Ministry of Transport of Republic “AZERROADSERVICE” OJSC

The 5th working group meeting of Asian Highway Investment forum on Bangkok

Participants from Azerbaijan: Mrs Gojulu Shafiga (Head of department of international relations and translation of “Azerroadservice” OJSC, expert of UNESCAP, Doctor of transport sciense Academician and active member of International Transport academy of Russian Federation, Highways of the Azerbaijan Republic (under the symbol "AH“) International AH-roads – 1504 km. Republican network has codes M1, M2, M3, M4, M5, M6, M7, M8. The main roads in the Republic 1. - Alat - - Ganja - Gazakh - border of the Republic of , stretching 503km (M2 AH-5 and E-60) 2. Guba - Baku - Salyan - Lenkaran - Astara - border Islamic Republic of , stretching 521 km (M1, M3, AH-8, E-119) 3. Baku-Shirvan - Goradiz - Mindzhevan - Megry - - - Sederek - the border of , stretching 631 km (M2, M6, M7, M8, AH-81 and E-002), There is accupation 20% (97 km) area. Pictures of Road signs of AH Main road indexes of Azerbaijan Financial sources of roads

Financial Sources of Transportation sector of Azerbaijan Republic - State budget, including: a) The miscellaneous type of taxes, b) Including road tax paid by owners of vehicles of the Republic and foreign countries; Financial sources of roads • Budget Fund "Avtomobil Yollari " (highways Fund) including:

a) Road Tax, b) Simplified tax paid by persons engaged in passenger and freight vehicles c) Excise taxes apply to imported passenger cars, d) The customs duties applicable to imported motor vehicles, e) The state fee charged for the granting of the authorization governing international road transport in the territory of Azerbaijan Republic, f) The state fee charged for an annual technical inspection of motor vehicles, trailers and semi-trailers Construction of roads and road infrastructures • Construction of roads and road infrastructures perform specialized organizations, companies and joint stock companies, including foreign companies, conducted under the competitive bidding - international tenders. • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh- Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry of Transport successfully negotiated with foreign investors, financial institutions and banks, imcluding WDB, Kuwait Faundation of Arabian economic development, Abu-Dhabi Faundation, European Devolepment Fund, Islamic Developing Bank, Asian Devoloping Bank and etc. Foreign investment projects THE 2014 PROJECT ROAD CONSTRUCTION Prediction Projects

Nr Names of projects Duration of construction 1 Ganja-Georgian state border highway 2014-2017

2 Minghacevir st – – Bahramtapa highway 2014-2016

3 Bahramtapa – Horadiz 2015-2017

4 Bahramtapa – Bilasuvar hw 2014-2017

5 – Zagatala –Georgia state border hw 2015-2018

6 Ujar – – Aghjabady hw 2014-2017

7 Ismailli – Mususlu highway 2014-2017

8 Ismailli – Shaki part of Garamaryam – Ismailli highway 2015-2017

9 Ganja – Toghana part of Ganja hw 2014-2017

10 Shirvan – Salyan – Neftchala highway 2017-2017

11 R-56 (M-5) – Karimli highway 2015-2017

12 Minghachevir dolama – Ganja – Yenikand Gibchag hw 2016-2018 Constant attention to road workers in Azerbaijan pays road safety. Work in the development of transport infrastructure and increase traffic safety in Azerbaijan continues. “Azerroadservice” OJSC does environmental requirements pre projects, constructions and exploitation during the work. Information about average intensity of movement 8 months of 2013

Title and name of Trucks from Heavy trucks Trailers Vehicle Total road 3 ton to 5 more 5 ton Half trailers Authomobiles, transport ton Tractor Bus units M1 Baku-Guba- Russian 2173 2363 929 16933 22398 border M2 Baku-Alat- Gazakh- 1912 1729 1051 4591 9283 Georgia

M3 Alat-Astara- Iran border 1410 1432 758 4638 8237 M4 Hajigabul- Bahramtapa 757 753 439 2274 4228 -Mingach Information about road accidents July 2013 Information about injured By reason of road Information of about Months Total numer of Perishes Injured Total number injured road accidents of RA Perishes injured January 25 27 21 0 0 0 February 42 24 45 0 0 0

March 46 42 50 0 0 0 1st quarter 113 93 116 1 0 1

April 50 32 56 1 0 1 May 29 34 27 0 0 0 June 40 28 29 0 0 0 2nd quarter 119 94 112 1 0 1

For 6 months 232 187 228 1 0 1 July 35 18 44 0 0 0 Information about road safety and road equipment January – August - 2013

