CANBERRACANBERRA REGIONREGION JOINT ORGANISATIONJOINT ORGANISATION

Road and Bridge Register

Report prepared by 20 December 2018

CANBERRA REGION Executive Summary JOINT ORGANISATION

The Region Joint Organisation (CRJO) Road and Bridge Register presents a summary of priority infrastructure projects within the Canberra Region, which require funding from NSW State and Federal Governments.

A total of 102 Road and 38 Bridge Projects are included in this Register; submitted by the eleven councils who are members of the CRJO. Project information was submitted by the Engineering, Infrastructure or Operations Department within each council.

The eleven councils who are members of the CRJO include: Palerang Regional Council, Snowy Monaro Regional Council, Snowy Valleys Council, , Council, Wingecarribee Shire Council, , Goulburn Mulwaree Council, Eurobodalla Shire Council, Bega Valley Shire Council and City Council.

A summary of the project costs is provided below, noting that the NSW Government is requested to provide funding to assist Councils move one step closer to being Shovel‐Ready to deliver on 140 road and bridge projects. For example, a commitment of $5.5M will fund 41 Options Studies and $1.7M for 20 Concept Designs on Road and Bridge Projects that have been prioritized to commence in 1‐3 years. This is high impact, immediately expendable funding.

Planning Framework Identify & Options Site Concept Design & Const Const Finalise Brief & Close Out Stages Define Study Assess Design Spec Proc’mnt Delivery Contracts Approval

1-3 year $876M $0.3M [5] $5.5M [41] $1.3M [18] $1.7M [20] $2.1M [14] $7.7M [28] $0.3M [5] $327M [48] projects [100] Roads $0.3M [5] $4.5M [30] $0.9M [16] $1.4M [14] $2M [12] $6.5M [19] $0.3M [5] $277M [34] $810M [75] Bridges $1.0M [11] $0.04M [2] $0.3M [6] $0.08M [2] $1.2M [9] $49.1M [14] $66M [25]

4-10 year $258.1M $2.4M [24] $0.9M [14] $0.33M [4] $3,1M [11] $644M [38] projects [26] Roads $2.1 [16] $0.5M [7] $0.1M [1] $2.1M [8] $224M [21] $277M [26]

Bridges $0.3M [8] $0.33M [7] $0.23M [3] $1.0M [3] $34.1M [5] $367M [12]

10-20 year $0.55M [2] $0.8M [1] $0.3M [1] $3.5M [1] $10M [1] $7.5M [2] projects Roads $0.3M [1] $0.8M [1] $0.3M [1] $3.5M [1] [1] Bridges $0.25M [1] $10M [1] $7.5M [1]

We trust you will seriously consider the work that has been undertaken to ensure councils are shovel ready to commence road and bridge work across the region.

Cr. Rowena Abbey Chair, Canberra Region Joint Organisation [email protected] 0411 251 018

2

CANBERRA REGION Road & Bridge Map JOINT ORGANISATION

3

CANBERRA REGION Delivery Framework JOINT ORGANISATION

Road Projects [1‐3 Year Priority] Phase IDENTIFY PLAN DEVELOP DELIVER CLOSE

Framework Identify & Planning & Design & Construction Construction Finalise Brief Options Study Site Assessment Concept Design Close Out Stages Define Approvals Specification Procurement Delivery Contracts

% Council [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Total Cost ‐ Total # Project Council contributes to to Next Stage to Next Stage to Next Stage to Next Stage to Shovel‐Ready Time] next stage

1 Port of Eden: Upgrades (R) (H) BVSC 50% [$10K‐1mo] [$3M‐1yr] [$3.2M‐1.25yr]

2 Towamba and Burragate Roads: Sealing (L) (H) BVSC [$65k‐4mo] [$10M‐2yr] [$10.07M‐2.5yr]

3 Tantawangalo Mountain Road: Sealing (L) (H) BVSC [$35k‐1mo] [$1.95M‐1.5yr] [$1.99M‐2yr]

4 Tathra Public School: Traffic Safety Upgrades (R) BVSC [$10k‐2mo] [$400k‐1yr] [$0.42M‐1.5yr]

5 Sapphire Coast Drive: Realignment (R) BVSC [$50k‐4mo] [$400k‐1yr] [$0.45M‐2.5yr]

6 Wolumla Public School: Traffic Safety Upgrades (L) BVSC [$25k‐3mo] [$405k‐1yr] [$0.43M‐2yr]

7 Doctor George Mountain Road: Sealing (L) BVSC [$35k‐3mo] [$5M‐2yr] [$5.2M‐2.5yr]

8 Market Street Merimbula CBD: Revitalisation (L) BVSC [$100k‐6mo] [$14M‐3yr] [$14.1M‐3yr]

9 Beach Road Intersections: Upgrades (R) (H) ESC [$100k‐6mo] [$4.2M‐12mo] [$4.3M‐2yr]

10 George Bass Drive: Duplication of Lanes (R) (H) ESC [$800k‐4mo] [$0.8M‐4mo]

George Bass Drive/Grandfathers Gully: 11 ESC 25% [$100k‐3mo] [$3.9M‐18mo] [$4M‐3yr] Realignment(R)(H)

12 Beach Road: Installation of Central Median (R) (H) ESC [$100k‐3mo] [$1.7M‐9mo] [$1.8M‐1yr]

13 George Bass Drive: Upgrades (R) (H) ESC [$150k‐6mo] [$7.85M‐18mo] [$8M‐2yr]

14 Eurobodalla Road: Upgrades (L) (H) ESC 25% [$150k‐3mo] [$750k‐6mo] [$0.9M‐9mo]

15 ESC High Priority Pathways: New Construction (R) ESC 20% [$100k‐3mo] [$5.4M‐24mo] [$5.5M‐3yr]

16 Moruya Town Centre: Pedestrian Activation (L) ESC [$800k‐12mo) [$0.8M‐yr]

17 Dunns Creek Road: Safety Improvements (L) ESC [$100k‐2mo] [$900k‐4mo] [$1M‐6mo]

18 Orient Street CBD Intersections: Upgrades (L) ESC [$100k‐3mo] [$3.4M‐9mo] [$3.5M‐1yr]

19 Gurrundah Road: Upgrades (L) (H) GMC [$50k‐3mo] [$50k‐3mo] [$4.07M‐4yr]

20 Bungonia Road: Upgrades (L) (H) GMC 50% [$50k‐3mo] [$50k‐3mo] [$50k‐3mo] [$1.2M‐2yr]

21 Range Road: Upgrades (L) (H) GMC [$100k‐6mo] [$3.7M‐4yr]

22 Road: Upgrades (L) GMC [$50k‐3mo] [$50k‐3mo] [$8.6M‐4yr]

23 Ford Road: Upgrades (L) GMC 50% [$50k‐3mo] [$100k‐6mo] [$4.04M‐4yr]

24 Lumley Road : Upgrades (L) GMC 50% [$50k‐3mo] [$3M‐2yr]

25 Cullulla Road: Upgrades (L) GMC 50% [$100k‐6mo] [$20M‐4yr]

26 Sandy Point Road: Upgrades (L) GMC 50% [$100k‐6mo] [$3M‐2yr]

27 : Upgrades (S) (H) HC 50% [$20k‐2mo] [$65k‐3mo] [$50k‐2mo] [$0.135]*

28 Murringo Road: Upgrades (R) (H) HC [$20k‐2mo] [$80k‐3mo] [$50k‐2mo] [$30M‐1yr]

29 Road Bypass: Upgrades (L) (H) HC 50% [$20k‐2mo] [$50k‐2mo] [$50k‐2mo] [$22M‐yr]

30 Chews Lane Bypass: Upgrades (L) (H) HC 50% [$20k‐2mo] [$50k‐3mo] [$50k‐2mo] [$24M‐1yr]

31 : Upgrades (L) HC [$20k‐2mo] [$80k‐3mo] [$50k‐2mo] [$24M‐1yr]

32 Bribbaree Road: Upgrades (L) HC 50% [$20k‐2mo] [$50k‐3mo] [$50k‐2mo] [$24M‐1yr]

33 Mahons Reef Road: Upgrades (L) HC 50% [$20k‐2mo] [$50k‐3mo] [$50k‐2mo] [$24M‐1yr]

34 Nerriga Road (R) (H) QPRC [$350k‐12mo] [$28M‐4yr] [$28M‐4yr]

35 : Road Realignment and upgrade (R) (H) QPRC [$36M‐6yr]

