NHM-1443 Dt 020920.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

NHM-1443 Dt 020920.Pdf Government of West Bengal Health & Family Welfare Department National Health Mission GN-29, 4th Floor, Swasthya Sathi Building, Swasthya Bhawan Premises Salt-Lake, Sector-V, Kolkata - 700091 (Phone) 033-2333 0238; (Fax) 033-2357 7930 Email: ponhmwb1 @gmail.com / [email protected]; Web: www.wbhealth.gov.in No.: HFW/NHM-338/2020/ J~~ 3 Date: oL/09/2020 OR DE R In pursuance of Administrative Approval and Financial Sanction accorded previously for infrastructure strengthening works at Darjeeling and Kalimpong, under GTA, an amount of Rs.2,87,44,880.00 (Rupees Two Crore Eighty Seven Lakh Forty Four Thousand Eight Hundred Eighty. ) only is hereby released and placed in favour of District H&F.W Samiti, Darjeeling ,GTA, as 1st installment being 50% of sanctioned amount for 9 (Nine ) schemes. 2. The released fund should be utilized against the schemes mentioned at Annexure: II 3. The expenditure will be booked under activity head Extension of F.W. Store [Tally Code- B.04.01.05.11 ] 4. The Senior Accounts Officer, NHM will act as Drawing & Disbursing Officer for the purpose. 5. This has been issued with the approval of the Mission Director, NHM and Secretary, Health & Family Welfare Department, Govt. of West Bengal. 6. All concerned are being informed accordingly. 1,~~.~~~... Programme Offic , & Deputy Secretary, Health & Family Welfare Department No.: HFW/NHM-338/2020/ 14~ 3 Date: 02./09/2020 Copy forwarded for information to: 1. Director of Health Services, Health & Family Welfare Department. 2. Additional Mission Director, National Health Mission. 3. District Magistrate, Darjeeling. 4. District Magistrate, Kalimpong. 5. Executive Director & Secretary, District Health & F.W Samiti, Darjeeling and kalimpong under G.T.A. 6. Chief Medical Officer of Health, Darjeeling. 7. Chief Medical Officer of Health, Kalimpong. 8. Senior Accounts Officer, National Health Mission with the request to release Rs. 2,87,44,880.50 (Rupees Two Crore Eighty Seven Lakh Forty Four Thousand Eight Hundred Eighty and fifty Paisa )only in favour of District health & F.W Samity, G.T.A. 9. Engineer-in-Charge, National Health Mission. 10. Dy.CMOH -I. Darjeeling and Klimpong 11. Assistant Engineer-l &2, SPMU, National Health Mission. 12. District Programm Co-Ordinator, Darjeeling , G.T.A. 13. Sub-Assistant Engineer, SPMU, National Health Mission. 14. District Accounts Manager, District health & F.W Samity, Darjeeling G.T.A. lS. P.A to Mission Director, NHM and Secretary, HF&W Department, Govt. of West Bengal. 16. ITCell, With a request to upload the order on the webside of this Department. 