Hiram's Highway Improvement Stage 2 - Plan (Sheet 1 of 3) ‚F Highways »­ Department Hong Kong

Total Page:16

File Type:pdf, Size:1020Kb

Hiram's Highway Improvement Stage 2 - Plan (Sheet 1 of 3) �‚F Highways »­ Department Hong Kong For Sai Kung District Council Meeting on 2 July 2019 SKDC(M) Paper No. 151/19 Sai Kung District Council Hiram’s Highway Improvement Stage 2 1. Introduction 1.1 This paper is to report the latest progress of the Hiram’s Highway Improvement Stage 2 project (“the Project”) to the Sai Kung District Council (SKDC). 2. Background 2.1 Hiram’s Highway is a road linking Sai Kung to Kowloon East and Tseung Kwan O. There is traffic congestion along some sections of the road during peak hours on weekdays and weekends. In view of the current traffic condition at Hiram’s Highway, the Highways Department (HyD) is implementing improvement works to Hiram’s Highway in stages, with the objectives to relieve traffic congestion and improve road design. 2.2 Hiram’s Highway Improvement Stage 1 project commenced in 2016. It covers the section of Hiram’s Highway between Clear Water Bay Road and Marina Cove and is anticipated to be mostly completed by end 2020. Hiram’s Highway Improvement Stage 2 project will improve the remaining section of Hiram’s Highway from Marina Cove to Sai Kung Town, Po Tung Road and Tai Mong Tsai Road to the South of Sha Ha. 1 3. Latest Progress 3.1 HyD has engaged consultants to conduct investigation study and preliminary design for the Project. The consultants proposed to widen the section of Hiram’s Highway between Marina Cove and Sai Kung Town to dual 2-lane carriageway. 3.2 Since 2013, HyD has consulted the major stakeholders on the proposed dual 2- lane on-line improvement scheme and arranged meetings with local residents and communities for exchange of views. From time to time, HyD has also reported the study progress to the SKDC and its Working Group and collected their views. 3.3 HyD presented the proposed road improvement scheme and implementation programme to SKDC in SKDC’s full council meeting on 6 November 2018. SKDC supported the proposed improvement scheme and requested HyD to implement the Project as early as possible. 3.4 In the past few months, HyD conducted follow-up meetings with local stakeholders at critical road sections, including the stakeholders from Pak Sha Wan, Sha Ha, Sha Kok Mei and Sai Kung Town, as well as Sai Kung Rural Committee. 3.5 Based on the comments received, HyD has enhanced the design of the proposed improvement scheme as follows:- (i) improving the Pak Sha Wan section of Hiram’s Highway as single 4-lane carriageway, in order to minimize the impact on existing roadside structures and reduce the land to be resumed; (ii) provision of a pedestrian subway crossing at Pak Sha Wan; (iii) provision of a new loading / unloading layby and improvement of a pick-up / drop-off layby for public transport at Pak Sha Wan; 2 (iv) modification of the Pak Kong Road junction to allow vehicle turning right from Pak Kong Road to Hiram’s Highway (Kowloon Bound); (v) omission of proposed noise barriers at Pak Sha Wan and Sai Kung Town; (vi) modification of the design to minimize impact to nearby historic structures, such as maintaining the “Tin Hau Temple” and the “Hip Tin Temple”, as well as the “Pai Lau” of “Man Yee Wan New Village and Sha Tsui New Village” in Sai Kung Town at their existing locations; and (vii) modification of the location and design of a pedestrian crossing at Tai Mong Tsai Road near Sha Kok Mei. 4. Proposed Road Scheme 4.1 The proposed works under the Project includes – (a) widening of an approximately 4.0 km long section of Hiram’s Highway and Po Tung Road (between Marina Cove and Sai Kung Town) to dual 2-lane carriageway, and widening of the Pak Sha Wan section to single 4-lane carriageway; (b) improvement of an approximate 600 m long section of Tai Mong Tsai Road between Sai Kung Town and Wai Man Road; (c) improvement of pedestrian crossing facilities; (d) provision of noise barriers; and (e) associated civil and road works, slope and geotechnical works, street lighting, drainage and water works, and landscaping works. 