36 Bypass (L) (H) QPRC [$1M‐24mo] [$1M‐2yr]*

37 Braidwood Bypass (L) (H) QPRC [$1M‐24mo] [$1M‐2yr]*

4

CANBERRA REGION Delivery Framework JOINT ORGANISATION

Road Projects [1‐3 Year Priority] Phase IDENTIFY PLAN DEVELOP DELIVER CLOSE

Framework Identify & Planning & Design & Construction Construction Finalise Brief Options Study Site Assessment Concept Design Close Out Stages Define Approvals Specification Procurement Delivery Contracts

% Council [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Total Cost ‐ Total # Project Council contributes to to Next Stage to Next Stage to Next Stage to Next Stage to Shovel‐Ready Time] next stage

38 Braidwood Mainstreet: Upgrade (S) QPRC [$150k‐18mo] [$300k‐24mo] [$16M‐1.5yr] [$16M‐5yr]

39 Williamsdale Road (L) QPRC [$250k‐12mo] [$25M‐4yr] [$25M‐4yr]

40 Burra Bends extension (L) QPRC 50% [$150‐12mo] [$3.4M‐3yr] [$3.4M‐3yr]

41 Black Lake Road: Upgrades (R) (H) SMRC 35% [$43k‐6mo] [$212k‐12mo] [$3.9M‐12mo] [$4.3M‐2.5yr]

42 Middlingbank Road: Upgrades (R) (H) SMRC 10% [$139k‐6mo] [$695k‐12mo] [$13.1M‐2.5yr] [$13.9M‐4yr]

43 The Snowy Way: Upgrades (R) (H) SMRC 10% [$66k‐6mo] [$330k‐12mo] [$6.2M‐1.5yr] [$6.6M‐3yr]

44 Polo Flat Road: Upgrades (R) (H) SMRC 10% [$18k‐6mo] [$90k‐12mo] [$1.7M‐1.5yr] [$1.8M‐3yr]

45 Cathcart Road: Upgrades (R) (H) SMRC 10% [$49.5k‐6mo] [$248k‐6mo] [$4.7M‐24mo] [$5M‐3yr]

46 : Upgrades (R) (H) SMRC 10% [$288k‐6mo] [$1.4M‐6mo] [$27M‐3yr] [$28.8M‐4yr]

47 Jerangle Road: Upgrades (L) SMRC 10% [$238k‐6mo] [$1.2M‐2yr] [$22.4M‐3yr] [$23.8M‐4yr]

48 : Overtaking Lanes (S) (H) SVC [$20k‐6mo] [$45M‐4yr]

49 : Heavy Vehicle Bypass (S) (H) SVC [$75k‐5mo] [$0.85M]*

50 Batlow Road: Climbing Lanes (S) (H) SVC [$20k‐6mo] [$0.20M]*

51 Snowy Mountains Highway: Upgrades (S) (H) SVC [$10k‐2mo] [$0.01M]*

52 Tooma Road: Upgrades (R) (H) SVC [$75k‐6mo] [$22M‐3yr]

53 Yellowin Access Road: Upgrades (L) (H) SVC [$40k‐4mo] [$15M‐4yr]

54 Brungle Road: Upgrades (L) SVC 50% [$40k‐3mo] [$10k‐2mo] [$0.8‐2yr]

55 Courabyra Road: Upgrades (L) SVC 50% [$75k‐7mo] [$6M‐3yr]

56 Rye Park Road (R) (H) Rye Park Road (R) (H) ULSC ULSC [$18.5‐3.5yr] [$18.5‐3.5yr]

57 Tablelands Way Various Sections (R) (H) ULSC [$100k‐9mo] [250k‐6mo] [$6.15M‐2.5yr] [$6.5M3.75]

58 Wombeyan Caves Road: Upgrades (R) ULSC [$11.05M‐5yr] [$11.05M‐5yr]

59 Grabine Road: Upgrades (L) ULSC [$4.25M‐2yr] [$4.25M‐2yr]

60 Moss Vale Bypass: Stages 1‐3 (R) (H) WSC [$850k‐18mo] [$50M‐10yr]

61 Exeter/Bundanoon Road: Upgrades (R) (H) WSC [$100k‐12mo] [$20M‐8yr] [$20M‐8yr]

62 Old South Road: Upgrades (L) WSC 15% [$250k‐12mo] [$25M‐6yr] [$25M‐6yr]

63 Holbrook Road: Reconstruction (R) (H) WWCC [$150k‐2yr] [$37.3M‐6yr]

64 Tumbarumba Road: Upgrades (R) (H) WWCC [$450k‐2yr] [$16.6M‐4yr]

65 Byrnes Road: Upgrades (L) (H) WWCC [$300k‐2yr] [$8M‐3yr]

66 Inglewood Road: Upgrades (L) (H) WWCC [$50k‐1yr] [$5.2M‐3yr]

67 Glenfield Road: Upgrades (L) (H) WWCC [$500k‐2yr] [$20.2M‐3yr]

68 Farrar Road: Upgrades (L) WWCC [$75k‐1yr] [$7.9M‐3yr]

69 Lake Albert Road: Reconstruction (L) WWCC [$50k‐2yr] [$18.2M‐3yr]

70 Gregadoo Road: Reconstruction (L) WWCC [$200k‐1yr] [$6.04M‐4yr]

71 Ivan Jack Drive: Reconstruction (L) WWCC [$20k‐1yr] [$6.4M‐4yr]

72 Macleay Street: Reconstruction (L) () WWCC [$75k‐1yr] [$3.4M‐2yr]

73 Mulligans Flat Road: Upgrades (R) (H) YVC 25% [$250k‐6mo] [$25k‐3mo] [$0.275M]*

74 Namima Road: Upgrades (L) H YVC 25% [$50k‐6mo] [$25k‐3mo] [$0.75]*

5

CANBERRA REGION Delivery Framework JOINT ORGANISATION

Road Projects [1‐3 Year Priority] Phase IDENTIFY PLAN DEVELOP DELIVER CLOSE

Framework Identify & Planning & Design & Construction Construction Finalise Brief Options Study Site Assessment Concept Design Close Out Stages Define Approvals Specification Procurement Delivery Contracts

% Council [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Total Cost ‐ Total # Project Council contributes to to Next Stage to Next Stage to Next Stage to Next Stage to Shovel‐Ready Time] next stage

75 : Upgrades (R) YVC 25% [$200k‐12mo] [$75k‐3mo] [$0.275M]*

Road Projects [4‐10 Yr Priority] 76 Guardrail: Replacement (R) BVSC [$50k‐6mo] [$2M‐10yr] [$2M‐10yr]

77 Bermagui‐Tathra Road: Upgrades (R) BVSC [$150k‐3mo] [$2.5M‐2yr] [$3M‐4yr]

78 Lamont St Bermagui: Revitalisation Project (R) BVSC [$100k‐18mo] [$10M‐5yr] [$10M‐5yr]

79 Carp St Bega: Revitalisation Project (R) BVSC [$100k‐24mo] [$2M7yr] [$5M‐7yr]

80 Mountain Ash Road: Upgrades (L) () GMC 50% [$100k‐6mo] [$100k‐6mo] [$7.33M‐4yr]

81 Bungendore Road (R) H QPRC [$200k‐15mo] [$26M‐5yr]

82 Cooma Street Queanbeyan (R) () QPRC [$200k‐15mo] [$21M‐5yr]

83 Badja Road: Upgrades (R) (H) SMRC 15% [$67k‐6mo] [$334k‐12mo] [$9.2M‐2yr] [$10M‐3.5yr]

84 Dalgety Road: Upgrades (R) (H) SMRC 10% [$39k‐6mo] [$192k‐6mo] [$3.6M‐24mo] [$3.9M‐3yr]

85 Countegany Road: Upgrades (R) H SMRC 10% [$50.5k‐6mo] [$252k‐6mo] [$4.7M‐24mo] [$5.1M‐3yr]

86 Numeralla Road: Upgrades (L) SMRC 10% [$423k‐6mo] [$7.95M‐24mo] [$8.5M‐3yr]

87 Wheeo Road: Upgrades (L) ULSC [$4.2M‐12mo] [$4.2M‐1yr]

88 Road (L) ULSC [$12.75M‐2yr] [$12.75M‐2.5yr]

89 Alternate Route Collector Rd: Upgrades (L) ULSC [$15.39‐4.5yr] [$15.39M‐4.5yr]

90 Peelwood Road (L) ULSC [$200k‐6mo] [$14.8M‐5yr] [$15M‐5.5yr]

91 Breadalbane Road: Flood Damage (L) () ULSC [$200k‐6mo] [$3.8M‐2yr] [$4M‐2.5yr]

92 Bowral Distributor Road: Stage 2 (R) (H) WSC [$15M‐4yr] [$15M‐5yr]

93 Berrima Road/Taylor Avenue: Upgrades (R) (H) WSC [$125k‐12mo] [$17.5M‐5yr] [$17.5M‐6yr]

94 Penrose Road: Upgrades (R) (H) WSC [$200k‐12mo] [$30M‐5yr] [$30M‐6yr]

95 Nowra Road: Upgrades (R) H WSC [$250k‐12mo] [$35M‐5yr] [$35M‐6yr]

96 Wilson Drive: Upgrades (L) WSC [$225k‐12mo] [$15M‐4yr] [$15M‐5yr]

97 Range Road: Upgrades (L) () WSC [$100k‐12mo] [$16M‐4yr] [$16M‐5yr]

Murrumbateman Road/Shingle Hill Road: Upgrades 98 YVC 25% [$100k‐6mo] [$50k‐3mo] [$0.15M]* (R) (H)

