Gzenith CONTROLS
Total Page:16
File Type:pdf, Size:1020Kb
ELECTRICAL SCHEMATIC DRAWING - GE ZENITH ZBTED SERIES TRANSFER SWITCHES - DELAY TRANSITION TYPE - 100 TO 400A LEGEND, FEATURES, OPERATION, AND ACCESSORIES 1.0 CONTROL CONFIGURATION GROUPS 5.0 SEQUENCE OF OPERATIONS 6.0 STANDARD INDICATORS, PUSHBUTTONS, AND ANNUNCIATION ZTE SWITCHES ARE CONFIGURED TO ONE (1) OF THE FOLLOWING FIVE (5) OPTION PACKAGES. NOTE: ATS CATALOG NUMBER NOTE: SEE OPERATIONS & MAINTENANCE MANUAL FOR ADDITIONAL SEQUENCE OF OPERATION DETAILS AND DIAGNOSTICS. SCHEME, DIGIT #9, INDICATES THE INSTALLED CONTROL PACKAGE OPTION PACKAGE RELATED LOCATION OF ZTE OPERATOR DESCRIPTION STATE DESCRIPTION FUNCTION: USER SETTINGS IN CODE DISPLAY (DOOR STANDARD PACKAGE FOR AUTOMATIC ATS. INCLUDES FULL FUNCTION ATS CONTROL, DIAGNOSTICS, USER SETTINGS MENU A SETPOINT-- CONTROL SWITCHES, (4) USER-CONFIGURABLE INPUTS, AND (4) USER-CONFIGURABLE OUTPUTS CONNECTED TO STAY ON PREFERRED SOURCE UNTIL A SOURCE FAILURE IS DETECTED OR SETTING OF MOUNTED) >OPERATION-- ALL FEATURES IN "A" PLUS: USER-CONFIGURABLE ANALOG & DIGITAL ALARMS, 20-CHANNEL DATA 0 PREFERRED A TEST (OR EXERCISE) WITH LOAD IS INITIATED. (NOTE: JUMP TO STEP #3 PREFERRED B >S1 (S2) LOGGER, 10-CHANNEL WAVEFORM CAPTURE, AUTO LOAD SHED FEATURE SOURCE IF TEST WITH LOAD) SOURCE SETTINGS ALL FEATURES IN "B" PLUS: (4) ADDITIONAL USER-CONFIGURABLE INPUTS AND OUTPUTS (TOTAL 8 INPUTS, C SETPOINT-- 8 OUTPUTS) SOURCE PREFERRED >OPERATION-- ALL FEATURES IN "C" PLUS: (4) ADDITIONAL USER-CONFIGURABLE INPUTS AND OUTPUTS (TOTAL 12 1 CONTROL SENSES THE FAILURE OF THE DESIGNATED PREFERRED SOURCE FAILURE D SOURCE FAILURE >S1 (S2) INPUTS, 12 OUTPUTS), FLEXLOGIC USER-PROGRAMMABLE CUSTOM LOGIC EDITOR SETTINGS SETTINGS STANDARD PACKAGE FOR MANUAL ATS. INCLUDES FULL FUNCTION ATS CONTROL, DIAGNOSTICS, USER PREFERRED DELAY FOR SETPOINT-- M CONTROL SWITCHES (SEE ITEM #4), (4) USER-CONFIGURABLE INPUTS, AND (4) USER-CONFIGURABLE CONTROL INITIATES A TIME DELAY (P) TO DELAY STARTING OF THE 2 SOURCE FAIL GENERATOR >OPERATION-- OUTPUTS GENERATOR IN CASE OF A FAST RETURN OF THE PREFERRED SOURCE TIMER START >TIMERS START 2.0 STANDARD CONTROL INTERFACE SIGNALS 3 CONTROL SENDS A START COMMAND TO THE GENERATOR ON INDICATOR DESCRIPTION GENERATOR EXPIRATION OF THE TIME DELAY (P) IN #2 ABOVE ZTE SWITCHES SUPPORT THE FOLLOWING STANDARD INTERFACE SIGNALS. SEE CUSTOMER CONNECTION SOURCE AVAIL LED'S S1 (GREEN) AND S2 (RED) INDICATE SOURCE HEALTHY SETPOINT-- SOURCE CONN LED'S S1 (GREEN) AND S2 (RED) INDICATE SOURCES CONNECTED TO LOAD DIAGRAM FOR TERMINAL