17. Copy for Guard file. 18. Office Copy. ktl\....l' WoQ. Programme Offic~r-,~~~ & Deputy Secretary, Health & Family Welfare Department Annexure :11Fund Release Details Difference I Work order I between Physical Amount I Amount Amount Work Order Amount (Excluding Sanctioned Amount Released % I No AAFS & Date Name Of the Scheme Progress( (Including 3% Released I Remarks I Sanctioned (Rs.) 3% Contingency) (Rs.) Amount and Released (Rs.) of Fund %) Contingency Previously (Rs.) Work Order )IRs.) Amount (Rs.) A I D I G 50%01 HFW/NRHM-51/2016/(4946)/4205 Dt: District Health & family welfare I 1,34,79,204.00 Civil 1,30,89,360.00 2,83f·.80 0.00 I 67,39,602.00 sanctioned 15.01.2017 store, Darjeeling (Civil) I amount HFW/NRHM-51/2016/(4946)/4209 Dt: District Health & family welfare' 33,62,144.00 Electrical 32,76,252.00 ~12,39556 O.OC 0.00 Work not started I :5.01.2017 store, Darjeeling (Electrical) I yet HFW-27011/15/2019-NHM-SEC- Civii 2,11,93,094.00 Construction of Denovo PHC at 50%0: DEDT.OF H&;W/G..,OOM PHC/3568 .is 2,96,73,119.00 2,91,74,0:0.45 4,99,:C8.54 I :,48,36,559.50 I Ghoom, GTA, darjeeling sanctioned DT::iO.0:.2019 Electrical 71,31,188.00 , amount I HFW-27811/395/2018-I\HM-SEC-::Jep~ I Repair and renovation of s~af' 25,06,394.80 ! 50%0· of r;&FW/3i;anbar!(R&R)/4598 I for MO/s~aff/Gro J Sta'f 30,00,800.CC 38,42,162.58 -42,:62.68 8.00 :5,00,000.80 sar-ctior-co datec:30.08.2018 Bijanbari RH Darjcel'ng GTA : Elcctr.cal 4,47,162.00 amount 1 I Repair a:"'o rcnovatlor; o~ sta~f I HFW-27011/395/2C18-NHM-SEC-Dept I Qtr for MO/staff/gro~p D sta : Civi: work 25,72,785.00 of H&FW/Lodno!'1a P"C/(R&R)/4S99 30,00,008.00 I 38,88,373.63 -88,373.63 8.C8 15,00,000.00 at Lodoma, PHC , carjee.ing datea:30.88.2818 sa~~::~:d I G-A 4,25,636.00 1 amount I ! HFW-27011/39 2/20 18- N'"'M-SEC-Dept Recair and Rcr"v~'" 0' Staff c: .. C'vii 23,89,307.79 sc ss o: of H&FW/Tai<cana 8PI-'C/(R&R)/4585 M.O /s~aff/Grp ) at Takdha :08 26,93,438.88 27,73,0:0.87 -79,57VJ7 0.08 :3,46,719.CO 6 I r-----t-------tI sanctoncd dated:30.08.2018 3PHC Electrical 3,02,935.00 I amount HFW/Nr' :111-378/20: 7/2583 I I Constructiontof :\on G?HQ SC Civi: 15,06,969.00 I :5t installment o~ Otd.23.87.20:8 & WW- I I at Jhalong undc- Gorubathan :cc : 7,51,061.00 17,28,:54.9C 22,895.10 8,75,530.88 0.00 50% already 270:1/206/2818-Nl-'M SEC Dept of Engineering Division Electrical 1,70,861.00 releasee H&FW/3901 )~0:23.07.2018 I I HFW/Nr;M-378/20: 7/2583 I i ('vi: 15,07,258.80 11s~ installmert of Cltd.23.07.20:8 & H;W- Constructior- 0' Non GPSC a: .co :7,51,C51.00 I 17,28,380.C1 22,680.99 8,75,530.00 0.00 50% already 27011/206/20:"8-\..,;V SEC Dcpt of Ringchingtong, S"~:"1a :,78,780.84 H&FW/398: )to:23.07.2018 I releasee J Clvil 15,56,497.00 list installment 0' ' HFW·27011/206/2018- \ ,,!If. SEC-Dept. Const of on GP SC a: :00 17,51,061.00 !1----+-------1 17,79,:78.74 -28,::"7.74 8,75,538.8C 0.00 50% already of H&FW/390: Date: 23.07.2018 Chamong sukhiapokhri I Electrical 