N o r t h M a c a d a m D i s t r i c t

F R A M E W O R K P L A N Steering Committee’s Recommended Plan

Accepted by City Council August 11, 1999 North Macadam District Framework Plan

Steering Committee’s Recommended Plan Accepted by City Council - August 11, 1999

In remembrance of Ron Smith, Steering Committee Member, for his invaluable contributions to this Framework Plan; always delivered with wisdom, wit and an eye towards the future.

The North Macadam District Framework Plan represents the collective efforts and recommendations of the Steering Committee and incorporates work from the six Work Groups appointed by the Steering Committee. It was prepared for and presented to the Steering Committee by Portland Development Commission staff and the Consultant Team.

The Steering Committee presented the North Macadam District Framework Plan to the Portland Development Commission, Portland Planning Commission and Portland City Council in July and August 1999 for review and acceptance.

For more information, please contact:

Cheryl Twete Portland Development Commission 823-3361 John Spencer Spencer & Kupper 282-9853

North Macadam District Framework Plan Consultant Team:

David Evans and Associates E.D. Hovee & Associates Greenworks Housing Development Center Lloyd Lindley ASLA OTAK Perron Collaborative Siegel and Associates Spencer & Kupper Zimmer Gunsul Frasca Partnership

Note: An on-line version of this document and a schedule of public meet- ings is available on the Portland Development Commission’s Web site, http://www.portlanddev.org/about/pubs.htm. The on-line version includes color illustrations and is published in Adobe Acrobat format. To view the document, you must have an Adobe Acrobat viewer installed on your personal computer; the viewer is available at no cost at http:// www.adobe.com/prodindex/acrobat/readstep.html. N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Table of Contents Preface Executive Summary i

I. Process and Stakeholders 1 Steering Committee and Work Groups 1 A Working Vision for the North Macadam District 4 Steering Committee Goals and Objectives 6

II. The North Macadam District Development Plan 9 Connections to Adjacent Neighborhoods 10 Regional Open Space and the Willamette Greenway 11 The Willamette Greenway and Open Space Network 12 Land Use Development - Jobs and Housing 22 The Transportation System and Parking 28 Environmental Considerations and Infrastructure Development 36 The Development Concept Plan 40 III. Implementation of the Framework Plan 43 Phasing Considerations 44 Activities Greenway, Parks and Open Space 46 Jobs 48 Housing 50 Transportation 53 Public/Private Partnerships 57 Development Regulations and Guidelines 62 Public Investment Principles 63 Public Investment Programs 67 Development Funding Strategy 70 Development Financing and Public Return on Investment Analysis 74 IV. Recommendations to City Council 81 and City Council Actions Resolution No. 35815 - Acceptance of the Framework Plan Resolution No. 35815 - Exhibit A - Proposed Work Program Ordinance No. 173651 - Approval of the North Macadam Urban Renewal Plan Appendix Glossary A-1 Work Group Membership A-2 List of Technical Documents A-5 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Preface

The North Macadam District Framework Plan defines the goals, objectives and overall vision intended to guide the redevelopment of the North Macadam District. It also describes an implementation strategy which proposes: (i) actions to be undertaken by the public and private sectors to achieve the vision and (ii) conceptual amendments to the City’s Compre- hensive Plan and development code to support the vision.

The plan is the result of an effort that began in June 1997, when the City Council appointed a North Macadam District Steering Committee to lead a public-private planning process, including the work of six citizen commit- tees on key topic areas. A tremendous amount of time and creative energy has been invested in the formation of this Plan. It is built on the work of all affected City bureaus, the Steering Committee and Portland’s citizens. The issues have been discussed in more than 150 public meetings in which all attendees were invited to offer comments and suggestions. This Plan presents a vision that balances the interests raised in these meetings and the financial realities of infrastructure and land development.

After approval by the Steering Committee, the plan was presented to the Portland Development Commission, the Planning Commission, and the City Council, who accepted the Plan on August 11, 1999. The Council’s action will initiate the implementation process to enact the vision, goals, and objectives for the District. Additional formal procedures, hearings and Planning Bureau analyses to enact the proposed amendments to the City’s Comprehensive Plan and development code will follow acceptance of the Plan by City Council.

The North Macadam District Urban Renewal Plan is closely related to - and shares similar goals and objectives with - this Framework Plan, but is not part of this plan. The Urban Renewal Plan has its own legal and technical requirements, and will require its own adoption process. Nonetheless, the Urban Renewal Plan is critical to the implementation of this Framework Plan. It identifies and funds many of the public investments and leverages the private investments required to realize the vision presented by this Framework Plan, and will be the primary mechanism for creating public/ private partnerships, although other funding sources and implementation tools will also be used.

The City will consider this Framework Plan with the related Comprehensive Plan and Development Code amendments as well as the Urban Renewal Plan. By enacting these, the City Council will establish a comprehensive and economically feasible development plan for the North Macadam District; a plan that advances significant public objectives and enhances the overall livability of the City of Portland and the metropolitan region. N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Executive Summary

The Opportunity

The 130-acre North Macadam District is the last major undeveloped area within the City’s core. The extraordinary opportunity afforded by so large a tract of land adjacent to downtown Portland and the Willamette River is threefold: to build upon the unique attributes of the place, to reconnect nearby neighborhoods divided by past infrastructure projects, and to complement what the City already provides with a new neighborhood where people may choose to live, work and play.

The fact that the area remains largely undeveloped, however, is not an accident. Poor transportation access and circulation, inadequate infra- structure and soil contamination in some areas present significant con- straints to development. At the same time, growing awareness of and response to environmental issues - including new clean water standards and Endangered Species Act listings - has appropriately increased expectations about new development near the River. Clearly, the small amount of development in the District over the past decade has occurred Immediately south of Downtown, a majority of the North Macadam at lower densities and without these expectations in place. District property is either vacant or underutilized. Redevelopment of To respond to this unique opportunity and address development con- the District provides a unique straints, in 1997 the City Council established a Steering Committee opportunity to create a vital, urban comprised of public and private citizens noted for their care about our neighborhood adjacent to the built and natural environments, and asked them to establish a vision for Willamette River. development of the North Macadam District. The North Macadam District Framework Plan is the result of their efforts.

i N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

The Vision

The vision for the North Macadam District reflects and reinforces Portland’s unique character and aspirations. A key objective of the City, and the region, is to attract and accommodate jobs and housing at its core in an effort to preserve the Region’s natural and agricultural re- sources. The Framework Plan supports this objective while providing an integrated open space, land use and transportation framework that will encourage a vibrant riverfront neighborhood to emerge. The Plan describes an urban neighborhood designed to accommodate 8,500 - 10,000 jobs and 1,500 - 3000 housing units during the next 20 years.

The District will provide a wide variety of public parks and open spaces, each differing in size, configuration, landscaping, adjacent uses and types of human activity. Likewise, the development of buildings will include a variety of sizes, uses and styles, reflecting the diverse interests and preferences of Portland’s citizenry. Transportation alternatives to, through, and within the District will accommodate pedestrians, bicycles, transit and automobiles. A series of pedestrian-enhanced east-west will connect the north-south transit corridors with the greenway and activate the life of the District’s interior.

Like the City’s vision for downtown Portland, the District’s vision com- prises modest but important ideas that create lively, urban neighborhoods: a diverse population, integrated jobs and housing, accessible and well- crafted open spaces, active streets, pedestrian scale, convenient transit and quality urban design.

The River

The signature of the District is its enthusiastic embrace of the Willamette River. The District neither turns its back nor advances too near as it engages the River in a complementary way, bringing the urban community to the River while respecting and enhancing its wildlife habitat and ecosys- tem. A widened greenway – roughly double the current standard – will grace the eastern edge of the District, providing a regional amenity that creates a rich diversity of open spaces for residents, workers, and visitors while promoting – among all of them - an appreciation for the living force that is the Willamette River.

The North Macadam District will achieve during the next twenty years what many cities around the world will attempt to do during the next century: demonstrate how a dense, vibrant urban environment can peacefully coexist with natural habitat in a riverside setting. North Mac- adam will exemplify a key component of Portland’s vision for 2025: a healthy river that centers our community. The River has given us life for centuries, and it’s time to return the favor. But the idea is not to step away from the River nor continue to spread jobs and housing elsewhere by reducing density downtown, but to build an urban community right next door to the River as a respectful and admiring neighbor. Visibility begets awareness, and awareness begets action; there is no better opportunity to demonstrate that notion than in North Macadam. ii Steering Committee’s Recommended Plan E x e c u t i v e S u m m a r y

The Development Plan HARRISON / LINCOLN CONNECTOR

ENHANCED OR NEW PEDESTRIAN CONNECTIONS

SHERIDAN INTEGRATED JOBS & HOUSING BAKER

JOBS EMPHASIS ARTHUR

HOUSING EMPHASIS MEADE

RETAIL AND SERVICES EMPHASIS HOOKER

PRIMARY PUBLIC PARKS, GREENWAY & PEDESTRIAN WAYS

IMPROVED R.O.W. OPEN SPACE

GROVER POTENTIAL NODES AT GREENWAY GIBBS ENHANCED PEDESTRIAN STREETS

PRIMARY STREETS CURRY

Y

A

SECONDARY STREETS W

K & ACCESSWAYS R

MOODY PENNOYER A I N T E R S T A T E 5 HOOD MACADAM

P BOND

R

E

IV TRANSIT HUB R GAINES

LANE STREETCAR & TROLLEY ALIGNMENT

ABERNETHY POTENTIAL TRAM ALIGNMENT

THOMAS

RIVER TAXI LANDINGS LOWELL

BANCROFT

Note: Locations shown are not site-specific, but conceptual only.

HAMILTON

Accepted by City Council - August 11, 1999 iii N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

The Commitment

Achieving the District’s vision will not be an easy task, and much work still needs to be done. Most urban communities are not built from scratch; they start slowly at lower densities and evolve over long periods of time. In North Macadam, this timeframe will be compressed.

Meeting the infrastructure, transportation and environmental challenges simultaneously requires both public and private investment, and the North Macadam District Urban Renewal Plan is a key component. Formation of the Urban Renewal District in 1999 will allow the capture of tax increment revenue from projects adjacent to the Framework Plan area that will soon begin construction. In addition, the financing commit- ment of the Urban Renewal Plan, as well as the development vision articulated in the Framework Plan, will offer a new, attractive and flexible choice for businesses, institutions, and other job-creating entities to locate and expand within the Central City instead of choosing suburban alternatives.

The Future

The purpose of the Framework Plan is not to predict the specific future of development in North Macadam, but to provide a framework of ideas - a touchstone - that will help guide and inform its development over the next two decades. The Framework Plan, although well-deliberated, is primarily an aspirational document - suggesting how the vision for the District can be achieved. As specific implementation activities are initiated and development begins to occur, refinements will continue. Changing mar- kets, economic conditions and development patterns, as well as new experience and knowledge, may influence attitudes and opportunities in unanticipated ways and affect how goals are balanced in the future. Consequently, the District will not evolve precisely as described in this document.

Ultimately, the success of the North Macadam District will depend on the efforts of those who shape its vision, the talent and commitment of those who endeavor to build it, and the investment and stewardship of those who choose to live, work and play there.

iv Steering Committee’s Recommended Plan I . P r o c e s s a n d S t a k e h o l d e r s

I. Process and Stakeholders

Steering Committee and Work Groups

In June 1997, City Council adopted Resolution Number 35618 which initiated an in-depth study of the North Macadam District to make recom- mendations on:

• Development plan for the District • Street right-of-way design standards • Housing implementation plan • Jobs strategy • Storm water management plan • Comprehensive public/private infrastructure plan and financing strategy • Return on investment plan • Urban renewal district formation • Non-park public spaces

The Council established the North Macadam District Steering Committee to lead the planning study and to make recommendations. The Steering Committee is currently comprised of the following members:

Chair, Rick Michaelson, Inner City Properties

Richard Brandman, Metro Dr. Patrick Burk, Portland Public Schools Kerry Chipman, CTLH Debi Chung, Pacific Richland Investments David Cook, OSF Ross Cornelius, PDC Lois Davis, OHSU Ken Dietrich, US Bank Trust Abe Farkas, PDC Janice Frater, HCDC Tim Grewe, OFA David Knowles, Planning Bureau Jon Moss, Pegasus Devel. Ann Gardner, Schnitzer Investment Eric Parsons, Standard Ins. Vic Rhodes, PDOT Rick Saito, NMDC Zari Santner, Parks Bureau Ron Smith, BES Bob Stacey, Tri-Met Barbara Walker, Citizen Rep. Denny West, HAP Dave Williams, ODOT Steven Shain, Zidell Companies

The Steering Committee established a detailed work program and appointed Work Groups, composed of citizen representatives and other individuals with a broad diversity of perspectives, to assist in overseeing technical analyses and proposing recommendations. The following are the major activities that were undertaken:

• Community Vision: An initial vision statement that balanced eco- nomic and development opportunities with community goals and objectives was developed through a series of charettes with Steering Committee and Work Group members, neighborhood representa- tives, property owners and stakeholders. This initial vision estab- lished the framework for analyses and design work that ensued.

Accepted by City Council - August 11, 1999 1 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

• Market Analysis: A technical analysis was completed that analyzed current and future economic and demographic conditions affecting the District. It identified the development market available to the District, considered the factors needed to accommodate that market and the associated development costs, and assessed the basic financial feasibility of development within the District.

• Development Capacity Analysis: This analysis established a baseline development scenario that could be accommodated by existing comprehensive plan policies and zoning code requirements and in the absence of any public assistance to the District beyond that available to other areas. The land use implications of existing transportation capacity constraints were also assessed.

• Transportation Report, Central City Streetcar and Right-of-Way Design Standards: These three inter-related components of the transportation system were analyzed to better understand the implications of absorbing targeted development. Multiple transporta- tion modes and district connectivity based on the North Macadam District Street Plan contributed to the analysis. The transportation analysis examined current conditions and projected traffic growth for 2003 and 2015 at the three primary district portals. The Metro 2015 transportation model and a projected development growth and distribution scenario provided by the Jobs and Housing Work Group were analyzed to gauge traffic effects on district access. Central City Streetcar evaluation criteria were developed and align- ment options were evaluated in conjunction with the transportation work. Preliminary District-wide right-of-way Design Standards were also prepared in conjunction with the transportation analysis and Central City Streetcar alignment work.

• Willamette River Greenway Concept/Open Space Analysis: This analysis focused on the local and regional policy issues affecting the Greenway and parks and open space within the District. It consid- ered connections between the Greenway and regional open space system and connections to nearby neighborhoods. It assessed potential uses and users of the Greenway and their design require- ments, as well as environmental issues affecting development along the riverfront. An assessment of parks and open space needs was also prepared.

• Work Group Recommendations: Based on the above referenced analyses, other technical work undertaken and many meetings, each of the Work Groups completed a draft set of conclusions and recom- mendations for submission to the Steering Committee for consider- ation and inclusion into the Framework Plan.

• Return on Investment Analysis

The conclusions and recommendations of the technical consultants and the Work Groups were integrated into a comprehensive and consistent set of recommendations. These recommendations have been reviewed and amended by the Steering Committee, producing this Plan.

2 Steering Committee’s Recommended Plan I . P r o c e s s a n d S t a k e h o l d e r s

Development of the North Macadam District Framework Plan

Planning for the North Macadam District built upon a public-private partnership and emphasized an open process to ensure that community goals and public benefit will be achieved.

Private Sector Development Concepts An Idea, Land and Financing Potential Demonstration and Catalyst Projects Infrastructure, Open Space, Commercial & Residential Market Analysis & Financial Strategy Housing Identify Potential Opportunities & Conflicts Provide Informal Review of Potential Project Greenway Work Groups & Parks

Articulate District Vision Jobs

Land Use & Transportation Inform Development Development & Infrastructure Plan & District Standards

A Framework Plan Key elements: Overall Development Vision, Financial Strategy, Urban Renewal Plan, Development Code & Design Guidelines Recommendations The Steering Committee The City, Property Owners & Other Interested Parties

Accepted by City Council - August 11, 1999 3 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

A Working Vision for the North Macadam District

The Neighborhood in the Year 2020...

The North Macadam District is a vibrant urban neighborhood. The area derives its character, identity and attractiveness from its exemplary riverfront and high quality open space system, its compact, mixed-use developments, and significant employment opportunities. The District is a desirable location for jobs and residences because of its unique riverfront location and strong connections to other Central City neighbor- hoods. It features an efficient, well-planned and integrated transportation network that serves an eclectic and well-designed mix of buildings and open space. Densities are exceeded only by the nearby downtown, yet the District’s architecture and design carefully incorporate human-scale elements and tremendous river views.

The waterfront and greenway are the focus of the District and support a variety of users and activities and a diverse range of experiences throughout North Macadam. Public access along the riverfront greenway complements private residential and commercial buildings oriented to their spectacular riverfront location. Active riverfront uses, commercial enterprises, public parks, plazas and open spaces are set at strategic locations along the greenway and are well connected to adjacent neigh- borhoods. Special care has been taken to vary the greenway to accom- modate adjacent uses, allow opportunities to access the river and to be compatible with and supportive of the river itself. All of this has been accomplished while providing a continuous pedestrian and bicycle trail that adequately serves these users while enhancing and integrating natural resource values, views and a contemplative character. Its exemplary riverbank establishes a standard for stabilization while en- hancing fish and wildlife habitat.

The North Macadam District provides a significant number and wide range of employment opportunities. A diverse array of neighborhood residents, including people working in service jobs, managers and professionals (as well as retirees) have access to local jobs and take advantage of the opportunity to live close to work. A full range of busi- nesses from incubator and emerging businesses to corporate headquar- ters are present and have opportunities to grow in the District. Many of the businesses are in technology related fields, including medical and bio-technology connections with Marquam Hill. North Macadam contin- ues to contribute to the city’s share of regional job growth and to the vibrancy and vitality of the Central City.

4 Steering Committee’s Recommended Plan I . P r o c e s s a n d S t a k e h o l d e r s

The North Macadam District is a diverse, inclusive riverfront neighbor- hood. The mix of incomes, household types, age and race of residents generally reflect the diversity found in the city as a whole, and are balanced with local employment opportunities. The specific housing needs of a full spectrum of residents were considered throughout the development of the District and are well-served. The challenge of creat- ing a public/private collaboration to finance and build an array of housing that is sufficiently affordable has been met with dramatic success.

It is a vibrant urban neighborhood that provides many of the day-to day recreational and commercial needs of residents and people who work in the District, as well as visitors. Retail opportunities are varied and support local residents and workers. Community meeting spaces are well inte- grated into the District and the Corbett-Terwilliger-Lair Hill neighborhood.

Local access and circulation is provided by a balanced mix of transit, pedestrian, bicycle and other modes, including automobiles. Relatively dense mixed-use development is well-served by a transit system that includes streetcar and buses. Congestion at the portals to the District has been resolved. An integrated street network creates a safe and efficient environment for pedestrians, cyclists, transit and cars. A region- ally popular tram connecting North Macadam to Marquam Hill has been carefully integrated into the District and the Corbett-Terwilliger-Lair Hill neighborhood. Parking is adequate, but limited in quantity and designed to be subordinate to the high quality urban environment created by buildings, open spaces and the river.

