Region I 16,359,463,253 937 Projects
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
The Cultural Practices, Mores and Traditions of the Cultural
Third Asia Pacific Conference on Advanced Research (APCAR, Melbourne, July, 2016) ISBN:978 0 9943656 20 www.apiar.org.au CULTURAL PRACTICES OF THE TRIBAL COMMUNITIES IN THE PROVINCE OF ILOCOS SUR, PHILIPPINES Severino G. Alviento a, Marife D. Alviento b abNorth Luzon Philippines State College, Philippines Corresponding email: [email protected] Abstract This study aimed to determine the extent of observance of the cultural practices of the tribal communities in the Upland municipalities of Ilocos Sur, Philippines. The respondents of this study were the federated officials of the tribal communities in Ilocos Sur, Philippines. This study employed the descriptive survey research with a questionnaire as an instrument in data gathering. The researchers’ findings and conclusions are as follows: Despite the fact that people are now living in the modern age, the tribal communities still preserved some of their cultural practices. Much of the value system being practiced by the tribal communities since the early days is still presently observed. The traditional justice system is sometimes observed by them. Their observance of value system and traditional justice system brings some degree of prosperity to their families and community. In the political arena,the upland areas in the Upland areas of Ilocos Sur, Philippines are better prepared as a result of observance and institutionalization of their value system and traditional justice system and also improve their social lives. It is recommended by the researchers that the tribal communities should try to understand the wisdom of their cultural practices which they inherited from their ancestors. They should retain what is good and beneficial, but should not follow the dogma or have no scientific meaning and relevance. -
Claimants Remarks 2015 Updates Indicate Source of Data) CODE
LIST OF IDENTIFIED AD AREAS in Region 01 2015 Updates Estimated Area CODE No. Location Claimants Remarks Indicate Source of (Has.) (Location) Data) 1. Bisangol, Elefante, Guardia, Lintic, Lopez, Monetro, Naguimba, Pila, 3,120.00 Itneg and Bago No. Application Poblacion, Banayoyo, Ilocos Sur Filed 2 2. Lucaban, Macaoayan, Luna, Poblacion Norte, Mambog, Burgos, 4,430.00 Tinguian No. Application 2 Ilocos Sur Filed 3. Nagsingcaoan, Sisim, Cabugao, Ilocos Sur 235.00 Tinguian No. Application Filed 2 4. Amguid,Bugnay, Palacapac, Cubcubbuot, San Andres, Sto. Tomas, 7,690.00 Bago No. Application Bagani Gabur, Calaoan, Bagani Tucgo, Candon City, Ilocos Sur Filed 2 5. Whole Municipality, Galimuyod, Ilocos Sur 10,400.00 Tinguian & Bago No application filed 2 6. Cadanglalaan, Magsingal, Ilocos Sur 8,520.00 Tinguian No application filed 2 7. Sarmingan, Narvacan, Ilocos Sur 200.00 Tinggguian No application filed 2 8. Whole Municipality of Salcedo, Ilocos Sur 2,310.00 Tinguian & Bago No application filed 2 9. Asilang, San Juan, Ilocos Sur 180.00 Tinguian No application filed 2 10. Asilang, Amarao, Babayoan, Banay, Capariaan, Casilagan, Sevilla, 10,160.00 Bago & Kankanaey No application filed Villa Garcia, Coscosnong, Daligan, Lalong, Padaoil, Sitio 2 Nazareth,Paratong, Pidpid, San Antonio, San Pedro, San Jose, Sta. Cruz, Ilocos Sur 11. Buliclic, Nagtablaan, San Pedro, Arangin, Sta. Lucia, Ilocos Sur 10,160.00 Bago No application filed 2 12. Lao-ingen, Sto. Domingo, Ilocos Sur 213.00 Itneg No application filed 2 13. Whole Municipality, Suyo, Ilocos Sur 12,400.00 Kankanaey & Bago No application filed 2 14. Ag-aguman, Amblayat, Cabulanglangan, Tagudin, Ilocos Sur 5,830.00 Bago No application filed 2 15. -
Malued ES Juan L