4.2 Please refer to Annex 1 for the general layout plan of proposed works. 4.3 According to the current design and relevant project details, HyD is conducting an environmental study for the proposed works to evaluate its potential implications to the environment (including air quality, noise, water quality, and waste 3 management), ecology, landscape and visual, cultural heritage, etc. Appropriate and practical mitigation measure will be proposed in order to mitigate the relevant implications. Based on the preliminary findings of the environmental study, HyD has proposed noise barriers and low noise road surfacing materials to be provided at certain road sections in order to minimize the traffic noise impact. 4.4 Subsequently, due to public’s views opposing the provision of noise barriers at Pak Sha Wan section and Sai Kung Town section, HyD has modified the extent of noise barrier. The modified list of noise barriers is presented in the following table and in the general layout plan in Annex 1. Noise Barrier No. Location V01 Near Pak Wai C01 Between Ta Ho Tun Road and Che Keng Tuk Road V02 Near Che Keng Tuk Road C02 – C03 Between Po Lo Che Road and Sai Kung Rural Committee Lane V03 – V06 V07 Near Sai Kung Rural Committee Lane V08 – V09 Near Sha Kok Mei Road 4.5 During construction, HyD will implement suitable temporary traffic arrangements to maintain the traffic flow at Hiram’s Highway. 4.6 The Project will require resumption of private land and clearance of government land. The design of the improvement works has minimized the land impact as far as possible. Eligible owners of the lots to be resumed will be offered compensation in accordance with the prevailing policy, while the affected households will be offered public housing (including Interim Housing) or ex-gratia allowances, where eligible. 4 5. Implementation Plan 5.1 HyD is currently co-ordinating with relevant departments for gazette of the road scheme. The earliest gazette time of the road scheme according to the Roads (Works, Use and Compensation) Ordinance (Cap. 370) is now anticipated in end 2019 for the public to comment on the road scheme. HyD will then seek authorization to execute the works in accordance with the statutory requirements. 5.2 HyD will continue to implement the Project according to the Public Works Programme procedures. If the relevant statutory procedures can be completed smoothly by end 2020, we anticipate that the detailed design of the Project can commence in 2021. 6. Conclusion 6.1 SKDC members’ comments on the latest improvement scheme are welcomed. We would also like to seek SKDC members’ support for gazette of the Project. Enclosure Annex 1: Layout Plan Highways Department June 2019 5 Ø¿⁄ 300 702 SAI 300 225 SHA Water Tunnel 6.4 Water Tunnel R Ø¿⁄ OAD 100 èF 8.2 200 400 o…– A` »­ 400 Disused Mine Lookout 7.5 300 T 400 A scale 500 I ROAD ‚F C 200 C HANG s¤õ¤A f 1:4000 Fire Lookout TUN HO TA 284 ‡_ 70.2 CHO 100 F H ROAD ´¥®Ä SHUI 240 414 j⁄ PYRAMID HILL U ‡_ 200 ( TAI KAM CHUNG ) j LUK CHAU SHAN 536 ñ¤ N 16.5 ´¥®Ä G 100 56.7 HAU CHUNG TAI SÅ A3 420 x 297 Pipeline 100 11.7 64.7 [¿n f³ H j¤F¯ Jade Villa ›ƒ Floral Villas A A` O Lookout U K¯ R 400 TIT CHI SHAN j¤ SAI R TAI CHAU D T T 400 AI 6.4 G 400 M O N 100 U©£ 12 LAP SAP CHAU 372 COPYRIGHT RESERVED t Ser Res aª HIGHWAYS DEPARTMENT HONG KONG Ø¿⁄ Sw P ¥ Water Tunnel Water TunnelSHEK NGA SHAN ·‰ ˆ· Ferry Pier Kwun Tsoi Pai 540 t 73.9 500 Ser