Publications of the Division of Watershed Management
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
The Acushnet River Restoration Project: Restoring Diadromous Populations to a Superfund Site in Southeastern Massachusetts
Massachusetts Division of Marine Fisheries Technical Report TR-56 The Acushnet River Restoration Project: Restoring Diadromous Populations to a Superfund Site in Southeastern Massachusetts J.J. Sheppard1, S. Block2, H.L Becker3, and D. Quinn4 1Massachusetts Division of Marine Fisheries South Shore Field Station 1213 Purchase Street, 3rd Floor New Bedford, MA 02740 2National Oceanic and Atmospheric Administration Restoration Center 55 Great Republic Drive Gloucester, MA 01930 3EA Engineering, Science, and Technology, Inc 221 Sun Valley Boulevard, Suite D Lincoln, NE 68528 4DQ Engineering 11 Hickory Lane Walpole, MA 02081 Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs Department of Fish and Game Massachusetts Division of Marine Fisheries Technical Report Technical March 2014 Massachusetts Division of Marine Fisheries Technical Report Series Managing Editor: Michael P. Armstrong Technical and Copy Editor: Elaine Brewer The Massachusetts Division of Marine Fisheries Technical Reports present information and data pertinent to the management, biology and commercial and recreational fisheries of anadromous, estuarine, and marine organisms of the Commonwealth of Massachusetts and adjacent waters. The series presents information in a timely fashion that is of limited scope or is useful to a smaller, specific audience and therefore may not be appropriate for national or international journals. Included in this series are data summaries, reports of monitoring programs, and results of studies that are directed at specific management problems. All Reports in the series are available for download in PDF format at: http://www.mass.gov/eea/agencies/dfg/dmf/publications/technical.html or hard copies may be obtained from the Annisquam River Marine Fisheries Station, 30 Emerson Ave., Gloucester, MA 01930 USA (978-282-0308). -
Elevation of the March–April 2010 Flood High Water in Selected River Reaches in Central and Eastern Massachusetts
Prepared in cooperation with the U.S. Department of Homeland Security Federal Emergency Management Agency Elevation of the March–April 2010 Flood High Water in Selected River Reaches in Central and Eastern Massachusetts Open-File Report 2010–1315 U.S. Department of the Interior U.S. Geological Survey Elevation of the March–April 2010 Flood High Water in Selected River Reaches in Central and Eastern Massachusetts By Phillip J. Zarriello and Gardner C. Bent Prepared in cooperation with the U.S. Department of Homeland Security Federal Emergency Management Agency Open-File Report 2010–1315 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior KEN SALAZAR, Secretary U.S. Geological Survey Marcia K. McNutt, Director U.S. Geological Survey, Reston, Virginia: 2011 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment, visit http://www.usgs.gov or call 1-888-ASK-USGS For an overview of USGS information products, including maps, imagery, and publications, visit http://www.usgs.gov/pubprod To order this and other USGS information products, visit http://store.usgs.gov Any use of trade, product, or firm names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Although this report is in the public domain, permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this report. Suggested citation: Zarriello, P.J., and Bent, G.C., 2011, Elevation of the March–April 2010 flood high water in selected river reaches in central and eastern Massachusetts: U.S. -
DCR's Beaver Brook Reservation
