Airan Corporation Residential Cum Commercial Form 1

Total Page:16

File Type:pdf, Size:1020Kb

Airan Corporation Residential Cum Commercial Form 1 Airan Corporation Residential Cum Commercial Form 1 APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information Sr. Item Details No 1 Name of the Project Residential Cum Commercial 2 S. number in schedule 8(a) Proposed capacity/area/length/tonnage to be Land area: 5101.54 m2 3 handled/command area/lease area/number of Built up area: 24,944.5 m2 well to be drilled 4 New/expansion/modernization New 5 Existing capacity/area etc. No 6 Category of project i.e. “A” or “B” ‘B’ Does it attract the general condition? If yes 7 No please specify Does it attract the specific condition? If yes 8 No please specify Location Shela S.P. No 1, F.P. Number: 124, R.S. No: 158, Plot/Survey/Khasra No 158/p/1, 158/p/2, 158/p/3, 158/p/4, D.T.P. Number 3, Shela, Ahmedabad 9 Village Shela Tehsil Sanand District Ahmedabad State Gujarat Gandhigram Railway Station is ~12.01 Km in NE Nearest railway station/airport along with 10 Direction distance in Kms. Ahmedabad Airport is ~18.6 Km in NE Direction Ahmedabad city, it’s a Headquarter of District and Nearest town, city, district headquarter along 11 project is developed in Ahmedabad Urban with distance in Kms. Development Authority Ahmedabad Urban Development Authority Village Panchayat, Zila Parishad, Municipal (AUDA), Sardar Vallabhbhai Patel Sankul, 12 Corporation, local body (Complete postal Usmanpura, Ashram Road, Ahmedabad – address with telephone nos to be given) 380014, Telephone no: 079-27545051 to 54 13 Name of the applicant Airan Corporation 21 A, Riviera Blue, Opp Vodafone House, 14 Registered address Corporate Road, Prahaladnagar, Ahmedabad 15 Address for correspondence As above Name Mr. Sandeep Agrawal Designation Partner Address As above Pin code 380015 E-mail [email protected] Telephone 9879507005 Fax No Details of alternative sites examined, if any. No 16 Location of these sites should be shown on a Location of Site shown on Topo sheet is given in topo sheet Annexure 1. 17 Interlinked Project No Whether separate application for interlinked 18 No project has been submitted? 19 If yes date of submission - 20 If no reason Individual project 1 Airan Corporation Residential Cum Commercial Form 1 Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given 21 No The Forest (Conservation) Act, 1980 The Wildlife (Protection) Act, 1972 The CRZ Notification 1991 Whether there is any Government order/policy 22 No relevant/ relating to site 23 Forest Land involved? No Whether there is any litigation pending against the project and / or land in which the project is propose to be set up 24 Name of court No litigation pending Case no Order/directions of the court, if any and its relevance with the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 1.1 Permanent or temporary change in Yes The project will change the land use, land cover or land use, land cover or topography topography with respect to local landuse. The project including increase in intensity of will be developed as a Residential cum commercial land use (with respect to local land units. use plan) 1.2 Clearance of existing land, Yes Some Vegetation may be required to be cut before vegetation and buildings? construction work. 1.3 Creation of new land uses? Yes Residential cum Commercial units will be developed as per AUDA approved plan. 1.4 Pre-construction investigations e.g. Yes Soil testing report is attached vide Annexure 2. bore houses, soil testing? 1.5 Construction works? Yes There is construction of Residential cum commercial units and one level of Basement. (Total 196 No. of Flats & 40 No. of Shops) 1.6 Demolition works? No Not Applicable. 1.7 Temporary sites used for No Not Applicable. construction works or housing of construction workers? 1.8 Above ground buildings, structures Yes There is a construction of G/HP+ 13 floors and one or earthworks including linear level Basement. structures, cut and fill or excavations 1.9 Underground works including No Not applicable. mining or tunneling? 1.10 Reclamation works? No Not applicable. 2 Airan Corporation Residential Cum Commercial Form 1 S. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 1.11 Dredging? No Not applicable. 