Malued ES Juan L. Siapno ES Lucao ES Dagupan City, East Central ES Pangasinan Lasip Grande ES PG Villamil ES Bacayao Sur ES Pogo-Lasip ES Talibaew ES Mancup ES Dalonge ES Pangasinan I- Sta. Rosa ES Lingayen Calit ES Tombor ES Gayaman ES Source: DepEd SitRep No. 6 as of 8:00 AM, 23 September 2014 D. Incidents Monitored (Tab C) A total of twenty-one (21) incidents were reported in Regions I, IV-A and NCR. INCIDENT REGION PROVINCE / CITY / MUNICIPALITY I (15) Ilocos Norte, La Union and Pangasinan Landslide (19) IV-A (4) Rizal, Cavite, Batangas and Quezon Maritime (2) NCR (2) Manila E. Damaged Houses (Tab D) A total of 426 houses were reportedly totally damaged and 1,963 were partially damaged in Regions I, III, IV-A, IV-B, and CAR. F. Cost of Damages (Tab E) A total of PhP 907,170,093.16 worth of damages in infrastructure and agriculture were reported in Regions I, III, CAR and NCR INFRASTRUCTURE . A total of PhP 343,677,680.00 worth of infrastructure damages: Particulars Amount (PhP) Roads, Bridges, and Other Structures (National) 237,702,680.00 Roads, Bridges, and Other Structures (Local) 46,675,000.00 Flood Control 59,300,000.00 AGRICULTURE . A total of PhP 563,492,413.16 worth of agricultural damages in Regions I and CAR: Particulars Amount (PhP) Crops (Rice & Corn) 501,061,677.10 Livestock 1,741,600.00 Irrigation 6,502,972.00 High Value Commercial Crops (HVCC) 27,604,296.06 Fisheries 26,581,868.00 G. -
Province of Ilocos Sur Cellphone Number
DIRECTORY OF LOCAL CHIEF EXECUTIVES, PROVINCIAL/CITY/MUNICIPAL NUTRITION ACTION OFFICERS, AND DISTRICT/CITY NUTRITION PROGRAM COORDINATORS IN REGION I AS OF October 2019 PROVINCE OF ILOCOS SUR CONTACT DETAILS PROVINCE/CITY/ STATUS OF NAME OF GOVERNOR/ MAYOR NAME OF P/C/MNAO & D/CNPC SEX BIRTHDATE OFFICE/ POSITION CELLPHONE MUNICIPALITY APPOINTMENT NUMBER TELEPHONE NUMBER EMAIL ADDRESS ILOCOS SUR HON. RYAN LUIS V. SINGSON DR. CARMELIZA T. SINGSON F Dec-21 PHO II DESIGNATE 9778515877 [email protected] Gov's Office- (077)722- 1391/771-3962/722-2776 MS. AMPARO JAVILLONAR F 7/21/1974 PHO- DNPC DESIGNATE 9759079352 (077)722-2771 MS. BERNADETTE A. MAURCIO F 9/12/1975 PNO- DNPC FULLTIME 9359529299 (077)722-1790 MS. ALMA S. CASTILLO F 2/15/1985 PNO- DNPC FULLTIME 9272986818 [email protected], VIGAN CITY HON. JUAN CARLO S. MEDINA MR. JENO JOSEF FIGURACION F 1/3/1990 CHO-NOI- CNAO FULLTIME 9354493012 (077)722-8771/722-6785 [email protected] Mayor's Office- (077)722-2466/722-3838 MS. MYLENE AMANO F CHO-CNPC DESIGNATE [email protected], [email protected], MS. NIMFA P. PASCUA CHO-NOII- CNAO FULLTIME CANDON CITY HON. ERICSON G. SINGSON F 2/10/1955 9264421619 (077)742-6063/5008 [email protected] MS. FE DIASEN F CHO- CNPC/Nurse II DESIGNATE 9175680918 (077)772-0289 [email protected] Mayor's Office- (077)742-6136/674-0098 [email protected]/ MR. REUBEN A. UMALLA, JR. M 04/14/87 MNAO DESIGNATE 9307116001 ALILEM HON. VELMOR P. SUMABAT [email protected] BANAYOYO HON. VIRGILIO G. -
Indications of Recruitment Enhancement in the Sea Urchin Tripneustes Gratilla Due to Stock Restoration Efforts
Proceedings of the 11th International Coral Reef Symposium, Ft. Lauderdale, Florida, 7-11 July 2008 Session number 22 Indications of Recruitment Enhancement in the Sea Urchin Tripneustes gratilla Due to Stock Restoration Efforts M. A. Juinio-Meñez1 , D. Pastor1 and H. G. Bangi2 1Marine Science Institute, College of Science, University of the Philippines, Diliman, Quezon City 110 2College of Aquatic Sciences and Applied Technology, Mariano Marcos State University, Currimao 2903, Ilocos Norte, Philippines Abstract Field monitoring activities were conducted in various sites in five provinces in northwestern Philippines in 2004-2007 to assess the impacts of