Massachusetts Department of Conservation and Recreation Bureau of Planning and Resource Protection Resource Management Planning Program RESOURCE MANAGEMENT PLAN DCR’s Beaver Brook Reservation Historic Beaver Brook Reservation and Beaver Brook North Reservation Belmont, Lexington and Waltham, Massachusetts March 2010 DCR’s Beaver Brook Reservation Historic Beaver Brook Reservation and Beaver Brook North Reservation Belmont, Lexington and Waltham, Massachusetts RESOURCE MANAGEMENT PLAN 2010 Deval L. Patrick, Governor Timothy P. Murray, Lt. Governor Ian A. Bowles, Secretary Richard K. Sullivan, Jr., Commissioner Jack Murray, Deputy Commissioner for Parks Operations The Massachusetts Department of Conservation and Recreation (DCR), an agency of the Executive Office of Energy and Environmental Affairs, oversees 450,000 acres of parks and forests, beaches, bike trails, watersheds, dams, and parkways. Led by Commissioner Richard K. Sullivan Jr., the agency’s mission is to protect, promote, and enhance our common wealth of natural, cultural, and recreational resources. To learn more about DCR, our facilities, and our programs, please visit www.mass.gov/dcr. Contact us at [email protected]. Printed on Recycled Paper RESOURCE MANAGEMENT PLAN Expanded Beaver Brook Reservation Belmont, Lexington and Waltham, Massachusetts Contents Executive Summary 1 Introduction 1 Planning Process 2 Distinctive Characteristics of the Expanded Reservation 2 Priority Findings 3 Recommendations 5 Capital Improvements 7 Land Stewardship Zoning Guidelines 9 Management -
Plymouth County, Massachusetts (All Jurisdictions)
VOLUME 3 OF 5 PLYMOUTH COUNTY, MASSACHUSETTS (ALL JURISDICTIONS) COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER ABINGTON, TOWN OF 250259 MARSHFIELD, TOWN OF 250273 BRIDGEWATER, TOWN OF 250260 MATTAPOISETT, TOWN OF 255214 BROCKTON, CITY OF 250261 MIDDLEBOROUGH, TOWN OF 250275 CARVER, TOWN OF 250262 NORWELL, TOWN OF 250276 DUXBURY, TOWN OF 250263 PEMBROKE, TOWN OF 250277 EAST BRIDGEWATER, TOWN OF 250264 PLYMOUTH, TOWN OF 250278 HALIFAX, TOWN OF 250265 PLYMPTON, TOWN OF 250279 HANOVER, TOWN OF 250266 ROCHESTER, TOWN OF 250280 HANSON, TOWN OF 250267 ROCKLAND, TOWN OF 250281 HINGHAM, TOWN OF 250268 SCITUATE, TOWN OF 250282 HULL, TOWN OF 250269 WAREHAM, TOWN OF 255223 KINGSTON, TOWN OF 250270 WEST BRIDGEWATER, TOWN OF 250284 LAKEVILLE, TOWN OF 250271 WHITMAN, TOWN OF 250285 MARION, TOWN OF 255213 PRELIMINARY: APRIL 18, 2018 FLOOD INSURANCE STUDY NUMBER 25023CV003D Version Number 2.3.3.5 TABLE OF CONTENTS Volume 1 Page SECTION 1.0 – INTRODUCTION 1 1.1 The National Flood Insurance Program 1 1.2 Purpose of this Flood Insurance Study Report 2 1.3 Jurisdictions Included in the Flood Insurance Study Project 2 1.4 Considerations for using this Flood Insurance Study Report 5 SECTION 2.0 – FLOODPLAIN MANAGEMENT APPLICATIONS 17 2.1 Floodplain Boundaries 17 2.2 Floodways 34 2.3 Base Flood Elevations 35 2.4 Non-Encroachment Zones 35 2.5 Coastal Flood Hazard Areas 35 2.5.1 Water Elevations and the Effects of Waves 35 2.5.2 Floodplain Boundaries and BFEs for Coastal Areas 37 2.5.3 Coastal High Hazard Areas 38 2.5.4 Limit of Moderate Wave Action 39 SECTION 3.0 -
Maine Inland Ice Fishing Laws : 1966 Maine Department of Inland Fisheries and Game
Maine State Library Digital Maine Inland Fisheries and Wildlife Law Books Inland Fisheries and Wildlife 1-1-1966 Maine Inland Ice Fishing Laws : 1966 Maine Department of Inland Fisheries and Game Follow this and additional works at: https://digitalmaine.com/ifw_law_books Recommended Citation Maine Department of Inland Fisheries and Game, "Maine Inland Ice Fishing Laws : 1966" (1966). Inland Fisheries and Wildlife Law Books. 79. https://digitalmaine.com/ifw_law_books/79 This Text is brought to you for free and open access by the Inland Fisheries and Wildlife at Digital Maine. It has been accepted for inclusion in Inland Fisheries and Wildlife Law Books by an authorized administrator of Digital Maine. For more information, please contact [email protected]. MAINE INLAND ICE FISHING LAWS * Department of Inland Fisheries and Game 1966 RONALD T. SPEERS, Commissioner GEORGE W. BucKNAM, Deputy Commissioner Members of Commissioner's Advisory Council: DR. ALONZO H. GARCELON, Augusta ARTHUR M. BENNETT, Presque Isle FRED B. HOWARD, South Portland REGINALD L. PARKER, Bath PHILIP F. RowE, West Buxton JAMES MENDELSON, Belfast DoN WILSON, Moosehead Supervisors: MAYNARD F. MARSH, Chief Warden WILLIAM JoHN SHAW, Deputy Chief Warden Strong CHARLES S. ALLEN Div. A North Windham ARTHUR G. ROGERS B Waterville WALTER R. BISSET, JR. c Ellsworth LLOYD CLARK D Milltown JOHN F. SHAW E Wilton WENDELL L. BROWN F Dover-Foxcroft DAVID C. PRIEST G Lincoln Center VIRGIL M. GRANT H Houlton CURTIS F. COOPER I Stockholm WALLACE E. BARRON J Bingham GEORGE w. LATER Chief Pilot Greenville Published in accordance with Section 1960, Chapter 303 of Title 12 Revised Statutes of 1964, as amended. -