In summary, North Macadam is a dense, energetic urban community which fits its role and location in Portland’s Central City.

Accepted by City Council - August 11, 1999 5 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Steering Committee Goals and Objectives

The Steering Committee goals and objectives for the North Macadam District respond to the goals of the Central City Plan, Metro’s Region 2040 Concept, Central City Transportation Management Plan and Design Guidelines for the North Macadam District: The goals and objectives are:

1. The North Macadam District should be a distinct neighborhood of exceptional urban character with a diversity of jobs and housing. The Plan should:

• Support Central City employment and housing objectives. • Encourage a complementary mix of housing, employment, retail, open space, recreational and institutional facilities. • Attract Marquam Hill’s economic, research, and related residential developments. • Attract job intensive businesses that support family wage incomes. • Promote both ownership and rental housing options. • Address environmental constraints including, but not limited to, soil contamination, freeway noise, and threatened species listings. • Create an examplary greenway system throughout the District.

2. The North Macadam District should be visually and physically re-attached to adjacent neighbor- hoods, facilitating use of District amenities by neighboring residents and use of neighboring amenities by District residents. The Plan should:

• Support the role of the District identified in the Central City Plan as the southern gateway to the downtown urban core. • Promote enhancements to existing connections and new connecting routes between the District, the Corbett-Terwilliger-Lair Hill (CTLH) neighborhood and downtown that provide access to commercial, retail and recreational destinations while meeting the District’s own development needs. • Promote improved physical connections between North Macadam and adjacent neighborhoods that link with existing institutional uses in the area, such as schools, recreational and religious facilities. • Encourage development of complementary fixed-alignment transit modes such as tram and streetcar that connect the District to Marquam Hill, Downtown and adjacent neighborhoods. • Encourage development of pedestrian and bike connections over the I-5 freeway and at north and south portals. • Preserve established view corridors from the CTLH neighborhood to the Willamette River.

3. The North Macadam District should capitalize on the unique opportunities of the Willamette River through the creation of an extraordinary open space network that establishes a relationship between the site’s history, natural areas, and public and private development. The Plan should:

• Utilize the waterfront as the focus of an open space network that recognizes the District’s maritime industrial history. • Complete the Willamette Greenway Trail through the District and connect it to the 40-Mile Loop. • Encourage a diversity of well-designed open spaces that reflect the housing and employment objec- tives and are an asset to the District. These open space types should include: the Willamette Greenway, major parks and plazas, pocket parks and enhanced pedestrian streets and pedestrian ways. • Promote design of open spaces and adjacent development so that each complements the other. • Ensure the development of a structurally sound riverbank, if necessary, that is integrated with the natural environment and supports fish and wildlife habitat along the Willamette River.

6 Steering Committee’s Recommended Plan I . P r o c e s s a n d S t a k e h o l d e r s

• Encourage physical and visual connections to the Willamette River from both the district and the adjoining neighborhoods. • Integrate institutions of the adjacent neighborhood within the regional open space network. • Anticipate an implementation program for the public acquisition, construction, operations and manage- ment of Parks and Open Space facilities. • Establish criteria and provide incentives for the private sector to contribute to the quality and quantity of open space in the District. • Anticipate open space programming to meet the needs of the District’s and the City’s residents and public and private interests. • Promote a storm water management plan that complies with present and future clean water standards.

4. The North Macadam District should address access, transportation and parking challenges. This should be achieved through strong commitments by both the public and private sector for early implementation of a logical transportation strategy that establishes a balance of transportation modes. The Plan should:

• Encourage improved access and circulation options to, through and within the North Macadam District. • Coordinate transportation solutions with those of inner Southwest Portland. • Identify distinct district access points that recognize the limited number of ways into the district and provide entry features that reinforce the sense of community and neighborhood. • Promote the development of multiple transportation options, including a safe and convenient walking environment; tram, streetcar and light rail alignments; improved bus service; water taxi; ride-sharing; bicycles and shared parking. • Encourage neighborhood streets through the district that meet the transportation needs of pedestrians, bicyclists, transit riders and vehicle drivers. • Provide access and circulation for service vehicles, minimizing conflicts with other street uses. • Recommend development of a district-wide parking strategy that considers timing, control of commuter trips, equitable treatment for near and long term developments, parking meters, shared parking policy and a Transportation Demand Management Program that balances a multi-mode transportation system.

5. Development of the North Macadam District should be implemented through strong public and private investment. Phasing should support a competitive and predictable development environ- ment. The Plan should:

• Promote phased development of under-utilized property while also accommodating the ongoing operation of appropriate existing uses. • Promote viable redevelopment while avoiding remnants of land that cannot be developed economically. • Plan for flexibility to allow for changes in market demand while also assuring that an urban neighbor- hood is developed that benefits public and private interests, and is realized within a reasonable period of time. • Establish public investment priorities for Transportation, Parks and Greenway, Infrastructure, Housing and Jobs. • Promote public investments that leverage significant private investments. • Guide incremental expansion of the infrastructure system in a manner that preserves land use options and maximizes the benefits from capital investments. • Use an Urban Renewal Plan and other public financing and policy tools to help implement the Plan.

Accepted by City Council - August 11, 1999 7 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

8 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

II. The Development Plan

The Development Plan responds to both the aspirations of the Working Vision and the projections of the Residential and Commercial Market Evaluation Study developed by E.D. Hovee and Company. The Market Evaluation Study established a market development scenario that pro- jected (to the year 2020):

• 8,500-10,000 jobs (a net gain of 8,300). Development would include 1.9 million square feet of office, 250,000 square feet of retail and 900 rooms of lodging. • 1,500-3,000 housing units (primarily market-rate condominiums).

These projections slightly exceed the CCTMP Policy Framework projec- tions of 1,420 added dwellings and two million square feet of commercial space. Ability to achieve the market development scenerio assumes:

• Adequate multimodal transportation access to and from the district to serve the development anticipated, coupled with an ability to provide parking at ratios adequate to attract residents and businesses. • Market rate development of all real estate product types at densities that are at or near the top end of what could be expected without public intervention (in the form of direct financial incentives). • Continued population growth consistent with Metro Regional forecasts. • Early implementation of necessary on- and off-site infrastructure to allow early phases of development by 2000. • Resolution of key public policy questions as part of the North Mac- adam framework planning process. • Private owner and development initiative responding to highest and best use opportunities in an economic climate which is consistent with regional growth expectations.

The Development Plan has been developed and refined through a series of presentations to the Steering Committee and the Work Groups. First, the numerous options for housing, jobs, retail, open space and transportation infrastructure were illustrated and discussed with the Steering Committee. Subsequently, three alternative development concepts that organized the various options into complementary relationships were presented and discussed. The Development Plan builds on the following comments from the Steering Committee and the Work Groups:

• Connections to the adjacent neighborhoods are vital. • Open Space opportunities should be diverse with parks internal to the neighborhood and along the riverfront. • Housing and Jobs should be mixed throughout the neighborhood to ensure a vital, “18 hour” mixed-use District. • Neighborhood Retail and Service should reinforce the east-west connections between the transit service and the Greenway. • Transit (Streetcar, Bus and Tram) should serve the areas with the highest potential development densities.

These key elements are illustrated on the following pages.

Accepted by City Council - August 11, 1999 9 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Connections to Adjacent Neighborhoods

The North Macadam Distict’s open space, land use, and transportation should complement those in the adjacent neighborhoods of Corbett- Terwilliger-Lair Hill, RiverPlace and Downtown.

Downtown and RiverPlace

Corbett, Terwilliger Lair Hill North Macadam

John’s Landing Business District

The improvement of physical connections will foster economic and social opportunities for both the District and the adjacent neighborhoods.

10 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

Regional Open Space and the Willamette Greenway

The North Macadam District provides a unique opportunity to establish access to the Willamette River Greenway from the 40 Mile Loop at Terwilliger , and from adjacent neighborhoods. Improvements to the existing pedestrian connections at Sheridan Street and Bancroft are anticipated. Pedestrian-only connections, via of I-5, may be developed along the Ross Island , Gibbs Street and Gaines Street corridors. A future extension of Arthur Boulevard from Front Ave. to River , with an underpass at I-5, may provide both vehicular and pedestrian access.

HARRISON / LINCOLN CONNECTOR

DUNIW AY PARK SHERIDAN

ARTHUR BARBUR

FRONT HOOKER

NEIGHBORHOOD CONNECTIONS SCHOOL

PRIMARY PUBLIC PARKS, GREENWAY & LAIR HILL PARK G E PEDESTRIAN WAYS A ND BR ID RO SS ISL

IMPROVED R .O.W . OPEN SPACE GIBBS

POTENTIAL NODES AT GREENWAY

ENHANCED PEDESTRIAN STREETS CURRY

PRIMARY DISTRICT STREETS

PRIMARY C.T.L.H. STREETS GAINES EA T R E T 5 S T N I

TRANSIT HUB HO OD MACADAM MOODY BOND RIVER PARKWAY

STREETCAR & TROLLEY ALIGNMENT

POTENTIAL TRAM ALIGNMENT LOW ELL

RIVER TAXI LANDINGS BANCRO FT

Note: Locations shown are not site-specific, but conceptual only.

HAMILTON

Accepted by City Council - August 11, 1999 11 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

The Willamette Greenway HARRISON / LINCOLN and Open Space CONNECTOR Network

The Willamette Greenway and a diversity of river-oriented and internal parks will create the open space network within the North SHERIDAN Macadam District. East-West Urban connections will be reinforced with Park/Plaza BAKER the development of Enhanced Pedestrian Streets and Pedestrian ARTHUR Ways.

MEADE

ENHANCED OR NEW PEDESTRIAN CONNECTIONS HOOKER

PRIMARY PUBLIC PARKS, GREENWAY & PEDESTRIAN WAYS

IMPROVED R.O.W. OPEN SPACE Ross Island

Bridge Park GROVER POTENTIAL NODES AT GREENWAY GIBBS ENHANCED PEDESTRIAN Riverside STREETS Park 5

Note: Locations CURRY shown are not site-specific, but PENNOYER MOODY I N T E R S T A T E T T A S R T E N I BOND MACADAM HOOD conceptual only. RIVER PARKWAY

GAINES

Neighborhood Park (to be located ABERNETHY in this area)

THOMAS

LOWELL

BANCROFT

Development along the Greenway will be varied in dimension and character.

HAMILTON

12 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

The Willamette Greenway and Open Space Network

The North Macadam District will be identified by the quality of its waterfront and open space development. Unique opportunities in North Macadam include:

• Excellent views of the river, mountains, downtown Portland, Ross Island, southeast Portland and beyond. • Extension of the Willamette Greenway Trail providing access for pedestrians, bicyclists and other users to Tom McCall Waterfront Park, RiverPlace, CTLH and the 40 Mile Loop Regional Trail. • The potential for improved riparian and upland habitat for fish and wildlife that utilize this river corridor across from Ross Island. • Close proximity to the downtown core. • Recognition of a long-standing maritime and industrial heritage that was pivotal in the development of the city.

Creation of the open space network is key to the Framework Plan and is an integral part of the District’s infrastructure. It will create social, ecologi- cal and economic benefits for future residents and employees of the District, for the current and future property owners, and for residents of the City of Portland. The following are key objectives for public open space development within the North Macadam District:

• Create an exemplary open space network that exceeds minimal requirements while meeting community objectives in a creative, functional and ecological fashion. • Strive for high-quality planning, design, construction and maintenance of parks and open space improvements. Remnants of the area’s historic • Ensure public spaces evolve to serve the future residents and em- uses and activities, such as the ployees of the District. bargeway and dock structures, • Provide connections between adjacent neighborhoods and the North should be integrated into the Macadam District. development of the neighborhood • Create an outstanding example of public-private partnership that and waterfront to express the leads to a successful new neighborhood in the city. identity of the District. • Treat property owners and the public sector fairly. Provide a combina- tion of public and private investments, incentives and regulations to achieve an exemplary network of greenway development and open spaces. • Enhance the natural fish and wildlife habitat value of the riverbank, the Greenway environment and other public spaces in the District. • Maximize the public benefit from each proposed investment.

The open space network will include the Willamette Greenway (including Setback, Trail and Riverbank), Public Parks, Enhanced Pedestrian Streets, Pedestrian Ways, and other privately developed open space such as pocket parks.

Accepted by City Council - August 11, 1999 13 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

The Willamette Greenway

The Willamette River and Greenway is the North Macadam District’s most exceptional public amenity. The Greenway will help provide the District The Willamette River and with a unique image and sense of place, attract businesses, residents and Greenway is the District’s most visitors to the District, connect the District to adjacent neighborhoods, and exceptional public amenity and a enhance fish and wildlife habitat. Developing an exemplary Greenway is key catalyst for attracting busi- essential to achieving the vision of the North Macadam District. nesses, residents and visitors to the District. Therefore, the design The Willamette Greenway in the North Macadam District should: and construction of the Greenway Trail and Riverbank should be • Provide high-quality spatial and visual experiences that vary along the expedited. waterfront. This variety should be accomplished by encouraging a range of activities, user groups, development patterns, active and passive spaces, building heights, greenway widths, and expanded ‘nodes’ at the intersections of the Greenway with east-west streets and accessways, including limited retail. The character of the Greenway should relate to adjacent land use. • Provide a pedestrian scale along the entire greenway by substan- tially widening the current minimum 25’ greenway setback to 50’ in most areas, providing numerous public accessways, and encouraging a diversity of massing, facade treatments and building details. • Emphasize the “Green” in Greenway. • Provide interpretive signage at locations along the Greenway as part of an interpretive design plan, including themes such as the District’s maritime heritage, wood processing and recycling history, fish and wildlife, and the urban/natural riverfront.

The Greenway Setback will be a minimum of 50 feet wide in most locations. Within the setback, a continuous paved trail 18 feet wide will accommodate both bicyclists and pedestrians.

14 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

• Provide gateways at major entry points to the Greenway, including information and wayfinding kiosks, public restrooms, seating, and decorative paving. • Connect functionally and thematically to districts at the north and south ends of North Macadam. • Provide active nodes adjacent to commercial and public use areas, and passive nodes adjacent to residential and other uses where privacy is a consideration • Provide a variety of flexible and attractive seating options at regular intervals, both adjacent to the Trail and within separate spaces accessable from the Trail. • Use consistent materials and themes to provide a sense of continuity along the Greenway through the District, including paving materials, railings, water features, signage, seating, rest rooms, lighting, trash receptacles, drinking fountains, public art, seasonal plant color, and Active Nodes native riparian plant materials. • Provide Greenway users with varied views to the river and beyond: at Active Nodes along the Williamette Greenway may include active uses or over the bank at some locations or from inland at other locations to such as retail storefronts and provide a weaving of experience - allowing riverbank habitat to wrap seating areas beyond the minimum over the top of bank in some locations while accentuating the views Greenway Setback and access and openness at the water’s edge in others. rights-of-way. Active Nodes are • Encourage views onto the trail from adjacent developments and typically located at commercial and streets. public use areas. • Minimize vagrancy and crime by limiting hidden areas of the trail. • Accommodate all intended uses safely.

Greenway Trail

The Greenway Trail in the North Macadam District will provide an 18’ wide clear pedestrian and bicycle zone. Signs, benches, light standards, landscaping and other site amenities will be placed outside of the 18’ clear zone. This width is designed to provide comfortable and safe passage for both pedestrian and bicycle traffic. In some areas where additional Greenway width is available, pedestrian and bicycle traffic may be sepa- rated into two distinct paths whose total width equals at least 18 feet.

The Greenway Trail will be located above the flood plain and should be usable on a year-round basis, consistent with current regulation. Passive Nodes

Passive Nodes provide relief and additional depth to the Greenway at accessways, maintaining a passive character. Passive Nodes are located at residential develop- ments or other locations where privacy is a consideration.

Accepted by City Council - August 11, 1999 15 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Greenway Setback

The Greenway Setback includes the 18’ Willamette Greenway Trail and landscaped areas on either side of the trail. The Greenway Setback is considered public open space with no encroachments of private or com- mercial uses. It should be accessible to the general public.

A minimum Greenway Setback of 50’ will be required throughout the North Macadam District. In three locations the minimum Greenway Setback is less than 50’ to help create a diversity of pedestrian experience and to preserve development flexibility within small or irregular parcels adjacent to the Greenway:

1. Between Hooker Street and Baker Street, the Greenway Setback is 35’ minimum. 2. Between Gibbs and the Ross Island Bridge, the 50’ minimum Greenway Setback is maintained, but commercial uses such as private outdoor seating may encroach a maximum of 15’ into the 50’ Greenway Setback. 3. Between Abernathy and Hamilton, the required Greenway Setback is 50’ average with 35’ minimum.

In addition, at the north end of the District, River Parkway will be closer than 50’ from the top of bank for approximately 200’ along the greenway. At its closest point, River Parkway will be approximately 35’ from the top of the bank.

The areas described above account for approximately 30% of the Greenway length within the North Macadam District. When the Greenway width is averaged over the entire length of the District, including 100’ greenway width at major parks and open spaces, but not including nodes, the average Greenway width will be at least 60’, a 140% increase over the current minimum Greenway setback of 25’. (The actual average Greenway width may be slightly higher, as buildings are expected to be faceted along the Greenway edge to maximize views and achieve building economy.)

Key objectives in the North Macadam District include substan- tially widening the Greenway Setback, providing a variety of quality pedestrian experiences and preserving development flexibility.

16 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

Building Heights

The current maximum permitted height of buildings located between the Greenway Setback and River Parkway is 75 feet. In order to promote discontinuous facades and a diversity of building forms and heights along the Greenway, the following building height options are proposed for developments along the Greenway (only one would apply to each develop- ment project):

1. Buildings may reach a maximum height of 95 feet between the Greenway Setback and River Parkway, but may not exceed an average maximum height of 75 feet within the zone 50 feet west of the Greenway Setback. Public and private open space provided beyond the required Greenway Setback can be included in calculating average building height within the 50 foot zone. 2. Alternatively, buildings may reach a maximum height of 75 feet between the Greenway Setback and River Parkway, except that buildings located more than 150 feet west of the Greenway Setback may reach a maximum height of 125 feet.

The current 125 feet maximum permitted building height between River Parkway and Bond Street would remain unchanged with building height bonuses increasing the allowable maximum to 170 feet. The current 250 feet maximum permitted building height at the west end of the District would also remain.

All proposed developments would remain subject to City of Portland design review to ensure appropriate pedestrian scale, articulation, relief and variation of buildings facades and treatments adjacent to the Greenway. Supplemental design guidelines should also be considered for buildings adjacent to the Greenway.

Existing regulations require a minimum Both proposed options would double the Greenway setback of 25 feet, and allow Greenway setback to 50 feet and allow maximum building heights along the additional building height. Greenway of 75 feet.

50' 50' Varies 25' Varies 75' 95' Max. 75' Max. Ave.

Option 1: 75’ Ave./95’ Max. height limits

50' 150' Varies

125' Max.

75' Max.