Res 300 77.7 Ϧ ‹‰ è¦ YEUNG CHAU C Cha Yue Pai 86.6 Łƒ^ A»¶ 26 EªY e Lakeside SAI KUNG 200 o´ 25 CHAM TAU CHAU Garden Water è¦ plan no. Treatment HWAY G Works HI _¥ p¤ê j¤ê Łƒ^Æ⁄~¥ SIU TSAN CHAU 5.2 AM'S TAI TSAN R Sai Kung _ SAI KUNG 50 HI Outdoor Recreation Centre CHAU ®ºÁ¥ 17 PAK KONG Fisherman Housing Estate ˆƒ⁄B ¥F t PAK SHA CHAU26 “T Ser Res Sewage 52.9 Treatment FU YUNG PIT ©ªvÅ Works 500 ´¥m 514 BUFFALO PASS ( TA SHE YAU AU ) 400 HOI SING WAN Z ] C L 30 The Giverny INNER PORT SHELTER 100 C¹¥¸± ( SAI KUNG HOI ) KIU TSUI BEACH C'¥› Ruin 6806TH-SK0004B Marina KIU TSUI COUNTRY PARK Ϲh« KIU TSUI 8.5 136 300 C 100 Łƒ^ SHARP ISLAND ƒm 132 ( KIU TSUI CHAU ) A-A LINE 53.4 CUT Water Tunnel HEBE HAVEN ( PAK SHA WAN ) KEY PLAN Kiu Tau30 200 Ø¿⁄ ¤bs⁄¥ ¶s97 ⁄˛‡u‰ HIGHWAY 100 S MA ON SHAN HAK SHAN TENG ' M COUNTRY PARK A F¨ 50 IR Sha Tsui H ƒŒ j¤F Lo Fu Ngam 100 Jƒ 96.7 33.7 Marina Cove TRIO BEACH 100 HAP MUN BAY BEACH ] U¸Y SAM SING WAN 114 Man Tau Tsui HAP MUN BAY ¥F Fence ˦ ⁄ ®ÄF¯ 100 ] Au Tsai Chuk Yuen Shui Hau Ho Chung Tsuen TAI CHUNG HAU ZÆ New Village D¿J TAI NGAM j¤¥ ¸¤ TÅ HAU Man Wo Tai Ngam Tsui Heung Yuen Ling n« û¸Å Chung n« Nam Wai Kau Tsin Nam Pin i±½ PAK SHA WAN Uk Wai ] Łƒ^ C @« CHEUNG KUNG Pei Tau è¦ ¥¤ ” SHAN Pak Ma Tsui j¤Å HO CHUNG VALLEY Wo Mei ½¤ Tai Lam û¤I ¥P Ngau Pui ]­ Shek Pok 100 HEBE KNOLL Wo Wai Mau Tin 122 †B ®Ä Mok Tse Che CAMPERS' BEACH ¥¤ 200 HIRAM'S ˦ Pak Ma Tsui Pai 1 100 “‚ Chuk Kok 100 KWAI AU SHAN HO CHUNG TA KU LING ´¥ª¹­ HIGHWAY Ta Ku Ling Fence 312 San Tsuen 178 y¦· Pik Uk HEBE HILL ”⁄ ( TSIM FUNG SHAN˛« ) Pik Shui j¤ 300 346 Sun Tsuen Tai Pai 71.2 Pik Uk San Tsuen 132.0 X¼ PAK SHUI WUN ÂÅl Cemetery Z ˛«g RAZOR HILL 10 ( CHE KWU SHAN ) PORT SHELTER Pik Uk ¥¥ Correctional Ruin 400 ( NGAU MEI HOI ) Pak Shek Wo Institution PIK UK AU 432 San Tsuen P D Hillview Court W ¥ »›·‹ «⁄ 300 j¤H The Hong Kong University Pak Shek of Science and Technology M Tai Po Tsai Tseng Lan Shue ¥ Terrace P ËÄs U¸º Pak Shek 14.4 Wo Denon Man King 200 Terrace Terrace A 84 300 „ K Graves R• K 7.4 83 19.4 O N Z G 30 R I 5.4 33.2 V 69.0 wƒ E R 100.1 ] 87.9 ' ROAD WO KUNG MANG 9.2 50 s©½¤ 41.7 103.0 44.9 10 fi 151.2 ] 52.1 Fence 1 Seawall 59.6 20 ] Z ' _˜¥ 16.7 Ruin RUBY
Recommended publications
  • 332 Controlling Officer's Reply
    Examination of Estimates of Expenditure 2019-20 Reply Serial No. FHB(FE)332 CONTROLLING OFFICER’S REPLY (Question Serial No. 5578) Head: (49) Food and Environmental Hygiene Department Subhead (No. & title): (-) Not specified Programme: (2) Environmental Hygiene and Related Services Controlling Officer: Director of Food and Environmental Hygiene (Miss Vivian LAU) Director of Bureau: Secretary for Food and Health Question: How many unisex toilets are there in the territory? Please provide their addresses with a breakdown by the 18 districts. Does the Food and Environmental Hygiene Department have any plan to continuously increase the number of unisex toilets? If yes, please provide the details. Asked by: Hon CHAN Chi-chuen (LegCo internal reference no.: 409) Reply: The Food and Environmental Hygiene Department (the Department) has 379 public toilets with accessible unisex toilets (AUTs) provision. A list of these toilets is provided at Annex. If circumstances permit, the Department will, based on “The Design Manual on Barrier Free Access 2008”, provide AUTs at new public toilets or during reprovisioning or refurbishment of existing ones. Access to AUTs does not necessitate traversing an area reserved for one sex only. - End - Session 13 FHB(FE) - Page 901 Annex (Page 1 of 20) List of Public Toilets with Accessible Unisex Toilets Serial District Name of Public Toilet Address No. 1 Central/Western Belcher's Street Public Behind No.2-12 Belcher's Street, Sai Toilet Wan 2 Central/Western Centre Street Public Toilet Near Centre Street Market,