1 Installation and restoration of road signs (unit) 754

2 Installation and restoration signal posts (unit) 6448

3 Installation of curvilinear bars (m) 40741

4 Installation and restoration of a handrail of the bridge (pm) -

5 Fastening of roadsides (m2) 190399 5

6 Marking of roads ( m2) 97186

7 Cancellation of illegal exits and entrances (unit) 305

8 Hole’s repair (m2) 221209 4 Information about road safety and road equipment January – August - 2013

9 Laying of borders (pm) 8756

10 Coloring of road elements (m2) 203441

11 Cleaning of ditches (pm) 3016676

12 Adding sand against sliding (m2) 19384

13 Adding salt against sliding (m2) 1431

14 Marking of roads – Road advertisement LTD (m2) 2010898

15 3 AAA LTD – Lining of roads (marking) (m2) 533566

Total lining (Azerroadservice, Road and advertisement, 3A LTD 2641650 INTERNATIONAL SEA TRADE PORT

Currently, work is underway on the construction of the new Baku International Sea Trade Port complex, which will cover the territory with an area of 490 hectares. In the center of the port and logistics facilities provided for the use of the latest technology. In 2015 it is planned to put into operation the first phase of the project - the construction of two ferries, three cargo berths for receiving containers, vessels "ro-ro" and conventional bulk carriers. INTERNATIONAL SEA TRADE PORT IN ALYAT SETTLEMENT

After commissioning of the planned processing of up to 8 tons of cargo and 50,000 containers a year and after commissioning is the construction of three cargo berths Phase 2 is planned to port processing 15 million tons of cargo, 150,000 containers a year after commissioning After the launch of the third stage is planned processing up to 25 million tons of cargo and 1 million containers a year. Present status on AH

AH Route Length Classification Note number

Inferior to Class Main Class I Class II Class III III

AH-5 “East-West” - Will be - completed under the Baku-Alyat-Gazakh- 2nd category Georgian Republic 513 km 175.0 km 338.0 km till 2015 Border (M-2)

“North-South’” Baku-Alat Russian Federation section is AH-8 (Dagestan) state considered border in AH5 and Baku (M-1)- Alyat- 509 km 235 km 162.7 km 111.3 km H.Z.Tagiyev Astara-IIR state border -Sahil (R6) (M-3, M-6) (Baku bypass). Will be completed in Present status on AH

97,0 km Horadiz – AH- Baku-Alat- Hajıgabul-- Armenian 81 Horadiz-Minjivan— Republic Armenian Republic.state state border border-Ordubad- 473km - 87,0 km is 138,0 151,0 is not under Nakhchivan-Sadarak- completed exploitation Turkey Republic state in 2013 as this area border (M-6.7,8) was occupied by .

AH-83 Gazakh-Uzuntala- Armenian Republic state border (R-23)

14 - - 14,0 - AH router under construction

Route Highway Length Progress of work Price, US$

1 2 3 4 5

a) Finished projects 21,5 Reconstruction (12,3) / 153,97 (12,3/9,2) new construction (9,2) -I class, Baku bypass 6 lane 98,0 Baku-Alat (km 22-49) 27,0+42 Reconstruction -1 class 6 lane (unfinished) AH-5 Reconstruction -1 class, 4 lane 35,31 “East-West” Alat-Hajigabul 45,6 Baku-Alat- Rehabilitation –I class.4 103,50 Qazakh- Lane (5,7)/ II class. 2 lane Georgia Hajigabul-Kurdamir 85,0 (5,7/79,3) (69,3) Republic New construction –II class, state border 2 lane (M-2) Kürdəmir by pass 502.0 km 88,83 Kurdamir-Ujar 42,1 Rehabilitation - II class. 2 lane 53,0 68,52 Ujar-Yevlakh (8,5/44,9) Rehabilitation –I class 4 lane (8,5) /II class 2 lane (44,9) 50,0 86.70 Yevlakh-Ganja Rehabilitation - II class. 2 lane AH router under construction

Rehabilitation -II class 2 Ganja by pass 37.5 lane 73.9

47.1

Ganja-Gazakh 94.0 Rehabilitation -II class 2 lane AH-5 25.5 Tavuz by pass 10.5 New consrt. II class 2 lane 50.70

Gazakh –state border of Georgia 35.8 Rehabilitation -II class 2 lane

b)Design in progress Reconstruction –I class 6 46,9 20,0 lane Baku-Alat (km 49-69) AH router under construction

Hajigabul-Kurdamir construction of 2 80.0 Reconstruction 416,5 lane – II class, 4 lane

Kurdamir-Yevlakh AH-8 construction of 2 lane 87,0 Reconstruction – 682,2 Iclass, 4 lane

295.8 km a) Finished projects

Baku-Russian Federation state border (M-l)