Option 2: 75’ Max./125’ Max. height limits

Accepted by City Council - August 11, 1999 17 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

The Willamette Riverbank

Enhancement of the 6200 linear feet of Willamette Riverbank in North Macadam is important for several major reasons. First, its stability is vital if redevelopment is to occur in the District. Second, within an urban context, the riverbank in North Macadam holds great potential for providing a corridor of improved wildlife habitat, both aquatic and terrestrial. Addi- tionally, the bank is the zone where people will experience the river; either visually from above, or physically, in a few limited places where they can have seasonal access to the river. Finally, since there are so many varied conditions along the bank, a variety of stabilizing and revegetation solu- tions will be needed, thus creating habitat diversity.

Key objectives for improvements to the Willamette Riverbank include:

Access to the river in the North • Within this urban setting, create a model for fish and wildlife habitat Macadam District will be provided that allows bank enhancement projects to more easily move through at key locations. Potential water taxi stops may be located at active the permitting process Greenway nodes on Arthur, Gibbs, • Provide for a variety of river experiences for people. Provide visual and Lowell Streets. and physical access to water that changes seasonally. • Improve the aesthetics of the riverbank from land and river. Provide views to the River from the North Macadam District. • Protect and improve water quality and habitat by: stabilizing slopes, isolating contamination, reducing erosion, and providing flexible vegetative cover. • Protect and enhance existing significant cultural remnants. • Integrate the design of the Greenway and riverbank

Riverbank Design Criteria

The following design criteria for riverbank development are intended to encourage the development of state-of-the-art bank treatments that integrate vegetation, enhancement, stability and habitat objectives, creating healthier fish and wildlife habitat while also providing adequate stability, protection for upland development, and maximized public ben- efits:

Recreation • Provide only passive recreation activities on the bank • To strengthen the habitat value, limit the number of places where people can access the bank. Riverbank design criteria are • Integrate bank design with the Greenway, Trail, Accessways, Nodes intended to be flexible enough to respond to the individual opportu- and adjacent Parks and Open Spaces. nities and contraints of specific • Focus education and interpretation emphasis in the district on natural, sites. cultural, maritime and historical themes.

Aesthetics • Protect existing established view corridors • Identify, preserve and enhance views and panoramas from the Greenway. • Enhance overall appearance of bank as viewed from the river - recognize the river as a designated view corridor. • Provide a diversity of bank treatments. • Create view opportunities without degrading fish habitat.

18 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

Stability/Hydrology • Ensure there are minimal negative effects on other sections of the river. • Provide a stable bank structure with flexible vegetation. • Match structural treatment to the level of acceptable risk. • Ensure proposed treatments are insurable. • Ensure bank is stable against wave and tidal action.

Fish and Wildlife Habitat • Maximize diversity of habitat types. • Complement Ross Island habitat. • Ensure ‘no take’ of threatened and endangered species as a mini- mum; exceed this requirement where appropriate. • Achieve habitat diversity through structural diversity of solutions.

Vegetation • Use vegetation with a high degree of flexibility in lower portions of bank (willow species, redtwig dogwood, etc.) • Develop 3 vegetation/habitat zones: aquatic, riparian, and upland. • Consider safety for trail users. • Utilize native plant species. • Conserve/protect existing pockets of established vegetation.

Regulatory Feasibility Riverbank solutions may include a limited • Design to 100 year flood event. number of secondary, • Ensure no net loss of water surface area in the floodway. non-continuous • Ensure no net loss of water storage capacity in the floodway. seasonal access • Exceed minimum requirements where appropriate. paths to water’s edge • Eliminate combined sewer outfalls where appropriate.

Riverbank Treatments

Riverbank treatments in the North Macadam District may include the following, depending on the specific design opportunities and engineering constraints of each site:

• Structured Soil Bank • Vegetated Seawall • Vegetated Steps • Stepped Bank • Rip Rap with Soil Cover and Integrated Plantings • Hybrid

It is not within the scope of this Framework Plan to recommend particular bank treatments in specific locations. The Portland Development Com- mission and the Bureau of Environmental Services are currently develop- ing optional design standards, criteria and solutions as part of the City’s response to the listing of Steelhead and Chinook Salmon as Threatened Species. The resources produced from this separate work effort should prove valuable to private property owners and city agencies involved with riverbank improvements in the North Macadam District.

Accepted by City Council - August 11, 1999 19 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Major Public Parks

The North Macadam District will include four major public parks, including the Riverside Park, the Ross Island Bridge Park, Neighborhood Park and an Urban Park/Plaza.

Riverside Park

The Riverside Park is a proposed major open space adjacent to the river and to the south of the existing Bargeway. Here the perceived width of the greenway will dramatically widen to fill the deep, wide expanse of the entire park. The bargeway at the northern edge of the park, when devel- oped, will provide a unique opportunity to incorporate an existing water feature that connects the dynamic, active, urban development to the north with the natural habitat and passive recreational areas to the south. The park should: Development along the north side of the bargeway will create an • Emphasize passive public use with no formal active recreation active urban edge with the opportu- nity to overlook the Riverside facilities. Park’s more natural habitat and • Include natural habitat and exemplary bank treatments as major innovative riverbank treatments. elements; address potential conflicts between habitat value and human use. • Be designed for use by the public, but not a performance venue or regional attraction. • Provide a possible opportunity for a river taxi stop at the Bargeway. • Emphasize passive recreation use with educational and interpretive features. • Emphasize habitat value along the bank with inclusion of native trees. • Provide transitional habitat between riverbank and interior develop- ment; it also must be compatible with human use.

Ross Island Bridge Park

A major opportunity within the District is to create Ross Island Bridge Park beneath and adjacent to the Ross Island Bridge. The Park could be the identifying icon for the District - the focal point that actually and themati- cally connects the dense, new urban development with its historic past. It will provide a 200 foot wide open space connecting the river and the western edge of the District and provide opportunities for connections for bicycle and pedestrian access to the Bridge, CTLH, and across the river to the Eastbank trail and neighborhoods. The area beneath the bridge is dry and relatively quiet, appropriate for an and gathering place. At the river’s edge the park would provide one of the District’s most Art on the recessed panels of the outstanding views of the Central City and Ross Island. The park should: Ross Island Bridge supports could depict the maritime history of the • Support active recreation uses. District. The art could celebrate the • Provide opportunities for concessions (skate rental, bike lockers, etc.) district’s role in early Portland, its near the west end of the bridge. contribution to the ship building • Create a scenic overlook at the river’s edge. effort in WWII and its role as the site • Provide a pedestrian connection between the river, streetcar and of Portland’s first major recycling CTLH. industry. • Incorporate potential daylighting of the Woods outfall, if feasible. • Be developed in conjunction with surrounding development, allowing for phased construction.

20 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

Neighborhood Park

The Neighborhood Park is conceptually located between River Parkway and Bond Street, south of the proposed Gaines pedestrian way, and intended for use primarily by local residents. The park should:

• Provide easy access from surrounding development • Be primarily “green”; with lawn, trees, and a small proportion of paving • Be programmed and designed as a Neighborhood Park to serve the citizens who live and work in the North Macadam District • Be sized to accommodate a variety of uses with the flexibility to change over time as District needs change. These uses, both active and passive, may include a play area, hard surface courts, open The Neighborhood Park will provide adequate open lawn area fields, picnic areas, and community gardens. The current City to accomodate a variety of informal standard for a neighborhood park is between 2.5 and 10 acres sports activities, including soccer, • Provide adequate space between the uses to avoid user conflicts softball, football or frisbee. In- • Rely upon on-street parking only. tended for recreational use primarily by District residents and Urban Park/Plaza workers, no dedicated parking will be provided. The Urban Park/Plaza is to be located north of the Ross Island Bridge and west of River Parkway. The park should:

• Provide easy access from surrounding development • Form the “heart” of the northern District area • Be programmed and designed as an Urban Park for the needs of District residents and workers • Be developed in conjunction with surrounding development; allowing for phased construction • Rely upon on-street parking only. The Urban Park/Plaza will provide Smaller Parks and Open Spaces a lively gathering place in the northern part of the District, “Pocket parks,” plazas and other smaller spaces should occur in various surrounded by active commercial, locations throughout the residential and office/commercial sectors of the office and retail development. neighborhood and, when possible, should be linked to the major open spaces. These parks and open spaces should:

• Be located along the street frontage to maximize the public benefit • Be inviting and visually accessible • Include amenities such as seating, landscaping, lighting and water features • Be sited to take advantage of solar access • Balance the use of hard and soft surfaces depending upon the adjacent uses • Address the needs of surrounding neighbors.

Enhanced Pedestrian Streets and Pedestrian Ways

The Greenway and major public parks will be complemented with the development of enhanced pedestrian streets and pedestrian ways that serve as east-west ‘fingers’ linking the River, transit corridors on the District’s east side, and major parks and open spaces. These are described in more detail in the Transportation section (page 30).

Accepted by City Council - August 11, 1999 21 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Land Use Development HARRISON / LINCOLN CONNECTOR

Jobs and Housing: Jobs and Housing will be integrated throughout the District with an empha- sis on jobs along the western edge and housing focused on the parks.

SHERIDAN Retail and Services: Neighborhood Retail and Services will be focused on the Primary East-West BAKER Streets and at the intersections with Moody-Bond and River Parkway. The ARTHUR east-west orientation is intended to attract and support public activity on the MEADE pedestrian corridors between the CTLH Neighborhood, the transit corridors and the Willamette Greenway. HOOKER

Parking: Parking will be dispersed throughout the District.

GROVER ENHANCED OR NEW PEDESTRIAN CONNECTIONS GIBBS INTEGRATED JOBS & HOUSING 5 JOBS EMPHASIS CURRY

HOUSING EMPHASIS PENNOYER I N T E R S T A T E T T A S R T E N I MACADAM MOODY BOND RIVER PARKWAY HOOD

RETAIL AND SERVICES EMPHASIS GAINES

LANE

ABERNETHY

THOMAS

LOWELL

BANCROFT

Note: Locations shown are not site-specific, but conceptual only.

HAMILTON

22 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

Land Use Development - Jobs and Housing

The Development Plan for the North Macadam District provides an opportunity to absorb a significant portion of the City’s projected employ- ment and housing growth in a relatively small area.

Jobs

The North Macadam District is an extension of the Central City as the regional employment center, and offers a medium-density employment transition area to close-in Southwest Portland neighborhoods. The area’s relationship to the river, the Corbett-Terwilliger-Lair Hill neighborhood, and proximity to the downtown offer the opportunity for development of an employment center unique to the region.

By stimulating employment growth in the North Macadam District, the City can work toward meeting Region 2040 job objectives. It can create quality job opportunities in, and adjacent to, the Central City. These job objectives support City goals to increase personal income levels and create community wealth by targeting jobs in industries where Portland has a comparative national advantage and that pay livable wages. Job creation in North Macadam will provide the primary source of tax incre- ment revenues available to support other district activities such as housing, transportation and parks. Like public investments in housing and transportation, job strategies will ensure the quality and quantity of jobs needed to support the vision of the District.

Employment Goals

• Support the development of targeted industries that are nationally North Macadam will be a strong competitive, offer a comparative advantage for the City of Portland, and vital neighborhood, complete with retail and services such as and pay above average wages. childcare centers and grocery • Encourage a mix of occupations and wage levels that provide a stores. range of employment opportunities consistent with the Central City, and Central City near-in workforce. • Develop a mix of employment density that reflects the District’s status as a transition area between the Central City and close-in neighborhoods. • Identify and encourage opportunities such as Oregon Health Sci- ences University development in the North Macadam District, includ- ing the potential capture of spin-off activities from OHSU’s bioscience and health technologies research and development. • Address the relocation of existing industrial uses within the District to other locations in the City of Portland. • Identify employment opportunities supported by the market, including the development of home offices, and develop an overall jobs policy, tools, incentives, and public investment programs available to achieve employment objectives. • Define additional employment objectives that will require special programs or policy. • Provide state-of-the-art telecommunications infrastructure.

Accepted by City Council - August 11, 1999 23 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

The North Macadam Jobs Strategy will support the City’s Central City employment goal. It will target clusters of industry groups that have wage, density and transportation characteristics compatible with the vision for the North Macadam District. Lease and tenant costs will be driven primarily by market rates and should be competitive with other compa- rable areas. The job strategy will support the link to the river and natural assets that increase the aesthetics and marketability of the District.

Job sectors included will be located in a mix of Class A office, retail, lodging and targeted industries. Employment activities supported by the market and economic trends will include: Creative Services (multimedia, public relations, advertising, software, film & video), Health Services, Engineering, Architecture, Legal, Accounting, Non-depository Financial Specialties, Business and Personal Services and Retail Sales. The density of jobs will average 250-300 jobs per acre. Approximately 5-10% of housing units will have home businesses.

Housing

OHSU, because of its close The District’s proximity to the Willamette River and Downtown offers the proximity and need to expand its opportunity for the evolution of a unique mixed-income, urban neighbor- facilities, continues to be a strong hood. The neighborhood’s vitality and livability will be characterized by candidate for one job-creating the opportunity for citizens to work and play near where they live. catalyst in the North Macadam District. OHSU is currently consid- Housing Goals ering its future development strategy, and the role of North • Provide a wide range of housing type options, including low- and Macadam within that strategy is under evaluation. moderate-income and market-rate rental and owner-occupied housing, to support prospective residential markets in, adjacent to, and near the District. • Develop quality housing in a manner that provides housing opportuni- ties for a profile of household incomes that are representative of the city as a whole; including low and very low-income households, consistent with City policy. • Promote and encourage a density of housing in the District that supports transit orientation and ridership, and that accommodates the City’s housing unit growth goals in this Central City location. • Encourage programs that create linkage between employment and housing in or near the District. Pursue an appropriate balance of jobs and housing to insure vitality and reduce congestion. Promote housing that supports and enhances the attraction of new jobs to the Central City and creates residential linkages with the research and medical facilities on Marquam Hill. • Promote the development of housing in the District that supports a connection with the surrounding neighborhood, and provides in- creased housing opportunities for nearby residents and workers. • Develop and support services and amenities necessary for a quality neighborhood that will assist in the maintenance and production of substantial and well-designed housing. • Assess the impact of new development on existing housing in the District to prevent or mitigate potential displacement.

24 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

An attraction to the North Macadam District for future residents will be the ease of access to nearby employment centers, downtown cultural and service amenities, neighborhood retail services and restaurants, and health care facilities on Marquam Hill. Residents’ choices for housing within the District will be influenced by proximity to the river, public open spaces and transit. The affordability and range of building types in North Macadam will also be influenced by potentially higher construction costs due to environmental mitigation, location of flood plain, and parking constraints.

The anticipated residential profile for the North Macadam District in- cludes:

• Younger, professional couples • Empty-nesters who have downsized from larger homes • Workers in or near the district, or employed downtown • Single-parent head of households with children old enough to ride transit independently • Seniors • Marquam Hill employees

The Comprehensive Plan Housing Policy

The recently adopted Comprehensive Plan Housing Policy (1999) includes objectives for both housing unit production and housing income. The Housing Income Policy, Policy 4.7, was adopted as a “balancing” policy and establishes the objective that large redevelopment areas that provide opportunities for housing development should reflect the income distribution of the city as a whole. Pursuit of this policy should also respond to other policies and public objectives for the area, such as job growth and open space.

Given that the urban renewal funds identified for housing in this frame- work plan are not adequate for achieving full compliance with the City income policy, then a reasonable and acceptable distribution of housing which provides for all income levels in the area should be pursued. For A variety of housing types may be the North Macadam area, this housing profile should also respond to developed in the District to include prospective employment activities in and near the area, and encourage a mix of uses and encourage shared parking. further housing density in the central city. However, should additional urban renewal funds become available for housing, they should be applied towards fulfillment of the housing income policy to the extent feasible.

Expected Housing Production

The current estimate of housing production for the Framework Plan area anticipates 1500-3000 units. Urban renewal funds will be used as a direct subsidy for housing production to accomplish the city’s adopted policy of matching the city’s income profile in new redevelopment areas. Housing affordability estimates were determined by applying the avail- able urban renewal resources to the city household income profile.

Accepted by City Council - August 11, 1999 25 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Assumptions of the required financing from the city, in combination with other private and public resources, were applied to each income level to determine how many units could be successfully financed. Given this analytic approach, $25 million of proposed urban renewal funding would generate approximately 800 affordable housing units, which would translate into a total of 1230 units in the district if the City’s income profile were to be achieved.

Three City objectives are: increasing the number of Central City housing units, matching housing availability to job growth in North Macadam, and improving the financial resources available to the urban renewal district. To achieve these, it is recommended that the production of units beyond that which reflects the City Income Policy should be undertaken by the private development community without direct financial subsidy.

Housing Production Targets

Based on the $25 million of urban renewal funding for housing which has Housing should be located and been identified in this plan, and an anticipated average household size of designed to provide “eyes on the 1.6 persons, the following affordable housing unit production targets by street” for security of those using household income level have been identified: neighborhood parks and transit... Targeted Affordable and Moderate Income Units

Affordable Affordable Total % of Median Rental Ownership Affordable Family Income Units Units Units 0 - 30% 166 0 166 31 - 50% 211 0 211 51 - 80% 205 0 205 81 -100% 1291 43 172 101 -120% 34 34 Total 711 772 788

1 Subsidy needs for these units are undetermined. An additional 102 units for 101-120% MFI have also been targeted. Provision of units serving house- holds in these income categories is considered an essential element of the Framework Plan. Due to potential changes in rental market conditions, yet- to-be determined construction costs, variation of unit sizes, amenities and parking configurations, requests for direct financial assistance for units in this income level will be addressed by PDC staff during project underwriting. 2 The 77 subsidized affordable ownership units are targeted for a non-profit community land trust affordable ownership model currently under develop- ment by the City.

It is assumed that the subsidized affordable units will require direct financial assistance from the City as underwritten by PDC. Voluntary zoning bonuses should also be considered as a mechanism for incenting production in the moderate income rental categories, especially in the 81- 100% MFI range. Anticipated required subsidies identified at the time of this plan are described in the technical appendix. Affordability covenants will be attached as part of the loan agreements, and the use of tax

26 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

abatements will be considered in determining project feasibility. Due to the desire to maintain a balanced profile of housing across the income spectrum, it is recommended that the housing unit build-out be monitored periodically in the district to review the unit mix provided by the market in the 120% -150% and 151+% categories. No targets have been identiied or set for these ranges because actual unit amounts and per- centages are difficult to predict at this time. The forecasts for different build-out scenarios are described in a separate document listed in the appendix.

Homeownership

In addition to the subsidized ownership units mentioned above, further ownership opportunities in the district are encouraged. It is anticipated that the market will respond by producing ownership units in the district serving the mid-to-upper income categories. The anticipated relationship between ownership opportunities and household incomes is described in a separate document listed in the appendix. In addition, a program to encourage ownership for workers who also live in the district is proposed ...and may incorporate ecologically and further outlined in the implementation section of the Framework Plan. progressive elements, such as roof gardens and storm water drainage systems, which enhance the 0-30% MFI Housing residential environment. The Framework Plan anticipates the production of 166 housing units affordable to households in the 0-30% MFI income bracket. These 166 units will serve households in the upper end of this bracket, i.e. house- holds with minimum wage earners working full-time. Additional operating subsidies would be needed to provide units affordable to households at the bracket’s lower end. While funding sources for such subsidies are unavailable at present and in the foreseeable future, they may eventually materialize. Should operating funds become available, units in this category should be developed in a manner which takes full advantage of North Macadam’s proximity to health services in Marquam Hill, as well as other nearby service providers.