99 Dog Trap Road: Extension (L) H YVC 25% [$250k‐6mo] [$25k‐3mo] [$0.275M]*

100 Wee Jasper Road: Upgrades (R) YVC 25% [$150k‐9mo] [$75k‐3mo] [$0.225M]*

101 Euroka Avenue: Upgrades (L) YVC 25% [$50k‐6mo] [$25k‐3mo] [$0.75]*

Road Projects [10‐20 Yr Priority] 102 Oallen Ford Road (L) (H) QPRC [$300k‐12mo] [$800k‐18mo] [$300k‐6mo] [$3.5M‐12mo] [$63M‐4yr]

6

CANBERRA REGION Delivery Framework JOINT ORGANISATION

Bridge Projects [1‐3 Yr Priority] Phase IDENTIFY PLAN DEVELOP DELIVER CLOSE

Framework Identify & Planning & Design & Construction Construction Finalise Brief Options Study Site Assessment Concept Design Close Out Stages Define Approvals Specification Procurement Delivery Contracts

% Council [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Total Cost ‐ Total # Project Council contributes to to Next Stage to Next Stage to Next Stage to Next Stage to Shovel‐Ready Time] next stage

103 Whipstick Creek Bridge: Replacement (R) (H) BVSC [$55k‐1mo] [$1.1m‐6mo] [$1.2M‐9mo]

104 BVSC Bridges: Replacement (1‐3yr package) (R) (H) BVSC [$250k‐12mo] [$10M‐3yr] [$10.05M‐3yr]

105 Cuttagee Bridge: Upgrades (R) (H) BVSC [$250k‐6mo] [$14M‐3yr] [$12‐$15M‐4yr]

106 Pericoe Creek Bridge: Replacement (L) BVSC [$15k‐1mo] [$115k‐3mo] [$0.13M‐3mo]

107 Slaters Lane Bridge: Replacement (L) BVSC [$25k‐3mo] [$290k‐1yr] [$0.3M‐1.5yr]

108 Garlandtown Bridge: Upgrades (R) ESC 35% [$150k‐6mo] [$950k‐10mo] [$1.1M‐2yr]

109 May Street Bridge: Replacement (L) GMC [$1.6M‐1yr] [$1.7M‐1yr]

110 Bridge: Replacement (L) GMC [$150k‐4mo] [$4.2M‐2yr]

111 Resch's Crossing (L) QPRC [$1.8M‐2yr] [$1.8M‐2yr]

112 Peak Creek Bridge: Replacement (R) (H) SMRC 50% [$50k‐3mo] [$25k‐3mo] [$100k‐6mo] [$700k‐12mo] [$0.9M‐2yr]

113 Bridge: Replacement (R) (H) SMRC 25% [$50k‐3mo] [$50k‐3mo] [$100k‐6mo] [$1.8M‐12mo] [$2M‐2.25yr]

114 Bridge: Upgrades (L) SMRC 15% [$50k‐3mo] [$50k‐6mo] [$120k‐6mo] [$980k‐12mo] [$1.2M‐2yr]

115 Sherlock River Bridge: Upgrade/Replacement (L) SMRC 15% [$50k‐3mo] [$50k‐6mo] [$200k‐12mo] [$3M‐12mo] [$3.3M‐2.5yr]

116 Jacksons Bridge: Replacement (S) (H) SVC [$50k‐6mo] [$12M‐3yr]

117 Wingecarribee Street Bridge: Duplication (L) (H) WSC [$400k‐12mo] [$12M‐4yr] [$12M‐4yr]

118 Lockhart Road: Culvert Replacement (R) (H) WWCC [$25k‐6mo] [$1.05M‐1yr]

119 Burkes Creek Bridge: Upgrades (R) (H) WWCC [$20k‐6mo] [$0.45M‐3yr]

120 Umbango Creek Bridge: Upgrades (L) (H) WWCC [$50k‐6mo] [$0.75M‐1yr]

121 Tooles Creek Bridge: Upgrades (L) (H) WWCC [$30k‐6mo] [$0.75M‐2yr]

122 Beavers Creek Bridge: Upgrades (R) WWCC [$20k‐12mo] [$0.75M‐3yr]

123 Brooklynn Lane Bridge: Replacement (L) WWCC [$25k‐12mo] [$0.45M‐3yr]

124 Mona Vale Road Bridge: Replacement (L) WWCC [$25k‐12mo] [$0.45M‐3yr]

125 Wollundry Lagoon Bridge: Upgrades (L) WWCC [$750k‐12mo] [$0.75M‐2yr]

126 Big Springs Road: Culvert Replacement (L) WWCC [$25k‐18mo] [$0.75M‐2yr]

127 Bulloc Hills Road Bridge: Replacement (L) WWCC [$25k‐12mo] [$0.45M‐3yr]

7

CANBERRA REGION Delivery Framework JOINT ORGANISATION

Bridge Projects [4‐10 Yr Priority] Phase IDENTIFY PLAN DEVELOP DELIVER CLOSE

Framework Identify & Planning & Design & Construction Construction Finalise Brief Options Study Site Assessment Concept Design Close Out Stages Define Approvals Specification Procurement Delivery Contracts

% Council [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Cost ‐ Time] [Total Cost ‐ Total # Project Council contributes to to Next Stage to Next Stage to Next Stage to Next Stage to Shovel‐Ready Time] next stage

128 Tathra Wharf: Renewal (State Owned) (State) BVSC [$150k‐6mo] [$10M‐1yr] [$10M‐10yr]

129 BVSC Bridges: Replacement (4‐10yr package) (R) BVSC [$125k‐12mo] [$10m‐10yr] [$10.2M‐10yr]

130 Thornford Bridge: Replacement (L) GMC [$50k‐3mo] [$50k‐3mo] [$0.7M‐3yr]

131 Carrick Road Bridge: Replacement (L) GMC [$50k‐3mo] [$50k‐3mo] [$0.9M‐3yr]

132 Foxlow Bridge (L) QPRC [$3.6M‐2yr]

133 Badja River Bridge: Upgrade (R) (H) SMRC 15% [$50k‐3mo] [$50k‐6mo] [$200k‐12mo] [$3M‐12mo] [$3.3M‐2.5yr]

134 Bridge: Upgrades (L) SMRC 50% [$50k‐3mo] [$30k‐3mo] [$100k‐6mo] [$800k‐12mo] [$0.97M‐1.75yr]

135 ULSC Bridges: Replacement (4‐10yr package) (L) ULSC [$700k‐12mo] [$10.3M‐10yr] [$11M‐11yr]

136 Burrinjuck Road Bridge: Replacement (R) (H) YVC 50% [$20k‐6mo] [$25k‐3mo] [$0.045]*

Burrinjuck Road Bridge: Replacement (Childowa Trail) 137 YVC 50% [$20k‐6mo] [$25k‐3mo] [$0.045]* (R) (H)

138 Bango Lane Bridge: Replacement (L) YVC 50% [$20k‐6mo] [$25k‐3mo] [$0.045]*

139 Garryowen Road Bridge: Replacement (L) YVC 50% [$20k‐6mo] [$25k‐3mo] [$0.045]*

Bridge Projects [10‐20 Year Priority] 140 BVSC Bridges: Replacement (10‐20yr package) (R) BVSC [$250k‐12mo] [$10M‐20yr] [$10.3M‐20yr]

* refers to a project that does not have a total close out cost or cost to commission (L) Local Road (R) Regional Road (S) State Road (H) Heavy Vehicles Road

KEY – PROJECT STATUS

Under preparation Funding Required, Submitted, Awaiting Funding

Completed

Declined Funding*

8

CANBERRA REGION Project Data JOINT ORGANISATION

Road Road Name(s) Project Description Electorate AADT Project Council Number(s) State / Federal Vehicles / Heavy Vehicles

