Download 349.51 KB i Due Diligence Report on Environment and Social Safeguards Final Report April 2015 UZB: Housing for Integrated Rural Development Investment Program Prepared by: Project Implementation Unit under the Ministry of Economy for the Republic of Uzbekistan and The Asian Development Bank ii ABBREVIATIONS ADB Asian Development Bank DDR Due Diligence Review EIA Environmental Impact Assessment Housing for Integrated Rural Development HIRD Investment Program State committee for land resources, geodesy, SCLRGCSC cartography and state cadastre SCAC State committee of architecture and construction NPC Nature Protection Committee MAWR Ministry of Agriculture and Water Resources QQB Qishloq Qurilish Bank QQI Qishloq Qurilish Invest This Due Diligence Report on Environmental and Social Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. iii TABLE OF CONTENTS A. INTRODUCTION ........................................................................................................... 4 B. SUMMARY FINDINGS .................................................................................................. 4 C. SAFEGUARD STANDARDS ........................................................................................ 4 D. DUE DILIGENCE PROCESS ........................................................................................ 5 E. FINDINGS ................................................................................................................... 10 F. CONCLUSIONS AND RECOMMENDATIONS ........................................................... 11 4 A. INTRODUCTION 1. To mitigate risks associated with inappropriate land selection an independent review of the HIRD safeguard due diligence process was commissioned for HIRD 2015 new housing sites (massifs). While the review was initially planned to be undertaken on a sample basis, it was determined that a 100% due diligence review would improve implementation of HIRD safeguard requirements nationwide, strengthen capacity of participating technical agencies, and better ensure compliance. B. SUMMARY FINDINGS 2. Of the 274 massifs proposed and considered for HIRD 2015, to date 209 massifs were approved for new construction of HIRD 2015 rural houses. For each of the approved massifs, a safeguard due diligence review was undertaken and compliance with national and ADB environmental and social safeguard requirements confirmed. The safeguard review process was undertaken in close coordination with the PIU and relevant technical agencies to ensure timely briefing and immediate corrective action on all GOU and ADB safeguard issues. 3. The safeguard due diligence review encompassed: a. A review of ADB and GOU safeguards requirements. b. An initial screening of massifs based on information provided by GOU. c. Field assessment of environmental and social risks and land acquisition or resettlement issues. 4. A desk review was undertaken of land selection documentsand assessments and certifications required from technical agencies for each of the 274 massifs. The documentation review was undertaken from 18 August 2014. 5. Site inspections were scheduled by region. Regional site inspections included a briefing on safeguard issues and ADB and GOU safeguards requirements for participating staff of regional and district local governments and technical agencies. Site inspections were undertaken starting 21 August 2014 to 13 September 2014,21October 2014 to 11 November 2014 and 03 February 2015 to 14 February 2015 C. SAFEGUARD STANDARDS 6. ADB Safeguard Policy Statement.The safeguard review was conducted on the basis of policy guidance provided by the ADB Safeguard Policy Statement (SPS) (2009) under three key areas: environment, involuntary resettlement, and indigenous peoples. 7. For safeguard purposes, HIRD is classified as FI category C. HIRD land selection criteria as specified by Tranche 3 loan and project agreements were used as a basis for the safeguard review. Criteria applied are: a. The site of the house plot must be on land approved by the District Hokimiyat for residential use. b. The site of the house plot must be on land that was classified as reserved land by the local government or administered by state agencies not later than 31 December 2012 for Tranche 3. c. The activities financed under the mortgage will not cause involuntary resettlement or have an adverse effect on Indigenous People, including any adverse effect on any third party land user of site where the house plot is located. d. The site of the house plot must not be situated in or near an area that has been classified as an environmentally sensitive area by the Regional Nature Protection Committee or the State Committee for Geology and Mineral Resources. 5 e. The site must have an environmental clearance from the Regional Nature Protection Committee. f. ADB's prohibited investment activity list applies as appended to the Loan Agreement. 