1.12 Offshore structures? No Not applicable. 1.13 Production and manufacturing No Not applicable. processes? 1.14 Facilities for storage of goods or Yes Construction Phase: materials? Minimum bulk material for construction would be brought as and when required and would be temporarily stored at site. Proper arrangement of storage with proper cover would be done. 1.15 Facilities for treatment or disposal Yes Solid Wastes: of solid waste or liquid effluents? Solid waste generated in Project area will be mainly of domestic nature. The 0.6 ton/day of solid wastes generated will be segregated into biodegradable and non-biodegradable wastes and collected in separate bins. The non-biodegradable wastes will be sold to recyclers and the biodegradable wastes will be collected and convert into compost. Liquid Effluent: On site sanitation facilities will be provided for proper disposal during the construction phase. It is estimated that about 112.32 kld of wastewater will be generated from the project during operation phase; wastewater will be treated into125 KLD STP. Treated wastewater will be reused for flushing and gardening purpose. Balance Treated wastewater will be disposed into Sewer line with prior permission. 1.16 Facilities for long term housing of No Not applicable. operational workers? 1.17 New road, rail or sea traffic during No Not applicable. construction or operation? 1.18 New road, rail, air, waterborne or No Not applicable. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not applicable. or pipelines? 1.21 Impoundment, damming, culverting, No Not applicable. realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable. 1.23 Abstraction or transfers of water Yes Construction Phase: from ground or surface waters? During construction phase fresh water requirement 17.5 kld will be met through the tankers Operation Phase: During operational phase fresh water requirement of 3 Airan Corporation Residential Cum Commercial Form 1 S. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 95.71 kld will be met through AUDA 1.24 Changes in water bodies or the No Not applicable. land surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes Transport of personnel and materials will be required for construction, operation or for both construction and operation phases. decommissioning? 1.26 Long-term dismantling or No Not applicable. decommissioning or restoration works? 1.27 Ongoing activity during No Not applicable. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes During construction phase, about 100 workers would temporarily or permanently? be employed temporarily and hired from local area. During the operational phase, there will be influx of more than 1262 (962 permanent, 300 visitors) people. 1.29 Introduction of alien species? No Not applicable. 1.30 Loss of native species or genetic No Not applicable. diversity? 1.31 Any other actions? No Not applicable. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. Information/checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 2.1 Land especially undeveloped or No Not applicable. agricultural land (ha) 2.2 Water (expected source & Yes Water demand will be as follows: competing users) unit: kld Construction phase Maximum Quantity:17.5 ( kld ) Source: Tankers Operation phase Maximum Quantity:95.71 ( kld) Source: AUDA 2.3 Minerals (MT) No Not applicable. 2.4 Construction material – stone, Yes Construction materials such as stone, cement, sand, aggregates, sand / soil (expected bricks, marble, paints, tiles, electric ware, sanitary ware, source – MT) glass would be used. All the above materials would be purchased from the local market and from nearest approved quarries, as and when required. It would be stored temporarily at the site. 2.5 Forests and timber (source – MT) No Not applicable 2.6 Energy including electricity and Source: UGVCL fuels (source, competing users) Yes Expected Demand : 1500 KVA Unit: fuel (MT), energy (MW) D.G. set: 40 KVA in case of power failure (only for fire pump) Fuel : HSD, 10 l/hr 2.7 Any other natural resources (use No Not applicable 4 Airan Corporation Residential Cum Commercial Form 1 S. Information/checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.