1 Port of Eden: Upgrades BVSC Mitchell St, Calle Upgrade of the intersection of Imlay Street/Albert Terrace including bus drop off for two buses on Imlay Street, upgrade of Bega / Eden Monaro 1917 (2017) / 167 (2017) Calle St, Chandos the intersection of Albert Terrace/Museum Street, upgrade of Albert Terrace between Imlay Street and Weecoon Street St, Albert Terrace, including; Construction of a 1.5M auxiliary lane for prospective cycleway of tourist ‘road trains’. Construction of four new Weecoon St pedestrian platforms for an interactive walk along Albert Terrace. Installation of stairs leading from Albert Terrace to Eden Whale Museum. Replacement of rock retaining wall at Albert Street, south of Imlay Street/Albert Street intersection. 3m shared pathway on the eastern side of Albert Street. Upgrade of inlet to stormwater pits along Albert Street. Upgrade of Chandos Street, Calle Calle Street and Mitchell Street for a Heavy Vehicle Route bypassing Eden town centre. Landscaping works. Development of an historic interpretive walk. 2 Towamba and Burragate Roads: Sealing BVSC Towamba Rd, Seal the remaining 25km of gravel road on Towamba and Burragate Roads. Bega / Eden Monaro 140 (2017) / 11 (2017) Burragate Rd 3 Tantawangalo Mountain Road: Sealing BVSC Tantawangalo Seal 1.6km of gravel road between the two sealed sections on Tantawangalo Mountain Road. Bega / Eden Monaro 177 (2018) / 24 (2018) Mountain Rd 4 Tathra Public School: Traffic Safety Upgrades BVSC Bega St Reform entrance to Tathra Public School, to include parking formalisation, signage, bus stop, and pathways (which are to Bega / Eden Monaro 5391 (2018) / 412 (2018) link to the Tathra to Kalaru Bike Track). 5 Sapphire Coast Drive: Realignment BVSC Sapphire Coast Sapphire Coast Drive/Berrambool Drive realignment forms the northern approach to Merimbula. It is one of three access Bega / Eden Monaro 9453 (2007) / Drive, Berrambool points into the key activity centre of Merimbula. It is currently a T‐intersection with the priority to Berrambool Drive. Project Drive is to re‐align intersection so that Sapphire Coast Drive has right of way over Berrambool Drive. 6 Wolumla Public School: Traffic Safety Upgrades BVSC Bega St Concrete footpath from the school main entrance on top of the bank to Bellbird Court. Concrete footpath Bellbird Court. Bega / Eden Monaro 635 (2018) / 72 (2018) Pedestrian fence full length of Bega Street where new footpath goes in. Footpath from main entrance 50m to the north east to the bus set down facility. Edgelines full length of school frontage on Bega Street. Two speed control devices on Bega Street. VAS signs both ends. 7 Doctor George Mountain Road: Sealing BVSC Doctor George Seal 11.1km of gravel road. Bega / Eden Monaro 165 (2017) / 20 (2017) Mountain Rd 8 Market Street Merimbula CBD: Revitalisation BVSC Refer to the recent submission. The upgrade requirements have identified with a landscape master plan to address the tired Bega / Eden Monaro infrastructure. The works include active transport improvements and safe crossing facilities improving traffic flows specially the commercial vehicles. 9 Beach Road Intersections: Upgrades ESC MR560 Beach Rd, Pacific St Install CHR intersections including pedestrian activated traffic signals at Pacific Street, central median/traffic islands, services Bega / Gilmore 15330 (2017) / 613 and Herarde St relocation, land acquisition, stormwater, pavement and bitumen seal. (2017) 10 George Bass Drive: Duplication of Lanes ESC MR7630 George Bass Drive Construct 1000m of additional lane to create two lanes in both directions including earthworks, kerb and gutter, Bega / Gilmore 5598 (2013) / 391 (2013) stormwater, pavement construction and new bitumen seal. 11 George Bass Drive/Grandfathers Gully: Realignment ESC MR7630 George Bass Drive Realign 1100m of road including clearing, earthworks, land acquisition, services relocation, stormwater, pavement Bega / Gilmore 4981 (2017) / 349 (2017) construction and new bitumen seal. 12 Beach Road: Installation of Central Median ESC MR560 Beach Rd Install central median 630m of road including services relocation, widening of pavement, stormwater, new kerb and gutter Bega / Gilmore 17995 (2017) / 720 and bitumen seal. (2017) 13 George Bass Drive: Upgrades ESC MR7630 George Bass Drive Widen, strengthen and improve safety to 1000m of road including service relocation, roundabouts, restricted right turns, Bega / Gilmore 4039 (2012) / 282 (2012) shared pathway, 600m median, new pavement and bitumen seal. 14 Eurobodalla Road: Upgrades ESC Eurobodalla Rd Widen and strengthen 800m of road including kerb and gutter, footpath, stormwater and new bitumen seal. Bega / Eden Monaro 497 (2013) / 94 (2013) 15 ESC High Priority Pathways: New Construction ESC Various High priority pathways identified from the Eurobodalla Pathways Strategy 2017. Footpaths and shared pathways providing Bega / Gilmore/Eden Monaro 2000 (2018) / 140 (2018) strategic connectivity to commercial, recreational, cultural and education centres and to integrate with public and school transport. The pathways selected are limited to those with a significant road safety benefit, separating pedestrians and young cyclists from vehicular traffic on the busiest roads in the Shire. 16 Moruya Town Centre: Pedestrian Activation ESC Ford St, Queen St, Design and install speed controls and pedestrian crossing points. Bega / Gilmore 7737 (2018) / 387 (2018) Church St and Shore St 17 Dunns Creek Road: Safety Improvements ESC Dunns Creek Rd Safety improvements to 4350m of road including linemarking, CAMS's, signage, provision of sealed shoulder, improving Bega / Gilmore 1957 (2013) / 78 (2013) clear zones and guardrail. 18 Orient Street CBD Intersections: Upgrades ESC Orient St, Camp St Signalise and realign intersection including islands, service relocation, earthworks, land acquisition, kerb and gutter, signals, Bega / Gilmore 3863 (2013) / 154 (2013) and Museum Place pavement and asphalt surface. 19 Gurrundah Road: Upgrades GMC 0041 Gurrundah Rd Rehabilitate damaged pavement and widen the road to achieve a 9m formation with 8m seal for the 17.4km length. Goulburn / Hume 651 (2017) / 78 (2017) 20 Bungonia Road: Upgrades GMC 0451 Bungonia Rd Road widening and overlay of 595m length road section between Lansdown Bridge and Braidwood Road intersection, Goulburn / Hume 2131 (2016) / 130 (2016) including footpath, kerb and gutter, culvert extension and elevated road level to cater for 1 in 5 flood event. 21 Range Road: Upgrades GMC 0128 Range Rd Widening and rehabilitation of entire length from 0.212km to 20.278km which is about 19.8km of haulage route. Goulburn / Hume 607 (2017) / 65 (2018) 22 Windellama Road: Upgrades GMC 0042 Windellama Rd Rehabilitate damaged pavement and widen the road to achieve a 9m formation with 8m seal for the 37km length. Goulburn / Hume 1658 (2017) / 162 (2017) 23 Oallen Ford Road: Upgrades GMC 0024 Oallen Ford Rd Road widening and rehabilitation work, starting from Windellama Road intersection up to Sandy Point Road intersection Goulburn / Hume 1282 (2017) / 86 (2017) length of 4.77km including replacement of bridge size culvert/causeway at 24.4km from Windellama Road intersection. 9

CANBERRA REGION Project Data JOINT ORGANISATION

Road Road Name(s) Project Description Electorate AADT Project Council Number(s) State / Federal Vehicles / Heavy Vehicles