LOCATIONS AND DETAILS NON-PREFERRED SOURCE >OPERATION-- 4 SOURCE CONTROL DETECTS THAT THE NON-PREFERRED SOURCE IS AVAILABLE RETURN RED LED, INDICATES AN ACTIVE ALARM. ALSO ILLUMINATES WHEN ATS SIGNAL (CODE) DESCRIPTION RATINGS >S1 (S2) AVAILABLE SETTINGS ALARM LED IS ‘NOT IN AUTO’ (S5, S12, OR CONTROL DISCONNECT SWITCH IS ON). SEE START SIGNAL FROM ATS TO GENSET IN EVENT OF LOSS OF PREFERRED FORM 'C' CONTACTS, SETTINGS STATUS SCREEN (HOME-->STATUS) FOR DETAILED ALARM MESSAGE ENGINE START SIGNAL (E) SOURCE 10A @ 28VDC/120VAC DELAY – RED LED, INDICATES CONTROLLER IS TIMING FOR NEXT ACTION. SCROLL MAINTAINED DRY CONTACT (CLOSE FOR TEST) FROM BUILDING CONTROL NON-PREFERRED XFER TO SETPOINT-- TD ACTIVE TO BOTTOM OF STATUS SCREEN (HOME-->STATUS) FOR A DESCRIPTION FORM 'C' CONTACT, CONTROL INITIATES A TIME DELAY (W) TO PERMIT THE GENERATOR TO SYSTEM TO SIMULATE AN OUTAGE CONDITION. SWITCH WILL START 5 SOURCE NON >OPERATION-- OF THE TIME DELAY AND DISPLAY OF REMAINING TIME REMOTE TEST SIGNAL (Q2) RATED FOR 28VDC, STABILIZE BEFORE TRANSFER OF THE LOAD. GENERATOR AND TRANSFER LOAD TO NON-PREFERRED SOURCE. SWITCH STABILITY TIMER PREFERRED >TIMERS 1A MINIMUM INDICATES ATS IS WAITING FOR AN INHIBIT SIGNAL TO BE REMOVED WILL RETURN TO PREFERRED SOURCE UPON REMOVAL OF TEST SIGNAL. SRC BEFORE PROCEEDING TO TRANSFER THE LOAD. POSSIBLE INHIBIT IF (S13) IS SET TO "ENABLED" - CONTROL WILL INITIATE THE TRANSFER QTY (2) N.O. HOME-- XFER INHIBIT SIGNALS INCLUDE: CUSTOMER INPUT CONFIGURED FOR INHIBIT SOURCE 1 CONNECTED TO COMMIT SEQUENCE EVEN IF THE PREFERRED SOURCE RETURNS BEFORE AUXILIARY CONTACT INDICATING ATS LOAD IS CONNECTED TO SOURCE #1 CONTACTS, 10A @ >SETPOINT-- TRANSFER (Q3, Q7), LOCAL CONTROL DISCONNECT SWITCH (DS), LOCAL LOAD (A4) TRANSFER TO EXPIRATION OF TIME DELAY (W) IN #5 ABOVE. COMMIT 28VDC/120 VAC >CONTROL OR REMOTE MANUAL MODE SWITCH (S5, S12). 6 NON-PREFERRED XFER QTY (2) N.O. or GREEN ALARM RESET USED TO RESET LATCHED ALARM CONDITIONS. SOURCE 2 CONNECTED TO SOURCE (S13) IF (S13) IS SET TO "DISABLED" AND PREFERRED SOURCE RETURNS BEFORE SWITCH (S13) AUXILIARY CONTACT INDICATING ATS LOAD IS CONNECTED TO SOURCE #2 CONTACTS, 10A @ 'CONTROL' TEST JUMP BUTTON TO TEST MENU. LOAD (A3) EXPIRATION OF TIME DELAY (W) IN #5 ABOVE, CONTROL REMOVES START 28VDC/120 VAC PUSHBUTTON INFO JUMP BUTTON TO RUN REPORT. QTY (1) N.O. SIGNAL AND STAYS CONNECTED TO PREFERRED SOURCE. BYPASS MTS CONNECTED AUXILIARY CONTACT INDICATING THAT OPERATOR HAS MANUALLY CONTROL JUMP BUTTON TO CONTROL MENU. CONTACT, 10A @ IF AUTO/MANUAL SWITCH IS SET TO "AUTO" OR "MANUAL S2 TO S1 ONLY HOME JUMP BUTTON TO HOME SCREEN TO SOURCE 1 BYPASSED SOURCE 1 TO THE LOAD (BYPASS ATS ONLY) (S5)" – ATS WILL AUTOMATICALL INITIATE THE A TRANSFER SEQUENCE HOME-- 28VDC/120 VAC UP/DOWN ARROW PERMITS UP/DOWN SCROLLING WITHIN SCREEN AUTO/ MANUAL TO THE NON-PREFERRED SOURCE. >SETPOINT-- QTY (1) N.O. AUTO /MAN ‘ESC’ KEY BRINGS OPERATOR TO PREVIOUS SCREEN BYPASS MTS CONNECTED AUXILIARY CONTACT INDICATING THAT OPERATOR HAS MANUALLY SELECT SWITCH >CONTROL CONTACT, 10A @ 7 SELECT TO SOURCE 2 BYPASSED SOURCE 2 TO THE LOAD (BYPASS ATS ONLY) PERMISSIVE (S5, IF AUTO/MANUAL SWITCH IS SET TO "MANUAL S1 TO S2, S2 TO S1 (S12)" – or GREEN ‘ENTER' KEY SELECTS ITEMS WITHIN MENU SYSTEM AND CONFIRMS OPERATIONS 28VDC/120 VAC SWITCH S12) ATS WILL WAIT FOR A PERMISSIVE SIGNAL BEFORE INITIATING THE 'CONTROL' ‘HELP' KEY TRIGGERS MENU-DEPENDENT HELP POPUP MESSAGE PERMITS CALIBRATION UPLOAD/MODIFY/DOWNLOAD USING ENERVISTA TRANSFER SEQUENCE. PERMISSIVE SIGNAL IS EITHER AN OPERATOR PUSHBUTTON USB PORT 3.0 NETWORKING AND METERING OPTIONS PUSHBUTTON ON THE 'STATUS' SCREEN OR CUSTOMER INPUT SIGNAL. SETUP ™ SOFTWARE. DELAY – 5 x SOFT KEYS MENU-DEPENDENT PUSHBUTTONS. FUNCTION OF PUSHBUTTON IS ZTE SWITCHES MAY BE CONFIGURED WITH BUILT-IN NETWORKING AND METRING OPTIONS. SEE ATS CATALOG NUMBER TRANSFER TO SETPOINT-- CONTROL WILL OPEN PREFERRED SOURCE, AND NON-PRERFERRED NEUTRAL TO (BLUE ARROWS) INDICATED ON GRAPHICAL SCREEN ABOVE BUTTON. SCHEME DIGITS #13 AND #14 AND THE TABLE BELOW TO DETERMINE INSTALLED OPTIONS 8 MID/CENTER >OPERATION-- SOURCE WILL REMAIN OPEN FOR A TIME DELAY PERIOD (DW) NON POSITION >TIMERS DIGIT #13 DESCRIPTION PREFERRED CONNECT TO ELEMENT LOCATION IN MENU INCLUDES POWER QUALITY METERING. CONTROL WILL CONNECT THE LOAD TO THE NON-PREFERRED SOURCE D, G, H, J, L, M, N, OR O 9 NON-PREFERRED LAST & NEXT EXERCISE TIME HOME SCREEN INCLUDES (2) CT'S FOR SINGLE PHASE, (3) CT'S FOR 3PH/3W OR (4) CT'S FOR 3PH/4W SYSTEMS. AFTER EXPIRATION OF TIME DELAY (DW) IN #8 ABOVE SOURCE LAST TRANSFER TIMES S1-->S2, AND S2-->S1 HOME SCREEN DIGIT #14 DESCRIPTION GEN CONTROL WILL DELAY ACTIVATION OF SOURCE 2 FAILURE (UNDER TIME DELAY SETPOINT-- SWITCH AMP, VOLT RATING AND TYPE HOME SCREEN X NO COMMUNICATIONS 10 STABILIZATION VOLTS/FREQ) TO PERMIT GENERATOR SET TO STABILIZE AFTER FOR GEN >OPERATION-- PREFERRED SOURCE SETTING HOME SCREEN S INCLUDES BUILT-IN SERIAL (RS-485) MODBUS RTU COMMUNICATIONS TIMER CONNECTION OF LOAD SAG >TIMERS SOURCE VOLTAGES, FREQUENCY HOME-->VALUES SETPOINT-- INCLUDES BUILT-IN SERIAL (RS-485) MODBUS RTU COMMUNICATIONS AND ETHERNET TCP/IP PREFERRED CONTROL WILL SENSE THE RETURN OF THE DESIGNATED PREFERRED SOURCE LOAD AMPS, KW, KVAR, PF (REQUIRES >OPERATION-- HOME-->VALUES E COMMUNICATIONS. 