1,70,861.00 re'cascc Construction of No~ G? +cac Civi. 12,74,602.00 HFW/NRr M- :69/2C09/( 27)/789 50 % o! 10 Ouarter SC a: Puttung :C8 :4,:1,000.08 :4,19,433.73 -8,433.73 0.00 7,05,500.00 Dt:05/C6/28: 7 sanctioned Mirik(30) I Elcctricai :,03,489.00 i : amount I I HFW/ RHM-:69/2009/(27)/789 Construction 0 :l:or G"hQ SC Civil 12,77,730.00 1: :co ~4,11,OCO.00 14,22,655.57 11,655.57 0.00 7,05,500.00 I sa~~;:~~d I D~:05/06/2017 at Thurbo, :IIIirl I Electrical ~,03,489.00 I amount I HFW/NRHM-169/2009/(27)/789 Construction of :\Io~ G"SC at Civi' 12,77,857.00 50%of II :00 14,:1,000.00 14,22,786.38 -11,786.38 C.OO 7,05,500.00 sanctioned 12 I Dt:05/06/2017 Singritam, GTA Electrical 1,03,489.00 I amount I HFW/NRHM-169/2009/(27)/789 I Construction of Nor GPHQ SC Civil 12, 7~,663.00 50%0 13 100 14,11,000.00 14,19,496.56 -8,496.56 0.00 7,05,500.00 sanctioned Dt:05/06/20: 7 at Moondakothi Sukhiapokhri I Electrical 1,03,489.00 I amount I TOTAL 6,61,05,088.00 I 6,39,36,148,63 6,58,54,233.09 2,50,854.91 26,26,590.00 2,87,44,880.50.
Recommended publications
  • Gorubathan Development Block NOTICE INVITING TENDER NO. BDO/GBN/NIT /231(PBSSM)/2020-21 GOVERNMENT of WEST BENGAL OFFICE OF
    Gorubathan Development Block NOTICE INVITING TENDER NO. BDO/GBN/NIT /231(PBSSM)/2020‐21 GOVERNMENT OF WEST BENGAL OFFICE OF THE BLOCK DEVELOPMENT OFFICER, GORUBATHAN DEVELOPMENT BLOCK, P.O. FAGU; DIST. KALIMPONG. E‐mail :‐ [email protected] 03552‐222008 Memo No:231/GBN Dated:01.02.2021 NOTICE INVITING TENDER NO. BDO/GBN/NIT /231(PBSSM)/2020‐21 The Block Development Officer, Gorubathan Development Block of West Bengal, invites separate tender for the works detailed in the table below from the bonafide, eligible and experienced contractors having sufficient credential and financial capability for execution of works of similar nature. Sl. Name of Source of Estimated Earnest Time of Price per No. Works Fund amount money completion set of other document (Rs.) A B C D E F G Construction of Additional Girls Toilet at 90 (Ninety) Jaldhaka H.S. 750.00 days from the 1. School under PBSSM 424464.00 8489.00 date of issue PBSSM under of work order. Goubathan Development Block Cost of Tender Form : Cost of collection of Tender Form is Rs. 250.00. Place of availability of Tender Form : Office of the Block Development Officer Gorubathan Development Block P.O. Fagu, District: Kalimpong. Last date of collection of Tender Form :10th February, 2021 up to 15 hrs. Last date of dropping of Sealed Tender Form : 11th February , 2021 up to 17:30 hrs. Date of opening of Tender :12th February, 2021 at 11.30 hrs. Place of opening of Tender : Office Chamber of the Block Development Officer Gorubathan Development Block P.O. Fagu, District: Kalimpong. Date of meeting with Bidders at the office of the undersigned :05rd Feb, 2021 at 14:00 hrs.