restocking and grow-out culture of hatchery-reared Tripneustes gratilla juveniles. High incidences of recruits (<4.0 cm test diameter) were noted during the last quarter of 2005 through the first quarter of 2006. Very high densities (up to 460 individuals 100 m-2) were recorded in Lucero, Bolinao, Pangasinan, which is the site for sea urchin broodstock and grow-out cages. Eighty percent of the total density was comprised of recruits of the year. In Sinait, Ilocos Sur, total density and incidence of recruits were significantly higher (up to 67 individuals 100 m-2) than two sites in Ilocos Norte where there was no grow-out culture of sea urchins. In Poro Pt., La Union sea urchins increased after the initiation of grow-out culture activities in 2005 and peaked at 14 individuals 100 m-2 in 2007. The positive correlation in the density of recruits and adults in four sites in Bolinao together with the higher densities and incidence of recruits in different grow-out areas concur with the hypothesis that the aggregation of adults in grow-out culture areas enhanced benthic recruitment. -
Item Indicators Bacarra Badoc Bangui Burgos Currimao Laoag
Item Indicators Bacarra Badoc Bangui Burgos Currimao Laoag Pagudpud Paoay Pasuquin Pinili 1.1 M/C Fisheries Ordinance Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 1.2 Ordinance on MCS Yes Yes No Yes Yes Yes No No Yes Yes 1.3a Allow Entry of CFV Yes No No No No No No No No N/A 1.3b Existence of Ordinance Yes No No No Yes No N/A No N/A No 1.4a CRM Plan Yes Yes No Yes No Yes Yes No Yes No 1.4b ICM Plan Yes Yes No Yes Yes Yes Yes No Yes No 1.4c CWUP Yes Yes Yes No No Yes No No Yes Yes 1.5 Water Delineation No Yes No Yes No Yes No No Yes No 1.6a Registration of fisherfolk Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 1.6b List of org/coop/NGOs Yes Yes Yes Yes Yes Yes Yes No Yes Yes 1.7a Registration of Boats Yes Yes Yes Yes Yes Yes Yes Yes Yes N/A 1.7b Licensing of Boats Yes Yes No Yes Yes Yes Yes Yes Yes N/A 1.7c Fees for Use of Boats Yes Yes No Yes Yes Yes Yes Yes Yes N/A 1.8a Licensing of Gears No Yes No Yes Yes Yes Yes No Yes N/A 1.8b Fees for Use of Gears No Yes No Yes Yes Yes Yes No Yes N/A 1.9a Auxiliary Invoices No Yes No No No Yes No No Yes N/A 1.9b Monthly Summary Report No Yes No No No No No No No No 1.10a Fish Landing Site Yes Yes No Yes Yes No No No Yes N/A 1.10b Fish Ports No Yes No No Yes No No No No N/A 1.10c Ice Plants No No No No No No No Yes No N/A 1.10d Cold Storage No No No No No N/A No No Yes N/A 1.11a Licensing of Fishery Structures No Yes No Yes No Yes No Yes No No 1.11b Fees for Fishery Structures No Yes No Yes No Yes No Yes No No 1.11c Registry of Fishery Structures Yes Yes No Yes No No No No Yes Yes 1.12a Area of Aquaculture Yes Yes No Yes N/A No N/A Yes Yes Yes 1.12c 10% Area Limit of Aquaculture Yes Yes No Yes N/A Yes Yes Yes Yes No 1.13 Fish Catch Monitoring No Yes Yes Yes Yes Yes Yes Yes Yes Yes 1.14a Livelihood Yes Yes Yes Yes Yes Yes Yes Yes Yes No 1.14b Training Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 1.14c Marketing No Yes Yes Yes Yes Yes Yes Yes Yes Yes 1.14d Production Yes Yes No Yes Yes Yes Yes Yes Yes Yes 1.14e Credit No Yes No Yes Yes Yes Yes No Yes No 1.14f Research No Yes No Yes Yes Yes No Yes Yes Yes 1.14g Technology Mngt. -
48325-001: 150 MW Burgos Wind Farm Project
