Highway Works Programme 2011/12
Total Page:16
File Type:pdf, Size:1020Kb
To: Maidstone Joint Transportation Board By: KCC Highways, Transportation & Waste Date: 14th October 2020 Subject: Highway Forward Works Programme – 2020/21 onwards Classification: Information Only Summary: This report updates Members on the identified schemes approved for construction 1. Introduction This report provides an update and summarises schemes that have been programmed for delivery in 2020/21. Kent County Council has agreed a substantial increase in the budget for planned highway works over the next three years, and as a result we are still in the process of identifying and designing schemes for inclusion in our full Year One to Two (2020/21 and 2021/22) and Year Three to Five (2022/23 to 2024/25) programmes. Because of this, we have decided to publish an interim programme, and to publish the full programmes later this year. For some assets this interim programme covers approximately the first six months of 2020/21, whilst for others it includes most of the works planned for the whole year. This programme is subject to regular review and may change for several reasons including budget allocation, contract rate changes, and to reflect KCC’s changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase. Road, Footway & Cycleway Renewal and Preservation Schemes – see Appendix A Drainage Repairs & Improvements – see Appendix B Street Lighting – see Appendix C Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures Externally funded schemes Local Growth Fund Developer Funded Works – see Appendix E Bridge Works – see Appendix F Traffic Systems – see Appendix G Combined Member Fund – see Appendix H Conclusion 1. This report is for Members’ information. Contact Officers: The following contact officers can be contacted on 03000 418181 Kirstie Williams Highway Manager Mid Kent Susan Laporte Maidstone District Manager Alan Casson Strategic Asset Manager Earl Bourner Drainage & Structures Asset Manager Sue Kinsella Street Light Asset Manager Toby Butler Traffic & Network Solutions Asset Manager Jamie Hare Development Agreements Manager Jamie Watson Schemes Programme Manager Appendix A – Road, Footway and Cycleway Renewal and Preservation Scheme The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes. Machine Resurfacing – Contact Officer Mr Byron Lovell Road Name Parish Extent of Works Current Status Between A249 and Square A249 Andrew Broughton Way Maidstone Completed Hill A20 London Road/A26 Rocky Maidstone Gyratory to th Maidstone Programmed 6 Hill Terrace Road October 2020 Between Stacey's Street rd B2012 Lower Boxley Road Maidstone Programmed 23 and Wheeler Street September 2020 A20 Ashford Road to Mote To be Square Hill Road Maidstone Road programmed early 2021 A249 Mote Road to Willow To be Mote Avenue Maidstone Way programmed early 2021 Fishers Road/Hurst To be Fishers Estate Staplehurst Close/Newlyn Drive/Fishers programmed early Close 2021 Between A249 To be Union Street Maidstone Sittingbourne Road and programmed early Wheeler Street 2021 Footway Improvement - Contact Officer Mr Neil Tree Road Name Parish Extent and Description of Current Status Works To be designed and programmed Full length Including Kenward in Roseleigh Avenue Allington Road and Glenwood Close coordination with (Footway resurfacing) the Virgin Media programme. St. Michaels Road Various sections throughout Maidstone the entire length. To be designed (Footway resurfacing) and Programmed. Full length including Lismore Sheppey Road Loose Close Completed (Footway Protection) Full length Staffa Road Loose (Footway Protection) Completed Full length Dane Court Coxheath (Footway Protection) Completed Full length Hildenborough Crescent Allington (Footway Protection) Completed Full length Sussex Road Maidstone (Footway Protection) Completed Full length Spencer Way Maidstone (Footway Protection) Completed Full length Garden Close Maidstone (Footway Protection) Completed Full length Freeman Way Maidstone (Footway Protection) Completed Full length Wilson Close Maidstone (Footway Protection) Completed From Sandy Lane to the vicinity of The White Horse Completed Ware Street Bearsted Public House (Footway Protection) Full length Mount Avenue Yalding (Footway Protection) Completed Downs Road Full length Yalding (Footway Protection) Completed Full length Blunden Lane Yalding (Footway Protection) Completed Full length Adisham Road Allington (Footway Protection) Completed Full length Blackmanstone Way Allington (Footway Protection) Completed Full length Cheriton Way Allington (Footway Protection) Completed Full length Chilham