    [Show full text]
  • (Prevention of Pollution by Garbage) Regulation and Merchant Shipping (Prevention of Pollution by Garbage) Regulation (Repeal) Regulation
    LC Paper No. CB(4)1043/14-15(01) Subcommittee on Merchant Shipping (Prevention of Pollution by Garbage) Regulation and Merchant Shipping (Prevention of Pollution by Garbage) Regulation (Repeal) Regulation Follow-up to the Last Meeting on 12 May 2015 I refer to the subcommittee meeting on 12 May 2015 at which Members requested the Administration to provide further information. The responses prepared by the Marine Department (“MD”) in consultation with Environmental Protection Department and other relevant departments are set out as follows: (a) the number of prosecutions made in the past three years against any marine littering offences, involving both Hong Kong and non-Hong Kong ships, under section 4D of the Summary Offence Ordinance (Cap. 228), the existing Merchant Shipping (Prevention of Pollution by Garbage) Regulation, or other legislation relating to marine littering 2. In the past three years, a total of 24 offenders were prosecuted by MD for contravention of section 4D of the Summary Offence Ordinance (Cap. 228). Of these, 4 cases involved marine littering from ships. Details are as follows - Year Fixed Summons Total Cases related to Penalty (Fine) Cases of littering from ship Notices the year 2012 2 1 ($1,500) 3 2 Note 1 2013 10 NIL 10 2 Note 2 2014 10 1 ($2,000) 11 NIL Note 1 Both cases involved local vessels certificated under the Merchant Shipping (Local Vessels) Ordinance (Cap. 548) Note 2 One case involved a local vessel certificated under Cap. 548, while the other involved a Hong Kong registered cross- boundary ferry (b) the study report issued by the Inter-departmental Working Group on Clean Shorelines established in 2012 under the coordination of the Environment Bureau to identify the sources of marine refuse, review existing measures, and formulate strategic policies to prevent and reduce marine refuse 3.
    [Show full text]
  • Annual Report on Capital Works Reserve Fund Block Allocations for the 2006-07 Financial Year
    For information PWSCI(2007-08)13 NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE Annual Report on Capital Works Reserve Fund Block Allocations for the 2006-07 Financial Year We have been compiling exception reports on block allocations under the Capital Works Reserve Fund (CWRF) to account for the difference between the actual programme and the indicative one which we presented to Members for approving the funding allocation. This report covers the 2006-07 financial year. Enclosures 1 to 11 provide details on each block allocation under the 11 CWRF Heads of Expenditure and include – (a) a comparison of the approved provision and actual expenditure in 2006-07 and the reasons for those items with variations greater than 15%; (b) a list of minor works projects which were implemented in 2006-07 as planned, including those which had had the works contracts awarded but had not started incurring spending (as compared with the indicative list in PWSC(2005-06)33), and those which were shelved or withdrawn; and (c) a list of new injection items (i.e. items not shown in the indicative list in PWSC(2005-06)33) approved in 2006-07. 2. In overall terms, the approved allocation for CWRF block allocations in 2006-07 totalled $7,952 million. The actual expenditure was $6,044 million. ------------------------- Financial Services and the Treasury Bureau October 2007 PWSCI(2007-08)13 Index of Enclosures and Annexes Head/Subhead Reference Page Head 701 - Land Acquisition ......................... Enclosure 1 1 Subhead 1004CA Annex 1A 2 - 4 Subhead 1100CA Annex 1B 5 - 9 Head 702 - Port and Airport Development ..