Initial Environmental Examination Project Number: 48325-001 July 2015 PHI: 150 MW Burgos Wind Farm Project Transmission Line and Jetty Section 7 – Marine Ecology and Seawater Quality Section 8 – Water and Drainage Assessment Section 9 – Soil and Groundwater Contamination Section 10 – Air Quality Assessment (Part 4 of 14) Prepared by EDC Burgos Wind Power Corporation for EDC Burgos Wind Power Corporation and the Asian Development Bank. The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Table of contents 1. Introduction................................................................................................................................. 1-1 2. Project Description ..................................................................................................................... 2-1 3. Assessment Methodology .......................................................................................................... 3-1 4. Land Use Assessment .............................................................................................................. -
Preparedness Measures and Effects for Typhoon “OMPONG” (I.N
SITREP NO. 50 TAB A Preparedness Measures and Effects for Typhoon “OMPONG” (I.N. “MANGKHUT”) AFFECTED POPULATION As of 30 September 2018, 6:00 AM TOTAL SERVED - CURRENT Region/Province/ AFFECTED No. of Evac Inside Evacuation Centers Outside Evacuation Centers (Inside + Outside) Mun/City Centers Brgys Families Persons Families Persons Families Persons Families Persons GRAND TOTAL 5,797 713,004 2,968,010 39 540 2,121 3,018 13,457 3,558 15,578 NCR 41 6,620 29,885 - - - - - - - LAS PIÑAS CITY 2 24 130 - - - - - - - MALABON 6 63 240 - - - - - - - MANILA CITY 5 1,483 5,264 - - - - - - - MARIKINA 11 3,604 18,066 - - - - - - - MUNTINLUPA CITY 2 400 1,655 - - - - - - - NAVOTAS CITY 7 215 1,098 - - - - - - - PASIG CITY 2 9 46 - - - - - - - QUEZON CITY 5 749 3,202 - - - - - - - SAN JUAN 1 73 184 - - - - - - - REGION I (ILOCOS REGION) 2,239 301,399 1,263,577 0 0 0 83 489 83 489 ILOCOS NORTE 552 41,483 181,365 0 0 0 0 0 0 0 LAOAG CITY 80 14,133 63,001 - - - - - - - ADAMS 1 298 1,329 - - - - - - - BACARRA 44 1,930 8,687 - - - - - - - BADOC 31 2,773 11,711 - - - - - - - BANGUI 14 1,375 5,862 - - - - - - - BANNA (ESPIRITU) 20 857 2,573 - - - - - - - BATAC 43 2,853 13,269 - - - - - - - BURGOS 12 717 2,716 - - - - - - - CARASI 3 29 149 - - - - - - - CURRIMAO 23 1,001 4,227 - - - - - - - DINGRAS 29 791 3,195 - - - - - - - DUMALNEG 4 864 3,070 - - - - - - - MARCOS 13 780 2,740 - - - - - - - NUEVA ERA 11 729 3,497 - - - - - - - PAGUDPUD 16 2,775 12,524 - - - - - - - PAOAY 32 2,202 8,915 - - - - - - - PASUQUIN 33 1,948 8,916 - - - - - - - PIDDIG 22 440 2,226 -
Sitrep No.21 Re Preparedness Measures and Effects
SitRep No. 21 Tab A PREPAREDNESS MEASURES AND EFFECTS OF TY "LANDO" AFFECTED POPULATION As of 28 October 2015, 6:00 AM No. of TOTAL SERVED - CURRENT Region/Province/ AFFECTED Inside Evacuation Centers Outside Evacuation Centers Evac (Inside + Outside) Mun/City Centers Brgys Families Persons Families Persons Families Persons Families Persons GRAND TOTAL 3,445 666,562 2,898,507 124 6,304 27,673 199,097 863,819 205,401 891,492 NCR 7 1,431 6,696 0 - - - - - - MARIKINA 2 500 2,450 - - - - NAVOTAS CITY 2 17 85 - - QUEZON CITY 3 914 4,161 - - REGION I (ILOCOS REGION) 1,324 217,599 973,457 4 126 546 22,767 98,231 22,893 98,777 ILOCOS NORTE 26 1,402 5,182 0 - - 250 1,250 250 1,250 ADAMS 1 526 2,013 250 1,250 250 1,250 BURGOS 6 14 53 - - CARASI 3 20 60 - - NUEVA ERA 3 394 1,262 - - PAGUDPUD 9 29 141 - - SOLSONA 4 419 1,653 ILOCOS SUR 98 3,362 15,063 0 - - 19 95 19 95 BANAYOYO 9 30 133 BURGOS 2 116 580 0 - - - - CAOAYAN 3 13 46 - - GALIMUYOD 1 5 25 - - - - LIDLIDDA 14 259 1,062 - - NAGBUKEL 12 540 1,914 - - NARVACAN 14 259 1,062 - - SALCEDO (BAUGEN) 3 7 35 - - SAN EMILIO 2 18 90 18 90 18 90 SAN ESTEBAN 1 3 15 - - SAN VICENTE 1 4 20 - - SANTA CATALINA 9 1,700 8,199 - - SANTA CRUZ 2 51 180 - - SANTA MARIA 8 24 117 - - SANTIAGO 8 118 462 - - SIGAY 2 5 10 - - SUGPON 3 130 650 1 5 1 5 TAGUDIN 4 80 463 - - LA UNION 356 24,606 97,822 2 9 33 8,856 39,243 8,865 39,276 SAN FERNANDO 27 1,049 4,092 2 9 33 670 2,782 679 2,815 AGOO 47 1,745 6,980 125 465 125 465 ARINGAY 12 143 554 17 68 17 68 BACNOTAN 12 454 1,821 107 433 107 433 BAGULIN 10 302 1,208 265 1,060 -