    [Show full text]
  • Environmental, Economic and Agricultural Surveys of an Ecologically Important Forest Edge Hamlet in Darjeeling District, West Bengal, India
    Available online at www.worldscientificnews.com WSN 5 (2015) 66-80 EISSN 2392-2192 Environmental, economic and agricultural surveys of an ecologically important forest edge hamlet in Darjeeling district, West Bengal, India Sayan Bhattacharya1,*, Arkajyoti Shome2, Abhishek Dutta3, Gourab Majumder1, Raktim Banerjee1 1Department of Environmental Studies, Rabindra Bharati University, India 2Department of Ecology and Environmental Sciences, Pondicherry University, India 3Department of Environmental Studies, Visva Bharati University, India *E-mail address: [email protected] , [email protected] ABSTRACT Forest cover in the hill regions is essential to maintain environmental, economic and ecological balances. North Bengal accounts for 3,086 sq km (26 %) of the 11,876 sq km area of classified forests in the state, and for nearly 5,000 sq km (40 %) of all land under tree cover. Khumani is a Village (26.84o N, 88.60o E) in Gorubathan Block in Darjeeling District of West Bengal State, India. The survey work was done in December, 2014 by visiting the Khumani Forest Village (established in 1949) of upper Kumai and the primary data were gathered through field survey and direct contact with common people and authorized centers of the region. Surveys on the demography, agriculture, livestock management, water management, education, culture, health, waste management, disaster management, transport, biodiversity, human animal conflict were done in this area. Topographic map of the area was prepared by using the database of National Atlas and Thematic Mapping Organization (NATMO), Kolkata office. In every phase of the survey work, pictorial documentation was done. In spite of being positioned in a diverse and sensitive ecological zone, the village is not adequately managed.
    [Show full text]
  • The Study Area
    THE STUDY AREA 2.1 GENERALFEATURES 2.1.1 Location and besic informations ofthe area Darjeeling is a hilly district situated at the northernmost end of the Indian state of West Bengal. It has a hammer or an inverted wedge shaped appearance. Its location in the globe may be detected between latitudes of 26° 27'05" Nand 27° 13 ' 10" Nand longitudes of87° 59' 30" and 88° 53' E (Fig. 2. 1). The southern-most point is located near Bidhan Nagar village ofPhansidewa block the nmthernmost point at trijunction near Phalut; like wise the widest west-east dimension of the di strict lies between Sabarkum 2 near Sandakphu and Todey village along river Jaldhaka. It comprises an area of3, 149 km . Table 2.1. Some basic data for the district of Darjeeling (Source: Administrative Report ofDatjeeling District, 201 1- 12, http://darjeeling.gov.in) Area 3,149 kmL Area of H ill portion 2417.3 knr' T erai (Plains) Portion 731.7 km_L Sub Divisoins 4 [Datjeeling, Kurseong, Kalimpong, Si1iguri] Blocks 12 [Datjeeling-Pulbazar, Rangli-Rangliot, Jorebunglow-Sukiapokhari, Kalimpong - I, Kalimpong - II, Gorubathan, Kurseong, Mirik, Matigara, Naxalbari, Kharibari & Phansidewa] Police Stations 16 [Sadar, Jorebunglow, Pulbazar, Sukiapokhari, Lodhama, Rangli- Rangliot, Mirik, Kurseong, Kalimpong, Gorubathan, Siliguri, Matigara, Bagdogra, Naxalbari, Phansidewa & Kharibari] N o . ofVillages & Corporation - 01 (Siliguri) Towns Municipalities - 04 (Darjeeling, Kurseong, Kalimpong, Mirik) Gram Pancbayats - 134 Total Forest Cover 1,204 kmL (38.23 %) [Source: Sta te of Forest
    [Show full text]