Recommended publications
  • Infobook 1 O.K. 30-5-2014
    GUJARAT UNIVERSITY Gujarat University Admission Committee (GUAC) INFORMATION BOOKLET 2015-16 Three Years’ LL.B. Programme (After Graduation) for the Academic Year 2015-16 GUJARAT UNIVERSITY ADMISSION COMMITTEE IAS Training Centre, Gujarat University, Navrangpura, Ahmedabad 380 009. Help Line Number : 1800-233-77777 (11:00 AM to 5:00 PM) Visit us: www.gujaratuniversity.org.in INDEX Description Page No. Index 2 1 Preamble 3 2 Admission Rules 4 1. Short Title and Commencement 4 2. Definitions 4 3. Acronyms 6 4. Admissions to various Programs 6 5. Seats Available for Admission 6 6. Eligibility for Admission 7 7. Reservation of Seats 7 8. Reservation for Physically Disabled Candidates 8 9. General Rules for the Programme 9 10. Distribution of Seats between candidates of Gujarat 10 Board and Other Boards 11. Supernumerary Seats 10 12. Preparation of Merit List 10 13. Correction of Marks 10 14. Registration for Admission 11 15. Admission Procedure 11 16. Fee 12 17. Documents to be attached with the application 13 18. Ineligibility for admission on production of false documents 14 19. Cancellation of Admission and Refund of Fee 14 20. Vacant Seats 14 21. Penalty 15 22. Interpretation 15 3 Instructions for online Three Years’ Integrated LL.B. 16 Programe Application 4 List of the Affilated Law Colleges 24 5 List of HDFC Bank Branches 25 6 List of Help Centers 27 7 Proposed Key Dates (Schedule) 28 2 1. PREAMBLE The Gujarat University is established in the year 1949 by The Gujarat University Act, 1949. As per the powers conferred in the said Act, Gujarat University has constituted “Gujarat University Admission Committee” to regulate the admission of candidates to the certain programmes as mentioned in “The Gujarat University Three Years’ Integrated LL.B.
    [Show full text]
  • 87 Bus Time Schedule & Line Route
    87 bus time schedule & line map 87 Kalupur Terminus - Chandkheda View In Website Mode The 87 bus line (Kalupur Terminus - Chandkheda) has 2 routes. For regular weekdays, their operation hours are: (1) Chandkheda: 6:40 AM - 9:30 PM (2) Kalupur Terminus: 7:50 AM - 10:40 PM Use the Moovit App to ƒnd the closest 87 bus station near you and ƒnd out when is the next 87 bus arriving. Direction: Chandkheda 87 bus Time Schedule 26 stops Chandkheda Route Timetable: VIEW LINE SCHEDULE Sunday 6:40 AM - 9:30 PM Monday 6:40 AM - 9:30 PM Maninagar Maninagar Railway Station, Ahmadābād Tuesday 6:40 AM - 9:30 PM Jawahar Chowk Wednesday 6:40 AM - 9:30 PM Bhairavnath Thursday 6:40 AM - 9:30 PM Friday 6:40 AM - 9:30 PM Sah Alam Darwaja Saturday 6:40 AM - 9:30 PM S. T. Stand Kamnath Mahadev / Raipur Darwaja Sarangpur 87 bus Info Direction: Chandkheda Kalupur Stops: 26 Trip Duration: 47 min Naroda Road, Ahmadābād Line Summary: Maninagar, Jawahar Chowk, Prem Darwaja Bhairavnath, Sah Alam Darwaja, S. T. Stand, Kamnath Mahadev / Raipur Darwaja, Sarangpur, Kalupur, Prem Darwaja, Dariyapur Darwaja, Delhi Dariyapur Darwaja Darwaja, Income Tax O∆ce, Usmanpura, Vadaj Bus Terminuss, Subhash Bridge, Keshav Nagar, Delhi Darwaja Dharmanagar, Ram Nagar, Chintamani Society, Abu Koba Cross Road, Gujarat Stadium, Motera Gam, Income Tax O∆ce Government Engineering College, Santokba Hospital, Shivshakti Nagar, Chandkheda Usmanpura Vadaj Bus Terminuss Subhash Bridge Keshav Nagar Dharmanagar Ram Nagar Chintamani Society Abu Koba Cross Road Ram Bag Road, Ahmadābād Gujarat Stadium
    [Show full text]
  • Kindly Send Your Correct Contact Details(Address, Mobile No., E-Mail Id) at [email protected] LIST of MEMBERS WHOSE ADDRESS ARE NOT CORRECT