Road Allington (Footway Protection) Completed Full length Eastry Close Allington (Footway Protection) Completed Full length Fordwich Close Allington (Footway Protection) Completed Full length Frinstead Walk Allington (Footway Protection) Completed Full length Halstead Walk Allington (Footway Protection) Completed Full length Kilndown Close Allington (Footway Protection) Completed Completed Full length Lamberhurst Close Allington (Footway Protection) Surface Treatments – Contact Officer Mr Jonathan Dean Road Name Parish Extent and Description of Current Status Works Lower Ladysden Farm Completed Goudhurst Road (including (Pumpkin Farm) to Winchet Hill) Marden Sherenden Lane Completed Benover Road and Collier From LupoFresh to Haviker Street Yalding Street Completed Stockett Lane to Vanity Heath Road Coxheath Lane Completed Heath Road Coxheath Wood lands to Ewell Lane Completed Wheelbarrow Roundabout Maidstone Road Nettlestead to Bow Road Completed Gravelly Bottom Road to Lenham Road Kingswood Chegworth Lane Postponed to From Unicumes Lane to 2021 Hackney Road Fant Gatland Lane Completed Lenham Road to Gravelly Bottom Road Lenham Broomfield Road Completed From Boxley Road to The Sandling Lane Penenden Heath Gateway Barhams Mill Road to just Completed Southernden Road (including past Sherway Road Grigg Lane) Egerton (Horseshoes Farm) Completed Stilebridge Lane to Tilden Lane Marden Khernfields Farmhouse To be From junction of Dickens Programmed Sheridan Close Ringlestone Road to outside 26 ASAP Otterden Place (Rigshill Completed Otterden Road) to Warren Street Bunce Court Road (Payden Street) Completed Linton Linton Hill to Vanity Lane Wheelers Lane To be Programme ASAP Northdown Close Maidstone Whole Road Appendix B - Drainage Drainage Repairs & Improvements - Contact Officer Earl Bourner Road Name Parish Description of Works Current Status No further works planned. Investigation works and Smith’s Hill West Farleigh Clearing gully tops usually clearance of drainage resolves any issues. Long running flooding outside Avis Car Rental. Works completed; Fairmeadow Maidstone Appears pipes were drainage system was also damaged by third party fully cleaned after repairs. works Repair broken pipe and Plans are drawn up to replace one of the two install a new soakaway Dunn Street Bredhurst existing soakaways due to it into the existing system, reaching the end of its they are awaiting useful life. approval. Lower Road East Farleigh Repair broken pipes Works Completed West Street Hunton Repair broken pipes Works Completed Drainage cleansing carried out, but some defects Repair Works Completed Liverton Hill Grafty Green identified during course of September 2020 works. Full CCTV confirmed multiple defects. CCTV Completed, further works required to rectify broken pipe o/s pub (bollard The Street Boxley installation has broken pipe) Works Completed and replace defective pipework near Street Farm Cottage Repair Works Completed. Further work was Eyhorne/Upper Various repairs to the identified between Street/Hollingbourne Hollingbourne highway drainage system. highway and outfall in Hill pond. Programmed 2nd Nov. The existing drainage has been cleaned and surveyed Underground Utility A20 Ashford Rd and is working but an Survey reprogrammed for under rail bridge by Maidstone improvement scheme is to 30th September to inform Square Hill be developed to reduce risk design. of blockages and flooding Existing soakaway unmaintainable due to Entered onto Forward Harp Farm Road Boxley location in field. Work Programme. Replacement soakaway(s) to be considered Surveys Completed, no Redwall Lane, broken pipes found. opposite Davis Linton Broken pipes require repair Water leak confirmed Farm nearby. Issue passed to SEW. Replacement Aco Fairmeadow Faulty non-return valve and channels fitted. Awaiting Subway (near Maidstone damaged Aco Channel approval from the EA to Medway Street) drainage covers. replace non-return valve. Early contractor Gravelly Bottom Multiple defects found in involvement taking place Kingswood Road CCTV survey early October prior to raising works order. Flooding affecting properties Ordered raised for between The Orpines and additional trial holes to Church Street. Replacement Tonbridge Road Teston locate fibre optic service drainage being designed. position before Underground utilities are implementing scheme. main constraint for delivery Appendix C – Street Lighting Structural testing of KCC owned streetlights has identified the following as requiring replacement. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement. Street Lighting Column Replacement – Contact