    [Show full text]
  • List of Recognized Villages Under the New Territories Small House Policy
    LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN,
    [Show full text]
  • Ϊᄂ൳ढ۝Җੑ Historyhiisttory Andand Developmentdevellopmentt Ofoff Saisaii Kungkung
    ፡Ϊᄂ൳ढ۝җੑ HistoryHiisttory andand DevelopmentDevellopmentt ofoff SaiSaii KungKung ࠗಋɁ Situated in southeastern New Territories, Sai Kung܃ᅕɊα੡˞Ӿ஠ೕࢄcၤኝٶכ஫cͅΛ࠯˸ࢌ՗ȼɊΛ࠯ Ϲ঳ڲ׭ވϹ঳Ͻ୮ณ .eݯ৉΋ comprises several peninsulas and over 70 islands of various sizesڝɣؿᗐ۾ჱᄈ˱՗຤ዃடαؿߕҠτ܈ɣɩࢌᎯୂιeɊȼ˖޵۪ࡼଫ̵඀նԷϹ঳ȹ੓ց ɟ Since the 17th Century, the Hakka people began migrating to Sai ֚ܧͲಋ௖ɣؿ᎝ˋ࢒ི߮cɀɊ˖޵ȼɊαˤۺֈcΕ؜ֶࣵ،ӱɐಌ඀ኊ१Δcၙֈι൰ҦeҦ̵ ጙ Kung and engaging in agricultural cultivation in the valley and the ϹۺੀϹ঳ᄇடઅɣ၉ˠؿ༞༏Њ֝ϭຒփᜪcԎጙ כΛ˞৻༛ֶࢰேݯ́c͛τʭᅕҦ̵ႇАᜤጅeͅ coastal area. Rural settlements gradually appeared. Early settlers ࣵپɣஃᅡؿᄇ̟cྦྷ͚̔஝͛ ҳʔ༏ட஑Ɋ̒൰ϭҳ̈́eՇˋ࢒ɮೡᄧᚊcւ͓ۺʑɁɟ༖ʭcӀτਂ primarily made their living by farming or fishing, while a few τ༎൙ɬᎰؿɩࢗc஝֡Ⱦ᎘ֶҳ̈́ؿᕳ฻೩Δe̋ ༟ΕϹ঳ᄇʨ engaged in manufacturing sugar or salt. As the population could֚ܧࢇԭ֌Λૈ൰ҦؿҦ̵჏߬ሰӶc ʒɊαˤࠗಋԹˋ౨ංc̵̟ረ࠰ࠕˋؿߕؗ Long queue of people fetching water during the ΍ᄢྦྷ඀ؿΔʿc൬Ϸිࣵɮೡ˞ԜሰҦɾ͂eϹ঳ not sustain a marketplace, villagers had to travel through winding water restriction period in 1960s ຒփˋ࢒c˞໬Һࠕˋɺӷۺࣵࢇጙپ1971αϭ1978αΕւ ɮೡϤྵ֛ trackways to Kowloon, Lik Yuen of Shatin or other destinations. ਐᕀۺᄇȹ੓ؿࠍႜc͛፭㠥ිࣵʥΛඖਥ The Kwun Mun Strait where the High Island Reservoir was built for fresh water supply from 1971 to 1978 ҝᛰe Sai Kung has experienced rapid development in recent decades due to speedy population growth and severe droughts after the Second World War. To complement the largest reservoir construction project of Hong Kong in the 1970s, the road connecting Sai Kung Town and Tai Mong Tsai was extended to Man Yee Wan, while the Sai Sha Road was paved to link Shap Sze Heung with Shatin.