24 Lumley Road : Upgrades GMC RD112 Lumley Rd Widening and rehabilitation of entire length from 33km to 37.771km which is about 5km of haulage route. Goulburn / Hume 770 (2017) / 45 (2017) 25 Cullulla Road: Upgrades GMC RD33 Cullulla Rd Widening and rehabilitation of entire length from 0km to 37.771km which is about 37.77km of haulage route. From Lumley / Hume 818 (2017) / 100(2017) 26 Sandy Point Road: Upgrades GMC RD95 Sandy Point Rd Widening and rehabilitation of entire length from 10.86km to 16.5km which is about 5.64km of haulage route. Goulburn / Hume 794 (2017) / 60 (2017) 27 Lachlan Valley Way: Upgrades HC MR56 Lachlan Valley Way Improve the road alignment and road width, provide heavy vehicle passing bays, traffic safety improvements and pavement & Goulburn / 3000 (2017) / 390 (2017) strengthening, project length 44km. /Hume 28 Murringo Road: Upgrades HC RR241 Murringo Rd: Widen the road shoulders and seal 1m shoulders each lane, pavement strengthening 22km, five bridge replacements to Cootamundra & Goulburn / 1221 (2016) / 232 (2016) Shoulder HML vehicle capacity, project length 49km. Riverina/Hume 29 Jugiong Road Bypass: Upgrades HC RR381 Jugiong Rd Widen the road shoulders and seal 1m shoulders each lane 20km, pavement strengthening 20km, guardrail install at curves Cootamundra & Goulburn / 387 (2016) / 34 (2016) and drop‐offs. Two bridge replacements to HML vehicle capacity, project length 20km. acceleration lane off Riverina/Hume Riverside Drive (south). 30 Chews Lane Bypass: Upgrades HC 66 Chews Lane, part Widen the road shoulders and seal 1m shoulders each lane 14km, pavement strengthening 14km, guardrail install at curves Cootamundra & Goulburn / 173 (2015) / 17 (2015) and drop‐offs, one bridge replacement to HML vehicle capacity, project length 14km. Riverina/Hume 31 Henry Lawson Way: Upgrades HC RR3239 Henry Lawson Way Shoulder widening, 26km of pavement strengthening, four bridge replacements and major culverts to HML vehicle capacity, Cootamundra & Goulburn / traffic safety improvements, project length 26km. Riverina/Hume 32 Bribbaree Road: Upgrades HC 70 Bribbaree Rd Widen the road shoulders and seal 1m shoulders each lane 42km, pavement strengthening 42km, 3 x bridge replacement to Cootamundra & Goulburn / 251 (2014) / 36 (2014) HML vehicle capacity, project length 42km. Riverina/Hume 33 Mahons Reef Road: Upgrades HC McMahons Reef Rd Widen the road shoulders and seal 1m shoulders each lane 35km, bitumen seal full length 35km, pavement strengthening Cootamundra & Goulburn / 112 (2017) / 35 (2017) 35km, guardrail install at curves and drop‐offs and bridge replacement to HML vehicle capacity, project length 35km. Riverina/Hume 34 Nerriga Road QPRC MR92 Pavement rehabilitation from Nerriga‐, widening and rehabilitation from Oallen Road to Nerriga Widening and Monaro / Eden Monaro 1210(2018) / 108(208) rehabilitation from MR51‐Halls Lane. 35 Captains Flat: Road Realignment and upgrade QPRC MR72 Realign and widen road to allow for 100km/h alignment. Replace bridges to allow for 11m wide road and shoulder. Monaro / Eden Monaro 1070 (2018) / 401 (2018) 36 Bungendore Bypass QPRC Bypass. Monaro / Eden Monaro 37 Braidwood Bypass QPRC Bypass. Monaro / Eden Monaro 38 Braidwood Mainstreet: Upgrade QPRC HW51 Kings Hwy Mainstreet upgrade and construction of a car park to accommodate approximately 180 (TBC) vehicles to increase parking Monaro / Eden Monaro 5072 (2017) / 598 (2017 capacity of the town, relocate Councils depot to locate the carpark. Redevelop some of the land to assist with funding the project. 39 Williamsdale Road QPRC Seal Williamsdale Road and realign vertical and horizontal curves to allow a 100km/h speed limit. Replace the low level Monaro / Eden Monaro 356 (2018) / 36 (2018) crossing at the Burra end of Williamsdale Road to reduce flood impacts on the road. 40 Burra Bends extension QPRC Widen and realign road to allow 100km/h vertical and horizontal alignment and install safety barriers as required. Monaro / Eden Monaro 1072 (2018) / 49 (2018) 41 Black Lake Road: Upgrades SMRC MR563 Black Lake Rd Widen and realign formation for 9.5km to regional road standards, improve drainage as required, overlay 200mm DGB20 Monaro / Eden Monaro Currently collecting data road base, primer seal 9.5km x 10mm primer and final seal 9.5km x 14mm C240. 42 Middlingbank Road: Upgrades SMRC MR585 Middlingbank Rd Widen and realign formation for 30.86km to regional road standards, improve drainage as required, overlay 200mm DGB20 Monaro / Eden Monaro 156 (2016) / 6 (2016) road base, primer seal 30.86km x 10mm, final seal 30.86km x 14mm C240. 43 The Way: Upgrades SMRC MR7626/394 Snowy River Way Widen and realign formation for 14km to regional road standards, overlay 150mm DGB 20 road base, primer seal 14km x Monaro / Eden Monaro 267 (2015) / 39 (2015) 10mm primer, final seal with 14mm C240. 44 Polo Flat Road: Upgrades SMRC MR7624 Polo Flat Rd Overlay Road 150mm DGB20 for 4km, stabilise road with 60/40 slag lime, place 7mm primer for 4km and place AC50mm for Monaro / Eden Monaro Currently collecting data 4km. 45 Cathcart Road: Upgrades SMRC MR91 Cathcart Rd Widen and realign formation to meet regional road standards 11km, overlay 200mm DGB 20 road base, primer seal 11km x Monaro / Eden Monaro Currently collecting data 10mm, final seal with 14mm C241. 46 Barry Way: Upgrades SMRC MR4056 Barry Way Realign road to meet Collector road standards for 29km, improved drainage, overlay 100mm DGB 20 road base, primer seal Monaro / Eden Monaro 1230 (2014) / 33 (2014) 29km x 10mm, final seal with 14mm C240. 47 Jerangle Road: Upgrades SMRC Jerangle Rd Widen and realign formation to meet Collector road standards 53km, overlay 200mm DGB 20 road base, primer seal 53km x Monaro / Eden Monaro 159 (2017) / 19 (2017) 10mm, final seal with 14mm C240. 48 Snowy Mountains Highway: Overtaking Lanes SVC Snowy Mountains Widen road and seal 1m shoulders, new seal across the entire length. 28km of new seal and 150km shoulder widening. Wagga Wagga / Eden Monaro Hwy 49 Tumbarumba: Heavy Vehicle Bypass SVC Tumbarumba Heavy Vehicle bypass route feasibility study, investigation, costing and implementation to remove heavy vehicles (including / Eden Monaro Township HML) from the Main Street of the town. 50 Batlow Road: Climbing Lanes SVC Batlow‐ Creation of climbing lanes on the Batlow Road (MR85) to allow safe opportunity for traffic to negotiate timber haulage Wagga Wagga / Eden Monaro Tumbarumba Rd traffic. 51 Snowy Mountains Highway: Upgrades SVC Realignment of corners to improve safety and widening to consistent width. Wagga Wagga / Riverina 52 Tooma Road: Upgrades SVC Tooma Rd: Widen road to 8m seal, 9m formation and overlay of pavement with 150mm gravel from Maragle Road to . Albury / Eden Monaro Increased Strengthen deteriorating B‐Double route pavement. 53 Yellowin Access Road: Upgrades SVC MR85 Yellowin Access Rd Pavement strengthening and sealing of the Yellow Access Road (21km) from Batlow to Talbingo. Wagga Wagga / Eden Monaro 54 Brungle Road: Upgrades SVC Brungle Rd Improvement of alignment, site distance and road width (to minimum 7m seal) from Wee Jasper Road to Brungle. Wagga Wagga / Riverina 55 Courabyra Road: Upgrades SVC Courabyra Rd Overlay of 150mm and widening to 8m to allow for HML vehicle access and removal of weight restriction for 22km. Albury / Eden Monaro

10

CANBERRA REGION Project Data JOINT ORGANISATION

Road Road Name(s) Project Description Electorate AADT Project Council Number(s) State / Federal Vehicles / Heavy Vehicles

