling gradient of approximately three metres between its western and eastern boundaries. Access is currently taken from a field gate off a metalled driveway direct from the public highway and this access point, widened and with a reduced gradient would be used to serve the proposed residential development. Cherry trees, within the landscaped highway verge were planted behind the line of the visibility splay and would be retained. The site shares its eastern boundaries with the domestic gardens of dwellings within the existing built up area of the village. These are predominantly formed of hedging with some small scale hedgerow trees and fencing.
    [Show full text]