    LIST OF MEMBERS WHOSE ADDRESS ARE NOT CORRECT Membersh Category Name ip No. Name Address City PinCode EMailID IND_HOLD 6454 Mr. Desai Shamik S shivalik ,plot No 460/2 Sector 3 'c' Gandhi Nagar 382006 [email protected] Aa - 33 Shanti Nath Apartment Opp Vejalpur Bus Stand IND_HOLD 7258 Mr. Nevrikar Mahesh V Vejalpur Ahmedabad 380051 [email protected] Alomoni , Plot No. 69 , Nabatirtha , Post - Hridaypur , IND_HOLD 9248 Mr. Halder Ashim Dist - 24 Parganas ( North ) Jhabrera 743204 [email protected] IND_HOLD 10124 Mr. Lalwani Rajendra Harimal Room No 2 Old Sindhu Nagar B/h Sant Prabhoram Hall Bhavnagar 364002 [email protected] B-1 Maruti Complex Nr Subhash Chowk Gurukul Road IND_HOLD 52747 Mr. Kalaria Bharatkumar Popatlal Memnagar Ahmedabad 380052 [email protected] F/ 36 Tarun - Nagar Society Part - 2 Opp Vishram Nagar IND_HOLD 66693 Mr. Vyas Mukesh Indravadan Gurukul Road, Mem Nagar, Ahmedabad 380052 [email protected] 8, Keshav Kunj Society, Opp. Amar Shopping Centre, IND_HOLD 80951 Mr. Khant Shankar V Vatva, Ahmedabad 382440 [email protected] IND_HOLD 83616 Mr. Shah Biren A 114, Akash Rath, C.g. Road, Ahmedabad 380006 [email protected] IND_HOLD 84519 Ms. Deshpande Yogita A - 2 / 19 , Arvachin Society , Bopal Ahmedabad 380058 [email protected] H / B / 1 , Swastick Flat , Opp. Bhawna Apartment , Near IND_HOLD 85913 Mr. Parikh Divyesh Narayana Nagar Road , Paldi Ahmedabad 380007 [email protected] 9 , Pintoo Flats , Shrinivas Society , Near Ashok Nagar , IND_HOLD 86878 Ms. Shah Bhavana Paldi Ahmedabad 380006 [email protected] IND_HOLD 89412 Mr. Shah Rajiv Ashokbhai 119 , Sun Ville Row Houses , Mem Nagar , Ahmedabad 380052 [email protected] B4 Swetal Park Opp Gokul Rowhouse B/h Manezbaug IND_HOLD 91179 Mr.
    [Show full text]
  • Public-Private Partnership for Road Infrastructure Development
    Public-Private Partnership for Road Infrastructure Development Until recently, city road development was considered to be in public domain with the government bearing the prime responsibility for development and maintenance of roads. Implementation of road projects and their maintenance suffered as it became solely dependent on the availability of funds from the government budget. Thus, it was important to explore alternative means of financing infrastructure projects. The Sardar Patel Ring Road in Ahmedabad demonstrates how public-private partnership (PPP) models can be used effectively for city infrastructure Documented by: development. Ahmedabad Urban Urban Management Centre (UMC) as a part of Development Authority (AUDA) has Mega Cities....Poised For Change - Leading been working with the private sector to Practices Catalogue - 2007 realize this prestigious project. AUDA has managed to implement a major part Contact: of this large scale project in a brief time Urban Management Centre, period. The case study highlights the 3rd Floor, AUDA Building, key features of the project, which are Usmanpura, Ashram Road, reflected in its financing model, land Ahmedabad - 380014 development mechanism, project management and aspects of PPP. Telefax: 079-27546403/ 5303/1599 Email: [email protected] Public-Private Partnership for Road Infrastructure Development Mega Cities...Poised for Change, Leading Practices Catalogue, 2007 SBTIituation efore he nitiative ISmplementation trategies he peripheral areas of Ahmedabad have been Conceptualizing the Ring Road expanding after 1980s. Population growth in these T The Sardar Patel (SP) Ring Road was conceptualized in areas has been more rapid than the areas within the city the Revised Development Plan of 2011 of AUDA. limits.