    [Show full text]
  • TKO Bus Routes 2021-22 (Tentative)
    2021 - 2022 [FOR REFERENCE ONLY] FIS TKO Campus (Return Schedules for Primary Students) *Bus routes and stops are subjected to change based on number of applicants **All schedules are depending on actual traffic conditions Bus 1B HK Parkview, Happy Valley Return Point RETURN TIME TKO Campus (approximate time +/- 10min) 2:30 1 80 Kennedy Road 3:00 2 3 Repulse Bay Road 3:12 3 HK Parkview (Hotel) 3:14 4 Green Lane (Wendy Apartments) 3:20 5 Wong Nai Chung Road: near Market Place 3:23 Bus 2 Midlevel Return Point RETURN TIME TKO Campus (approximate time +/- 10min) 2:30 1 11 Maganize Gap Road 3:00 2 1, 3, 12 Tregunter Path 3:03 3 23 Old Peak Road 3:06 4 9 Old Peak Road 3:08 5 8 Kotewall Road 3:15 6 6 Park Road 3:20 7 80-82 Bonham Road 3:25 8 High Street / Bonham Road 3:28 Bus 3A Kornhill, Fortress Hill, Tai Hang Return Point RETURN TIME TKO Campus (approximate time +/- 10min) 2:30 1 Kornhill (Block D, K) 2:55 2 Mount Parker Residences (front gate) 2:58 3 The Orchards (before traffic light) 3:03 4 Nam Fung Sun Chuen Block 4 3:04 5 238 King's Road (MacDonald) 3:12 6 City Garden Hotel (on Electric Road) 3:15 7 111 Mount Butler Road 3:25 8 70 Tai Hang Road 3:30 Page 1 of 5 Bus 3B North Point, Taikoo, Sai Wan Ho Return Point RETURN TIME TKO Campus (approximate time +/- 5min) 2:30 1 Kwun Tong Police Station (bus stop) 2:40 2 Grand Promenade 2:50 3 Taikoo Shing (HSBC) 2:57 4 Healthy Road West (across of Yoshinoya) 3:03 5 35 Cloud View Road 3:10 6 26 -32 Tin Hau Temple Road (Fly Dragon Terrace) 3:12 7 6 Tin Hau Temple Road 3:12 8 Hing Fat Street (Victoria
    [Show full text]
  • Chapter 5 Provision of Aquatic Recreational and Sports Facilities
    Chapter 5 Provision of aquatic recreational and sports facilities Audit conducted a review to examine the provision and management of aquatic recreational and sports facilities by the Leisure and Cultural Services Department (LCSD) and to ascertain whether there were areas for improvement. Gazetted beaches 2. According to paragraph 2.4(a) of the Audit Report, a consultant, who carried out a coastal safety audit on the beaches of Hong Kong in 2000, had advised that the Rocky Bay Beach should be deleted from the list of gazetted beaches because of safety reason and low usage. However, the LCSD considered that de-gazetting beaches was a sensitive issue and decided not to take further action. The Committee asked about the sensitivity of the de-gazetting and whether the LCSD would de-gazette the beach. 3. In response, Ms Anissa WONG Sean-yee, Director of Leisure and Cultural Services, said that: - in deciding to close the Rocky Bay Beach because of its poor water quality, the Administration had considered whether the beach should be de-gazetted. At that time, the Administration was of the view that it should consider the development of the beach water quality. It was also concerned that the relevant District Council and beach goers might consider that they might need to observe the development of the issue for a period of time; and - taking into account the current situation of the water quality, the usage of the beach, as well as other factors, such as the usage rate of the Shek O Beach, the LCSD agreed in principle to Audit’s recommendation that the Rocky Bay Beach be de-gazetted.
    [Show full text]
  • DSP 382DS1 11023 11024 Si
    “ ENCLOSURE 1 21.2 116.1 51.6 9.5 402.7 63.5 SHEET 1 OF 2 68.7 ¥G⁄i 60.3 76.5 ¶¸ 118.6 91.2 136.8 Wong Chuk Wan 58.5 104.6 44.7 55.1 81.7 72.0 71.8 27.5 52.1 391.5 F¨¤ 828 000 N 38.1 50.1 Sha Kok Mei 34.5 22.6 42.9 51.6 6.8 38.6 29.9 371.8 è¦ 66.9 38.7 61.8 49.7 SAI KUNG 37.4 26.3 _¥ s· p 23.1 30.6 Pak Kong x San Uk 398.6 28.5 20.5 102.5 14.7 19.7 j¤F ¥ 40.9 · 14.7 61.1 Jetty 22.4 391.0 Tai Chung Hau 33.5 Wo Tong Kong 14.9 14.4 5 67.6 54.1 54.5 10.9 ¥© 14.5 Rocky Area 50.3 n« 11.3 13.3 ß⁄ Nam26.6 Shan 5.7 11.1 PORT SHELTER 40.8 17.9 58.6 12.9 85.8 4.2 31.1 50.3 40.8 5.6 F¨¤ 10.8 81.3 50 43.6 13.7 827 500 N j⁄ Sha15.8 Kok Mei ƒm LOCATION PLAN 7.4 11.3 SCALE 1 : 100 000 Tai Shui Tseng 21.3 ñ¤ 44.4 5.3 30.6 78.9 5.0 6.7 I¬u ˇ„ 121.4 15.0 7.5 LEGEND: 47.4 5.6 10.6 5.3 124.8 217.2 6.3 –Ø»ƒ{†‡ƒ”“ 5.6 85.7 ¥ 3.7 CONNECT TO EXISTING 76.5 53.6 6.1 5.6 4.6 GRAVITY TRUNK SEWERS 43.2 Kap Pin Long3.6 34.7 I¬u Works in 5.4 progress «”“m¶ł§ˆƒ 32.2 195.7 90.3 4.3 110.0 ⁄D¥— 36.4 5.4 PROPOSED AREA FOR 50.7 IMPLEMENTATION OF 4.5 VILLAGE SEWERAGE WORKS 4.2 97.1 3.8 57.1 76.3 4.4 20.0 94.1 70.5 91.6 p 827 000 N 88.7 3.8 100.6 88.4 4.5 33.4 59.1 63.1 4.3 3.9 3.7 ⁄› p 19.5 X½ 14.2 6.1 X½ Pier Tai Ping Village Pier 146.1 107.0 73.3 168.3 4.1 51.5 _¥ 28.2 68.7 10.4 7.2 82.9 105.8 29.5 3.9 4.8 è¦ 91.0 63.2 Pak Kong 4.0 88.9 6.2 56.8 23.8 5.9 105.8 SAI KUNG 95.1 40.2 23.5 99.1 o´ 4.0 X½ Filter Bed 29.6 X½ 5.7 Pier Pier 36.8 5.8 26.8 90.2 21.4 36.8 29.6 17.7 p 31.8 23.5 27.4 † Slipway 26.8 X½ X½ p 18.8 12.9 Pier 106.3 Pier X½ X½ Pier 826 500 N 27.6 Pier 30.0 5.1 27.3 63.5 0 100 200 300 400 500 m 34.8 17.1 44.7 24.0 15.0 22.2 68.2 1 : 7500 SCALE BAR 17.4 34.6 48.5 27.0 33.3 48.1 111.1 13.9 78.4 44.7 53.0 38.2 35.4 5.0 18.6 24.8 47.5 43.6 C.