Bristol County, Massachusetts (All Jurisdictions)
VOLUME 2 OF 4 BRISTOL COUNTY, MASSACHUSETTS (ALL JURISDICTIONS) Bristol County COMMUNITY NAME COMMUNITY NUMBER ACUSHNET, TOWN OF 250048 ATTLEBORO, CITY OF 250049 BERKLEY, TOWN OF 250050 DARTMOUTH, TOWN OF 250051 DIGHTON, TOWN OF 250052 EASTON, TOWN OF 250053 FAIRHAVEN, TOWN OF 250054 FALL RIVER, CITY OF 250055 FREETOWN, TOWN OF 250056 MANSFIELD, TOWN OF 250057 NEW BEDFORD, CITY OF 255216 NORTH ATTLEBOROUGH, TOWN OF 250059 NORTON, TOWN OF 250060 RAYNHAM, TOWN OF 250061 REHOBOTH, TOWN OF 250062 SEEKONK, TOWN OF 250063 SOMERSET, TOWN OF 255220 SWANSEA, TOWN OF 255221 TAUTON, CITY OF 250066 WESTPORT, TOWN OF 255224 REVISED JULY 16, 2014 FLOOD INSURANCE STUDY NUMBER 25005CV002B NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood Insurance Study (FIS) may not contain all data available within the repository. It is advisable to contact the community repository for any additional data. Selected Flood Insurance Rate Map panels for the community contain information that was previously shown separately on the corresponding Flood Boundary and Floodway Map panels (e.g., floodways, cross sections). In addition, former flood hazard zone designations have been changed as follows: Old Zone New Zone A1 through A30 AE V1 through V30 VE (shaded) B X C X Part or all of this Flood Insurance Study may be revised and republished at any time. In addition, part of this Flood Insurance Study may be revised by the Letter of Map Revision process, which does not involve republication or redistribution of the Flood Insurance Study. -
South Coastal Watershed Action Plan
This project was funded by: Massachusetts Executive Office of Environmental Affairs South Coastal Watershed Action Plan Chapter Three Indian Head River Watersheds Prepared by: 110 Winslow Cemetery Rd. Marshfield, MA 02050 (781) 837-0982 CHAPTER THREE: INDIAN HEAD RIVER WATERSHEDS Part I. Watershed Assessment 3-2 1.0 Watershed Characteristics 3-2 2.0 Water Quality Impairments 3-3 3.0 Aquatic Habitat Impairments 3-8 4.0 Water Withdrawal and Stream Flow Impairments 3-11 Part II. Indian Head Rivers Watersheds Five Year Action Plan 3-13 List of Tables Table 3-1. Indian Head River Watershed Characteristics 3-2 Table 3-2. Water Quality Summary for Indian Head River Watersheds 3-4 Table 3-3. Percent Impervious Surface for each Indian Head River Watershed 3-6 Table 3-4. Water Withdrawal by Indian Head River Watershed 3-11 List of Maps Map 3-1. Indian Head River Water Resources Map 3-17 Map 3-2. Indian Hear River Assessment Map 3-18 Map 3-3. Indian Head River Watershed Impervious Surface Vulnerability Ma 3-19 Map 3-4. Indian Head River Watershed Action Map 3-20 Indian Head River Watershed Introduction The public process involved in creating this document included two steps,1) an assessment of the Indian Head River watersheds and 2) the development of a Five Year Action Plan. The assessment involved extensive literature review and interviews with stakeholders. Based on this process, information and a list of recommended actions were presented to the public at two public forums for additional input and priority ranking. These recommended actions are listed at the end of the discussion of each goal Based on the input and votes of those who attended the public forum, some of these recommendations were included in the Five Year Action Plan at the end of this chapter. -
Mercury Pollution in Massachusetts' Waters