    [Show full text]
  • 'Town Planning Scheme' a Tool for Planned, Fair and Equitable Urban
    Land based financing mechanisms adopted for large scale urban projects (Case of Sabarmati River front Development and Bus Rapid Transit System) DR. VATSAL PATEL Engineer – Urban Planner Chief City Planner Ahmedabad Municipal Corporation and SRFDCL *Source of graphical slides HCPDPM Major Issues of Large scale Urban Projects in India: • High pressure on urban local body (ULB) for providing Basic Services • Under Direct/ Indirect control of State Government on ULB • Lack of technical resources • Lack of financial resources . Resources for financing of Large scale Urban Projects in India: • Aid from central or state government • Grants from state government • Lone from state government • Lone from local financial institutes e.g. HUDCO etc. • Loan from international financial institutes . • Land as resource Breaking the Trap Lack of funds Low quality of infrastructure Low tax revenues projects Enough funds Public dissatisfaction More maintenance high tax revenues good quality of infrastructure projects Public satisfaction low maintenance Land as Resource for financing of Large scale Urban Projects: Case of Sabarmati River Front Development Project Case of Sabarmati River Front Development Project Sabarmati River Passing from middle of the city Reclaimed Sabarmati River land River Training and Land Reclamation • Defined Waterway – 275 m wide • Total Project area – 204 Ha. out of which 162 Ha. Reclamation area Defined East waterway Bank Reclaimed West land bank SRFD Project Development Plan Area statement of land use for the land, included
    [Show full text]
  • Portal Electrical Contactor List.Xlsx
    Disclaimer: Electrical contractors are licenced by the Chief Electrical Officer. The list of Licenced Electrical Contractors attached herewith is based on the data currently available with us. If required, an updated list of all licenced electrical contractors would be available with the Chief Electrical Inspector office, Gandhinagar. SR License NO Name Address District / City R.M. ENGINEERING WORKS 3, GIDC ESTATE, PHASE 1, 1 GHTC/359 RAJESH MALLOABLES LIMITED. AHMEDABAD VATVA, AHMEDABAD - 382445 MAFATLAL INDUSTRIES LIMITED (TEXTILE 2 GHTC/354 AHMEDABAD UNIT, ASARWA ROAD, AHMEDABAD. AHMEDABAD DIVISION) W/12, BHAVANA FLATS, NARAYAN NAGAR ROAD, 3 GAC/3232 POWER DISTRIBUTORS AHMEDABAD VASNA, AHMEDABAD. D/92, NIRMAN COMPLEX, NR. R.C.TRCHNICAL HIGH 4 GAC/3228 PUSHYA ASSOCIATES SCHOOL, CHANAKYAPURI ROAD, CHANDLODIA, AHMEDABAD AHMEDABAD. 2675, HAIDAR MANZIL, NR. SHAHPUR VAD, SHAHPUR, 5 GAC/3227 SIGMA ELECTRIC WORKS AHMEDABAD AHMEDBAD. A/51,SHAKTI ENCLAVE, JUDGES BUNGLOW ROAD, 6 GAC/3226 SHREE KRISHNA ENTERPRISE AHMEDABAD BODEKDEV, AHMEDABAD. 4, STAR APPT., MEHTA PARK, NR. HIRABAG, 7 GAC/3225 ADISHVARAM CORPORATION AHMEDABAD AMBAWADI, AHMEDABAD. 7, NILDHARA APPT, OPP. VYASWADI, NAVA WADAJ, 8 GAC/3222 SHREE ELECTRICALS AHMEDABAD AHMEDABAD. 4, PARIBHRAHAMNAGAR CO.OP. HOUSING SOC, NR. 9 GAC/3221 ATULKUMAR RASIKLAL NAYAK AHMEDABAD RUTURAJ SOC, CHANDLODIA, AHMEDABAD. 64/583, CHANDRABHAGA HOUSING BOARD, NAVA 10 GAC/3220 OM ELECTRICALS AHMEDABAD WADAJ, BHAVSAR HOSTEL, AHMEDABAD. 51, SHAIWALI SOC, OPP. A.D.C. BANK, JIVRAJ PARK, 11 GAC/3215 OM ENGINEERING AHMEDABAD VEJALPUR ROAD, AHMEDABAD. OPP. CHEPI HOSPITAL, PIRANA ROAD, BAHERAMPURA, 12 GAC/3214 STAR ELCTRO FEBRICATION AHMEDABAD AHMEDABAD. AVISHKAR II, OPP. G.A.SHAH CLASSES, MADALPUR, 13 GAC/3209 JCSHAH CO AHMEDABAD ELLIS BRIDGE,AHMEDABAD.