Rehabilitation-II 10.0 km class, 2 lane 68,29 Section km 6-16 Rehabilitation-II class, 2 lane 33,28 North-South Section km 89-109 20,0 Rehabilitation-II class, 2 lane Section km 121-125,5 4,5 51,82 AH router under construction

Section km-28-45 ( 17,0 Rehabilitation -I class, 104,7 circular road) 4 lane

Reconstruction and AH-8 Section km-16-134 (Khirdalan- new construction -I cl. Gandob) 118,0 (cement-concrete) 4 lane, and: new 875,10 construction -I cl.., 4 lane -23,6 km ( and Shabran circular) Reconstruction - 92,4km

Information on projects on Baku-Alat section (Baku circular, Baku-Alat (km 22-49 and 49-69)) is indicated in AH5

Alat-Astara-Iran Islam Republic state border (M-3) Reconstruction -I cl. 4 48,12 AH -81 Section km 9-31 22,0 lane, 57,4 Section 0-9 km 9,0 New construction (on the present highway exploitation)- construction finished Bilasuvar roundable 10,0 II class, 2 lane 13.8

Section Hajigabul- 50.0 Is completed in 2013 127.18 Bahramtapa Project under progress

Baku-Russian Federation state border (M-l) New construction and reconstruction I cl, 4 lane Section km-132-192 60,0 (asphalt-concrete) and: 229 new construction -50,0 km AH-8 Reconstruction -10,0km Section km 31,0-54,4 23,4 New construction 134,14 “North- I class, 4 lane 50,74 South” Section km 54,4-55,8 1,4 New constr. class, 4 lane(Kur bridge) 148,19 Section km 55,8-80,6 24,8 New construction I class, 4 lane R-6 Tagiyev-Sahil 42,0 Rehabilitation-II class, 2 lane 107,41 (Baku circular) Project under progress

Route Highway Length Progress of work Price, US$

1 2 3 4 5

Alat-Astara-Iran Islam New construction- 379.5 AH-8 Republic state border (M- 46.0 I class 4 lane 3) masalli Lenkoran “A”- North-South ”B” Project under progress

AH-81 Hajigabul- Bahramtapa- Horadiz-Minjivan- Hajigabul-Bahramtapa-Horadiz- Armenian Minjivan-Armenian Rep.state 63,0 Rehabilitation, II class, 2 148.82 Rep.state border- border (M-6) lane Ordubad- Bahramtapa-Horadiz Nakhchivan- Sadarak- Turkeyrepublic state border Further priority projects on AH Highways

Route Highway Length Progress of work Price, US$

AH-5 Ganja-Georgian state border 130 Reconstruction I class 637.20 EAST -WEST Construction of additional 2 lanes 4 lane

Alat-Astara-Iran Islam Republic state New construction- border (M-3) 80.6-142.9 km 39.3 I class 4 lane 270.2 AH-8

Masalli-Astara 16,74 New construction- I class 4 lane 138,24 Section C,km 46,15-61,74

AH-81 Hajigabul-Bahramtapa-Horadiz- 69,0 Rehabilitation, II class, 2 lane 176,40 Minjivan-Armenian Rep.state border (M-6) Bahramtapa-Horadiz Further priority projects on AH Highways

a) Finished projects Reconstruction (12.3 km) 21.5 153.97 Baku-Alat-Gazakh-Georgian Republic state New construction (9.2 border AH-81 km)- I class, 6 lane Baku-Alat- Hajıgabul- Baku by pass Horadiz-Minjivan- Armenian Republic.state border- Ordubad-Nakhchivan- Baku-Alat (km22-49 ) 27.0 km Reconstruction- I class, 99.33 Sadarak-Turkey Republic state border 6 lane (There is 97 km part of occupational area) Alat-Hajigabul is indicated in 45.6 Reconstruction- I class, 35.31 4 lane 87,0 Nakhchivan-Sadarak-Turkey Republic state Reconstruction- I class, border (M-7) 4 lane

Hajigabul-Bulagli (0-40.5 km) 50.0 Reabilitation II class, 2 94.11 lanes

b) Projects in progress Reconstruction- I class, 46,9 20,0 Baku-Alat-Gazakh-georgian Republic state 6 lane border (M-2) Baku-Alat (km 49-69)

Hajigabul-Bahramtapa-Horadiz-Minjivan- Armenian republic state border (M-6) Rehabilitation, II class, 72,6 2lane 134,31 Section km 40,5-113,1 0,43 Rehabilitation, II class, 21,97 Kur bridge (Shirvan) 2lane Report on the road sector

The territory of the country, thousands of square km 86.6 The population, in thousands 9356.5 The density of public roads On 1000 sq km, area 219.3 Per 1000 inhabitants 2.03 The length of the road network, km