Duration of Affordability

Recognizing that a goal of the North Macadam area is to create and sustain an economically diverse neighborhood over the life of the district, further study is needed to determine ways to maintain the affordability of rental units which are produced without direct City subsidy for affordable or moderately affordable income levels. Voluntary zoning bonuses or incentives may be one tool to accomplish this.

Affordable Housing and Parking

It is recommended that mixed-use configurations of affordable housing and structured parking be explored where applicable throughout the district as a way of optimizing the use of public investment. Parking structures that could be shared by multiple housing developments, or between commercial and residential uses, should also be examined.

Accepted by City Council - August 11, 1999 27 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

The Transportation System HARRISON / LINCOLN CONNECTOR Transit: Transit (Bus and Streetcar) will be located along the western edge on Moody and Bond where the projected density will be highest. The Tram will connect with Bus and Streetcar at the Multi-modal Transit Hub. SHERIDAN

Bicycle: BAKER Moody-Bond is designated as a Central City Bikeway. The Willamette Greenway Trail, Bancroft, Curry and ARTHUR River Parkway north of the Marquam

Bridge will function as Bicycle Paths. MEADE

Neighborhood Connections: Improvements to the existing pedestrian HOOKER connections at Sheridan Street and Bancroft are anticipated. Pedestrian- only connections, via overpasses of I-5, may be developed along the Ross Island Bridge, Gibbs St. and Gaines St. corridors. An extension of Arthur Boulevard from Front Ave. to River GROVER Parkway, with an underpass at I-5, could provide vehicular & pedestrian GIBBS access. 5 ENHANCED OR NEW PEDESTRIAN CONNECTIONS CURRY

Y

A

GREENWAY & W K PEDESTRIAN WAYS R PENNOYER A I N T E R S T A T E T T A S R T E N I MACADAM MOODY BOND HOOD

P

R

E

IV

ENHANCED PEDESTRIAN R GAINES STREETS

LANE PRIMARY STREETS

ABERNETHY SECONDARY STREETS & ACCESSWAYS

THOMAS

TRANSIT HUB LOWELL

BANCROFT STREETCAR & TROLLEY ALIGNMENT

POTENTIAL TRAM ALIGNMENT Note: Locations shown are not site-specific, but RIVER TAXI LANDINGS conceptual only.

HAMILTON

28 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

The Transportation System and Parking

Successful development in North Macadam will depend on an efficient and comprehensive transportation system. The Transportation goals for the District include:

• Improve the primary portals to accommodate projected development growth of 1,500 to 3,000 residences and 8,500 to 10,000 jobs. • Promote mixed-use, transit-friendly development by accommodating and increasingly improving service to and from the District through a variety of means, such as: Central City Streetcar, efficient bus service, Central City Transit Hub, Marquam Hill Tram, River Taxi, and future South/North Light Rail Transit. Preserve the Willamette Shore Line rail corridor for future passenger rail operations, including streetcar and trolley alignments. • Develop a District-wide pedestrian and bicycle network using streets New pedestrian connections over and accessways to link internal employment, residential, neighbor- Interstate 5 will reconnect North Macadam with the Corbett- hood service, recreational and transit destinations. Terwilliger-Lair Hill Neighborhood. • Develop a transportation system that is integrated with land uses anticipated in the District and respects the existing street plan. • Create a parking strategy, including approaches to interim parking, that acknowledges an early need for North Macadam development to be competitive with other commercial submarkets, but reduces parking ratios as transit service increases. The parking strategy should serve residents, visitors, and employees of the neighborhood. • Make transit efficient, convenient, and attractive enough to allow people to choose to live, work, and visit in North Macadam. Develop a transportation system that facilitates efficient transit movement. • Provide safe, direct bicycle and pedestrian connections between the Transit opportunities include the North Macadam portion of the Willamette Greenway and adjacent Streetcar... neighborhoods, including CTLH and River Place. • Achieve at least a 30% mode split (tranportation by means other than single-occupancy vehicle), utilizing Transportation Demand Manage- ment (TDM), parking ratios, local Transportation Management Association (TMA), and transit. The achievement of this mode split should be a responsibility shared by all developers. • Design and develop east-west streets to physically and aesthetically connect the western edge of the District to the river. • Develop a transportation system that reduces the traffic impacts on surrounding neighborhoods resulting from North Macadam develop- ment. • Develop a tram that provides effective connections between North ...and the River Taxi. Macadam, Marquam Hill and CTLH.

Accepted by City Council - August 11, 1999 29 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

The North Macadam District Street Plan

The North Macadam District Street Plan, prepared by the Portland Office of Transportation and accepted by the City Council in December 1996, identified a network of streets to address the transportation needs of pedestrians, bicyclists, transit riders and vehicle drivers. Subsequently, work on the Framework Plan has conceptually identified aspects of the Street Plan that should be reviewed for potential adjustments:

• Curry Street - The shift of the portal from Gibbs to Curry will require revised rights-of-way and function of Curry and Gibbs. • Streetcar Alignment - A two-way alignment on Moody will require an additional 2’ of right-of-way, reconfiguration, or removal of on-street parking on one side of the street to accommodate pedes- trian activity.

Street Standards will be finalized based on the completed Framework Plan.

Enhanced Pedestrian Streets

The Willamette Greenway and Major Public Parks will be complemented with the development of enhanced pedestrian streets that serve as east- west ‘fingers’ linking the River, the District’s transit corridors, and major parks and open spaces. Potential corridors for enhanced pedestrian streets include Sheridan, Arthur, Hooker, Curry, Gibbs, Gaines and Lowell Streets. (An additional east-west connection is provided by the Ross Island Bridge Park.)

The North Macadam District Street The pedestrian enhancements should be provided within existing street Plan reflects the Central City rights-of-way, and may include pedestrian amenities such as benches, Design Guidelines, which envisions an extension of the 200-foot block water features, lights, bike racks, trash receptacles, and drinking foun- pattern and the ratio of open space tains, as well as extensions, where appropriate, at intersections for to buildings that it produces. pedestrian convenience and to provide additional landscaping.

Pedestrian Ways

If the Neighborhood Park is located adjacent to Gaines Street, Gaines has been identified as a possible pedestrian way between Bond Street and the Greenway, providing a right-of-way accessible only to pedestri- ans and bicycles and expanding the open space available to the Park. A Gaines pedestrian way would require additional accessways at Lane and Pennoyer between Bond and River Parkway, and the expansion of Abernathy to a 60’ right-of-way between Bond and River Parkway.

Pedestrian ways would have a maximum of 50% of their total area covered with paved, impervious surfaces, with the remainder densely planted with vegetation. Pedestrian ways may provide similar pedestrian amenities as the enhanced pedestrian streets.

30 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

Street configurations, function and character will vary in response to the adjacent uses and access requirements.

Moody-Bond Street - 70’ R.O.W. with a landscaped median. The introduction of on-street parking for a portion of Moody-Bond will require a revised street section.

Curry Street (Bond Street to River Parkway) - 70’ R.O.W. with bicycle and on-street parking.

Moody Street (south of Gibbs Street) - 60’ R.O.W. with Streetcar and on-street parking. A two-way alignment for streetcar may require an additional 2’ of right-of-way, sidewalk reconfiguration, or removal of on-street parking on one side of the street to accommodate pedestrian activity.

River Parkway (south of Baker Street) - 60’ R.O.W. with on-street parking.

Accepted by City Council - August 11, 1999 31 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Transportation and Development

Three transportation portals at Bancroft at Macadam, Curry at Macadam, and at Moody and Harbor Drive provide connections to and from the district. Today, these portals all operate above acceptable levels of service and primarily accommodate trucking and automobile access. The North Macadam District Transportation Report (November 1998) and subsequent refinements have determined that to reach the District’s development expectations, street and improvements will be necessary at Bancroft and Curry on Macadam in conjunction with some version of the planned Harrison/Lincoln Connector.

The transportation analysis for 2015 included minimal Transportation Demand Management (TDM) assumptions; some transit service as well as parking restrictions in the District result in a 15% mode split. The CCTMP goal for this district is a 30% mode split: 20% transit and 10% alternative modes.

Specific recommendations include:

• Two access improvement projects - 1) Bancroft, Hood and Macadam intersection improvements, and 2) Macadam weave mitigation project that moves the central portal from Gibbs Street to Curry Street. • The transportation improvements at Bancroft should be a priority because the portal is expected to operate at or above capacity in the near future. The Macadam weave project is proposed for a later phase of improvements if warranted and agreed to by ODOT. In the interim, all existing connections to Macadam must be maintained to provide vehicular ingress to and egress from the District. • The transportation system, with the proposed improvements, will meet regional standards for target growth with a two-hour PM peak for significant congestion. TDM measures will be necessary to meet the expected growth in the district, comply with the CCTMP goal of a 30% mode split, and assist with achieving an acceptable balance between development density and livability in the District and adja- cent neighborhoods. These measures include: promotion of alterna- tive modes, parking management and trip reduction.

Parking

Adequate parking will be essential to support both commercial and residential development within the North Macadam District. Parking implementation strategies within the District should ensure:

• A balance between parking development and transit service is achieved over time. • Metered parking is implemented. • Shared parking policies are created. • Off-street parking ratios and phasing strategies are developed. • Public parking - both interim surface parking and permanent struc- tured parking - are planned, located, and developed.

32 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

The Market Evaluation Study completed in 1998 for the Framework Plan concluded that, along with significant transit investment and Transporta- tion Demand Management (TDM) programs, a parking ratio of 3 spaces per 1000 square feet of commercial space will be needed to serve the office market identified for the North Macadam District. Parking ratios for residential development within the District are anticipated to be similar to those allowed for the River District. The forecasts of tax increment funds generated within the North Macadam Urban Renewal District are based on these market assumptions. If parking ratios are inadequate, commer- cial growth objectives are unlikely to be achieved and, as a result, tax increment funding will not be available to meet public objectives.

Parking ratios established for the District should reflect market require- ments to achieve growth objectives, CCTMP goals and a 30% mode split objective. Interim parking ratios should also take into account the current deficiency in transit service levels, the absence of existing public and private parking spaces within the District, and the schedule for develop- ing public parking.

Transportation Demand Management

Transportation Demand Management (TDM) programs promote alterna- tive modes of transportation such as transit, ridesharing in vanpools and carpools, biking and walking. They also help establish and manage parking by creating special off-street parking ratios, by developing phasing strategies and shared parking policies, and by controlling on- street parking through timing and/or metering. Promotion of programs that encourage residents to live and work within the same District through telecommuting, compressed work weeks and alternating work hours can further contribute to the reduction of vehicle trips and congestion.

Implementation of a TDM program in the North Macadam District will be necessary to assure acceptable operation of the street system. It will also be necessary to achieve the CCTMP mode split goal of 30%. Ultimately, a TDM program can help assure the viability and livability of the District.

A Transportation Management Association (TMA) should be established to manage the expected traffic growth in the District and be responsible for implementing a Transportation Demand Management program. Early establishment of a TMA will be necessary to manage expected traffic growth in the District. The TMA should prepare an implementation strategy to guide and manage the initiation of various TDM programs, and should account for the dynamic characteristics of development growth and equity for property owners over the foreseeable future.

Accepted by City Council - August 11, 1999 33 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

South / North Light Rail Project

To fill the transit gap left by the defeat of the South/North Light Rail funding proposal in November 1998, a higher emphasis on other modes of transit such as bus and streetcar will be important to support develop- ment in the North Macadam District. However, nothing within this Frame- work Plan precludes the most recent South/North Light Rail alignment from being constructed through the District in the future.

Central City Streetcar

The Streetcar is an integral component of the multi-modal transportation system in the district. The proposed Willamette Shore Line/Moody Avenue alignment runs along the existing Willamette Shore Line north of the Ross Island Bridge, and along Moody Avenue south of the Ross Island Bridge. The selection of the preferred alignment was influenced by these factors:

• Urban Design - The Willamette Shore Line/Moody Avenue alignment will serve as a catalyst for areas of the district with the highest development potential. • Land Use - The highest densities follow the Bond corridor and will eventually attract the greatest number of riders. • East-West Connectors - The alignment will reinforce the east-west connector streets of the district, and encourage pedestrian traffic between the western transit edge and the eastern river’s edge. • Operations, Connections and Transfers - The Willamette Shore Line/ Moody Avenue alignment would provide service to the highest density housing and employment areas, be easily understood, provide convenient transfer to other modes of travel including the Marquam Hill Tram and be closer to the the CTLH neighborhood. • Early Construction - Complete construction of River Parkway and the timing of the barge manufacturing facility’s relocation is uncertain and could preclude streetcar service on River Parkway for many years. • Cost - Improvement costs in the Willamette Shore Line segment would possibly be less than other public rights-of-way in the district.

Bus

Bus service should be implemented concurrent with the reconstruction of Bond Street, providing expandable transit service to the District. A transit service strategy should be prepared by Tri-Met that projects service requirements based on anticipated and realized development growth. A transit implementation strategy should be part of the service strategy and should account for service growth, rider incentives, transit priority mea- sures and other programs that would coincide with TDM programs. Proposals for widening and providing exclusive bus lanes or bus pullouts on Moody/Bond, or creating a combined transit corridor with streetcar, can only be evaluated based on Tri-Met’s service strategy for the District.

34 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

Marquam Hill Tram

A study that investigated alternatives for connecting the North Macadam District and Oregon Health Sciences University (OHSU), the Central City’s largest employer, was completed in August 1998. The study considered various aerial tramway systems and alignments that would connect OHSU to one of two primary locations in the North Macadam District. One alignment proposed a tram terminal on the north side of the Ross Island Bridge near Hooker while the second alignment proposed a terminal facility on the south side of the bridge at Gibbs. Guiding prin- ciples for the Tram include:

• Transit and Transportation - The tram should link Marquam Hill medical facilities to the district’s Transit Hub, which will provide modal transfer to other travel modes such as bus, streetcar, taxi cabs, automobiles and shuttles. • Connections - Tram service should provide an opportunity to en- hance connections to CTLH. • Employment - Tram service should provide convenient transportation to and from the OHSU campus that is one of Oregon’s largest employers. It would also provide to employees “on the hill” alterna- tive access to any new OHSU facilities that may locate within the North Macadam District. • Housing - Housing for OHSU employees could be provided within the District. The tram would support living and working within the same immediate area by providing residents with an alternative mode of transportation for commuting to and from work.

The tram could provide alternative mobility for the district’s target densi- ties of employment and households and would reduce automobile trips on the local street system by connecting potential OHSU facilities on the river with services “on the hill”. This connection is integral to the jobs and housing strategy, should intersect with the Central City Transit Hub and is a fundamental component of the TDM and parking strategy.

Neighborhood and Regional Transportation Issues

Neighborhood representatives have expressed concerns regarding traffic impacts to the Corbett-Terwilliger-Lair Hill neighborhood resulting from the current use of local service streets to access the regional system and the potential for increased traffic due to North Macadam development. These concerns should be addressed as part of the Neighborhood Transportation Alliance outlined in the next section. Continued coordina- tion with the South Portland Circulation Study and the I-405 Reconnais- sance Study is also necessary to ensure complementary projects will be undertaken.

Accepted by City Council - August 11, 1999 35 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Environmental Considerations and Infrastructure Development

Brownfield Redevelopment

Brownfield cleanup and reuse projects are an integral part of the City’s comprehensive growth management strategy. Portland’s Livable Com- munity Showcase - Brownfield Renewal Program has identified the North Macadam District as a significant opportunity to demonstrate a high potential for environmental restoration and economic reuse of the City’s brownfields.

Several industrial uses have occupied sites in the North Macadam District, including a steel recycling and fabrication plant, a wood products factory, and the existing barge construction operation. A clean-up plan for the Schnitzer Steel properties has been approved by the Oregon Department of Environmental Quality (DEQ) that requires the removal of all hazardous soils and the capping of remaining contaminated soils with clean soil, impervious paving or buildings. Other properties in the District are in the process of initiating similar clean-up plans.

Endangered Species Act

The City’s comprehensive response to the listing of Steelhead and Chinook Salmon as Threatened Species under the Endangered Species Act is in the process of being formulated. The City Council has declared its goal to be recovery of threatened fish populations. Because of the significance of the development in this district and the degree to which public dollars are being invested, development should be supportive of this commitment. New development in the North Macadam District should satisfy the Endangered Species Act requirement of ensuring a “no take” of endangered species while also improving existing Willamette riverbank habitat conditions. In addition to the riverbank goals, objec- tives, and design criteria set forth in this Framework Plan, development projects within North Macadam should be coordinated with the riverbank design standards described in the Willamette Downtown Design Note- book, currently being developed by the Portland Development Commis- sion and the Bureau of Environmental Services.

36 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

Utilities

All utilities for the North Macadam District are to be placed underground. Consequently, the North Macadam District will require substantial im- provements to its existing utilities infrastructure. Existing above-ground structures and electrical and telecommunications wires will need to be relocated and buried. A high-voltage electrical tower south of the Ross Island Bridge is currently sited within the proposed Riverside Park, and supports electrical lines spanning across the Willamette River. Replace- ment and/or relocation of the tower may be possible, although relatively costly. To ensure the level and type of telecommunications infrastructure is competitive with the types of high technology jobs that are likely to locate in the District, state-of-the art telecommunications systems will also need to be developed. Relocation and burial of existing utilities, as well as installation of new underground utilities, will need to be carefully coordinated with street development, brownfield considerations and improvement projects.

Water, Sanitary Sewer and Stormwater Management

The North Macadam District will require significant improvements to its water, sanitary and storm sewer infrastructure to support its projected employment and housing growth.

Water System

Initial findings by the Water Bureau indicate that no upgrades are neces- sary to the water feeder systems with water service provided by an extension of the existing two pressure zones and improvements will be limited to new distribution lines within the new public roadways.

Based on input from the Water Bureau, the following system improve- ments are anticipated to serve the District. First, a 12-inch main distribu- tion line will need to extend from Macadam at Bancroft along River Parkway to the PG&E building. This 12-inch line will serve as the main distribution loop supplemented by east-west cross connections of 8-inch and 12-inch lines to the existing 12-inch system in Macadam and Moody. Flow and pressure appears adequate to serve the development of the District assuming approximately 3,000 housing units and 10,000 jobs as a base case. Fire flows dictate line sizes for a development of this size and the conceptual cost estimate assumes a number of hydrants based on the street grid and coverage for the proposed buildings. Because of the proposed location of the Streetcar within the Moody right-of-way, no new water lines are proposed in that street.