Cebu Cpar Center, Inc. 1 Audit Of
CEBU CPAR CENTER, INC. www.Cebu-CPAR.com AUDIT OF RECEIVABLES PROBLEM NO. 1 Your audit disclosed that on December 31, 2006, the accounts receivable control account of Alilem Company had a balance of P2,865,000. An analysis of the accounts receivable account showed the following: Accounts known to be worthless P 37,500 Advance payments to creditors on purchase orders 150,000 Advances to affiliated companies 375,000 Customers’ accounts reporting credit balances arising from sales return (225,000) Interest receivable on bonds 150,000 Other trade accounts receivable – unassigned 750,000 Subscriptions receivable for common stock due in 30 days 825,000 Trade accounts receivable - assigned (Finance company’s equity in assigned accounts is P150,000) 375,000 Trade installment receivable due 1 – 18 months, including unearned finance charges of P30,000 330,000 Trade receivables from officers due currently 22,500 Trade accounts on which post-dated checks are held (no entries were made on receipts of checks) 75,000 P2,865,000 Questions: Based on the above and the result of your audit, determine the adjusted balance of following: 1. The trade accounts receivable as of December 31, 2006 is a. P1,147,500 c. P1,485,000 b. P1,522,500 d. P1,447,500 2. The current trade and other receivables net as of December 31, 2006 is a. P2,647,500 c. P2,272,500 b. P2,610,000 d. P1,822,500 3. How much of the foregoing will be presented under noncurrent assets as of December 31, 2006? a. P1,200,000 c. -
Solid Waste Management Sector Project (Financed by ADB's Technical Assistance Special Fund [TASF- Other Sources])
Technical Assistance Consultant’s Report Project Number: 45146 December 2014 Republic of the Philippines: Solid Waste Management Sector Project (Financed by ADB's Technical Assistance Special Fund [TASF- other sources]) Prepared by SEURECA and PHILKOEI International, Inc., in association with Lahmeyer IDP Consult For the Department of Environment and Natural Resources and Asian Development Bank This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. All the views expressed herein may not be incorporated into the proposed project’s design. THE PHILIPPINES DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ASIAN DEVELOPMENT BANK SOLID WASTE MANAGEMENT SECTOR PROJECT TA-8115 PHI Final Report December 2014 In association with THE PHILIPPINES THE PHILIPPINES DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ASIAN DEVELOPMENT BANK SOLID WASTE MANAGEMENT SECTOR PROJECT TA-8115 PHHI SR10a Del Carmen SR12: Poverty and Social SRs to RRP from 1 to 9 SPAR Dimensions & Resettlement and IP Frameworks SR1: SR10b Janiuay SPA External Assistance to PART I: Poverty, Social Philippines Development and Gender SR2: Summary of SR10c La Trinidad PART II: Involuntary Resettlement Description of Subprojects SPAR and IPs SR3: Project Implementation SR10d Malay/ Boracay SR13 Institutional Development Final and Management Structure SPAR and Private Sector Participation Report SR4: Implementation R11a Del Carmen IEE SR14 Workshops and Field Reports Schedule and REA SR5: Capacity Development SR11b Janiuay IEEE and Plan REA SR6: Financial Management SR11c La Trinidad IEE Assessment and REAE SR7: Procurement Capacity SR11d Malay/ Boracay PAM Assessment IEE and REA SR8: Consultation and Participation Plan RRP SR9: Poverty and Social Dimensions December 2014 In association with THE PHILIPPINES EXECUTIVE SUMMARY ....................................................................................5 A. -