    [Show full text]
  • Life Membership 2011-18 Dec Telephone
    LIFE MEMBERSHIP 2011-18 DEC TELEPHONE . Sl.No Name Designation ADDRESS NO SABZAZRE_NASEEBA-17,Muslim 1 A A MUNSHI HD Pharmasist soc. Navrangpura, AHMEDABAD 9979148439 380009. Gineshwar part - I Nr Kanti part 2 A B PANT EE(D) society,Ghatlodia Ahmedabad- 27604204 380061 B-32, Orchid park nr Shailby Hospital 3 A C Bajaj Mgr(Logistic) 9904981023 opp. Karnavati c;lub Satelite , A-22,Park Avenue New cg 4 A C Barua Dy.SE(P) 9427336696 roadChandkheda Ahmedabad-380005 22,Somvil Bunglows,Bhaikaka Nagar 5 A C Saini SE(P) Thaltej Ahmedabad-55 B-302.Chinubhai Tower Satelite 6 A D PATEL SE(P) 9428563893 Memnagar AHMEDABAD-52. 27,Konark Society Sabarmati 7 A D VAID DySE(E) 9898218428 Ahmedabad -380019 A-9 AL-Ashurfi Society,B/H Haider 8 A G SHAIKH AEE(P) Nagar, JUHAPAURA, Sarkhej Road 9428330591 AHMEDABAD 380055 B-27, Shardakrupa Society, B/H 9 A H Naik Dy. SE(P) Janatanagar Chandkheda, 27516085 GANDHINAGAR-382424. 66/7 Madini Chamber ,Mahakali 10 A I Shaikh AE(M) Temple Dudeshwar Shahibaug 9824591030 Ahmedabad 8 Sindhu Mahal soc. Ashram road Old 11 A J Sharma DM(HR) 9428008152 Vadaj Ahmedabad 380013. D-303 Aditya residency Motera 12 A K Dhawan GM(Res) 9428332121 Ahmedabad 380005. H-6,Karnavati Soc.GHB Chandkheda 13 A K GAHLAUT GM(P) 23296926 Ahmedabad-382424 Flat no 1001 Sangath Diomond 14 A K Gupta Exe.Director Tower nr PVR cinema Motera 9712922825 Ahmedabad 380005. 2nd floor Rituraj Apartment op Rupal 15 A K Gupta DGM(MM) flats nr Xavier Loyla school 9426612638 Ahmedabad B-77,RJESHWARI 09428330135- 16 A K MEHTA EE(M) SOCIETY,PO,TRAGAD,IOC ROAD 27508082 CHANDKHEDA AHMEDABAD-382470.