Accepted by City Council - August 11, 1999 37 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Sanitary Sewer System

Two sanitary sewer pump stations serve this area. These pump stations lift sewer flows into a 42-inch gravity line in Moody. Both pump stations are slated for upgrade by BES; however, the timing is highly dependent on the North Macadam development.

The development of the District will require extension of gravity collection systems and possibly construction of one or two sanitary sewer pump stations. These pump stations may not be required depending on the timing and construction of a new 96-inch gravity interceptor, located in Moody-Bond, planned by BES as part of the CSO program and sched- uled to be in place by 2003. Initially, this 96-inch line is to operate as a wet weather line intercepting a portion of the combined sewer flows that currently discharge to the Willamette River. This line will not completely eliminate overflows to the river and will provide capacity for the North Macadam District whether by gravity or as a connection point from a pumping system.

The conceptual plans project either a one- or a two-pump station option for development. A one-pump station option is preferred and possible if the Zidell Barge Facility is decommissioned prior to needing gravity collection lines in the area of the bargeway. Depending on the timing of development, this station could be temporary until the 96-inch line is installed and operational, or permanent should the 96-inch line not be able to serve the site by gravity. The same conditions exist under the two-pump station option. The two-pump station option assumes the District develops around an operating barge facility which would not allow for continuous gravity sewer lines running north/south.

The gravity sewer system includes pipe sizes ranging from 8- to 10- inches in diameter. The conceptual plan assumes that due to the flat grades existing within the North Macadam District the pipe size will need to be increased from 8- to 10-inches in downstream reaches to accom- modate the anticipated flows. Because of the proposed location of the Streetcar within the Moody right-of-way, no new lines are proposed in that street.

38 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

Stormwater Management

The North Macadam District will be required to provide water quality systems meeting present and future City of Portland standards, which currently include removal of at least 70% of total suspended solids. New development will require a new collection system and also include removing existing connections from the combined sewer.

The stormwater system concept includes dividing the site into smaller drainage basins in order to minimize flow concentrations and pipe sizes. The District’s urban character and density, its proximity to the river, as well as DEQ requirements to cap brownfield soils, will limit the use of surface stormwater treatment within the District. Nonetheless, the use of some pervious surfacing materials and other landscape treatments such as vegetated swales and roof gardens could reduce the size of the mechanical systems required. Combined public and private stormwater management will also be an important policy to apply in the District.

At present, the District’s storm drainage systems are limited to the five existing outfalls (3 City of Portland and 2 ODOT), catch basins within existing roadways, and private properties with small piping connections to the combined sewer system. The City of Portland 60-inch combined sewer located along the south side of the Ross Island Bridge appears to be the oldest outfall in the district. This pipe is a and stone con- struction that will need to be replaced along its entire length by a new 72- inch pipe. This outfall has also been identified as a potential daylighting opportunity at the Ross Island Bridge Park if feasible and appropriate. Portions of the other two City of Portland outfall pipes most likely will need to be reconstructed and increased in size. A portion of the 66-inch outfall pipe located within Sheridan will need to be replaced by a 72-inch pipe from River Parkway to the river. The 36-inch outfall pipe located within Lowell will need to be replaced with a 72-inch line from Bond to the river.

The two ODOT systems carry only stormwater and are separated from the City system. The ODOT 42- to 48-inch pipe located to the north of Sheridan will need to be removed from its current location and recon- structed within the Marquam Bridge right-of-way. This new location has been discussed with ODOT during the preliminary design of Sheridan and River Parkway done for the Schnitzer property. At this time, it appears that the 36- to 42-inch ODOT culvert located approximately 400 feet south of Bancroft will not be affected by North Macadam District development.

Because of the proposed location of the Streetcar within the Moody right- of-way, no new systems are proposed in that street.

Accepted by City Council - August 11, 1999 39 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

The Development Plan HARRISON / LINCOLN CONNECTOR

ENHANCED OR NEW PEDESTRIAN CONNECTIONS

SHERIDAN INTEGRATED JOBS & HOUSING BAKER

JOBS EMPHASIS ARTHUR

HOUSING EMPHASIS MEADE

RETAIL AND SERVICES EMPHASIS HOOKER

PRIMARY PUBLIC PARKS, GREENWAY & PEDESTRIAN WAYS

IMPROVED R.O.W. OPEN SPACE

GROVER POTENTIAL NODES AT GREENWAY GIBBS ENHANCED PEDESTRIAN STREETS

PRIMARY STREETS CURRY

Y

A

SECONDARY STREETS W

K & ACCESSWAYS R

MOODY PENNOYER A I N T E R S T A T E 5 HOOD MACADAM

P BOND

R

E

IV TRANSIT HUB R GAINES

LANE STREETCAR & TROLLEY ALIGNMENT

ABERNETHY POTENTIAL TRAM ALIGNMENT

THOMAS

RIVER TAXI LANDINGS LOWELL

BANCROFT

Note: Locations shown are not site-specific, but conceptual only.

HAMILTON

40 Steering Committee’s Recommended Plan I I . T h e D e v e l o p m e n t P l a n

The Development Plan Neighborhood Connections: Improvements to the existing pedestrian connections at Sheridan A key objective of the City and the Region is to attract and accommodate a Street and Bancroft are anticipated. dense concentration of jobs and dwellings at its core. The Development Pedestrian-only connections, via Plan supports this objective, but its primary purpose is to provide a frame- overpasses of I-5, may be devel- oped along the Ross Island Bridge, work that will encourage a healthy, self sufficient neighborhood to emerge Gibbs Street and Gaines Street in the North Macadam District. The integration of exceptional open space, corridors. An extension of Arthur land use development that is urban in character, and an efficient transpor- Boulevard from Front Ave. to River tation system will establish the foundation for a quality neighborhood. Parkway, with an underpass at I-5, may provide both vehicular and The Development Plan provides an environment projected to accommo- pedestrian access. date 8,500 - 10,000 jobs and 1,500 - 3000 housing units. Approximately 33 acres, or 25%, of the District’s gross area of 130 acres is dedicated to Open Space: streets and accessways. An additional 18.5 acres, or 14%, of the District The Willamette Greenway and a diversity of river-oriented and will form the basis for the public open space network including the internal parks will create an open Willamette Greenway and four major parks: the Riverside Park, a Ross space network within the North Island Bridge Park, a Neighborhood Park, and an Urban Park/Plaza. In Macadam District. East-West addition, private open space will be developed to complement the public connections will be reinforced with open space network. the development of Enhanced Pedestrian Streets and Pedestrian Ways.

Jobs and Housing: Jobs and Housing will be integrated throughout the District with an emphasis on jobs along the western edge and housing focused on the parks.

Retail and Services: Neighborhood Retail and Services will be focused on the Primary East-West Streets and at the intersections with Moody-Bond and River Parkway. The east-west orientation is intended to attract and support public activity on the pedestrian corridors between the CTLH Neighborhood, the transit corridors and the Willamette The District will become a vibrant Greenway. urban neighborhood that provides many of the daily recreational and Transit and Circulation: commercial needs of residents, Transit (Bus and Streetcar) will be workers and visitors. located along the western edge where the projected density will be highest. Bicycle circulation will be on Moody-Bond, the Willamette Greenway, Bancroft, Curry, and the north end of River Parkway.

Parking: Parking will be dispersed through- out the District.

Accepted by City Council - August 11, 1999 41 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

42 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

III. Implementation of the Framework Plan

The Development Plan described in the previous section outlines the vision, goals and objectives of the North Macadam District, and is in- tended to provide a foundation for a successive series of actions that will initiate, guide and implement its development.

The following section describes potential strategies, tools and activities to implement the Development Plan, including phasing considerations. Included are a series of matrices that outline implementation activities and their funding options, a description of five public/private partnerships to assist in coordinating those activities, and a preliminary list of proposed changes to plan policies, zoning code regulations and design guidelines within the District.

Also described are public investment principals and a public investment program that includes specific costs estimates of capital improvements to the District and the primary assumptions underlying those cost estimates. The public investment program defines two levels of financial investment: development funding to support the overall objectives of the Framework Plan, and enhanced development funding to fully achieve the vision of the North Macadam District.

An important implementation tool is the proposed North Macadam Urban Renewal District. The Tax Increment Financing generated by the Urban Renewal District will be a significant source of revenue to fund proposed capital improvement projects. Agreements between the City and property owners that assure public and private performance of obligations in exchange for necessary and beneficial public and private investments may also be used to achieve public objectives.

Accepted by City Council - August 11, 1999 43 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Phasing Considerations

One challenge to producing a quality high-density neighborhood in North Macadam is finding the appropriate balance between public and private investments, and the sequencing and phasing of those investments. Catalyst projects, whether public infrastructure or private development, tend to stimulate subsequent investments nearby. These diagrams illustrate how long-term development may be expected to grow sequen- tially, depending on the location and timing of early catalyst projects.

Catalyst Development along the Moody-Bond Corridor

Improvements to Moody-Bond can be expected to stimulate development on the western CATALYST DEVELOPMENT edge of the District.

EXPANSION DIRECTION

Phasing of transportation improvements to Moody-Bond,

River Parkway, and east-west MOODY-BOND & CONNECTORS connector streets will need to be carefully coordinated with RIVER PARKWAY & CONNECTORS planned below-grade infrastruc- ture improvements (water, sewer, and utilities).

44 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Catalyst Development on the River

Improvements to River Parkway and the Greenway can be CATALYST DEVELOPMENT expected to stimulate develop- ment along the eastern edge of the District.

EXPANSION DIRECTION

Because of the infrastructure costs attached to early catalyst

MOODY-BOND & CONNECTORS projects, including streets, utilities, riverbank, greenway,

RIVER PARKWAY & CONNECTORS and environmental mitigation, early catalyst projects may require a higher proportion of public investment than projects built in later years, when much of the District infrastructure will already be in place.

Accepted by City Council - August 11, 1999 45 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Greenway, Parks and Open Space Activities

The following matrix lists implementation activities intended to encourage exemplary open space development in the District.

Time (Years) Partners Funding Related Benefits 0-6 7-13 14-20 NJTH Develop Williamette Riverbank, Greenway and Trail Establish North Macadam Greenway Partnership: PDC This partnership will focus on accelerating the Parks implementation of riverbank stabilization, restoration, OPDR greenway and trail. Determine appropriate public l l l l l BES incentives to private developers who accelerate Private improvements (see page 58). Develop Habitat Performance Standards: Determine PDC PDC specific native species and appropriate habitat for both Parks Private the riverbank and greenway setback. Coordinate with lOPDR l lll Willamette Downtown Design Notebook currently in BES development. Private Develop Design Theme for Greenway: Develop a PDC PDC design theme that unites all of the diverse spaces, Parks Private greenway and trail, bank treatments and adjacent OPDR developments into a recognizable whole. The theme l llll BES should address: media, paving, materials, amenties and Private furnishings, vegetation and signage. Identify Key Enhancement Opportunities: Locate PDC PDC sites within the District and develop preliminary plans for Parks Private enhancement that meet habitat standards described l OPDR lll l above. BES Private

46 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Time (Years)Partners Funding Related Benefits 0-6 7-13 14-20 NJTH Develop Four Major Parks (Riverside, Neighborhood, Urban and Ross Island) Develop Preliminary Park Designs: Consistent with PDC Private the criteria described within the Framework Plan, define Parks Bonds the uses, major elements, access, materials, art l OPDR PDC ll l program, and relationships to adjoining development. BES BES Develop detailed design program and concept. Private SDC Evaluate Land Acquisition Strategies: These include PDC PDC long-term purchase options, sale and lease-back l Parks l l l provisions, and property exchanges. Private Determine Operations Responsibilities: Identify Parks Parks operations and maintenance standards for each park. Private Private When applicable, negotiate between City and property l ll l owners regarding operations.

Develop Design Standards Develop General Landscape Design Standards: PDC PDC These standards address the various types of vegetated Parks Parks areas (bank, greenway, streets, accessways, parks and l OPDR Private llll buffers) with standards for species, percent of cover, BES SDC density, stability, sizes and maintenence standards. Private BES Identify Key Viewpoints and View Corridors: Identify PDC PDC viewpoints and corridors along the riverbank to be Parks Parks protected and enhanced. l OPDR BES llll BES Private Private Develop Interpretive Plan: Identify potential themes, PDC PDC media and locations. l Private Parks llll Parks Private

Key to Related Benefits: N Neighborhoods J Jobs T Transportation H Housing

Accepted by City Council - August 11, 1999 47 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Jobs Activities

Job strategies focus on the quality and quantity of jobs, targeting jobs that pay livable wages and create community wealth. Livable wage jobs support city goals of increasing personal income and assist residents in meeting affordable housing needs. Investment in job strategies provides significant returns and leverages the ability for the District to meet its overall objectives.

The employment base, which requires commercial development, will be the primary generator of tax increment revenue available to finance public capital improvements needed in the North Macadam Urban Renewal District. A clear and comprehensive job strategy provides an effective means to reach the level of employment needed to support the vision of North Macadam.

In the absence of job-creating catalysts, new jobs associated with office and retail activities can be expected to grow relatively slowly in North Macadam due to the historical office absorption and job growth rates of the Central City and the sustained economic competitiveness of surround- ing suburban office developments. This in turn will reduce the amount of tax increment revenue available to the North Macadam Urban Renewal District to finance capital improvements for housing, transportation and parks.

48 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Time (Years) Partners Funding Related Benefits 0-6 7-13 14-20 NPTH Determine Job Activites and Tools that Support Employment Objectives Develop a Marketing and Business Assistance Fund: PDC PDC This fund would support overall employment goals and lll l l target quality jobs. Provide Predevelopment Assistance: Provide PDC PDC assistance to private developers to acquire, prepare or PDOT otherwise assist in the development of land for the lllPrivate l l purpose of pursuing quality job growth.

Establish North Macadam - OHSU Partnership: OHSU OHSU Subject to OHSU's determination that North Macadam PDC PDC should be part of its development strategy, establish a PDOT Private North Macadam - OHSU Partnership to determine lll l OPDR feasibility of OHSU facilities within the District (see page 59). Develop Wage Incentive Program: Develop target PDC PDC industry strategies that provide incentives for lll l l businesses that pay livable wages of at least 200% of minimum wage. Develop Telecommunications Infrastructure: Ensure PDC PDC the level and type of telecommunications infrastructure OPDR Private is competitive with the types of high technology jobs that ll PDOT l l l are likely to locate in the District. Private Determine Market for and Economic Feasibility of PDC PDC Business Innovation Center: Determine the feasibility of developing a business innovation center or business facilities that support target industries, including ll ll tenancy, operating subsidy, phasing and land requirements. (The following two actions are only applicable if the business innovation center is feasible.) Secure Funding for Business Innovation Center: PDC PDC Determine and secure financial commitments required to ll Private Private ll develop a business innovation center. Grant Evaluate Land Acquisition Strategies: These include PDC PDC long-term purchase options, sale and lease-back lllPrivate l l provisions, and property exchanges. Develop Employee Home Ownership Program: Assist PDC PDC employees to acquire housing within the District; geared l lPrivate Private l l l toward moderate-income households.

Key to Related Benefits: N Neighborhoods P Parks T Transportation H Housing

Accepted by City Council - August 11, 1999 49 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Housing Activities

The following matrix lists activities intended to encourage the development of a full range of housing types and affordability levels within the North Macadam District. A combination of financial resources and development methods, in addition to urban renewal resources, will be needed to accom- plish the desired housing mix.

Time (Years) Partners Funding Related Benefits 0-6 7-13 14-20 NJPT Develop Housing Tools and Strategies Evaluate Mixed-Income Development Methods: PDC PDC These include a) allocating some units as affordable Private within a larger housing complex, and b) cross- subsidized projects, which depend on the ratio of lll ll l public/private investment, return on investment, land value, and infrastructure costs. Evaluate Mixed-Use Development Methods: Identify PDC PDC and evaluate non-housing funding sources to facilitate Private commercial development in conjunction with housing in lll ll l mixed-use buildings. Establish Housing Implementation Group: This group PDC PDC would monitor progress toward housing goals, targets lllPrivate ll l and forecasts (see page 60). Evaluate Implementation Strategies: These include PDC PDC linkage, owner buy-out provisions, land swaps, Private adjustment to housing targets over time, and periodic lll l l monitoring of housing inventory.

Evaluate Land Acquisition Strategies: These include PDC PDC long-term purchase options, sale and lease-back lllPrivate l l provisions, and property exchanges. Encourage Alternative Financing Options: These PDC options include employer-assisted housing, trusts and Private cooperatives, mortgage discounts for transit-riding l ll l l households and veteran's home loan program.

Assemble Public Funding and Development PDC PDC Assistance Sources: Identify and secure funding HAP et al HUD sources to 'package' housing deals and make Private Bonds development feasible at a range of income levels, Private including direct PDC financial assistance, tax credits, lll ll 1st Purch. bonds, and brownfield redevelopment/showcase funds. LIHTC et al

50 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Time (Years) Partners Funding Related Benefits 0-6 7-13 14-20 NJPT Evaluate Parking and Housing Configurations Evaluate Shared Parking Options: Examine options PDC PDC for parking structures that could be shared by multiple Private Private housing developments, or between commercial and residential uses, or wood-framed housing on top of lll commercial parking structures. Shared parking should be considered as part of a District-wide parking strategy (see page 56). Evaluate Shared Automobile Options: Cars are made PDC PDC available to tenants for shared, short-term use; reduces llPrivate Private l l required parking ratios.

Evaluate Developing Assisted Living/Senior Housing Evaluate Feasibility: Examine market potential, PDC PDC determine housing product, location and rent/purchase OHSU Private price preferred by senior market. Ascertain associated Private development and operations costs and financial l ll l l feasibility. (The following two actions are only applicable if the study concludes that such housing is feasible.) Acquire Land (if necessary): Property acquisition by PDC PDC PDC or the housing developer may be necessary if OHSU Private existing property owner interest is low. (If private lllPrivate l l interest is high, this project may proceed as an ordinary private development.) Implement Development Offering or Negotiated PDC PDC Agreement Process and Construct Housing: The OSHU Private developer may be selected through an RFP or l lPrivate l l negotiated agreement process administered by PDC.

Key to Related Benefits: N Neighborhoods J Jobs P Parks T Transportation

Accepted by City Council - August 11, 1999 51 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Housing Activities (continued)

Time (Years)Partners Funding Related Benefits 0-6 7-13 14-20 NJPT Evaluate Marquam Hill-Related Housing Evaluate Market Potential of District Housing Aimed PDC PDC at Marquam Hill Employees, Interns and Students: OHSU Determine housing product, location and rent/purchase VA/Shr. ll l l price preferences of Marquam Hill employee market. Private (The following five actions are only applicable if the study concludes that housing needs are not being met.) Determine Financial Feasibility of Serving this PDC PDC Market: Determine associated development and OHSU operations costs, revenue potential and economic l l VA/Shr. l l feasibility. Private Determine Ownership and Funding Requirements: PDC PDC Determine proper organizational structure for developing OHSU and operating Marquam Hill employee housing: public llPrivate l l vs.non-profit vs. private. Acquire Land (if necessary): Property acquisition by PDC PDC PDC or the housing developer may be necessary if OHSU HUD existing property owner interest is low. (If private Private TOD interest is high, this project may proceed as an ordinary Bonds private development.) l l l Private 1st Purch. et al Implement Development Offering or Negotiated PDC Agreement Process and Construct Housing: The OHSU developer may be selected through an RFP or llPrivate l l negotiated agreement process administered by PDC and/or private partners.