8. GOU Safeguards.The safeguard review was conducted based on government safeguards regulations implemented by mandated technical agencies and state committees 1. The safeguard review confirmed that the following assessments and certifications were completed: a. Soil, geology, hydrology, groundwater, and sanitation assessments as undertaken by regional and district branches of responsible technical agencies. b. Certification of infrastructure requirements, i.e., access to water supply, gas and electricity networks, and fire safety arrangementsissued by district branches of relevant agencies. c. Environmental assessments asapproved by NPC, which includes: (i) confirmation by NPC that the proposed housing site is not located in an environmetally sensitive area, (ii) an environmental impact proposal prepared by QQI, and (iii) an environmental impact assessment (EIA) carried out by the NPC regional department of the NPC. D. DUE DILIGENCE PROCESS 9. Scope of Work. The first list of proposed massifs was prepared in September- December 2014 to January-April 2015, and subject to numerous revision prior to being finalized in April 2015. Table 1 reflects the extensive changes made. Table 1: Summary of Amendments Made to the List of Housing Sites September-December 2014 January-April 2015 Reduced* Increased** New*** Reduced* Increased** New*** National 26 15 41 12 14 12 Karakalpakstan - 1 2 - - - Andijan 1 - 3 1 1 1 Bukhara 1 1 - 1 1 - Djizak 1 - - - 1 2 Kashkadarya 6 - 1 1 1 1 Navoiy - - - - - - Namangan 3 3 9 1 2 5 Samarkand 2 3 2 2 2 2 Surkhandarya 5 1 5 2 2 - Sirdarya 2 1 7 1 2 - Tashkent 2 1 5 1 1 1 Ferghana 1 2 4 1 - - Khorezm 2 2 3 1 1 - * Sites with reduced number of massifs ** Sites with increased number of massifs *** Newly selected massifs 10. Desk Review.A two phased desk review was undertaken. Phase 1 comprised a review of (i) ADB Safeguard Policy Statement (SPS) (2009), and (ii) all relevant government legislation and regulations on national social and environmental safeguard requirements. 1 Attachment 1: List of agencies and mandates involved in the GOU Safeguard process. 6 11. Regulation of Land Acquisition and Resettlement. In Uzbekistan all land acquisition and/or resettlement is subject to the following laws and regulations: i. Law on “State Cadastre”, N171-II, December 2000. ii. Law on “State Land Cadastre”, N666-I, August 1998, amended 2002-2004. iii. Cabinet of Ministers Resolution on “Approval of the Regulation on the order of adjudication of land disputes in the Republic of Uzbekistan”, №246, May 1992. iv. Cabinet of Minister Resolution on “Order of realization into private property of objects of trade and public services together with land plots, where they are located, and land plots into life inherit tenure”, №126, April 1995, amended CoM Resolution № 202, April 1999. v. Cabinet of Ministers Resolution on “Land Acquisition and Compensation for State and public needs” № 97, May 2006. vi. Cabinet of Ministers Resolution on “Procedure for granting land for urban development and other non-agricultural activities”, № 146, May 2011. vii. Cabinet of Ministers Resolution on “Procedure for granting land for urban development and other non-agricultural activities”, № 54, May 2013. viii. Resolution of the State Committee of the Republic of Uzbekistan on Land Resources, Geodesy, Cartography and State Cadastre, Ministry of Agriculture and Water Resources of Uzbekistan and of the State Committee of the Republic of Uzbekistan for Architecture and Construction, Reg. No. 2464 dated from 03.06.2013. 12. Regulation of Environmental Issues. In accordance with national environmental legislation 2, an environmental assessment must be conducted for all types of construction activities. The scope of the environmental assessment is defined in the Appendix to the Resolution of CoM No.491, dated 31.12.2001. Based on this Resolution, HIRD rural house construction activity is categorized as Class 4, having a low environmental impact. 3 As a Class 4 activity, 4 an environmental impact statement (EIS) must be prepared, and environmental clearance for each massif obtained from the regional NPC, prior to commencing construction works. During construction, the district NPC is required
Recommended publications
  • Research Article Temirov Sherali Abdikhalilovich the Proper Names
    April 2018 e-ISSN: 1857-8187 p-ISSN: 1857-8179 Research Article Linguistics Keywords: toponym, orographic objects, Oronymic Dimension and Branch of oronym, oronymy, oronymics, oronymic Oronymics sphere, names of mountains, names of belts, names of peaks, names of passes, (on the basis of materials of Samarkand region) names of hills, names of cliffs, names of uplands, names of descents, names of whirlpools, etc. Temirov Sherali Researcher of Samarkand State University. City Samarkand, Uzbekistan Abdikhalilovich Abstract Oronym, oronymic terms are analysed on the basis of Samarkand region materials, oronymic dimension of the Uzbek language, oronymic objects are defined, sphere of oeonymics and its issues to study, several tasks of Uzbek oronymics are given in this article. Important information about relations of oronyms with other types of toponymics: oykonym, hydronym, urbonym, drymonym, phitonym, zoonym; connection with folklore, history, geography. As a result of scientific researches in the sphere of Uzbek toponymy some scientists worked on oronymy. Besides oronymics as a department of toponymics has its object and subject to study. The ancientness, stability, including different historical-geographical information; demand to study such subjects as history, geography, archeology, country study and linguistics; implementation of experiments of world onomastics into Uzbek oronymics; creating etymological, practical transcriptional-comparative dictionaries are the most actual tasks of Uzbek toponymics. The proper names of orographic objects in the Uzbek language toponymy compose particular semantic group. Oronyms have defined as following in scientific sources of toponymy. S.Karimov and S.Buriev considered that oronyms are ―names of mountains‖ and such words as peak, hill, upland, pass, canyon, precipice can be included into this group [3, p.