    [Show full text]
  • Report on the Management of Recreation and Sports Facilities in Sai Kung District in May and June 2020 by the Leisure and Cultural Services Department
    Sai Kung District Council District Facilities Management Committee Committee Paper for 14.7.2020 SKDC(DFMC) Paper No. 70/20 (Revised) Report on the Management of Recreation and Sports Facilities in Sai Kung District in May and June 2020 by the Leisure and Cultural Services Department Purpose This paper briefs Members on the management of recreation and sports facilities by the Leisure and Cultural Services Department (LCSD) in Sai Kung District in May and June 2020. Background 2. To give Members a better understanding of the services provided by the LCSD, the LCSD makes regular submissions on the management and the usage of recreation and sports facilities in Sai Kung District. Management of Recreation and Sports Facilities 3. In view of the alleviation of COVID-19 recently, the LCSD had reopened the facilities in phases from 6 May 2020 onwards for public use. Details of the usage of recreation and sports facilities in Sai Kung District in May and June 2020 are tabulated in Annex I. 4. The major services provided by the LCSD’s contractors in Sai Kung District are cleansing, horticultural maintenance and security guard services and their performances were satisfactory. The LCSD carries out regular inspections to monitor the work and performance of the contractors. Improvement Projects 5. Please refer to Annex II for information on facility improvement project conducted in Sai Kung District in May and June 2020. 6. The maintenance contractor of Tiu Keng Leng Sports Centre accidentally damaged a fire services sprinkler head when undergoing routine maintenance of lighting fittings in the arena in December last year.
    [Show full text]
  • 12 GPS+GLONASS+Beidou: 33
    Hong Kong GNSS infrastructure for surveying and navigation, and environment monitoring Wu Chen Department of Land Surveying and Geoinformatics Hong Kong Polytechnic University Email: [email protected] © 2015 Hong Kong R&D Centre for Logistics and Supply Chain Management Enabling Technologies. All rights reserved. Background 1. GPS revolutionize the concepts of positioning/navigation/timing (PNT) 2. GPS has become an important infrastructure to support economic development – Military – Transportation – Telecommunication – Space Industry – Finance – Location Based Services – Surveying – Weather forecasting – Scientific researches 3 Background • International Developments – Augmentation systems • To improve performance of GPS – Accuracy, Integrity, Coverage • Satellite Based Augmentation Systems (SBAS) – WAAS, EGNOS, MSAS, QZSS, GAGAN, …. • Ground Based Augmentation systems (GBAS) – Other Independent GNSS systems • GLONASS (Russian) • Compass (Beidou, China) • Galileo (Europe) • IRNSS (India) 4 Background • GNSS Based Services – Global Services • GPS, GLONASS, Beidou (III), Galilieo – Regional Services • Compass (II), IRNSS • Satellite Based Augmentation Systems (SBAS) – WAAS, EGNOS, MSAS, QZSS, GAGAN, …. – Local Services • Ground Based Augmentation systems (GBAS) (Aviation) • DGPS Services (Marine) • GNSS RTK Network (Surveying) 5 GNSS Development in Hong Kong Lands Department GNSS control network “SatRef” Network (12 stations) Marine Department DGPS system for marine navigation Automatic Identification System (AIS) for port management Airport Authority Considering a GBAS system for landing Hong Kong Polytechnic University 20 year research on GNSS technologies GNSS ionosphere monitoring network Spatial water vapour distribution in Pearl Delta region 6 HK GNSS Reference Network (SatRef) 7 Hong Kong Land-based Automatic Identification system (AIS) • Established in 2003 • 6 land AIS stations to cover HK water • Provide DGPS correction • Also – A DGPS beacon covers 150 nmi 8 Hong Kong Airport 9 Problems identified 1.