Key to Related Benefits: N Neighborhoods J Jobs P Parks T Transportation

52 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Transportation Activities

The following matrix lists activities intended to improve the District’s transportation system.

Time (Years) Partners Funding Related Benefits 0-6 7-13 14-20 NJPH Develop Transportation Demand Management Plan Establish District Transportation Management Private PDOT Association: The property owners should establish a PDOT Tri-Met Transportation Management Association (TMA), in llTri-Met PDC l l l conjunction with PDOT and Tri-Met to prepare and PDC implement a Transportation Demand Management (TDM) Plan for the District (see page 60). Prepare and Enact TDM Plan: The goal of the TDM Private Private Plan is to achieve a 30% mode split for alternative PDOT CMAQ modes to the single-occupant auto. The TDM plan Tri-Met should address methods for: dispersing commuter arrival and departure times, maximizing carpool, l l l lll bike/pedestrian and transit use, providing circulation within the District, and effective use of parking resources and live and work in same district.

Develop Neighborhood Connections Establish Neighborhood Transportation Alliance: PDOT Private The alliance will evalute and propose solutions to CTLH LID common transportation problems between the District NMDC Gas Tax and adjacent neighborhoods (see page 61). l OHSU ll PDC et al Design and Construct Pedestrian and Bicycle PDOT PDC Improvements: These include improvements to PDC SDC Sheridan and Corbett, overcrossings at I-5, and ll CTLH TEA-21 l l improvements incorporated into the Greenway Trail. Private Gas Tax

Key to Related Benefits: N Neighborhoods J Jobs P Parks H Housing

Accepted by City Council - August 11, 1999 53 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Transportation Activities (continued)

Time (Years) Partners Funding Related Benefits 0-6 7-13 14-20 NJPH Implement District Network Update Street Plan as Required: Potential updates PDOT PDC include revised rights-of-way and function of Curry and PDC PDOT Gibbs, adjustments to Moody right-of-way to support two- Private way streetcar, rights-of-way associated with the Gaines l ll l Pedestrian Way, and/or other modifications relating to street widths, function, and transit priority.

Finalize and Enact North Macadam District Street PDOT PDC Standards: Completion of standards awaits resolution PDC of issues regarding Pedestrian Ways, on-street parking l Private l l l and others. Develop Design Guidelines for Enhanced Pedestrian PDOT PDC Streets: These east-west connectors link the eastern PDC Parks transit corridors, the major parks and open spaces in the l Parks Private llll heart of the District, and the Willamette Greenway. The Private PDOT guidelines should address width, design, location and access. Design and Construct Portal Improvements: These PDOT PDC include reconfiguration of Bancroft/Hood/ Macadam PDC SDC intersection and the Harrison and/or Lincoln connectors. llPrivate TEA-21 ll ODOT Gas Tax Design and Construct Improvements to PDOT PDC Macadam/Curry Intersection: This weave mitigation PDC SDC project moves the central portal from Gibbs Street to l l Private TEA-21 l l Curry Street. ODOT Gas Tax Design and Construct Moody/Bond Avenue: This will PDOT PDC be the major route through the District, and is required to PDC SDC allow bus circulation through the District (see next l Private TEA-21 l page). Gas Tax Design and Construct River Parkway: This major PDOT PDC north-south street will be constructed in phases as PDC Private development occurs. ll Private LID l l l SDC Gas Tax Design and Construct Primary East-West Streets: PDOT PDC Arthur, Gibbs, Curry and Lowell are the primary PDC Private connectors between Moody-Bond and River Parkway, ll Private LID lll and will be constructed in phases as development SDC occurs. Gas Tax Design and Construct Local Road Network: The PDOT PDC local road network will be constructed in phases as PDC Private development occurs. lll Private LID l ll SDC Gas Tax

54 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Time (Years)Partners Funding Related Benefits 0-6 7-13 14-20 NJPH Implement Regional Transit Access/Egress to District Implement Transit Service Strategy: Prepare a transit Tri-Met Tri-Met service strategy for the District that includes phasing and l PDOT l l l implementation. Private Initiate Macadam Bus Service: After completion of Tri-Met Tri-Met required street improvements, Tri-Met initiates service. l Private lll

Establish Implementation Plan for Transit Hub: Tri-Met Tri-Met Develop implementation and funding plan for capital and PDOT Metro operating costs of Transit Hub. l PDC l l Private Locate and Design Transit Hub: Confirm the location Tri-Met Tri-Met for the transit hub within the District in close proximity to PDOT Metro the streetcar alignment and the terminus of the possible ll Private l l Marquam Hill tram. Initiate design and engineering. PDC CTLH Implement Transit Hub Service Plan: Build transit Tri-Met Tri-Met center. Tri-Met commences service. PDOT TIF ll PDC Donation ll l Private TEA-21 Metro Implement Central City Streetcar Design Central City Streetcar Alignment: Begin PDOT PSI conceptual design work on selected Willamette PDC PDC Shore/Moody alignment. Determine captial and l lPSI Metro llll operating costs, station locations and phasing plan. Private Private Establish Funding Plan and Secure Funds: This PDOT PDC activity addresses both capital and operating needs. PDC LID l lPSI Parking llll Private TEA-21 HUD Final Design, Engineering and Construction of Initial PDOT (See Segment of North Macadam Streetcar Alignment ll PSI above) llll PDC

Key to Related Benefits: N Neighborhoods J Jobs P Parks H Housing

Accepted by City Council - August 11, 1999 55 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Transportation Activities (continued)

Time (Years) Partners Funding Related Benefits 0-6 7-13 14-20 NJPH Implement Marquam Hill Tram (Applicable if OHSU decides to locate facilities in North Macadam.) Complete Tram Study: Finalize alignment and OHSU OHSU technology, cost estimates, funding plan, operations PDC PDC plan and community decision-making. l PDOT Private llll CTLH Private Seek Funding for Tram: Secure funding for tram OHSU OHSU design, construction, and operations. PDC TEA-21 PDOT HUD ll CTLH PDC l lll Private Grants Private Enter into Design/Build Contract(s) for Tram OHSU (See Construction: Organize and implement design/build PDC above) request for proposals; negotiate and manage ll PDOT llll construction contracts. Private Implement Parking Strategy Implement On-Street Parking Program: The program PDOT PDOT will include signage, parking meters, passes, and on- l PDC PDC l l street parking locations. Private Establish Parking Ratios for District and Allow OPDR OPDR Certain Interim Uses: Determine appropriate policy to PDC PDOT allow higher interim parking ratios and/or interim surface l PDOT l l parking lots. Private Establish Shared Visitor Parking Program: Establish PDOT shared parking program that may include City-owned lllBGS l l short term structured parking space. PDC Develop River Taxi System Investigate Feasibility of River Taxi System: The PDOT Private feasibility of the river taxi system will be evaluated in a PDC PDC broader context than North Macadam. Costs, operation Private responsibilities, funding, and operating characteristics l ll will be considered.

Key to Related Benefits: N Neighborhoods J Jobs P Parks H Housing

56 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Public/Private Partnerships

The activities listed in the previous matricies, as well as other implemen- tation actions necessary to achieve the goals and objectives of the Framework Plan, will involve the coordinated efforts of public agencies, institutions, as well as private property owners and developers. The sharing of responsibility between each will vary, depending on the specific activity. Multiple property owners are represented within the District, which presents unique challenges and opportunities to achieve District- wide public objectives while preserving appropriate development flexibility for each property owner.

During the first few years of Framework Plan implementation, the North Macadam District Steering Committee will continue to play a role by working with City staff and consultants on implementation activities, such as finalizing planning and development standards, street design stan- dards, District-wide parking strategy and/or additional transportation planning. In addition, it may be appropriate for the Committee to continue to represent the District’s interests within larger City and Regional planning and policy areas.

More specialized public/private partnerships may also help coordinate and focus implementation efforts involving specific aspects of the Framework Plan. These public/private partnerships might include long-term develop- ment agreements between the City and a property owner, or negotiated agreements on a project-by-project basis. In some cases, a formalized public/private partnership will be helpful to support collaboration and highlight the importance of the project activity. Five such partnerships are described here:

Williamette Greenway Partnership North Macadam - OHSU Partnership Housing Implementation Group Transportation Management Association (TMA) Neighborhood Transportation Alliance

Each of the partnerships, if established, would coordinate their efforts with each other as well as the continuing North Macadam District Steering Committee.

Accepted by City Council - August 11, 1999 57 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

North Macadam Greenway Partnership

This strategic partnership will focus on accelerating the implementation of riverbank stabilization and enhancement, greenway and greenway trail within the North Macadam District, consistent with the design criteria described in Section II of this plan. Expediting these improvements will:

l Provide an accelerated public return from Urban Renewal and other public investments, and address the local and regional goal of com- pleting the Willamette Greenway trail quickly. l Create a unique, exemplary amenity that serves both the District and the region, and enhances the economic vitality of the district by attracting businesses, residents and visitors. l Serve as an important component of the City and Region’s response to the Endangered Species Act listings, and provide a public show- case of an urban environment that peacefully co-exists with - instead of competing with - fish and wildlife habitat.

One approach might be that each owner of property along the riverbank that chooses to participate in this partnership, in consultation with PDC, the Parks Bureau, BES, Army Corps of Engineers and National Marine Fisheries Service, would prepare a detailed plan for streambank stabiliza- tion and restoration, greenway setback and greenway trail consistent with the design criteria set forth in Section II of this Plan. Long-term maintenence of the greenway and riverbank is also an important consider- ation, and would be described in detail within the plan. This is only one example; other approaches might be preferable, and it would be the responsibility of the Greenway Partnership to articulate and implement them.

58 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

North Macadam - OHSU Partnership

OHSU is currently evaluating its future long-term development strategy and the role, if any, of the North Macadam District within that strategy. A direct connection between North Macadam and OHSU presents a unique opportunity for OSHU-related development within the District. The pur- pose of this partnership is to establish agreements between OHSU, PDC and the affected property owners to advance such a development.

Subject to OHSU’s determination that North Macadam may be part of its development strategy and describing its requirements for administrative, research and/or clinical space, PDC, OHSU and property owners should:

l Determine the feasibility of developing research facilities and labora- tory space in the District, including tenancy, phasing and land require- ments.

l Determine the feasibility of relocating and/or expanding other OHSU departments into the District, including internal administrative offices, education, clinical and outpatient services.

l Finalize the preliminary design and operations plans for the tram and seek federal grants and other funding to support its construction.

l Determine the feasibility of developing housing within the District for OHSU students, residents and staff, including the financial incentives necessary to develop OHSU-related housing, and develop requests for proposals.

Accepted by City Council - August 11, 1999 59 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Housing Implementation Group

This group would be formed to continue the public input and review of the housing build-out of the North Macadam district. The group would monitor progress towards the housing goals, targets and forecasts for the district, and play an advisory role in reviewing further implementation and housing development strategies to meet the public benefit.

The Housing Implementation Group will continue to pursue options of creating linking mechanisms which support the development of affordable housing targets in or near the district at development costs that provide the best return on the public investment, while pursuing the preferred balance of income profiles.

Transportation Management Association

The property owners, in conjunction with PDOT, PDC and Tri-Met, should establish a Transportation Management Association (TMA) to prepare and implement a Transportation Demand Management (TDM) Plan for the District.

The responsibility of a TMA is to distribute information such as bus schedules, through brochures and fairs. A TMA also offers financial incentives to use alternative transportation modes such as free or subsi- dized transit passes or free shuttle busses or vans to common destina- tions or transit centers. The association can help improve transit by providing bus and streetcar shelters at key stops, requesting improved transit service and selling transit passes and tickets on-site.

A District-wide parking strategy is another way that the TMA can manage transportation demand. On-street parking management techniques include promotion of ridesharing by establishing preferential parking for carpools and vanpools, organizing car-sharing cooperatives and initiating “guaran- teed ride home” programs for personal or family emergencies. In concert with on-street parking management, shared parking programs and incen- tives can maximize private parking.

A TMA can also increase bicycling and walking by providing sufficient, safe and secure bike parking, employee showers and lockers and pedes- trian enhancements such as benches and drinking fountains.

60 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Neighborhood Transportation Alliance

This alliance will focus on finding overarching and efficient transportation solutions for Southwest Portland that will accomodate growth without sacrificing community livability. Years of regional planning that provided through-traffic benefits at the expense of local neighborhoods, as well as accidental results of well-intentioned traffic management plans, have resulted in increased regional traffic on neighborhood streets, increased congestion, higher speeds, and less efficient traffic movement. Individual traffic studies have been conducted in Southwest Portland, including the South Portland Circulation Study, I-405 Reconnaissance, and the traffic analysis that informed the local traffic improvements proposed in this framework plan, but none have included a truly comprehensive approach.

The alliance membership will consist of neighborhood representatives, public agencies, and institutions, and has already assembled on an ad-hoc basis. Activities may include but are not limited to:

l Coordinating future North Macadam transportation development with other adjacent regional transportation improvements.

l Evaluating ways to alleviate additional traffic flows created by the new North Macadam neighborhood southbound on Macadam Avenue, and to provide improved connections from the District to the Ross Island Bridge and Barbur Blvd.

l Participating in the selection of a preferred tram alignment connecting the North Macadam transit hub and Marquam Hill.

l Developing proposals to control regional traffic cutting through adja- cent neighborhood streets.

Potential neighborhood participants include: Corbett-Terwilleger-Lair Hill Neighborhood Association (CTLH) Downtown Community Association (DCA) Homestead Neighborhood Association North Macadam Development Council (NMDC) Central Eastside Industrial Council (CEIC) Southeast neighborhood assocations

Potential Public Agency participants include: Portland Development Commission (PDC) Association for Portland Progress (APP) Portland Department of Transporation (PDOT) Oregon Department of Transportation (ODOT) Tri-Met

Potential Institutional Participants include: Oregon Health Sciences University (OHSU) Portland State University (PSU) Oregon Museum of Science and Industry (OMSI)

Accepted by City Council - August 11, 1999 61 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Development Regulations and Guidelines

After City Council acceptance of the North Macadam Framework Plan, the conceptual changes to the plan policies, zoning code regulations, and design guidelines will be detailed and reviewed through a citizen involve- ment process that complies with State Goal 1, Citizen Involvement, and the provisions of Portland’s Comprehensive Plan. The preliminary propos- als in the Framework Plan will be adjusted to reflect the understandings that emerge during public review. A refined proposal will then be forwarded by the Steering Committee to the Planning and Design Commissions for public hearings. The Planning Commission will send on the recommended changes to the City Council for adoption. Council consideration of the changes is planned for the latter half of FY 99-00. The potential changes are grouped by topic and apply to the North Macadam District only.

Required Residential Development Area • Establish process for permitting commercial projects which are located within the existing residential overlay zone to proceed without a complementary housing project or associated master plan.

Height Bonus Options Allowed in other Central City Subdistricts • Allow the North Macadam subdistrict access to the Central City plan district’s bonus height in conjunction with floor area bonus options. Up to 45 feet of bonus could be achieved.

Revisions of Current Floor Area Bonus Options and Height Transfers • Allow transfers of height and bonus height for dedications of additional Greenway area. • Revise mapping of the retail bonus option to reflect retail service emphasis areas shown on the Development Plan, and transportation capacity limitations. • Change the “percent for art” bonus option to clarify the actual owner- ship of the works of art. They must be transferred to the Regional Arts and Culture Council to qualify for the bonus. • Reduce the locker room bonus option for the construction of locker room facilities to encourage bicycling. • Revise the rooftop gardens bonus to incent green roofs.

New Floor Area and Height Provisions • Exempt structured parking from the calculation of floor area ratios. • Revise the allowed FARs and building heights in the district along the Greenway setback as described in the Framework Plan. Consider eliminating or modifying the Willamette Greenway floor area bonus option if increased height and FAR are allowed by right on Maps 510-2 and 510-3. • Create incentives for greenway setbacks of greater than 50 feet.

Guidelines and Design Standards to be Revised or Completed • Design Guidelines for the North Macadam District. • Street Design Standards. • Greenway Design Standards (, furniture, signage, etc.). • Standards for Private Development of Public Open Space.

62 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Public Investment Principles

The North Macadam District Framework and Urban Renewal Plans anticipate the planned expenditure of significant tax increment and other city, state and federal resources over a multi-year period. As with down- town Portland, the Convention Center and other urban renewal districts, City of Portland investment has proven critical to leveraging private investment in support of public objectives that otherwise would not occur.

Purpose of Public Investment: The primary purpose of public funding is to obtain a return on investment that exceeds what would be expected without a major public contribution to redevelopment of the North Mac- adam District.

Public Funding Objectives: Public investment serves a series of objectives more specifically focused on outcomes desired for the North Macadam District. These objectives include:

• Increased density of development with less parking than would otherwise occur. • Amenities ranging from parks and open space to pedestrian scale development and improved quality of development. • Office development to improve the Central City’s competitive position within the region for new jobs including an expanding health services and technology community. • A greater mix of housing affordable to the full range of incomes found in Portland for both renters and owners. • More efficient, less expensive use of infrastructure, particularly transportation investment by encouraging people to live and work in the same district. • A faster pace of redevelopment better addressing Central City population and employment objectives. • Creation of a neighborhood reflecting the full range of activities and values of the entire city.

Public investment in North Macadam also serves broad citywide policy objectives for housing and job development. To the extent that North Macadam succeeds, the pressure on other city neighborhoods to meet Metro job and housing targets is correspondingly reduced.

Scenarios Evaluated: The degree to which the District Framework Plan and Urban Renewal Plan can make a difference is to be assessed through the formulation and subsequent evaluation of three alternative scenarios:

(A) Base Case Development — assuming limited public capital investment, maintenance of the current land use regulatory framework, public-private development tools currently available and market rate development. This scenario also assumes no significant transportation infrastructure or planning constraints that would limit the level of private sector-driven development other- wise achievable.

Accepted by City Council - August 11, 1999 63 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

(B) Urban Renewal/Tax Increment Strategy — predicated on adoption of an urban renewal plan enabling multi-year funding of a balanced set of project and program activities including jobs, parks/open space/greenway, housing investment, transportation, public parking and infrastructure — achieved through tax increment financing (TIF).

(C) An Enhanced Development Funding Strategy — assume availability of additional public resources (as yet undetermined) beyond TIF and private development capital to accomplish the full range of investment proposed with the North Macadam Frame- work Plan (as the preferred development program).

Performance Measures: Quantitative measures of investment perfor- mance to be applied in assessing prospective effects of the three develop- ment scenarios are anticipated to include:

• Total private investment leveraged — by project phasing. • Density of development — both employment and residential. • Parks, open space and greenway — in acreage and dollars invested. • Net added employment — and associated incomes. • Number of housing units — by income range and owner/rental status. • Transportation efficiency — improvements enabling full build-out, non-auto mode availability, mode split, live/work opportunity, and parking spaces.