    [Show full text]
  • The Traditions of Carpet Weaving in the Southern Regions of Uzbekistan
    ------------------------------------------------------------------------------------------------------------------------------------------------------------------- EPRA International Journal of Socio-Economic and Environmental Outlook (SEEO) ISSN: 2348-4101 Volume: 8 | Issue: 3| March 2021 | SJIF Impact Factor (2021): 7.426 | Journal DOI: 10.36713/epra0314 | Peer-Reviewed Journal THE TRADITIONS OF CARPET WEAVING IN THE SOUTHERN REGIONS OF UZBEKISTAN Davlatova Saodat Tilovberdiyevna Doctor of Science Of the National University of Uzbekistan, The Head of the «Applied Ethnology» laboratory Abdukodirov Sarvar Begimkulovich, Teacher of Jizzakh State Pedagogical University, Tashkent, Uzbekistan ANNOTATION In the article is enlightened local features of traditions of the Uzbek carpet weaving on examples of samples from southern regions (Kashkadarya and Surkhandarya regions) of Uzbekistan. Also, are shown distinctive features in the processes of preparing raw materials and weaving machines, including the dyeing process of yarns, and are also described types of carpets and their features. KEY WORDS: carpet weaving, craft, loom, types of carpets, wool, carpet products DISCUSSION At the end of the 19th century and at the Carpet weaving is a long developed rare beginning of the 20th century the main raw material type of textile, it has been continuing its traditions of carpet weaving was sheep wool. The carpet for ages[4]. Mainly women deal with carpet weaving weavers of the southern regions almost didn’t use the and they knit many household furnishings, felt rugs, wool brought from Russia. But, there is information felts, carpets and other carpet products. about that they used the products brought from Carpet weaving is basically tightly Afghanistan, Iran and Eastern Turkistan[14]. connected with livestock, it is developed in Andijan, On the carpets of Kashkadarya the Samarkand, Kashkadarya, Surkhandarya, Bukhara traditions of carpet weaving of desert livestock cities of Uzbekistan and lowlands of Amudarya and breeder tribes are seen.
    [Show full text]
  • Housing for Integrated Rural Development Improvement Program
    i Due Diligence Report on Environment and Social Safeguards Final Report June 2015 UZB: Housing for Integrated Rural Development Investment Program Prepared by: Project Implementation Unit under the Ministry of Economy for the Republic of Uzbekistan and The Asian Development Bank ii ABBREVIATIONS ADB Asian Development Bank DDR Due Diligence Review EIA Environmental Impact Assessment Housing for Integrated Rural Development HIRD Investment Program State committee for land resources, geodesy, SCLRGCSC cartography and state cadastre SCAC State committee of architecture and construction NPC Nature Protection Committee MAWR Ministry of Agriculture and Water Resources QQL Qishloq Qurilish Loyiha QQI Qishloq Qurilish Invest This Due Diligence Report on Environmental and Social Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. iii TABLE OF CONTENTS A. INTRODUCTION ........................................................................................................ 4 B. SUMMARY FINDINGS ............................................................................................... 4 C. SAFEGUARD STANDARDS ......................................................................................