56 Rye Park Road ULSC Corridor widening to 12m (21.76km), pavement strengthening, compaction, seals line making and sings in addition to some Goulburn / Hume 126 (2017) / 13 (2017) minor rectification of horizontal and vertical curves. 57 Tablelands Way Various Sections ULSC Realignment of Curraweela Creek causeway with installation box culvert and elevated road pavement, corridor widening Goulburn / Hume 301 (2018) / 135 (2018) 10m and slope stabilization over decline to (6.5km). 58 Wombeyan Caves Road: Upgrades ULSC Grabine Rd Corridor widening to 10m on ridge (9km) and 7m over decline (4km), pavement strengthening, compaction, seals line Goulburn / Hume 166 (2013) / 4.05 (2013) making and sings in addition to some minor rectification of horizontal and vertical curves. 59 Grabine Road: Upgrades ULSC Various Corridor widening to 7m (5.7km), pavement strengthening, compaction, seals, signs in addition to some minor rectification Goulburn / Hume 82 (2018) / 19 (2018) of horizontal and vertical curves, remove of gates with bypasses and fencing out road reserve. 60 Moss Vale Bypass: Stages 1‐3 WSC MR260 Moss Vale Bypass Construction of 3.3 km of new road, a railway overbridge and eight roundabouts. Goulburn/Wollondilly / 6320 (2015) / 700 (2015) Whitlam/Hume 61 Exeter/Bundanoon Road: Upgrades WSC MR569 Bundanoon and Pavement reconstruction, widen road and place new seal, including 1m shoulder over entire length. 10 km from Sutton Goulburn/Wollondilly / 3453 (2016) / 350 (2016) Exeter Rds Forest to Bundanoon. Whitlam/Hume 62 Old South Road: Upgrades WSC 1587 Old South Rd Pavement reconstruction, widen road and place new seal, including 1m shoulder over entire length. 12.7 km from Goulburn/Wollondilly / 5887 (2016) / 300 (2016) Merrigang Street to Old Hume Hwy. Whitlam/Hume 63 Holbrook Road: reconstruction WWCC 1154 Holbrook Rd 30km total. Construction of new pavement and increased width, formalised gravel shoulders and roadside drainage. Wagga Wagga / Riverina 1021 (2018) / 201 (2018) Intersection improvements for rural freight and associated vehicles. 64 Tumbarumba Road: Upgrades WWCC 575 Tumbarumba Rd 11.5km total length. Complete upgrade and reconstruction of roadway within section nominated, includes new vertical and Wagga Wagga / Riverina 481 (2013) / 140 (2013) horizontal alignment as per design. Construction of heavy duty pavement to support heavy freight and significant roadside drainage provisions considering surrounding environment and terrain. 65 Byrnes Road: Upgrades WWCC 4038 Byrnes Rd 13.2km total length. Construction of new pavement and increased width, formalised gravel shoulders and roadside Wagga Wagga / Riverina 2422 (2015) / 460 (2015) drainage. Intersection improvements for surrounding industrial precinct and associated heavy plant. 66 Inglewood Road: Upgrades WWCC 350 Inglewood Rd 2.4km total length. Construction of new pavement and increased width, formalised gravel shoulders and roadside drainage. Wagga Wagga / Riverina 2535 (2011) / 127 (2011) 67 Glenfield Road: Upgrades WWCC 305 Glenfield Rd 2.3km total length. Road widening (from 10m to 17m) to support two additional 3.5m traffic lanes. New seal over road in its Wagga Wagga / Riverina 12466 (2017) / 1384 entirety. Project to include formalising roadside drainage and gravel shoulders. (2018) 68 Farrar Road: Upgrades WWCC 1195 Farrar Rd 1700m total length. Complete upgrade and reconstruction of roadway within section nominated. New vertical and Wagga Wagga / Riverina 2856 (2017) / 268 (2017) horizontal alignment as per design. Road widening to 10m to support general residential growth within the area and linemarking improvements and bus parking areas for schools within the vicinity. 69 Lake Albert Road: Reconstruction WWCC 568 3.8km total length. Construction of heavy bound asphaltic pavement within section nominated and intersection Wagga Wagga / Riverina 6841 (2018) / 711 (2018) improvements to support high traffic volumes and significant growth of the southern suburbs. 70 Gregadoo Road: Reconstruction WWCC 1016 Gregadoo Rd 3.8km total length. Construction of new pavement and increased width, formalised gravel shoulders and roadside drainage. Wagga Wagga / Riverina 2728 (2017) / 216 (2017) Construction of slip lanes for adjacent developments and schools and pedestrian refuge islands. 71 Ivan Jack Drive: Reconstruction WWCC 2677 Ivan Jack Drive 500m total length. Construction of new pavement and kerb and gutter renewal. Two roundabout improvements with Wagga Wagga / Riverina 8263 (2018) / 190 (2018) Gurwood Street and Johnson Street. Linemarking improvements to formalise parking areas, cycleways and pedestrian areas. 72 Macleay Street: Reconstruction WWCC 599 Macleay Rd 800m total length. Construction of new pavement and kerb and gutter renewal. Intersection improvements with Coleman Wagga Wagga / Riverina 1630 (2017) / 46 (2017) Street and linemarking to formalise parking areas, considering close proximity of schools. 73 Mulligans Flat Road: Upgrades YVC New seal and install safety barriers (2.4km). Goulburn / Eden Monaro 816 (2015) / 69 (2015) 74 Namima Road: Upgrades YVC Widen existing seal, new seal entire width and install safety barriers (13.7km). Goulburn / Eden Monaro 514 (2016) / 52 (2016) 75 Yass Valley Way: Upgrades YVC Widen existing seal, new seal entire width and install safety barriers (17.3km). Goulburn / Eden Monaro 6163 (2016) / 795 (2016) 76 Guardrail: Replacement BVSC Replacement of the chain mesh guardrail that does not offer any level of protection for road users. Bega / Eden Monaro 77 Bermagui‐Tathra Road: Upgrades BVSC Tathra‐Bermagui Pavement lifting and protection from high water sea levels. This is primarily about protection of the north south route as an Bega / Eden Monaro 578 (2013) / Rd alternative to the . 78 Lamont St Bermagui: Revitalisation Project BVSC Lamont St The seasonal traffic volumes change significantly during holiday periods for both vehicles and active transport users. This Bega / Eden Monaro 3500 (2017) / 175 (2017) revitalisation project will improve access for tourism with modified parking arrangements and locations for active users to navigate the tourist location. There are many safety issues due to the older standard of treatments in Lamont Street which are being addressed in accordance with current levels of funding. Therefore it will be many years before any form of change occurs. The works include active transport improvements and safe crossing facilities. 79 Carp St Bega: Revitalisation Project BVSC MR560 Carp St The upgrade to the commercial hub of Bega Valley has been identified with a landscape master plan to address the tired Bega / Eden Monaro 7200 (2017) / 650 (2017) infrastructure. The works include active transport improvements and safe crossing facilities. 80 Mountain Ash Road: Upgrades GMC 0038 Mountain Ash Rd Pavement widening with 9m formation (8m seal) and rehabilitation work, starting from 4.5km from Windellama Road Goulburn / Hume 767 (2017) / 94 (2017) intersection up to 22km towards Bungonia. 81 Bungendore Road QPRC 1.35km of new road construction to connect Bungendore Road directly to the Kings Hwy via the proposed sporting complex. Monaro / Eden Monaro 5095 (2018) / 1314 8.8km of shoulder widening and developing a full width clear zone. 5.5km of overlay and shape correction plus development (2018) of a full width clear zone. Reconstruction of four bridges. 82 Cooma Street Queanbeyan QPRC MR584 Cooma Street is one of Queanbeyan's busiest roads however the roadside environment isn't suitable for the traffic demand Monaro / Eden Monaro 15,987 (2017) / 623 due to the approx. 144 houses, 2 childcare centres, a primary school, and 19 intersections along it's 1.6km length. The (2017) proposed solution for the intersections is to restrictmost intersections to left in left out and install traffic signals at key

11

CANBERRA REGION Project Data JOINT ORGANISATION

Road Road Name(s) Project Description Electorate AADT Project Council Number(s) State / Federal Vehicles / Heavy Vehicles