    [Show full text]
  • Unpaid Unclaimed 2Nd Interim Dividend 2018-19
    RITES LIMITED DIVIDEND YEAR - 2018-19 (2ND INTERIM DIVIDEND) WNO FLNO NAM1 Add1 Add2 Add3 City PIN SHARES NETDVD 1 IN30020610711480 SANDEEP JAIN A - 7 C C COLONY DELHI 110007 1 4 2 IN30020610806332 AMITA JAIN A - 7 C C COLONY DELHI 110007 1 4 3 IN30020610979780 NITYA CHUGH 28 / 1 EAST PATEL NAGARNEW DELHI 110008 5 20 5 IN30047642343949 M L VERMA 41 A MES OFFICERS ENCLAVE KOTWALI ROAD NEW DELHI 110010 100 400 6 IN30226910628679 SANJIV GROVER A-120, 1ST FLOOR, INDERPURI, NEW DELHI 110012 50 200 7 1201330000335373 PREM CHAND CHACHRA G3/1 MALVIYA NAGAR NEW DELHI . NEW DELHI 110017 1 4 8 IN30105510079453 PRITVI RAJ BAWEJA R - 9 NEHRU ENCLAVE KALKAJINEW DELHI 110019 100 400 10 IN30177412964854 ANJANA BAGAI 4/2508 GALI NO-12 BIHARI COLONY SHAHDARA NORTH EASTDELHI 110032 190 760 11 IN30051312082990 ANURAG SHARMA 472 A/1B GALI NO 7 BHOLA NATH NAGAR SHAHDARANEW DELHI 110032 75 300 13 IN30011810763626 AMIT SEHRAWAT RZ - 17 NAYA BAZAR NAJAFGARHNEW DELHI 110043 80 320 14 0000003 GAURAV KUMAR SINGH WZ-122-A, GALI NO-3 SADH NAGAR-1 PALAM COLONY NEW DELHI 110045 1 4 15 0000104 RAM CHANDRA SINGH WZ-122-A, GALI NO.3 SADH NAGAR, PART-1 PALAM COLONYNEAR PALAM RAILWAY STATION NEW DELHI 110045 1 4 16 0000105 PRABHAWATI SINGH WZ-122-A GALI NO.3 SADH NAGAR-1PALAM COLONY NEW DELHI 110045 1 4 17 0000106 RAM CHANDRA SINGH WZ 122 A GALI NO 3 SADH NAGAR I PALAM COLONY NEW DELHI 110045 1 4 18 0000109 RAM CHANDRA SINGH WZ-122-A GALI NO.3 SADH NAGAR-1PALAM COLONY NEW DELHI 110045 1 4 20 IN30051314288050 SHIV SAGAR SHAH B 2/8 RITES FLATS ASHOK VIHAR PHASE 3 NEW DELHI
    [Show full text]
  • 3.2 Zoning and Development
    3.2 Zoning and Development 3.2.1. Introduction ................................................................................................................ 14 3.2.2. Considerations for Proposals ...................................................................................... 14 3.2.3. Proposals and Recommendations .............................................................................. 16 Proposal 1: Densification of existing zoned areas ..................................................... 20 Proposal 2: Development of Central Business District (CBD) .................................... 21 Proposal 3: Densification along transit corridors through Transit Oriented Zone ..... 24 Proposal 4: Development around existing zoned areas to incentivize affordable housing ....................................................................................................................... 26 Proposal 5: Development in Growth Centers ............................................................ 27 Proposal 6: Development around village gamtals ..................................................... 30 Proposal 7: Introduction of Prime Agriculture Zone to preserve agriculture land .... 30 Proposal 8: Special Planned Area Development Zones (SPD) .................................... 31 3.2.4. Recommended Actions for implementation .............................................................. 33 3.2. Zoning and development 3.2.1. Introduction Today urban areas within AUDA limits are home of about 60 lakh people. As this number continues
    [Show full text]
  • Route of First Phase of Ahmedabad Metro Rail Project Approved, to Be Sent to Centre for Assistance
    Route of first phase of Ahmedabad Metro Rail Project approved, to be sent to centre for assistance Ahmedabad, 16 January 2014 State Finance Minister and Metro Rail project high power committee’s head Nitin Patel today in a statement said that a meeting chaired by Chief Minister Narendra Modi was held to review the Metro rail project. The previous route of Metro Rail in Ahmedabad has been slightly modified in the meeting. He said the modifications in previous route are done after detailed house hold survey, traffic analysis, geo-technical investigation, topographical survey, multi- model integration analysis, environment impact assessment, financial and economic viability etc related studies. Nitin Patel further said that the state government had earlier sent a detailed project report(dpr) as per the old route to central government which was returned for clarifications on some points. Now state will send a new dpr on the basis of newly approved route. It will be as per the guidelines of government of India. The first phase will cost around Rs. 10,000 crore and dpr in this regard will be sent to government of India soon. After approval to it, the central government will also join the Metro rail project. The state government has approved following routes: (1) Thaltej – Drive-In road – Helmet char rasta, Vijay char rasta – Commerce college chha rasta – Stadium char rasta – Ashram road – Khanpur – Shahpur – Relief road – Gheekanta – Kalupur railway station – Amraiwadi – Vastral – Sardar Patel ring road (2)Vasna APMC – Anjali – Paldi – V.S.Hospital – Ashram road – Vadaj – Ranip AEC – Sabarmati – Motera stadium Patel said, the areas of east and west Ahmedabad will enjoy metro rail connection with Kalupur railway station.