Photo: Supe87, Under license from Shutterstock.com from Supe87, Under license Photo: ToXIC WATERWAYS Mercury Pollution in Massachusetts’ Waters Lauren Randall Environment Massachusetts Research & Policy Center December 2011 Executive Summary Coal-fired power plants are the single larg- Human Services advises that all chil- est source of mercury pollution in the Unit- dren under twelve, pregnant women, ed States. Emissions from these plants even- women who may become pregnant, tually make their way into Massachusetts’ and nursing mothers not consume any waterways, contaminating fish and wildlife. fish from Massachusetts’ waterways. Many of Massachusetts’ waterways are un- der advisory because of mercury contami- Mercury pollution threatens public nation. Eating contaminated fish is the main health source of human exposure to mercury. • Eating contaminated fish is the main Mercury pollution poses enormous public source of human exposure to mercury. health threats. Mercury exposure during • Mercury is a potent neurotoxicant. In critical periods of brain development can the first two years of a child’s life, mer- contribute to irreversible deficits in verbal cury exposure can lead to irreversible skills, damage to attention and motor con- deficits in attention and motor control, trol, and reduced IQ. damage to verbal skills, and reduced IQ. • While adults are at lower risk of neu- In 2011, the U.S. Environmental Protection rological impairment than children, Agency (EPA) developed and proposed the evidence shows that a low-level dose first national standards limiting mercury and of mercury from fish consumption in other toxic air pollution from existing coal- adults can lead to defects similar to and oil-fired power plants. -
Outdoor Recreation Recreation Outdoor Massachusetts the Wildlife
Photos by MassWildlife by Photos Photo © Kindra Clineff massvacation.com mass.gov/massgrown Office of Fishing & Boating Access * = Access to coastal waters A = General Access: Boats and trailer parking B = Fisherman Access: Smaller boats and trailers C = Cartop Access: Small boats, canoes, kayaks D = River Access: Canoes and kayaks Other Massachusetts Outdoor Information Outdoor Massachusetts Other E = Sportfishing Pier: Barrier free fishing area F = Shorefishing Area: Onshore fishing access mass.gov/eea/agencies/dfg/fba/ Western Massachusetts boundaries and access points. mass.gov/dfw/pond-maps points. access and boundaries BOAT ACCESS SITE TOWN SITE ACCESS then head outdoors with your friends and family! and friends your with outdoors head then publicly accessible ponds providing approximate depths, depths, approximate providing ponds accessible publicly ID# TYPE Conservation & Recreation websites. Make a plan and and plan a Make websites. Recreation & Conservation Ashmere Lake Hinsdale 202 B Pond Maps – Suitable for printing, this is a list of maps to to maps of list a is this printing, for Suitable – Maps Pond Benedict Pond Monterey 15 B Department of Fish & Game and the Department of of Department the and Game & Fish of Department Big Pond Otis 125 B properties and recreational activities, visit the the visit activities, recreational and properties customize and print maps. mass.gov/dfw/wildlife-lands maps. print and customize Center Pond Becket 147 C For interactive maps and information on other other on information and maps interactive For Cheshire Lake Cheshire 210 B displays all MassWildlife properties and allows you to to you allows and properties MassWildlife all displays Cheshire Lake-Farnams Causeway Cheshire 273 F Wildlife Lands Maps – The MassWildlife Lands Viewer Viewer Lands MassWildlife The – Maps Lands Wildlife Cranberry Pond West Stockbridge 233 C Commonwealth’s properties and recreation activities. -
The Buzzards Bay CCMP 2012
Action Plan 10 Managing Water Withdrawals to Protect Wetlands, Habitat, and Water Supplies Objective 10.9. Identify and protect open space for fu- Problem135 ture water supplies, when needed, located as far from As growth in the region has increased in recent dec- significant surface water resources as possible to mini- ades, both the quantity and quality of Buzzards Bay pub- mize potential impacts on natural water resources. lic water supplies have been threatened. In some cases, Objective 10.10. Incorporate new information, when both public and private water withdrawals are cumula- available, from ongoing or planned state studies on water tively affecting wetlands, anadromous fish runs, and oth- budgets and sustainable yields into local water resources er wildlife habitat, particularly during droughts. Buz- planning and regulation. zards Bay’s growing population is creating a need for Objective 10.11. Encourage accurate tracking of