locations. For the road, full pavement reconstruction is required to create a single lane in each direction separated by a central median, bike lanes and on‐street car parking. 83 Badja Road: Upgrades SMRC MR7624 Badja Rd Widen and realign formation for 21.2Km to regional road Standards, improve drainage as required, overlay 200mm DGB20 Monaro / Eden Monaro 56 (2012) / 9 (2012) road base, primer seal 21.2km x 10mm primer and final seal 21.2km x 14mm C240. 84 Dalgety Road: Upgrades SMRC MR394 Dalgety Rd Widen and realign formation to meet regional road standards 9km, overlay 150mm DGB 20 road base, primer seal 9km x Monaro / Eden Monaro Currently collecting data 10mm primer, final seal with 14mm C240. 85 Countegany Road: Upgrades SMRC MR7624 Countegany Rd Widen and realign formation to meet regional road standards 11km, overlay 200mm DGB 20 road base, primer seal 11km x Monaro / Eden Monaro Currently collecting data 10mm, final seal with 14mm C240. 86 Numeralla Road: Upgrades SMRC MR7624 Numberalla Rd Widen and realign formation to meet regional road standards 19km, overlay 200mm DGB 20 road base, primer seal 19km x Monaro / Eden Monaro 268 (2007) / 32 (2008) 10mm, final seal with 14mm C240. 87 Wheeo Road: Upgrades ULSC Wheeo Rd Corridor widening to 10m (4.9km), pavement strengthening, compaction, seals line making and sings in addition to some Goulburn / Hume 86 (2018) / 18 (2018) minor rectification of horizontal and vertical curves. 88 Reids Flat Road ULSC Reids Flat Rd Corridor widening to 7m (15km), pavement strengthening, compaction, seals, signs in addition to some minor rectification Goulburn / Hume 42 (2018) / 23 (2018) of horizontal and vertical curves, remove of gates with bypasses and fencing out road reserve. 89 Alternate Route Collector Rd: Upgrades ULSC Wombeyan Caves Corridor widening to 10m (18.1km) including decline of (1km), pavement strengthening, compaction, seals line making and Goulburn / Hume 112 (2016) / 1.12 (2016) Rd sings in addition to some minor rectification of horizontal and vertical curves. 90 Peelwood Road ULSC Breadalbane Rd Corridor widening to 10m (17.65km), pavement strengthening, compaction, seals line making and sings in addition to some Goulburn / Hume 55 (2018) / 1.10 (2018) minor rectification of horizontal and vertical curves. 91 Breadalbane Road: Flood Damage ULSC Tablelands Way 10m carriage width two sections totalling (4km), install culvert and raise pavement out flood zone. Goulburn / Hume 51 (2014) / 1.3 (2014) 92 Bowral Distributor Road: Stage 2 WSC MR639 Bowral Distributor 1.1km of new road, 4 lane and 2 roundabouts. Land acquisition required. Goulburn/Wollondilly / 13088 (2016) / 1100 Rd Whitlam/Hume (2016) 93 Berrima Road/Taylor Avenue: Upgrades WSC MR372 Berrima Rd and Pavement reconstruction, shoulder widening and new asphalt surface over entire length including shoulders, roundabout. Goulburn/Wollondilly / 6320 (2015) / 700 (2015) Taylor Avenue 7.5 km from Moss Vale to Old Hume Hwy. Whitlam/Hume 94 Penrose Road: Upgrades WSC 7636 Penrose Rd Pavement reconstruction, widen road and place new seal ‐ including 1m shoulder‐over entire length. 15 km from Goulburn/Wollondilly / 1045 (2017) / 150 (2017) Bundanoon to Wingello. Whitlam/Hume 95 Nowra Road: Upgrades WSC 2415 Nowra Rd Pavement reconstruction, widen road and place new seal including 1m shoulder‐over entire length (17.6km). Goulburn/Wollondilly / 1250 (2004) / 110 (2004) Whitlam/Hume 96 Wilson Drive: Upgrades WSC MR365 Wilson Drive Pavement reconstruction, widening of road and place new seal, including 1m shoulder over entire length. 11.5 km from Goulburn/Wollondilly / 3925 (2012) / 250 (2015) Colo Vale to Balmoral. Whitlam/Hume 97 Range Road: Upgrades WSC 3189 Range Rd Pavement reconstruction, widen road and place new seal, including 1m shoulder over entire length (8.1km). Goulburn/Wollondilly / 799 (2016) / 100 (2016) Whitlam/Hume 98 Road/Shingle Hill Road: Upgrades YVC Widen existing seal, new seal entire width and install safety barriers (37.5km). Goulburn / Eden Monaro 1461 (2017) / 100 (2017 99 Dog Trap Road: Extension YVC Construct new seal from end of existing seal to Isabel Drive (5.0km). Goulburn / Eden Monaro 205 (2015) / 25 (2015) 100 Wee Jasper Road: Upgrades YVC Widen existing seal, new seal entire width and install safety barriers (75.1km). Goulburn / Eden Monaro 1495 (2010) / 79 (2010) 101 Euroka Avenue: Upgrades YVC Widen existing seal, new seal entire width and install safety barriers (4.7km). Goulburn / Eden Monaro 325 (2017) / 33 (2017) 102 Oallen Ford Road QPRC 14km minor realignment, widening and pavement rehabilitation to allow heavy vehicle access. Monaro / Eden Monaro 1120(2017) / 60 (2017) 103 Whipstick Creek Bridge: Replacement BVSC Mt Darragh Rd Refurbish timber truss bridge, like for like. Bega / Eden Monaro 2228 (2017) / 428 (2017) 104 BVSC Bridges: Replacement (1‐3yr package) BVSC Various The bridge renewal program places significant pressure on Council given the number of bridges and their asset condition. Bega / Eden Monaro This program does not include the Cuttagee Bridge. 105 Cuttagee Bridge: Upgrades BVSC Tathra‐Bermagui 113m Timber Tres bridge. This significance of this project is the protection of the north south route as an alternative to the Bega / Eden Monaro 578 (2013) / ‐ Rd Princes Highway. 106 Pericoe Creek Bridge: Replacement BVSC Pericoe Rd Refurbish timber truss bridge, like for like. Bega / Eden Monaro 107 Slaters Lane Bridge: Replacement BVSC Slaters Lane Bridge Replace with 9.3m InQuick Bridge to remove weight restrictions. Bega / Eden Monaro 108 Garlandtown Bridge: Upgrades ESC MR7630 North Head Drive Partial removal and reconfiguration of existing bridge, widening of bridge abutments and deck, upgrade of bridge Bega / Gilmore 3882 (2014) / 233 (2014) approaches and new bitumen seal. 109 May Street Bridge: Replacement GMC 0623 May St Construct a new single span 2 lane concrete bridge with pedestrian path, new approaches with footpath, kerb & gutter. Goulburn / Hume 947 (2017) / 68 (2017) New bridge deck; 18.5m long and 10.5m wide 110 Towrang Bridge: Replacement GMC 0049 Towrang Rd Replace the existing bridge with an new five span 2 lane concrete bridge 4.5m above the existing bridge. New bridge deck; Goulburn / Hume 406 (2018) / 42 (2018) 85.5m long and 9.5m wide. 111 Resch's Crossing QPRC Replace the low level crossing with a bridge which allows traffic to cross Resch's Creek in flood events. Monaro / Eden Monaro 211 (2018) / 65 (2018) 112 Peak Creek Bridge: Replacement SMRC MR394 The Snowy River The bridge is a 10M Timber Bridge in need of significant Repairs, with a Level 3 safe Load Limit of 24T for T44 Traffic. Monaro / Eden Monaro 93 (2009) / 17 (2009) Way The proposed works are to carry out a survey and investigations of replacement options, then to upgrade the bridge to meet SM1600 STD. 113 Delegate River Bridge: Replacement SMRC MR93 Delegate Rd Current Bridge is a single lane 4 span timber bridge 36.7min length, in need of significant repairs. The bridge has had a Monaro / Eden Monaro 68 (2008) / 09 (2008) recent level 3 inspection recommending a 17T limit for T44 Vehicles. The proposal is to replace the bridge with a two‐lane SM1600 opening the Bonang Hwy into Victoria and removing the need for the current heavy vehicles to Bypass.

12

CANBERRA REGION Project Data JOINT ORGANISATION

Road Road Name(s) Project Description Electorate AADT Project Council Number(s) State / Federal Vehicles / Heavy Vehicles