  • Kalimpong 22 Kalimpong 1 Office of the ERO, 22-Kalimpong A.C
    Name of the Nodal District AC No. AC Name Location of the VFCs personnel of the VFC Sangay Tamang / Kalimpong 22 Kalimpong 1 Office of the ERO, 22-Kalimpong A.C. Nanglemit Lepcha Kalimpong 22 Kalimpong 2 BDO'Office, Kalimpong-II, Algarah Veronica Gurung Kalimpong 22 Kalimpong 3 Lingseykha GP Office Rohit Chettri Kalimpong 22 Kalimpong 4 Lingsey GP Office Umesh Pariyar Kalimpong 22 Kalimpong 5 Kagay GP Office Prakash Chettri Kalimpong 22 Kalimpong 6 Pedong GP Office Phup Tsh. Bhutia Kalimpong 22 Kalimpong 7 Sakyong GP Office Raj Kumar Sharma Kalimpong 22 Kalimpong 8 Kashyong GP Office Umesh Rai Kalimpong 22 Kalimpong 9 Santook GP Office Ravi Mangrati Kalimpong 22 Kalimpong 10 Paiyong GP Office Maheshwar Sharma Kalimpong 22 Kalimpong 11 Dalapchand GP Office Kharga Bikram Subba Kalimpong 22 Kalimpong 12 Sangsay GP Office Binod Gajmer Kalimpong 22 Kalimpong 13 Lolay GP Office Gopichand Sharma Kalimpong 22 Kalimpong 14 Lava Gitbeong GP Office Tarkeshwar Kanwar Kalimpong 22 Kalimpong 15 Gitdabling GP Office Robert Rai Kalimpong 22 Kalimpong 16 Block Development Office Kalimpong-I Phurba Tamang Kalimpong 22 Kalimpong 17 Bhalukhop GP Office Ranbir Tamang Kalimpong 22 Kalimpong 18 Bong GP Office Bijay Kiran Lama Kalimpong 22 Kalimpong 19 Kalimpong GP Office Deepak Kharga Kalimpong 22 Kalimpong 20 Tashiding GP Offfice Smt. Tshering Y. Bhutia Kalimpong 22 Kalimpong 21 Teesta GP Office Arpan Mukhia Kalimpong 22 Kalimpong 22 Dungra GP Office Gajendra Kr. Chettri Kalimpong 22 Kalimpong 23 Homes GP Office Dhan Kr. Chettri Kalimpong 22 Kalimpong 24 Upper Echhey GP Office Sulav Pradhan Kalimpong 22 Kalimpong 25 Lower Echhey GP Office Indra Kr.
    [Show full text]
  • Chapter Vi Landslide As an Agent of Rayeng Basin Degradation
    CHAPTER VI LANDSLIDE AS AN AGENT OF RAYENG BASIN DEGRADATION 6.0 Scenario of landslides The landslides are one of the significant types of natural hazards. Massive landslides make trouncing of both creature existence and assets. Yet, people livelihood in the mountainous regions is habituated to survive with such events. With the augmented tourism over the precedent few decades, residential areas have been make bigger over mountainous slopes, which of course necessitate new communication system. This disturbs the usual slopes and an environment of the mountainous regions, in that way greater than ever susceptibility to landslide happening. Geomorphic studies of landslides take account of the assessment of vulnerability and causes responsible behind occurrences. Landslides are the most significant disparaging geomorphic process accountable for degradation of Rayeng Basin. Throughout intense rainfall, the weathering process is accelerated reducing schists and mudstones into silts and fine sands, and succeeding failure of these fine materials triggers landslides in the Rayeng Basin. 6.1 Methodology of study Study of" landslides of the basin incorporate, recognition of affected areas based on the field study and secondary data from earlier study. Intensive study has been made on the factors associated to landslides such as geology, slope angles, soil, climatic condition, hydrologic conditions, vegetation, and last but not the least i.e. human interferences in the basin. In this milieu, topographical maps, geological map, satellite imageries of the basin have been studied intensively. Meteorological data are collected. On the basis of several factors an effort has been made to prepare a landslides susceptible zones map of the study area.