    [Show full text]
  • Agricultural Efficiency Under Resources Scarcity in Uzbekistan: a Data Envelopment Analysis | BEH, January 2011
    Agricultural efficiency under resources scarcity in Uzbekistan: A Data Envelopment Analysis | BEH, January 2011 Peer-reviewed and Open access journal BEH - Business and Economic Horizons ISSN: 1804-1205 | www.pieb.cz Volume 4 | Issue 1 | January 2011 |pp. 81-87 Agricultural efficiency under resources scarcity in Uzbekistan: A Data Envelopment Analysis Shavkat Hasanov 1, Ahmed Mirza Nomman 2 1Agricultural economics and management department, Samarkand Agricultural Institute 2Agricultural Policy and Market Research Institute, Justus Liebig University of Giessen, Giessen, Germany. e-mails: [email protected]; [email protected] Water scarcity and land degradation increases led to a sharp rise in input resource’s costs. These developments make it increasingly difficult for agricultural farms to produce according to the demand for food and other commodities, especially owing a rapid population growth. The present study aims to focus on scarce resource use in the agricultural production of the Zarafshan valley by means of the efficiency analysis. A DEA model is estimated to investigate the farm level efficiency levels with respect to the use of the limited resources available to the farmers. By the application of linear programming methods a ‘best practice frontier is estimated’, classifying farms on the frontier as efficient and others as inefficient with respect to different scales. Technical and allocative efficiencies are calculated relative to the frontier. Results shows input resources are not used efficiently and a great majority of farms could effectively reduce considerable amounts of input use by still producing the same output. JEL Classifications: C81, D24, Q12 Keywords: Efficiency, Zaravshan valley, household survey, scarce resources, DEA model.
    [Show full text]
  • The University of Chicago Old Elites Under Communism: Soviet Rule in Leninobod a Dissertation Submitted to the Faculty of the Di
    THE UNIVERSITY OF CHICAGO OLD ELITES UNDER COMMUNISM: SOVIET RULE IN LENINOBOD A DISSERTATION SUBMITTED TO THE FACULTY OF THE DIVISION OF THE SOCIAL SCIENCES IN CANDIDACY FOR THE DEGREE OF DOCTOR OF PHILOSOPHY DEPARTMENT OF HISTORY BY FLORA J. ROBERTS CHICAGO, ILLINOIS JUNE 2016 TABLE OF CONTENTS List of Figures .................................................................................................................... iii List of Tables ...................................................................................................................... v Acknowledgements ............................................................................................................ vi A Note on Transliteration .................................................................................................. ix Introduction ......................................................................................................................... 1 Chapter One. Noble Allies of the Revolution: Classroom to Battleground (1916-1922) . 43 Chapter Two. Class Warfare: the Old Boi Network Challenged (1925-1930) ............... 105 Chapter Three. The Culture of Cotton Farms (1930s-1960s) ......................................... 170 Chapter Four. Purging the Elite: Politics and Lineage (1933-38) .................................. 224 Chapter Five. City on Paper: Writing Tajik in Stalinobod (1930-38) ............................ 282 Chapter Six. Islam and the Asilzodagon: Wartime and Postwar Leninobod .................. 352 Chapter Seven. The
    [Show full text]
  • Download Download
    INTERNATIONAL JOURNAL OF DISCOURSE ON INNOVATION, INTEGRATION AND EDUCATION Volume: 02 Issue: 02 | February 2021 ISSN: 2181-1067 http://summusjournals.uz/index.php/ijdiie The situation with Walnut Production in Andijan Province, efficiency, and problems Barno Rakhmonova ABSTRACT: The study of the role of the walnut market at the national and regional levels and the need to develop EMAIL: [email protected] their activities is of scientific and practical importance through a comprehensive in-depth analysis of available Andijan Agriculture and Agri- sources. One of the most important aspects of this topic is technologies Institute the improvement of the organizational and economic Senior lecturer of the Agricultural framework of the system of walnut production in Andijan economics Department province and the development of scientifically based recommendations for future development. The walnut market is a relatively new market for Uzbekistan and is currently in its first steps. The importance of this market is growing every year for the following reasons. First, it is a resource base for confectionery, bakery products. For enterprises in this area, it is much cheaper to buy walnuts in the form of roasted (roasted, crushed, etc.) in accordance with international standards, rather than in the form of raw materials. Second, it is the sale of packaged nuts in the retail system. Marketing research conducted by the author has shown that the population’s demand for nuts is growing rapidly. Third, the export of these roasted and crushed nuts is important. KEYWORDS: walnut production, walnut yield, gross yield, efficiency, agrocluster, food market Walnut is a very useful tree and is planted in 1-2-year-old seedlings.