In addition to measures that can be directly quantified, the city’s return on investment also will be comprised of distinctive qualitative benefits — for the North Macadam District, adjoining neighborhoods, and the broader Portland community. Qualitative performance is not as easily measured in numerical terms, but can be discerned from the extent to which the working vision for the North Macadam District is realized — as a “vibrant urban neighborhood.”

The quality of the North Macadam experience undoubtedly will be as- sessed based on factors including but not limited to: accessibility to and diversity of waterfront, greenway and open space experiences; achieve- ment of compact, mixed-use, human-scale developments; housing affordable and attractive to those who work in the District; business activities ranging from incubator to corporate firms; active public, non- profit and civic institutions; and a mix of transportation modes lessening dependence on the automobile.

Principles for Investment: Based on the purpose and more specific public funding objectives as outlined, a set of recommended principles for investment of public resources in support of North Macadam District Framework Plan and urban renewal implementation can be articulated:

64 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

1. Provide public infrastructure and urban amenity investments to facilitate development consistent with the goals and objectives of the North Macadam Framework and Urban Renewal Plans.

• Make public investment decisions that serve private invest- ment in conformance with plan objectives calling for the creation of a jobs center with significant housing and mixed- use development in a high density environment. • Make beyond base level commitments as justified by public financing capacity — from urban renewal/tax increment resources and other sources as available.

2. Secure private financing for development and infrastructure that can be supported with reasonable returns to private investments made in periods of changing market conditions over time.

• Rely on private investment for residential market segments that can be served without public investment; target public resources to assure affordability to other renter and owner segments so that District housing is attractive to and reflects the income profile of all Portland households — with 1,500 to 3,000 housing units developed by 2020. • Encourage office development competitive with the edge-of- city market and attractive for expansion of nearby health service institutions and technology-based businesses to achieve an added 8,500-10,000 jobs by 2020. • Secure private investment that can be financially successful and supportive of Framework Plan implementation.

3. Target public funding for investments required to leverage private development competitive in the Central City and regional market throughout both the early and later phases of plan implementation.

• Link beyond base level investment to fulfillment of plan objectives not typically associated with private development in the Portland metro area, notably the public funding objec- tives described above. • Recognize the catalytic role of public sector investment, particularly for front-end infrastructure necessary to attract early phase private investment.

4. Assure adequate resources early on for investments necessary to attract a critical mass of initial job and housing related private invest- ment in the next five years (2000-2005).

• Target properties most efficiently served and ready to proceed with immediate private development.

Accepted by City Council - August 11, 1999 65 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

• Prioritize near term public funding on the infrastructure and transportation improvements together with park, open space and greenway acquisition set-asides necessary for first phases of private development to move forward quickly, beginning the District’s redevelopment process and establish- ing a tax base for tax increment generation. • Focus public funding for affordable housing and targeted jobs strategies in mid- and late-term phases after basic transporta- tion and infrastructure systems are in place. • Pursue agreements or mechanisms with property owners that assure private performance in exchange for the full comple- ment of public infrastructure necessary for development to proceed.

5. In addition to assuring adequacy of tax increment funding over the life of the Urban Renewal Plan, achieve a rate of return on public invest- ment that meets or exceeds city financial objectives over a long-term (30 year) time horizon.

• Identify categories of public investment and ongoing public services for which a financial return is expected versus investments benefiting the greater Portland community for which a direct financial return from the District is not required. • Prepare and periodically update projections of public invest- ment outlays versus revenues by source (both operating and debt) to assure year-by-year financial capacity to perform. • Modify funding priorities with periodic updates based on identification of public investments most likely to secure the next market-ready wave of development consistent with the Framework Plan. • Actively pursue additional public and private resources in order to fully realize all aspirations including full funding of the North Macadam Framework Plan.

66 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Public Investment Programs

The public investments necessary to accomplish the goals of the Frame- work Plan fall into six broad categories: jobs; greenway, parks and open space; housing; transportation; infrastructure; and public parking. De- scribed below are the elements of each category and the primary as- sumptions underlying the cost estimates.

Two levels of costs have been identified. The first level includes the basic funding required to achieve the overall objectives of the Framework Plan. The second level includes the enhanced funding required to fully achieve the vision of the North Macadam District. Tax Increment Financing (TIF) revenue, along with other known public sources and private investment, will be adequate to fulfill the basic funding requirements. Additional public funding and/or private investment will be required if the enhancedfunding levels are to be realized.

The following sections describe the basis for project cost estimates, allocation of costs by funding source and phasing of project activities for discussion and modification by the Market and Finance Work Group and Steering Committee.

1. Jobs

Employee Investment Program - assumes loan/grant programs to encourage creation of quality wage jobs in North Macadam, similar to programs in Airport Way and the Downtown. Assumes loan amounts of $2,000 - $5,000 per employee.

Strategic Land Acquisition - land acquisition of key parcels for imme- diate business development opportunities or land banking, focusing on target industries for the District.

Business Innovation Center - direct capital funding of a joint venture business innovation center, linking research activities with potential growth industries. Assumes acquisition of four-acre site (approxi- mately).

TIF Funding Allocation - assumes 2/3 of jobs programs are tax increment (TIF) funded. Unfunded category of $8.2MM (1/3 of total program). Basic infrastructure development is prerequisite for commercial development & job creation programs. Limited Jobs funding in Near Term.

2. Greenway, Parks and Open Space

Parks - assumes development of four major public parks throughout District, consistent with land use plan. Assumes low range cost estimates for land acquisition, design and construction costs. Greenway - assumes upper range construction/furnishings cost estimate above base case. Assumes no land acquisition. Assumes property owners pay for base case construction.

Accepted by City Council - August 11, 1999 67 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Bank Treatment - assumes construction cost funded with both private and public sources. No land acquisition.

TIF Funding Allocation - assumes low range cost estimates for parks and no land acquisition for greenway and bank treatments. To achieve enhanced park facilities, additional funds may be required. Assume initial funding is applied towards parks land acquisition and greenway/bank improvements. Unfunded category of $5.3MM.

3. Housing

Assumes $25 million during life of District, to be used for both rental and ownership programs, consistent with modeling assumptions of the Housing Work Group. Funding will be directed to achieve a citywide income distribution to the extent feasible with tax increment proceeds and other forms of public subsidy. Assume approximately 788 low/ moderate rate units to be developed. Encourage market rate housing, as market will demand to ensure achieving at least 3,000 units in the District.

TIF Funding Allocation - assumes limited funding in near term, as basic District infrastructure is created to support future residential and commercial development. To achieve citywide income distribution for 3,000-unit scenario, additional $36 MM of local housing resources will be needed.

4. Transportation

Cost estimates prepared by PDOT staff and consultants for those improvements necessary to support commercial and residential development in the District, consistent with the land use plan and jobs and housing unit goals. Projects include street improvements, transit projects and pedestrian and bike connections.

TIF Funding Allocation - approximately one-half of tax increment funds available during the near term are allocated for basic street improve- ment projects and transit projects. Mid- and Long-term allocations primarily support additional transit -related improvements, including completion of street car, transportation demand management projects and the Lincoln connector related to future LRT service (approx. $7MM of undetermined funding).

5. Infrastructure

Extensive water, sanitary and storm sewer system improvements necessary to support higher densities of development in the District. System concept designs and cost estimates prepared by OTAK, in conjunction with review by Bureau of Environmental Services and Water Bureau. Dollar amounts represent low range estimates with 10% contingency.

68 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Strategic Infrastructure Fund represents a program to encourage superior technology-related utilities in the District and to assist with basic infrastructure development to give the District a competitive edge with other sub-markets.

Utilities represent augmentation of private utility services in the District, if necessary. May include partial funding for relocation and undergrounding of 3 stage electrical tower south of Ross Island Bridge, though no cost estimates are available for this project. Additional analysis and consultation with PGE is necessary.

TIF Funding Allocation - 90% of total funding allocated during Near- and Mid-Term as a prerequisite to create private development capacity ($4.5MM unfunded).

6. Public Parking

Public parking and management will be a necessary ingredient of development build-out in the District. Anticipate two to three public parking facilities (approx. 10% of District parking 875 spaces), strategically located to support visitors to the area and nearby busi- nesses. Public parking will be coordinated with a strong transportation management program aimed at achieving the overall mode split target of 30% non-single occupancy vehicle trip

Funding Allocation - no funding in Near-term proposed. Three-quarters of funding expected in the last years of the life of the District to accommodate final phases of development, presumably as surface parking lots are developed and private parking ratios are decreased overall throughout the District. Because of other limited City parking resources, the parking strategy relies on TIF resources only, althought other funding options should be explored as well.

Distribution of Tax Increment Financing Revenue

Public Parking Jobs $16,000,000 $18,000,000 11% 12% Infrastructure Parks, Open $13,884,000 Space and 9% Greenway $23,000,000 15%

Transportation Housing $54,400,000 $25,000,000 36% 17%

Accepted by City Council - August 11, 1999 69 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Development Funding Strategy Proposed Project and Program Activities

Project Cost Estimate, 2000-2020 (1999 Constant Dollars)

OTHER Project/Program Activities TIF (1) PUBLIC (2) PRIVATE TOTAL

JOBS Employee Investment Program 8,000,000 8,000,000 Strategic Land Acquisition 4,000,000 4,000,000 Business Innovation Center(s) 5,000,000 5,000,000 Private Development (Office, Retail, Hotel) 433,140,000 433,140,000 Employee Assistance Home Ownership 1,000,000 1,000,000 18,000,000 - 433,140,000 451,140,000

PARKS, OPEN SPACE, & GREENWAY Neighborhood Park 4,040,000 4,040,000 Urban Park 3,010,000 3,010,000 Riverfront Park 4,230,000 4,230,000 Ross Island Bridge Park 5,775,000 5,775,000 ODOT Moody/Bond Property Open Space 230,000 230,000 Greenway Trail - Original 25 Foot Setback 3,100,000 3,100,000 Enhancement - GW Setback (add'l 25 ft) 3,100,000 3,100,000 Design & Construction 2,150,000 500,000 843,000 3,493,000 Bank Treatment 3,565,000 6,820,000 10,385,000 Enhanced Pedestrian Streets - - Total Parks & Rec. 23,000,000 500,000 13,863,000 37,363,000

HOUSING INVESTMENT (3) Affordable Rental (4) - 0-30% 7,140,461 7,140,461 31-50% 8,019,828 8,019,828 51-80% 4,703,592 4,703,592 81-100% 2,977,374 2,977,374 Affordable Ownership - 81-100% 1,208,210 1,208,210 101-120% 950,535 950,535 Private/Non Profit Development 443,012,500 443,012,500 Total Housing 25,000,000 - 443,012,500 468,012,500

70 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

OTHER Project/Program Activities TIF (1) PUBLIC (2) PRIVATE TOTAL

TRANSPORTATION Street Improvements: Bancroft, Hood, and Macadam Intersection 400,000 400,000 Curry and Macadam Intersection 900,000 900,000 Bond Ave. (Marquam Bridge to Bancroft) 5,000,000 5,000,000 Bancroft Widening to Bond 600,000 600,000 Curry Widening to River Parkway 500,000 500,000 Harrison Connector (Streetcar@Grade) (4) 3,100,000 3,100,000 River Parkway 3,500,000 3,500,000 Additional Street Improvements 3,750,000 3,750,000 East West Streets - 7,000,000 7,000,000 Sub-Total Street 15,750,000 - 7,000,000 24,750,000 Transit Improvements: - Central City Streetcar (6) 30,500,000 7,500,000 7,000,000 45,000,000 Central City Transit Hub 500,000 600,000 1,100,000 Tram 3,000,000 5,000,000 8,000,000 Other (Transportation Management, etc.) 1,000,000 1,000,000 2,000,000 Sub-Total Transit 35,000,000 9,100,000 12,000,000 56,100,000 Pedestrian/Bike Improvements: - Ped./Bike Cross. Over I-5 @ Gibbs/Gaines 1,500,000 1,500,000 Ped./Bike Improvements to Sheridan/Corb 150,000 150,000 Ped./Bike Cross. Over I-5 @ Bancroft - Sub-Total Pedestrian/Bike 1,650,000 - - 1,650,000

Total Transportation 54,400,000 9,100,000 19,000,000 82,500,000

PUBLIC PARKING 16,000,000 16,000,000

INFRASTRUCTURE Water System 1,050,000 350,000 1,400,000 Sanitary Sewer System 900,000 900,000 600,000 2,400,000 Storm Sewer 1,875,000 1,500,000 1,125,000 4,500,000 Strategic Infrastructure Fund 8,000,000 8,000,000 Utilities 2,059,000 686,250 2,745,250 Total Infrastructure 13,884,000 2,400,000 2,761,250 19,045,250

GRAND TOTAL 150,284,000 12,000,000 911,776,750 1,074,060,750

(1) Tax Increment Financing (2) Indicates possible, though not committed, funding sources. (3) Additional public sources (bonds, LIHTC, OLTC, etc.) required to leverage TIF to create a total of 3,000 units. (4) Assume 30% MFI served. Additional funding for operational expenses required to serve households below 30% MFI. (5) Harrison connector creates at-grade street for streetcar and vehicles. Not suitable for light rail service, which will require dedicated bridge structure. (6) Other public funds are not firmly identified. If the full $7,500,000 is not available for streetcar, additional funding from private sources or TIF may be necessary.

Accepted by City Council - August 11, 1999 71 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Enhanced Development Funding Strategy Additional Project and Program Activities

Project Cost Estimate, 2000-2020 (1999 Constant Dollars)

ADDITIONAL Project/Program Activities FUNDING (1)

JOBS Employee Investment Program 2,000,000 Strategic Land Acquisition 1,200,000 Business Innovation Center(s) 5,000,000 8,200,000

PARKS, OPEN SPACE, & GREENWAY Neighborhood Park 690,640 Urban Park 1,154,380 Riverfront Park 574,700 Ross Island Bridge Park 688,000 ODOT Moody/Bond Property Open Space 230,000 Enhanced Pedestrian Streets 2,000,000 Total Parks & Rec. 5,337,720

HOUSING INVESTMENT Affordable Rental (2) 0-30% 10,440,000 31-50% 11,160,000 51-80% 6,840,000 81-100% 4,320,000 Affordable Ownership 81-100% 1,800,000 101-120% 1,440,000 Total Housing 36,000,000

TRANSPORTATION Street Improvements: Lincoln Connector (Portal Connection) (3) 5,500,000 Arthur Boulevard Extension (4) Undetermined Sub-Total Street 5,500,000 Pedestrian/Bike Improvements: Over I-5 @ Bancroft 1,500,000 Ross Island Pedestrian Connection (5) Undetermined Sub-Total Pedestrian/Bike 1,500,000

Total Transportation 7,000,000

72 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

ADDITIONAL Project/Program Activities FUNDING (1)

PUBLIC PARKING

INFRASTRUCTURE Strategic Infrastructure Fund 4,500,000 Total Infrastructure 4,500,000

GRAND TOTAL 61,037,720

(1) Funding source (public or private) not yet determined and committed. (2) Assume 30% MFI served. Additional funding for operational expenses required to serve households below 30% MFI. (3) Lincoln connector for vehicular connection into south downtown. Light rail transit will require dedicated bridge structure and relocate vehicles onto Lincoln. Key north portal improvement. (4) The Arthur Boulevard Extension would be from Front Ave to Bond and includes an I-5 underpass. The project would provide another portal into the District. (5) Ross Island Bridge Connection would provide vertical circulation between the Bridge and the Ross Island Park.

Proposed Funding Sources

Tax Increment $150,284,000 14%

Other Public $12,000,000 1%

Private $911,776,750 85%

Ratio of Private Capital to Public Investment 6:1

Accepted by City Council - August 11, 1999 73 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Development Financing & Public Return on Investment Analysis

The central question addressed by this development financing and public return on investment analysis is whether and under what conditions the public/private investment contemplated is necessary and sufficient to accomplish the objectives of the North Macadam District Framework Plan and Urban Renewal Plan. The degree to which the Framework and Urban Renewal Plans can make a difference for the North Macadam District is assessed pursuant to three alternative scenarios:

A.Base Case Development - assuming limited public capital investment, maintenance of the current land use regulatory framework, public/ private development tools currently available and market rate develop- ment. This scenario also assumes no significant transportation infrastructure or planning constraints that would limit the level of private sector-driven development otherwise achievable. B.Urban Renewal/Tax Increment Strategy - predicated on adoption of an urban renewal plan enabling multi-year funding of a balanced set of project and program activities including jobs, parks/open space/ greenway, housing investment, transportation, public parking and infrastructure. Funding is achieved through urban renewal and associ- ated tax increment financing (TIF) with modest commitments of other outside public funding resources to accomplish basic North Macadam District Framework Plan and Urban Renewal Plan goals. C.Enhanced Development Funding Strategy - assuming availability of other (as yet undetermined) resources beyond tax increment financing and private development to accomplish a fuller vision for the area as proposed in the North Macadam District Framework Plan and Urban Renewal Plan.

Summary Comparison of Alternative Scenarios The chart on the facing page presents a summary comparison of the three alternative scenarios considered by public return on investment perfor- mance indicators including: • Framework Plan Area Development −- greenway, parks and open space, housing, jobs, density of development (with less parking), and transportation. • Urban Renewal Area Capital Investment – anticipated from both public and private sources. • City of Portland Operating Budget Impacts – on-going public revenues less expenses for provision of city services to support added district population and employment.

74 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Public Return on Investment Performance Indicators For North Mac- adam Alternative Development Scenarios

Scenario Considered A. Framework Base Case Urban Renewal/Tax Enhanced Plan Area Development Increment Strategy (TIF) Development Development Funding Strategy Greenway, Parks & Greenway built to current Four public parks, open Four public parks, open Open Space minimum public 25 foot space, & Greenway built to space, & Greenway built standard; no parks 50 foot setback, with to 50 foot setback, with planned moderate funding for design higher quality park and art & construction amenities Housing +/- 1,000 du +/- 3,000 du 3,000+ du Average density <50 Average density 80 du/acre Average density 80+ du/acre du/acre Mix of market rate Mix of affordable and market Mix of affordable and apartment and condo; rate condo and apartment; market rate condo and limited affordable housing 788 affordable housing units apartment; 1,928 affordable housing units Jobs 3,200 net added jobs 8,300 net added jobs 8,300 net added jobs 625,000 sf suburban scale 1.9 million sf mid-rise office; 1.9 million sf mid-rise office targeting of industries for office space with a higher which Portland has level of targeting for jobs competitive advantage and that increase personal which provide livable wages income levels and create community wealth 300 lodging rooms 900 lodging rooms 900 lodging rooms plus conference facilities

60,000 sf of local serving 250,000 sf of primarily local 250,000 sf of local serving retail development serving retail development retail plus additional destination retail/attractors

Parking Over half of land area Parking facilitates are Parking facilitates are developed expected to structured and most often structured and most often consist of surface parking developed with other uses, developed with other lots some surface lots in early uses, limited surface years parking in early years Transportation Improvements limited to Builds all transit (including a Funding similar to urban private funding of portion of streetcar and tram) renewal plus funding of Bancroft-Macadam and most North-South street Lincoln connector intersection, one half of and portal improvements; (required for light rail River Parkway and one most East-West streets services) half of East-West streets; privately funded Harrison connector publicly funded B. Urban Renewal Plan Area Capital Investment Public Investment Tax Increment $0 $150,284,000 $150,284,000 Other Public $3,100,000 $12,000,000 $12,000,000 Subtotal Public $3,100,000 $162,284,000 $162,284,000 Private Investment* $320,717,500 $911,776,750 $911,776,750 Undetermined $0 $0 $61,037,720 Total Investment $323,817,500 $1,074,060,750 $1,135,098,470 C. City of Portland Operating Budget Impacts On-Going Public Net positive due to Net positive due to combined Similar effect as with Revenues less combination of property business license and utility urban renewal/tax Expenses** and other tax revenues franchise fees, plus transient increment strategy lodging tax receipts Notes: The term du refers to number of dwelling units; sf denotes square feet of building area. * Includes investment within North Macadam Urban Renewal Plan area. ** This indicator is provided to show the North Macadam Urban Renewal District is expected to generate sufficient revenues to cover service costs. Development at scenario levels may or may not result in net revenue growth in the city.