    [Show full text]
  • District Disaster Management Plan-2019,Kalimpong
    DISTRICT DISASTER MANAGEMENT PLAN-2019,KALIMPONG 1 FOREWORD It is a well-known fact that we all are living in a world where occurrence of disasters whether anthropological or natural are increasing year by year in terms of both magnitude and frequency. Many of the disasters can be attributed to man. We, human beings, strive to make our world comfortable and convenient for ourselves which we give a name ‘development’. However, in the process of development we take more from what Nature can offer and in turn we get more than what we had bargained for. Climate change, as the experts have said, is going to be one major harbinger of tumult to our world. Yet the reason for global warming which is the main cause of climate change is due to anthropological actions. Climate change will lead to major change in weather pattern around us and that mostly will not be good for all of us. And Kalimpong as a hilly district, as nestled in the lap of the hills as it may be, has its shares of disasters almost every year. Monsoon brings landslide and misery to many people. Landslides kill or maim people, kill cattle, destroy houses, destroy crops, sweep away road benches cutting of connectivity and in the interiors rivulets swell making it difficult for people particularly the students to come to school. Hailstorm sometimes destroys standing crops like cardamom resulting in huge loss of revenue. Almost every year lightning kills people. And in terms of earthquake the whole district falls in seismic zone IV. Therefore, Kalimpong district is a multi-hazard prone district and the District Disaster Management Plan is prepared accordingly.
    [Show full text]
  • Darjeeling - Kampong Hills Land Slide and Flash Flood 30 Th June and 1 St July 2015
    State Inter Agency Group ––– WEST BENGAL Sit Rep-1: Darjeeling - Kampong Hills Land Slide and Flash Flood 30 th June and 1 st July 2015 Background: Incessant and heavy rainfall caused tremendous damage to the hills of Darjeeling. After the earthquake that hit Nepal on the 25 th of May 2015 with more than 300 aftershocks – each being felt in the neighbouring hills of Darjeeling had already opened up splits and cracks in the ever vulnerable region. Now, on the night of 30 th of June 2015, the cracks and splits gave way to huge landslides taking away life, land, property and overall, the peace of mind. After continuous spell of rain, over the past weeks Darjeeling witnessed landslide on yesterday July 1st 2015. This was one of the major kinds of devastation in the recent past in the district. The areas of Mirik, Lava, Kalingpong, Sukhia, Gorubathan was among the places which were worst hit. The landslide in Bichgaon in Mirik’s Tingling, which was the worst affected. Tingling is a tea garden and most affected are tea garden workers. As on 3 rd July 2015 the highest number of deaths has been reported from Tingling where at least eight houses swept away and 12 bodies were found dead. Seven are untraceable. Local administration, community and army are in search of people who are trapped under the landslide and are untraceable. Aftermath • Relief and rehabilitation has also stopped as major connecting roads leading to these places are blocked due to landslide. Rohini Road and Pankhabari Road between Darjeeling and Siliguri are open.
    [Show full text]
  • Dooars Tour and Travel Services
    Dooars Tour And Travel Services https://www.indiamart.com/dooars-tour-travel/ The beauty of the region lies not only in its tea gardens but also in the dense jungles that make up the countryside. About Us DOOARS is the combination of nature, culture, and architectural wonders. And we, Dooars Tour & Travel Services are the pioneer to introduce you with these Hidden treasure. More than a agent, we are the provider of a complete package of services in the field of travel & tourism, starting from an hotel room ticket to Dooars Jungle-Safaries. We are the complete tour operation company, who advices, plans and ensures our guests the most comfortable movement at the most competitive price. We also prepare necessary arrangements for the visitors to go for sight-seeing at various attractive places like Gorumara National Parks & Wild Life Sanctuaries, nearby places of Bhutan, Bindu, Lava- Lolegaon, Mirik, Darjeeling, Kurseong, Samsing, Santalakhola, Rockey-Island, Rohini Garden, Jhalong, Lataguri and many more. We are tied up with many resorts/hotels of Dooars to facilitate the travellers a hassle-free journey because we know your requirements. Our motto: Our primary objective is to promote eco-friendly and responsible tourism in Dooars region as well as maximize the employment opportunity for the local community. It is also dedicated to the conservation of na For more information, please visit https://www.indiamart.com/dooars-tour-travel/aboutus.html OTHER SERVICES P r o d u c t s & S e r v i c e s Booking related information Holiday Package Travel Services Honeymoon Packages Air Ticket Booking P r o OTHER SERVICES: d u c t s & S e r v i c e s Bus Booking Car Rental Hotel Booking Wildlife Tour Packages F a c t s h e e t Nature of Business :Service Provider CONTACT US Dooars Tour And Travel Services Contact Person: Manager Chalsa Jalpaiguri - 735206, West Bengal, India https://www.indiamart.com/dooars-tour-travel/.