11 SOURCE SOURCE, OR DETECT THAT THE TEST WITH LOAD OPERATION HAS BEEN RETURN METERING OPTION) >S1 (S2) NOTE: COMMUNICATION PORTS MAY BE USED SIMULTANEOUSLY. AVAILABLE CANCELLED. SETTINGS ALARM STATUS, STATUS OF TIMERS HOME-->STATUS SETTINGS CURRENT CONFIGURATION / ASSIGNENT OF DELAY – HOME-->STATUS-->INPUTS PREFERRED SETPOINT-- CUSTOMER INPUTS 4.0 NON-STANDARD CONTROL OPTIONS CONTROL INITIATES A TIME DELAY (T) TO PERMIT THE PREFERRED XFER TO 12 SOURCE RETURN >OPERATION-- CURRENT CONFIGURATION / ASSIGNENT OF SOURCE POWER SUPPLY TO STABILIZE PREFERRED HOME-->STATUS-->OUTPUTS TIMER >TIMERS CUSTOMER OUTPUTS SRC THE FOLLOWING OPTIONS MAY BE INSTALLED ON THE ATS. SEE ATS CATALOG NUMBER SCHEME DIGITS #9 & #13 AND THE TABLE CURRENT CONFIGURATION OF LOAD BELOW TO DETERMINE INSTALLED OPTIONS IF AUTO/MANUAL SELECT SWITCH IS SET TO "AUTO" – ATS WILL CONTROL RELAYS (ELEVATOR, LOAD PRE- HOME-->SETPOINT-->CONFIG AUTOMATICALL INITIATE THE RE-TRANSFER SEQUENCE TO THE HOME-- SIGNAL) ORDER PREFERRED SOURCE. AUTO/MANUAL >SETPOINT-- S1 FAIL/RESTORE SETTINGS HOME-->SETPOINT-->OPERATION-->S1 SETTING CODE AUTO /MAN VALUE FEATURE FEATURE DESCRIPTION SELECT SWITCH >CONTROL S2 FAIL/RESTORE SETTINGS HOME-->SETPOINT-->OPERATION-->S2 SETTING DIGIT 13 IF AUTO/MANUAL SWITCH IS SET TO "MANUAL S1 TO S2, S2 TO S1 (S12)" OR SELECT PERMISSIVE (S5, or GREEN # "MANUAL S2 TO S1 ONLY (S5)" ATS WILL WAIT FOR PERMISSIVE SIGNAL SWITCH TIME DELAY ADJUSTMENTS HOME-->SETPOINT-->OPERATION-->TIMERS S12) 'CONTROL' PROVISIONS ON POWER PANEL TO PERMIT TRANSFER OF SWITCH FROM ENERGIZED SOURCE BEFORE INITIATING THE RETRANSFER SEQUENCE. PERMISSIVE SIGNAL IS EVENT LOG HOME-->DIAG #2 TO A DE-ENERGIZED CENTER POSITION. ACTIVATES ON REMOTE CONTACT SIGNAL PUSHBUTTON STATISTICS HOME-->DIAG-->STATS A, E, F, EITHER AN OPERATOR PUSHBUTTON ON THE 'STATUS' SCREEN OR REMOTE FROM BUILDING AUTOMATION OR PARALLELING SWITCHGEAR SYSTEM. SWITCH HOME-->SETPOINT-->CONTROL OR GREEN 13 G, H, I, J, CUSTOMER INPUT SIGNAL. CONTROL SWITCHES LOAD SHED DISCONNECTS THE LOAD IMMEDIATELY UPON RECEIPT OF THE LOAD SHED SIGNAL, AND DELAY – 'CONTROL' PUSHBUTTON OR O TRANSFER TO SETPOINT-- RETURNS TO LIVE SOURCE AFTER REMOVAL OF LOAD SHED SIGNAL. NOTE: REQUIRES CONTROL WILL OPEN NON-PREFERRED SOURCE, AND PRERFERRED NEUTRAL TO EXERCISER STATUS HOME-->EXERCISER 14 MID/CENTER >OPERATION-- PRIMARY SOURCE SELECT SWITCH (S3) TO BE SET TO SOURCE #1.