Automobile roads – total

Including: 18993.6 Public Of which: 4640.0 state roads Local roads 14353.6

Department and private -

Toll roads -

International roads “E”, E60, E119, E002 1490.0

International roads CIS (Protocol 11.09.98) The length of public road on technical categories

Title of indices Public roads Including Km State roads, km Local roads, km Surfaced roads 18824.6 4634 14190.6

Including on technical roads:

Motorways

I 333.0 326.0 7.0

II 1379.3 1349.0 30.3

III 5264.7 2858.0 2406.7

IV 10466.6 101.0 10365.6

V 1381.0 1381.0 The length of public roads according of the types of road pavement, km

Title of indices Public roads Including Km State roads, km Local roads, km

Public automobile roads – total 18993.6 4640 14353.6

Including:

With surfaced pavement-total 18824.6 4634.0 14190.6

Or which: With asphalt-concrete pavement 8025.6 4345.0 3630.6

With cement-concrete pavement 129.0 125.0 4.0

Created translation (grit, gravel, 10670.0 164.0 10506.0 etc) Ground water 169.0 6.0 163.0 The presence and extent of man-made structures on public roads

Public Including Title of indices In units of roads Km State roads, km Local roads, km Bridges (over asses) – total Pieces 1455 620 835

R.M 50121.8 27674.5 22447.3

Including:

Pieces 1274 600 674 ferroconcrete R.M 44004.2 25904.3 18099.9

Pieces 178 20 158 Metallic R.M 6102.6 1770.2 4332.4

Pieces 3 3 Wooden R.M 15.0 15.0 The presence of transport vehicles

The total number of fleet vehicles 1237

Including:

Trucks 196

Cars 1009 buses 32 Financial resources, designed in 2013 in the road sector

Title of Incides Total vehicle Including on sources Road fund

Public roads-total 2136698.3 247133.8 906285.2 983279.3

Including:

-Maintenance of roads and man-made structures on 97923.6 96815.3 1108.3 them

Repair of roads and man-made structures on them 278367.1 150318.5 128048.6

Reconstruction (rehabilitation) of roads and man- 1084590.5 123048.6 657439.3 made structures on them

Construction of a new roads and man –made 675817.1 427151.2 325840.0 structures on them

The level of financial security (for 1 km of road) 112.5 13.01 47.72 51.77

State highways of the state (national) values all 1758086.2 147770.7 646765.5 963550

Including:

-Maintenance of roads and man-made structures on 40331.2 39490.4 840.8 them

Repair of roads and man-made structures on them 163288.6 108280.3 55008.3 637710.0

Reconstruction (rehabilitation) of roads and man- 979304.0 341594.0 637710.0 made structures on them Financial resources, designed in 2013 in the road sector

Construction of a new roads and 575162.4 249322.4 325840.0 man –made structures on them The level of financial security (for 1 378.9 3185 139.39 207.66 km of road)

Local roads, total 378612.1 99363.1 259519.7 19729.3

Including: -Maintenance of roads and man- 57605.2 57324.9 280.3 made structures on them

Repair of roads and man-made 115040.2 42038.2 73002.0 structures on them

Reconstruction (rehabilitation) of 105312.0 85582.7 19729.3 roads and man-made structures on them Construction of a new roads and 100654.7 100654.7 man –made structures on them

The level of financial security (for 1 26.37 6.92 18.08 1.37 km of road) Major accident rates on public roads (for 2013) 6 month and July

Title of accidents Public roads The total number of road accidents - all 267

İncluding due to road accidents - all 1

İncluding to road road conditions for 1000 vehicles 0.02

The number of died/because of road conditions 205/0

The number of injured/due to road conditions 272/1

The shared of road serviced in overload mode %

The length of roads providing a pass vehicles vvith an axle load. •thousands of km /% 18993.6 of the total length including:: 10 tons 19986/90.3

Also 11,5

Also 12 tons

Also 13 tons Road management

1. Full and short name of the body of state road management: "Azerroadservice"OJSC 2. Last name. fırst name, middle ııame and official title of the head: Javid Gurbanov Ganbar oglu, Chairman of "Azerroadservice" OJSC Information about the existence and condition of road infrastructure in the CIS interstate roads, on 01.01.2013

The presence of road infrastructure

1 Petrol stations, units 130

2 Hotels, units / seats 30

3 Power points (cafes, canteens. etc.), units / seats 221

4 Parking facilities, units / car place 19

5 Vehicle maintenance items, units 135

6 The introduction of intelligent transport systems - total length, km

7 The presence of items weighing units 9 Thank you for your kind attention