    [Show full text]
  • Gorumara National Park, Samsing, Sunthalekhola, Rocky Island, Murti, Jhalong, Bindu, South Khayerbari, Jaldapara and Any Three Watch Towers
    DOOARS TOUR: GARUMARA JALDAPARA 4 Nights & 5 Days Covers :- Gorumara National Park, Samsing, Sunthalekhola, Rocky Island, Murti, Jhalong, Bindu, South Khayerbari, Jaldapara and any three watch towers Day 1 : Arrival NJP/Bagdogra/Mal Junction and transfer to Lataguri. Upon arrival at the railway station/airport, you are received and driven to your hotel/resort at Lataguri. This place is close to the Garumara National Park. We prefer to put up our guests in hotels/resorts which give you a feeling of being either in the forest or in a tea garden. Late in the afternoon, Depending upon the availability of tickets/entry passes, we would take you to any one of the following watchtowers/jungle safari .Overnight at Lataguri Hotel/resort. Day 2 : Excursion to Samsing, Sunthalekhola After breakfast, we take you for an excursion to Samsing & Sunthalekhola. Samsing is a tea estate in the Dooars and a small locality of about 100 houses surrounding the tea gardens. On the top of the hill there is a beautiful Guesthouse. The silence of the place is disturbed only by the noise of the gurgling river Murti. The drive to Samsing is through lush green tea gardens and the descending mist on the tea gardens during the monsoons is a sight to behold. It is a great spot to watch birds. After you return from the trip, late in the afternoon, we take you for a visit of a watchtower in the forest. Depending upon the availability of tickets/entry passes, we would take you to any one of the following watchtowers/jungle safari.Overnight at Lataguri Hotel/resor.t Day 3 : Excursion to Murti, Jhalong and Bindu Today we would take you for an excursion to Murti, Jhalong and Bindu.
    [Show full text]
  • Conserving Springs As Climate Change Adaptation Action Lessons from Chibo–Pashyor Watershed, Teesta River Basin, Kalimpong, West Bengal, India About ICIMOD
    ICIMOD Working Paper 2019/2 Conserving springs as climate change adaptation action Lessons from Chibo–Pashyor Watershed, Teesta River Basin, Kalimpong, West Bengal, India About ICIMOD The International Centre for Integrated Mountain Development, ICIMOD, is a regional knowledge development and learning centre serving the eight regional member countries of the Hindu Kush Himalaya—Afghanistan, Bangladesh, Bhutan, China, India, Myanmar, Nepal, and Pakistan—and is based in Kathmandu, Nepal. Globalization and climate change have been asserting an increasing influence on the stability of the fragile mountain ecosystems and the livelihoods of the mountain people. ICIMOD aims to assist the mountain people to understand these changes, adapt to them, and make the most of new opportunities, while also addressing upstream–downstream issues. It supports regional transboundary programmes through partnership with regional partner institutions, facilitates the exchange of experience, and serves as a regional knowledge hub. It strengthens networking among regional and global centres of excellence. Overall, ICIMOD is working to develop an economically and environmentally sound mountain ecosystem to improve the living standards of the mountain populations and to sustain the vital ecosystem services for the billions of people living downstream—now, and for the future. About The Mountain Institute India The Mountain Institute (TMI) established its branch in India in Sikkim in 1996, and was later, in 2006, registered as TMI lndia. TMI itself and TMI India are committed to working towards conserving the world’s high-priority mountain ecosystems, improving the livelihoods of the mountain people, and increasing awareness about mountain issues through research, advocacy, education, and outreach. Currently, TMI India is involved in community-based conservation programmes in the Eastern Himalayan Region, partnering with local people to strengthen their communities and to conserve natural resources and cultural heritage.