water additional water supplies, but available land to develop use by agricultural users and promote agricultural BMP future water supplies is disappearing because of the in- practices for water conservation. tensity of land use and the loss of open space. Objective 10.12. If and when desalinization occupies a Goals water supply role in the watershed, encourage control technologies and operational measures that minimize Goal 10.1. Protect and preserve groundwater and sur- entrainment and impingement impacts at intakes and face water supplies in order to ensure a sustainable preserve the natural salinity structure of receiving water supply of high quality drinking water. bodies at outlets. Goal 10.2. Protect and restore the natural flows of riv- Objective 10.13. -
Massachusetts Estuaries Project
Massachusetts Estuaries Project Linked Watershed-Embayment Model to Determine Critical Nitrogen Loading Thresholds for the Slocum’s and Little River Estuaries, Dartmouth, MA University of Massachusetts Dartmouth Massachusetts Department of School of Marine Science and Technology Environmental Protection FINAL REPORT – December 2008 Massachusetts Estuaries Project Linked Watershed-Embayment Model to Determine Critical Nitrogen Loading Thresholds for the Slocum’s and Little River Estuaries, Dartmouth, MA FINAL REPORT – December 2008 Brian Howes Tony Millham Roland Samimy David Schlezinger John Ramsey Trey Ruthven Ed Eichner Contributors: US Geological Survey Don Walters and John Masterson Applied Coastal Research and Engineering, Inc. Elizabeth Hunt and Sean W. Kelley Massachusetts Department of Environmental Protection Charles Costello and Brian Dudley SMAST Coastal Systems Program Jennifer Benson, Michael Bartlett, Sara Sampieri, and Elizabeth White Lloyd Center for the Environment Mark Mello Cape Cod Commission Xiaotong Wu © [2007] University of Massachusetts All Rights Reserved ACKNOWLEDGMENTS The Massachusetts Estuaries Project Technical Team would like to acknowledge the contributions of the many individuals who have worked tirelessly for the restoration and protection of the critical coastal resources of the Slocum's and Little River Estuaries and supported the application of the Linked Watershed-Embayment Model to Determine Critical Nitrogen Loading Thresholds for these systems. Without these stewards and their efforts, this project would not have been possible. First and foremost we would like to recognize and applaud the significant time and effort in data collection and discussion spent by members of the Coalition for Buzzards Bay's BayWatcher, Water Quality Monitoring Program. These individuals gave of their time to consistent and sound nutrient related water quality from this system for over a decade. -
PLYMOUTH COUNTY, MASSACHUSETTS (ALL JURISDICTIONS) Volume 1 of 4
PLYMOUTH COUNTY, MASSACHUSETTS (ALL JURISDICTIONS) Volume 1 of 4 COMMUNITY NAME COMMUNITY NUMBER ABINGTON, TOWN OF 250259 BRIDGEWATER, TOWN OF 250260 BROCKTON, CITY OF 250261 CARVER, TOWN OF 250262 DUXBURY, TOWN OF 250263 EAST BRIDGEWATER, TOWN OF 250264 HALIFAX, TOWN OF 250265 HANOVER, TOWN OF 250266 HANSON, TOWN OF 250267 HINGHAM, TOWN OF 250268 HULL, TOWN OF 250269 KINGSTON, TOWN OF 250270 LAKEVILLE, TOWN OF 250271 MARION, TOWN OF 255213 MARSHFIELD, TOWN OF 250273 MATTAPOISETT, TOWN OF 255214 MIDDLEBOROUGH, TOWN OF 250275 NORWELL, TOWN OF 250276 PEMBROKE, TOWN OF 250277 PLYMOUTH, TOWN OF 250278 PLYMPTON, TOWN OF 250279 ROCHESTER, TOWN OF 250280 ROCKLAND, TOWN OF 250281 SCITUATE, TOWN OF 250282 WAREHAM, TOWN OF 255223 WEST BRIDGEWATER, TOWN OF 250284 WHITMAN, TOWN OF 250285 REVISED NOVEMBER 4, 2016 Federal Emergency Management Agency FLOOD INSURANCE STUDY NUMBER 25023CV001C NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood Insurance Study (FIS) may not contain all data available within the repository. It is advisable to contact the community repository for any additional data. The Federal Emergency Management Agency (FEMA) may revise and republish part or all of this Preliminary FIS report at any time. In addition, FEMA may revise part of this FIS report by the Letter of Map Revision (LOMR) process, which does not involve republication or redistribution of the FIS