114 Numeralla River Bridge: Upgrades SMRC MR7624 Cooma‐Braidwood The bridge is a 3 span 52m steel girder/concrete deck bridge in good repair, with a level 3 safe load limit of 28T for T44 Monaro / Eden Monaro 286 (2008) / 32 (2008) Rd Traffic and 51T for 25/26m B‐double traffic. Level 3 assessment indicates the deck meets load requirements but the beams fail. The proposal is to upgrade the substructure to ensure the bridge provides the required level of service. 115 Sherlock River Bridge: Upgrade/Replacement SMRC Jerangle Rd Existing bridge is a 4‐span 47M two‐lane concrete bridge. Monaro / Eden Monaro 159 (2018) / 19 (2018) Level 3 load limit Inspections have down graded the safe load capacity of the bridge to 33T for T44 traffic and 45T for 25/26M B‐double traffic. The required level of service by industry is for 44T for T44 traffic and 68T for 25/26M B‐doubles. The proposal is to upgrade/replace the bridge with one that meets current SM1600 STD's, opening Jerangle Road to 25/26M B‐double traffic. 116 Jacksons Bridge: Replacement SVC Batlow‐ Replace the existing timber bridge with an new single span precast concrete bridge. 150m new bridge, dual lane. Albury / Eden Monaro Tumbarumba Rd 117 Wingecarribee Street Bridge: Duplication WSC 1632 Wingecarribee St Duplication of the existing Rail Over Bridge on Wingecarribee Street. 50m new bridge, dual lane. Goulburn/Wollondilly / 4641 (1998) / 450 (1998) Whitlam/Hume 118 Lockhart Road: Culvert Replacement WWCC 636 Lockhart Rd Replacement of damaged concrete culvert with new concrete structure. Wagga Wagga / Riverina 771 (2011) / 162 (2011) 119 Burkes Creek Bridge: Upgrades WWCC 1154 Holbrook Rd Investigation and repairs of existing concrete structure/strengthening works. Wagga Wagga / Riverina 1021 (2018) / 201 (2018) 120 Umbango Creek Bridge: Upgrades WWCC 3596 Rd Investigation and shear strengthening works of bridge headstocks to strengthen structure and support heavy vehicle freight. Wagga Wagga / Riverina 136 (2013) / 37 (2013) 121 Tooles Creek Bridge: Upgrades WWCC 3324 Gregadoo East Rd Investigation and repairs of existing steel structure at abutments. Wagga Wagga / Riverina 346 (2011) / 73 (2011) 122 Beavers Creek Bridge: Upgrades WWCC 1247 Mundowy Lane Investigation and repairs of existing concrete structure and replacement of bearing pads. Wagga Wagga / Riverina 243 (2006) / 36 (2006) 123 Brooklynn Lane Bridge: Replacement WWCC 369 Brooklyn Land Replacement of timber bridge with new concrete structure. Wagga Wagga / Riverina 50 (2018) / 5 (2018) 124 Mona Vale Road Bridge: Replacement WWCC 357 Mona Vale Rd Replacement of timber bridge with new concrete structure. Wagga Wagga / Riverina 100 (2018) / 20 (2018) 125 Wollundry Lagoon Bridge: Upgrades WWCC 2677 Ivan Jack Drive Investigation and repairs of abutment walls either side of the structure. Wagga Wagga / Riverina 8263 (2018) / 190 (2018) 126 Big Springs Road: Culvert Replacement WWCC 111 Big Springs Rd Replacement of corroded steel culvert with new concrete structure. Wagga Wagga / Riverina 148 (2005) / 15 (2005) 127 Bulloc Hills Road Bridge: Replacement WWCC 597 Bulloc Hills Rd Replacement of timber bridge with new concrete structure. Wagga Wagga / Riverina 100 (2018) / 10 (2018) 128 Tathra Wharf: Renewal (State Owned) BVSC Tathra Wharf The iconic tourist facility is an active transport destination of significance for the region. Council has allocated $80k in the Bega / Eden Monaro current financial year to determine the full extent of the renewal requirements which are expected to be in the order of $10M over the next 10 years. 129 BVSC Bridges: Replacement (4‐10yr package) BVSC Various The bridge renewal program places significant pressure on Council given the number of bridges and their asset condition. Bega / Eden Monaro This program does not include the Cuttagee Bridge. 130 Thornford Bridge: Replacement GMC 0117 Thornford Rd Replace the existing timber bridge with an new single span 2 lane concrete bridge. New bridge deck; 8.5m long and 9.5m Goulburn / Hume 74 (2017) / 12 (2017) wide. 131 Carrick Road Bridge: Replacement GMC 0048 Carrick Rd Replace the existing timber bridge with an new single span 2 lane concrete bridge. New bridge deck; 12m long and 9.5m Goulburn / Hume 217 (2017) / 44 (2017) wide. 132 Foxlow Bridge QPRC Refurbish or replace Foxlow Bridge depending on structural engineers report. Increase weight limit on bridge to 10 tonne or Monaro / Eden Monaro 18 (2018) / 4 (2018) more. 133 Badja River Bridge: Upgrade SMRC MR7624 Cooma‐Braidwood Existing bridge is a 5‐span 77M two‐Lane concrete bridge. Monaro / Eden Monaro 65 (1997) / N/A Rd Level 3 load limit inspections have downgraded the safe load capacity of the bridge to 33T for T44 traffic and 59T for 25/26M B‐double traffic. The required level of service by industry is for 44T for T44 traffic and 68T for 25/26M B‐doubles. The proposal is to upgrade/replace the bridge with one that meets current SM1600 STD's, opening the Cooma Braidwood Road to 25/26M B‐double traffic. 134 Queanbeyan River Bridge: Upgrades SMRC Jerangle Rd Recent Level 3 inspections have set the bridges load capacity below industry requirements for 25/26M B‐Double Traffic Monaro / Eden Monaro 67 (2014) / 16 (2014) (68T). The bridge is a 38m steel beam with concrete deck. Level 3 assessment indicates the deck meets load requirements but the beams fail. The proposal is to upgrade the substructure to ensure the bridge provides the required level of service. 135 ULSC Bridges: Replacement (4‐10yr package) ULSC Various Replace timber bridges with reinforced box culverts to an 8m width. Goulburn / Hume 136 Burrinjuck Road Bridge: Replacement YVC Replace the existing timber bridge with an new single span precast concrete bridge. 15m new bridge, dual lane and resealed Goulburn / Eden Monaro 174(2017) / 58 (2017) approach road. 137 Burrinjuck Road Bridge: Replacement (Childowa Trail) YVC Replace the existing timber bridge with an new single span precast concrete bridge. 15m new bridge, dual lane and resealed Goulburn / Eden Monaro 51 (2011) / 7 (2011) approach road. 138 Bango Lane Bridge: Replacement YVC Replace the existing timber bridge with an new single span precast concrete bridge. 15m new bridge, dual lane and 100m Goulburn / Eden Monaro sealed approach road. 139 Garryowen Road Bridge: Replacement YVC Replace the existing timber bridge with an new single span precast concrete bridge. 15m new bridge, dual lane and 100m Goulburn / Eden Monaro 61 (2009) / 6 (2009) sealed approach road. 140 BVSC Bridges: Replacement (10‐20yr package) BVSC Various The bridge renewal program places significant pressure on Council given the number of bridges and their asset condition. Bega / Eden Monaro This program does not include the Cuttagee Bridge.

13

CANBERRA REGION Glossary/Disclaimer JOINT ORGANISATION

Acronym Description

QPRC Queanbeyan Palerang Regional Council SMRC Snowy Monaro regional Council SVC Snowy Valleys Council YVC Yass Valley Council ULSC Upper Lachlan Shire Council WSC Wingecarribee Shire Council HC Hilltops Council GMC Goulburn Mulwaree Council ESC Eurobodalla Shire Council BVSC Bega Valley Shire Council WWCC Wagga Wagga City Council

NSW Regional Service Infrastructure Plan

We have used the classification system from the 2056 Plan to introduce further strategic projects to improve social connectivity and economic efficiency in the region.

All infrastructure projects in the CRJO were reviewed and those that most met the goals of the NSW Regional Service and Infrastructure Plan priorities for inclusion in this prospectus. Projects fall into three categories:

$ Committed initiatives (0‐10yrs) Initiatives that either have committed funding, are committed/ contractually committed, are for immediate detailed planning, or are part of key maintenance, renewal or safety programs. Some initiatives are subject to final business case and funding.

Initiatives for investigation (0‐10, 10‐20yrs) Initiatives intended to be investigated for potential commitment or implementation within the next 20 years. Those listed in 0‐10 horizon will be prioritised for more detailed investigation to determine if they are required in the next 20 years.

Visionary initiatives (20+ years) Longer term initiatives that may be investigated within the next 10 years, but are unlikely to require implementation within 20 years.

Every effort and all reasonable care has been taken to ensure the accuracy of the material contained within this Document. This document is based on information provided by the Councils who are members of the Canberra Region Joint Organisation. Project information was supplied by the Engineering, Infrastructure or Operations Department within each Council. It is written using informative terminology and should not be interpreted otherwise. This document is copyright and the intellectual property of The Infrastructure Collaborative Pty Ltd. Methodology for collection, prioritisation and processing of data similarly remains the property of The Infrastructure Collaborative Pty Ltd and permission must be sought for use of same. The Infrastructure Collaborative Pty Ltd has provided this document using a degree of skill, care and diligence as is generally exercised by project engineers performing services of a similar nature, at the time the services are provided, however, does not accept any liability or responsibility in any way whatsoever and expressly disclaims any liability or responsibility for any loss, damage or costs however incurred by any person as a result or in connection with reliance upon any part of this document. Here required, independent advice from competent professional persons should be sought on matters covered in this Document. All rates and prices provided in this document are based upon figures provided directly by Councils. The Infrastructure Collaborative Pty Ltd has not tested the accuracy or sensitivity of these budget estimates. Some Councils have used their own rates to price work. The Document shall not be reproduced, except in full. The Document has been prepared for the nominated project, and no responsibility is offered or accepted for the use of any part of the Document in any other context or for any other purpose. Where required, independent advice from competent professional persons should be sought on matters covered in this Document.