Accepted by City Council - August 11, 1999 75 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

The primary purpose of public funding is to obtain a public benefit or return on investment that exceeds what would be expected with private market mechanisms alone. It is clear from comparison of the alternative develop- ment scenarios that the investment of tax increment financing (TIF) would stimulate substantial private expenditure in excess of what might other- wise occur.

The additional development stimulated with TIF in turn provides revenues for continued investment of public money in amenities, jobs and housing targets, transportation, and infrastructure necessary to support the overall objectives of the North Macadam District Framework and Urban Renewal Plans. Achievement of these objectives serves citywide policy goals for housing and job development. Enhanced development funding provides for a different quality of development reflecting the full vision for the district.

Private Development Feasibility A 1998 Residential and Commercial Market Evaluation identified North Macadam development potentials, assuming market rate development and availability of transportation and other infrastructure as needed. Financial pro forma analysis has been conducted — and updated in recent months — to ascertain the degree to which residential and office development appears financially feasible. Market and financial feasibility considerations have been applied to testing of development potentials under conditions of base case, urban renewal, and enhanced funding. Base Case Private development under base case conditions is expected to reach about one-third of projected development with urban renewal or enhanced development funding. Base case development anticipated includes up to 1,000 housing units and 3,200 net added jobs. More than one- half (55%) of the developed land area is expected to consist of surface parking lots.

Financial return on investment (per private equity dollar invested) is greater with lower density development — particularly the avoidance of structured parking facilities. Public transit investment would not be adequate to support achievement of the City Council’s targeted 30% mode split and resulting reduced parking demand.

With cost of infrastructure borne primarily by the private sector, property owners and developers would have little incentive to bear the added per square foot expense associated with more dense development. Total private investment over 20 years with the base case scenario is estimated at about $320 million. Little if any public open space and related amenities are anticipated.

76 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

The Willamette Greenway would be built to the 25-foot set back currently required; no public funding would be allocated for other parks and open spare. Transportation improvements would be limited to minimum access needs involving private funding of the Bancroft-Macadam intersection, half of River Parkway and half of the east-west streets.

Urban Renewal

This second scenario assumes expenditure of over $150 million in tax increment financing (TIF) between 2000-2020 in the North Macadam District, plus another $12 million in other public funds (possible, though not yet committed, funding sources). TIF resources would be expended for jobs, parks/open space/greenway, housing investment, transportation, and utility infrastructure.

The Urban Renewal/Tax Increment Strategy (TIF) is expected to result in an estimated 3,000 housing units and 8,300 net jobs added from 2000- 2020. Total private investment over 20 years is estimated to be in excess of $910 million. This scenario essentially triples the level of development projected with base case development for three reasons:

• Assumption of major portions of transportation/infrastructure/parking facility expense by the City/PDC reduces developer cost making it more feasible to assume added costs associated with greater density. • Urban amenities associated with parks and open space will be important to creating and marketing a denser pattern of residential and commercial development and should also prove attractive for prospec- tive office tenants. • The use of developer agreements will tie private performance to public delivery of the investment proposed.

There is also a major qualitative difference in the mix of housing that can be made available with urban renewal. With $25 million in planned public housing investment, a broader range of housing would be created, specifi- cally an estimated 788 affordable rental and condo housing units. Private development of affordable housing is not expected to be financially feasible in North Macadam without public investment.

Urban renewal funding will make it possible to fund four public parks and open spaces in addition to privately funded Willamette Greenway improve- ments. Most of the street improvements required to serve 20-year devel- opment would be built, as would a portion of the Central City Streetcar and tram.

Accepted by City Council - August 11, 1999 77 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Enhanced Development Funding

In addition to what is proposed with the Urban Renewal Strategy, en- hanced funding would add $61 million in public/private investment for North Macadam. Specific sources of this enhanced funding are as of yet undetermined. Added investment is targeted toward job-related strategies, parks/open space enhancement, affordable housing investment, added transportation improvements in the form of the Lincoln Connector and I-5 pedestrian (at Bancroft), and a strategic infrastructure fund:

• Job and infrastructure related investments are targeted to high wage jobs, strategic land acquisition, a business innovation center and superior technology related utilities. • Approximately two-thirds of the added investment ($36 million) would be targeted for affordable housing. The additional funding would significantly increase the number of affordable housing units created (from 788 to 1,927 units) and would enable North Macadam to achieve a housing distribution that could accommodate an income profile comparable to that of the entire city. • Additional investment is targeted to park improvements and pedes- trian improvements along major streets. Overall levels of development are not expected to increase appreciably as a result of enhanced funding. The emphasis of enhanced investment is primarily on the quality rather than quantity of development, public use opportunity, and fuller achievement of housing and job objectives.

Public Investment Program Each of the three scenarios considered carries different implications in terms of required public capital investment and effects for on-going City revenues and expenses.

Base Case

Public capital investment is expected to be limited to funding of the Harrison connector with the base case private sector driven development scenario. The City of Portland should receive net positive on-going revenues generated from development (including property tax, business license and utility franchise fees). Added revenues are projected to exceed costs to serve the new development (for police, fire protection and parks maintenance). Note: Other major City expenses as for water/sewer are essentially self-liquidating as user fees are set to repay the full cost of the service provided.

78 Steering Committee’s Recommended Plan I I I . I m p l e m e n t a t i o n

Urban Renewal/Tax Increment Strategy

Tax increment financing (TIF) is predicated on pledging added property taxes generated as a result of new development back to defray the cost of public investment planned for the district. In North Macadam, TIF rev- enues are closely matched to expenses, generating minimal net added property tax revenue to the City’s General Fund through 2020.

With incremental property tax revenues pledged to repay one time public capital improvements, the cost of providing public services is borne by transient lodging tax, business license and utility franchise fees. Rev- enues generated directly as a result of new development are expected to offset incremental public service expense to serve the district.

Enhanced Development Funding

The enhanced development funding scenario involves projected expendi- tures of an added $61 million. As noted, sources for this funding are as yet undetermined. Potential sources considered could include city rev- enues (SDCs, General Fund support), federal/state grants (including transportation funds), private donations, and a possible local or economic improvement district (LID, EID).

Projections of on-going city operating revenues versus expenditures with enhanced funding are not expected to be substantially different from the Urban Renewal/Tax Increment Strategy.

Public Private Investment Strategy

Successful implementation of the North Macadam District Framework Plan and Urban Renewal Plan depend upon a combination of private and public investment over the 2000-2020 time period.

Implementation of Framework Plan and Urban Renewal Plan Goals: Accomplishing complete implementation of the Framework and Urban Renewal Plans depends on a combination of private and public investment resources. The level of investment toward and Framework Plan/Urban Renewal goal achievement attained with each scenario is summarized in the figure on the following page.

Accepted by City Council - August 11, 1999 79 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Investment Level for North Macadam Alternative Development Scenarios

Investment Level by Scenario Considered Framework Base Case Urban Renewal/Tax Enhanced Plan/Urban Development Increment Strategy Development Renewal Goal (TIF) Funding Strategy Jobs: stimulating Public: limited Public: $18 million in jobs Public: $18 million in employment growth, Private: $144 million in programs jobs programs targeting industries office, retail and hotel Private: $433 million in office, Private: $433 million in and jobs which pay a development retail and hotel development office, retail and hotel livable wage development Undetermined: $8 million in jobs related programs Urban Amenities: Public: limited Public: $23 million for four Public: $23 million for encourage exemplary Private: $3 million for public parks and open space four public parks and open space greenway built to 25 foot Private: $14 million greenway open space development standard built to 50 foot standard and Private: $14 million bank treatment greenway built to 50 foot standard and bank treatment Undetermined: $5 million for higher quality park and art amenities Housing: encourage Public: limited Public: $25 million for 788 Public: $25 million for a full range of housing Private: $144 million for affordable housing units 788 affordable housing types and affordability market rate housing Private: $443 million primarily units levels for market rate housing (and Private: $443 million limited non-profit housing primarily for market rate development) housing (and limited non-profit housing development) Undetermined: $36 million for 1,140 affordable housing units Transportation: Public: $3 million Public: $63 million for street, Public: $63 million for development of an associated with Harrison transit, pedestrian and bike street, transit, pedestrian efficient and connector improvements and bike improvements comprehensive Private: $6 million for Private: $19 million for street Private: $19 million for transportation system minimum access needs and transit improvements street and transit improvements Undetermined: $7 million for additional street and pedestrian improvements Note: Not all public/private investment is identified in this table. Items do not add to Urban Renewal Plan Area capital investment totals.

The degree to which the Framework and Urban Renewal Plans can make a difference for the North Macadam District is clearly indicated by the comparisons in the above chart. Investment in and achievement of the North Macadam District Framework Plan and Urban Renewal Plan goals clearly increases with each subsequent development scenario. The base case results in little if any movement toward plan goals and substantially reduced investment in the district. Under the Urban Renewal/TIF Strategy there is direct public benefit or return on investment more closely accom- plishing the goals of the Framework and Urban Renewal Plans. The enhanced development funding scenario further succeeds in reaching the goals outlined.

80 Steering Committee’s Recommended Plan I V . R e c o m m e n d a t i o n s t o C i t y C o u n c i l a n d C i t y C o u n c i l A c t i o n s

IV. Recommendations to City Council and City Council Actions

The planning process has raised dozens of questions about how North Macadam will influence and relate to the larger urban context, and about how relationships within the area can be optimized. The Steering Commit- tee has drawn on assistance from citizen work groups and technical specialists regarding critical aspects of new development, from affordable housing to public open space, from traffic access to building heights. The Steering Committee distilled from this process the following recommenda- tions to City Council:

1. The City Council should acknowledge the vision, principles and concepts contained in the North Macadam Framework Plan, and accept the Framework Plan as the aspirational planning context for developing implementation recommendations to achieve the vision for the North Macadam District.

2. The North Macadam Steering Committee, with continued public involvement, should be charged with providing continued direction and recommendations on all implementation activities, and to evaluate proposed implementation activities against the vision, principles and concepts contained in the North Macadam Framework Plan.

3. The City Council should direct the Portland Development Commission to take lead responsibility for coordinating a City Bureau team and to develop recommendations implementing the Framework Plan. Sup- port will be provided by the Bureau of Planning, and Office of Trans- portation, Bureau of Parks & Recreation, Bureau of Environmental Services, Bureau of General Services and Office of Finance and Administration and other affected City Bureaus.

4. The City Council should direct a Public Negotiating Team composed of the City representatives on the Steering Committee, headed by PDC, to develop agreements with private property owners regarding public and private financial participation and performance obligations in projects and activities that may be proposed within the District.

On August 11, 1999, the City Council accepted by resolution the Steering Committee’s Recommended Plan and a proposed work program for Framework Plan Implementation. The City Council also approved the North Macadam Urban Renewal Plan. The documents listed below are available from the Portland Development Commission.

Resolution No. 35815 Acceptance of the Framework Plan

Resolution No. 35815 - Exhibit A Proposed Work Program for Framework Plan Implementation

Ordinance No. 173651 Approval of the North Macadam Urban Renewal Plan

Accepted by City Council - August 11, 1999 81 A p p e n d i x

Glossary

APP Association for Portland Progress BES Bureau of Environmental Services CAT Community Alliance of Tenants CCP Central City Plan CCTMP Central City Transportation Management Plan CDN Community Development Network CMAQ Congestion Management and Air Quality COE Army Corps of Engineers CTLH Corbett-Terwilliger-Lair Hill DCA Downtown Community Association HAP Housing Authority of Portland HCDC Housing and Community Development Commission HUD Federal Department of Housing and Urban Development LID Local Improvement District LIHTC Low-Income Housing Tax Credit ODOT Oregon Department of Transportation OFA Office of Finance and Administration OPDR Office of Planning and Development Review OSF Old Spaghetti Factory PDC Portland Development Commission PDOT Portland Office of Transportation PSI Portland Streetcar Inc. PSU Portland State University MFI Median Family Income NMDC North Macadam Development Council NMFS National Marine and Fisheries Service OHSU Oregon Health Sciences University OMSI Oregon Museum of Science and Industry SDC Systems Development Charge TEA-21 Transportation Equity Act for the 21st Century TOD Transit-Oriented Development TDM Transportation Demand Management TMA Transportation Management Association TIF Tax Increment Financing WSL Willamette Shore Line (trolley)

Accepted by City Council - August 11, 1999 A-1 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Work Group Membership

Greenway and Parks Work Group

Chair Barbara Walker Members Debbie Bischoff Bureau of Planning Beverly Bookin The Bookin Group Lynne Coward League of Women Voters Linda Dobson BES Jeanne Galick CTLH Michael Houck Audobon Society of Portland Kurt Lango Parks Bureau Ken Sanders Zimmer Gunsul Frasca Zari Santner Parks Bureau Steven Shain The Zidell Companies Cheryl Twete PDC

Housing Work Group

Chair Denny West HAP Members Dick Anderson Fannie Mae Baruti Artharee PDC David Bell GSL Properties Ross Cornelius PDC Ken Dietrich US Bank Trust Janice Frater HCDC John Hall PDC Tasha Harmon Community Development Network Brian McCarl Brian McCarl & Co. Ed McNamara Realty Trust Associates Barbara Sack Bureau of Planning Will White Housing Development Center Anne Willer League of Women Voters

Jobs Work Group

Chair Pat Scruggs Members Sherman Alldredge Entouch Systems Lois Davis OHSU Public Affairs & Marketing Ted Millar Westwood Swinterton Construction Michael Ogan PDC Anna Street PIVOT

A-2 Steering Committee’s Recommended Plan A p p e n d i x

Land Use and Development Work Group

Chair Rick Saito NMDC Members Beverly Bookin The Bookin Group Kerry Chipman CTLH Michael Harrison Bureau of Planning Deborah Howes Bureau of Planning Mel Kroker OSF International Kim MacColl Garry Papers SERA Architects Pat Scruggs Martin Slapikas CTLH Transportation Chair Cheryl Twete PDC Elaine Wilkerson METRO

Market Analysis and Financial Strategy Work Group

Chair Richard Michaelson Inner City Properties Members Steve Brenner PSU/League of Women Voters Susan Davidson Schnitzer Investment Group Mark Edlen Gerding/Edlen Development Abe Farkas PDC Tim Grewe Office of Finance and Administration Eric Parson Standard Insurance Company

Transportation and Infrastructure Work Group

Chair Ann Gardner Schnitzer Investment Group Members Pamela Allegria League of Women Voters Richard Brandman Metro David Cook OSF International Cheryl McDowell CTLH Land Use Karen Rabiner PDOT Lidwien Rahman ODOT Vic Rhodes PDOT Ron Smith BES Al Smith BES Bob Stacey Tri-Met Dave Williams ODOT

Accepted by City Council - August 11, 1999 A-3 N o r t h M a c a d a m D i s t r i c t F r a m e w o r k P l a n

Urban Renewal Advisory Committee

Chair Rick Saito NMDC

Members Sherman Alldredge Entouch Systems Baruti Artharee PDC Martin Brantley President, KPTV Laura Campos CTLH Abe Farkas PDC Steve Gray CTLH Tim Grewe OFA John Hall PDC Michael Harrison Bureau of Planning Timothy King Dave Kish General Services Richard Michaelson Inner City Properties Vic Rhodes PDOT Barry Rosen Schnitzer Investment Group Zari Santner Parks Bureau Chris Scherer PDC Steven Shain The Zidell Companies Ron Smith BES Barbara Walker Denny West HAP

A-4 Steering Committee’s Recommended Plan A p p e n d i x

List of Technical Documents

The following technical documents may be requested from the Portland Development Commission (823-3200).

Development Financing & Return on Investment Strategy, E.D. Hovee, June 1999

Draft Development Scenarios, Spencer & Kupper, October 1998

Draft Parks Standards: A Process for Determining Parks and Open Space Needs, Portland Parks & Recre- ation, August 1998

The Economic Benefits of Greenways, Bureau of Planning, February 1999

Market Evaluation Study, E.D. Hovee, October 1998

Marquam Hill to North Macadam District Tram Ridership Analysis, Parsons Brinckerhoff Quade & Douglas, August 1998

North Madacam District to OHSU Tram Study, Jewett Engineering, August 1998

North Macadam District Street Design Standards and Criteria Plan Transportation Report, David Evans & Associates for Lloyd Lindley and PDOT, November 1998

North Macadam District Street Standards and Criteria - Central City Streetcar Alignment Alternatives Progress Report, Lloyd D. Lindley, ASLA for PDOT, March 5, 1999

North Macadam District Transportation Analysis - Executive Summary, Lloyd D. Lindley, ASLA, and David Evans & Associates for PDOT, February 12, 1998

North Macadam District Urban Renewal Feasibility Study, PDC, March 1999

Parks, Open Space, & Recreation Needs, GreenWorks and Perron Collaborative, October 1998

Riverfront Bank Options, Greenworks and Perron Collaborative, November 1998

Summary of Development Standards, Bureau of Planning, February 1999

Transportation Analysis Summary, DEA and Lloyd Lindley, June 1998

Willamette Greenway User Survey, Portland Parks and Recreation, October 1998

Willamette Greenway Trail Design Standards, GreenWorks and Perron Collaborative, October 1998

Work Group Final Reports: Jobs, Housing, Transportation, Parks, Greenway, and Open Space, June 1999

Housing Report includes the following information: Demographic Findings of the Work Groups, Area Student Demographics, Housing Employment Linkages, Forecast of Market-rate Unit Build-outs, Housing Development in North Macadam, Forecast Market Production, Targeted Affordable Production, Housing Income Policy, Underwriting the City Investment, Addressing the Very Low Income Housing Segment, Housing Ownership, Affordable Ownership, Employer-Assisted Housing, Percentage of Ownership in North Macadam, Additional Information.

Working Vision for North Macadam, Livable Oregon and Spencer & Kupper, April 1998

Accepted by City Council - August 11, 1999 A-5