    [Show full text]
  • Speciman Copy Not for Sale
    Comprehensive Development Plan 2021 (Second Revised) PART III GENERAL DEVELOPMENT CONTROL REGULATIONS NOTIFICATION VIDE NO.GH/V/207 OF 2014/DVP/112013/4777-L DATED 20TH DECEMBER 2014 HAS BEEN SANCTIONED BY THE GOVT. OF GUJARAT UNDER SUB-CLAUSE(ii) OF CLAUSE(a) OF SUB-SECTION(1) OF SECTION 17 OF THE GUJARAT TOWN PLANNING AND URBAN DEVELOPMENT ACT, 1976 AND ORDER NO. VNM-102015-CM-38-L ST DATED 21 JANUARY 2015 Speciman Copy not for sale A h m e d a b a d U r b a n D e v e l o p m e n t A u t h o r i t y AUDA Speciman Copy not for sale AUDA Table of Content SECTION A: PREAMBLE AND DEFINITIONS 1.0 PREAMBLE 1 2.0 DEFINITIONS 2 SECTION B: PROCEDURE REGULATIONS 3.0 DEVELOPMENT PERMISSION AND BUILDING USE 34 PERMISSION 3.1 Development Permission Required 34 3.2 Development Permission Not Required 34 3.3 Grant of a Development Permission 34 3.4 Development Requirements 35 3.5 Lapse of Development Permission 35 3.6 Cancellation of Development Permission 35 3.7 Unauthorized Building 35 3.8 Procedures for Obtaining, Revising and Revalidating a 36 Development Permission 3.9 Building Use Permission Required 37 3.10 Grant of Building Use Permission 37 3.11 Revocation of Building Use Permission 38 3.12 Unauthorized Use of Building 38 3.13 Procedure for Obtaining Building Use Permission 39 3.14 Relaxation 39 3.15 Competent Authority to Clarify and Interpret Provisions of 40 the Regulations 3.16 Development Undertaken on Behalf of Government and 40 Appropriate Authority 3.17 Penalties 40 4.0 RESPONSIBILITIES OF OWNER OR developer AND PERSONS 41 ON RECORD
    [Show full text]
  • Guangzhou International Award for Urban Innovation Application Form 2012
    Guangzhou International Award for Urban Innovation Application Form 2012 Please return the Application Form to the Guangzhou Award Secretariat at [email protected] by 30 September 2012. A. Profile of the Initiative Name of City/Community: Ahmedabad Name of Province/State: Gujarat Name of Country/Region: India Africa (Sub-Saharan) Asia and Pacific √ Geographic Region (Please East and Central Europe select and tick one): North Africa and Middle East North America Latin America & Caribbean Title, name and position of person(s) submitting: 1. Basic City Data: Population size: 6.5 million Surface Area: 466 sq.km Population Density: 11948 /sq.km GDP : 72 billion USD Other: (please specify) B. Background Information: Title of Slogan of the Initiative (25 words max.): “Sabarmati Riverfront Development Project” Start date of Initiative: Dec 2004 (In May 1997, the Ahmedabad Municipal Corporation (AMC) established the Sabarmati River Front Development Corporation Limited (SRFDCL) to develop the riverfront. Construction activity commenced in Dec 2004 after obtaining all the clearances from the Government) Tentative end date of initiative Project development work is at the verge of completion. However, SRFDCL will be responsible for the Development of Control in the reclaimed area to create and maintain the urban neighborhood as an extended arm of the City Government Thematic area(s): Urban Infrastructure 1 C. Summary of the origins of the initiative: Describe how the initiative came about and what challenges or issues of sustainable development it is meant to address using the following lead questions as your guide (350 words max). 1. Describe briefly the reason(s) for undertaking initiative including challenge(s) or issues confronting the city/region/community.
    [Show full text]