    [Show full text]
  • Itinerary Details
    Address No. 203 2nd Floor Building Plot C, Fortune 2000, B Wing, Bandra Kurla Complex, Bandra East, Mumbai, Maharashtra 400051. Telephone 022-66467409 / 66467403 / 66467401 GSTIN 27AABCC3119L12Q Itinerary Details DOOARS, KALIMPONG 6Nights 7Days Corporate Office:203, 2nd Floor, Fortune 2000, B-Wing, Bandra Kurla Complex, Bandra(E), Mumbai - India 1 / CIN: 3 U63040WB1988PLC044001 PAN: AABCC3119L www.club7holidays.co.in | Toll Free: 1800 210 0210 Day 1 : NJP RLY STATION / IXB AIRPORT TO DOOARS On arrival at NJP Railway Station / IXB Airport & transfer to Dooars. On arrival Check-in to hotel & rest of the day at leisure. Overnight stay at Dooars. Breakfast,Dinner Day 2 : EXCURSION TO JHALONG & BINDU After breakfast start for an excursion to Jhalong & Bindu. Jhalong is the prime attraction. Being far from the reach of urban life, you can get closer to the Mother Nature and take shelter in the lap of her. Just a few Kilometres away from Jhalong, Bindu is another region to behold. Bindu Dam is the principal visitor magnetism over here. The scenic view of migratory birds scattered flying soothes the minds of every kind of bird enthusiasts. Overnight stay at Dooars. Breakfast,Dinner Day 3 : EXCURSION MEDLA WATCH TOWER After breakfast start day trip to Medla Watch Tower. Medla Watchtower is located in the eastern part of the park. The best part about this watchtower is the bullock cart ride which is a must-do thing in this park. Later go for Jeep Safari. Overnight stay at Dooars. Breakfast,Dinner Day 4 : DOOARS TO KALIMPONG After breakfast transfer to Kalimpong. Overnight stay at Kalimpong.
    [Show full text]
  • Disaster Management Plan Office of the District Magistrate Kalimpong 2017
    1 Disaster Management Plan Office of the District Magistrate Kalimpong 2017 2 FOREWORD This hand book on District Disaster Management Plan (DDMP) of Kalimpong Disaster Management section for information, guidance and management in the event of any disaster for the year, 2017 has been prepared. It contains the core concept of Disaster Management comprising preparedness, prevention, early warning system, Disaster Impact, quick response, mitigation, recovery and relief. The booklet comprises a discussion on the Hazard ,Vulnerability, Capacity and Risk Assessment, Institutional Arrangement for Disaster Management, Prevention and Mitigation Measures, Preparedness Measures, Capacity Building and Training Measures, Response and Relief Measures, Reconstruction, Rehabilitation and Recovery Measures, Financial Resources for implementation of DDMP, Procedure and Methodology for Monitoring, Evaluation, Updating and Maintenance of DDMP, Coordination Mechanism for Implementation of DDMP and Standard Operating Procedure and Check list, etc. including vulnerability assessment of the weak areas, of the District. The shelter point of the Kalimpong Municipality area and three blocks have been provided. The past history of the land slide under this District has been highlighted. The basic reasons of land slide in hill areas also have been added in this booklet. The action plans of the respective block and other line departments have been included in this booklet too. I extend my sincere thanks to Shri Nirmalaya Gharami W.B.C.S (Exe) Sub Divisional Officer, Kalimpong Sadar and Shri Abul Ala Mabud Ansar W.B.C.S(Exe) O/C DM Section and Dr. R.P. Sharma Engineer of this Office who has prepared all technical portion of the booklet, along with the officer and staff of the Disaster Management Section of this office, without whose help these booklet would not have been completed in due time.
    [Show full text]