    [Show full text]
  • Quotation Form
    Sheet 1 QUOTATION FORM THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION LEISURE AND CULTURAL SERVICES DEPARTMENT QUOTATION FOR THE GRANT OF A PERMIT TO CONDUCT THE LIGHT REFRESHMENT BUSINESS AT TRIO BEACH (Quotation Ref. : LRQ 2/SK 882/19 ) LODGING OF QUOTATION To be acceptable as a quotation, this form, properly completed in triplicate and enclosed together with other documents of this quotation as shown in Part I below, which must also be properly completed as required in triplicate, in a sealed plain envelope marked “Quotation for the Grant of a Permit to Conduct the Light Refreshment Business at Trio Beach” and addressed to the Chairman, Leisure & Cultural Services Department Quotation Opening Team, must be deposited in or mailed to the Leisure & Cultural Services Department Quotation Box situated at Sai Kung District Leisure Services Office, 9/F Sai Kung, Tseung Kwan O Government Complex, 38 Pui Shing Road, Tseung Kwan O before 12:00 a.m. (time) on 7 January 2020 (Tuesday) (date). Late quotations will not be accepted. Dated this 12.12.2019 Ms. KONG Po-yee, Alice, DLM(SK) Government Representative Part I — Quotation Documents These documents under the quotation reference LRQ 2/SK 882/19 consist of three (3) complete sets of : (a) This Quotation Form (Sheets 1 to 2); (b) Interpretation (Sheets 3 to 5); (c) Terms of Quotation (Sheets 6 to 31); (d) Conditions of Contract (Sheets 32 to 80); (e) Schedules (Sheets 81 to 96); First Schedule The Monthly Permit Fee Second Schedule A List of Commodities Recommended for Sale and
    [Show full text]
  • Note for Public Works Subcommittee of Finance Committee
    For information PWSCI(2005-06)20 NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE Supplementary information on 340DS - Port Shelter sewerage stage 3 – Sai Kung Area 4 and Mang Kung Uk sewerage INTRODUCTION In considering the paper referenced PWSC(2005-06)31 on the above project on 23 November 2005, the Public Works Subcommittee (PWSC) requested the Administration to – (a) provide supplementary information to account for any discrepancy between the computer modeling predictions in planning for the Stonecutters Island Sewage Treatment Works (SCISTW), and the actual impact of the SCISTW on the water quality of the Tsuen Wan beaches; (b) provide information on computer modeling used for assessing the impact of the sewerage and associated facilities in Sai Kung on the water quality and that adopted for the SCISTW; (c) report the E. coli level in the surrounding marine waters and beaches after the completion of the project; and (d) provide the Administration’s information paper on the project to the Sai Kung District Council (SKDC) for SKDC Members’ comments before the relevant FC meeting. THE ADMINISTRATION’S RESPONSE Comparison between Water Quality Predictions and Actual Impact for SCISTW 2. The SCISTW was built as part of the sewerage facilities under the Harbour Area Treatment Scheme (HATS) Stage 1. It is now providing chemical /treatment ..... PWSCI(2005-06)20 Page 2 treatment for 1.4 million m3/day i.e. 75% of the sewage generated from both sides of Victoria Harbour. Treated effluent is discharged via an outfall at the western harbour without disinfection. When the scheme was first introduced, water quality assessments were conducted using the “Water Quality and Hydraulic Models” (WAHMO) computer model suite in 1996.
    [Show full text]