    [Show full text]
  • Water Supply and Sanitation Services Investment Program - Tranche 1 (Navoi)
    Environmental Monitoring Report Bi-annual Report January-June 2013 UZB: Water Supply and Sanitation Services Investment Program - Tranche 1 (Navoi) Prepared by “Uzkommunhizmat” (UCSA) for the Government of Uzbekistan and the Asian Development Bank. WATER SUPPLY AND SANITATION SERVICES INVESTMENT PROGRAM Tranche 1 Environmental Monitoring Report according to the project "Modernization of an interregional Damkhodzhinsky water supply system with connection to it regional centers of Navoiysky and Bukhara areas. Reconstruction of system of the sewerage Termez" on Navoiysky area I SECTION INTRODUCTION The project "Modernization of the Damkhodzhinsky interregional water supply system with connection to it regional centers of Navoiysky and Bukhara areas. Reconstruction of system of the sewerage Termez" is the first draft of the Investment program of multitranche financing of Asian Development Bank "Water supply and sanitation service". Implementation of the project is provided at the expense of borrowed funds of ABR in the sum of 60 million US dollars (tranche No. 1) and means of joint financing of the Republic of Uzbekistan in the sum equivalent to 15 million US dollars. Total cost of the project – 75 million US dollars. The structure of the project includes two subprojects: - Modernization of the Damkhodzhinsky interregional water supply system with connection to it regional centers of Navoiysky and Bukhara areas; - Reconstruction of system of the sewerage Termez. In this volume the description of the "Modernization of the Damkhodzhinsky Interregional Water Supply System with Connection to It Regional Centers of Navoiysky and Bukhara Areas" subproject is submitted. The description of the "Reconstruction of System of the Sewerage Termez" subproject is submitted in volume II (Books 1 – 6).
    [Show full text]
  • INTERNATIONAL JOURNAL on ORANGE TECHNOLOGIES E- ISSN: 2615-8140|P-ISSN: 2615-7071 Volume: 03 Issue: 05 | May 2021
    INTERNATIONAL JOURNAL ON ORANGE TECHNOLOGIES www.journalsresearchparks.org/index.php/IJOT e- ISSN: 2615-8140|p-ISSN: 2615-7071 Volume: 03 Issue: 05 | May 2021 Diseases of Roots and Root in Winter Wheat in Uzbekistan Turdiyeva Dilfuza Tirkashboyevna, PhD, senior lecturer of the department of Plant Protection, Andijan Agricultural and Agrotechnological Institute in Andijan city. Senior Researcher of the Andijan Regional Branch of the Plant Quarantine Research Centre. Aznabakieva Dilrabo Tursunboevna, Senior lecturer of the Department of Plant Protection, Andijan Agricultural and Agrotechnological Institute in Andijan city. [email protected] Xusanov Baxriddin Baxtiyrjon ugli, 4rd year student, Andijan Agricultural and Agrotechnological Institute in Andijan city. Xayitalieva Gulxayo Abdusamad qizi, 2rd year student, Andijan Agricultural and Agrotechnological Institute in Andijan city. ------------------------------------------------------------------------***----------------------------------------------------------------- ABSTRACT Key words: winter wheat, root and foot rot, The occurrence of root and foot rot diseases whitehead, Fusarium spp., Bipolaris sorokiniana, on winter wheat fields has been surveyed in 16 Microdochium bolleyi, Heterodera avenae. districts of six regions of Uzbekistan. Reports about INTRODUCTION wide occurrence of Fusarium root and foot rots on Winter bread wheat Triticum aestivum L. wheat fields have been confirmed, and causal grown on irrigated areas may be considered as a agents have mostly been identified. For the first relatively new crop for Uzbekistan because at time in Uzbekistan severe infection of winter wheat Soviet times it has been considered as unimportant seedlings with common root rot (caused by B. and had been cultivated exclusively on unirrigated sorokiniana) has been determined on irrigated (boghara) drylands, mostly foothills, on limited fields in two districts of Bukhara region.
    [Show full text]
  • Business & Human Rights Resource Centre Berlin, 22 Januar 2019 Dear
    UZBEK-GERMAN FORUM FOR HUMAN RIGHTS E.V. Oppelner str. 48-49 10997 Berlin +49 (0)176 3120 2474 [email protected] www.uzbekgermanforum.org Business & Human Rights Resource Centre Berlin, 22 Januar 2019 Dear Ms Skybenko, On behalf of the Uzbek-German Forum for Human Rights (UGF), I am writing to draw your attention to the systemic use of forced labour by the Uzbek-Spanish joint ventures Maxam-Chirchiq and Ammofos- Maxam, located respectively in the cities of Chirchiq and Almalyk in the Tashkent region of Uzbekistan. Every year, employees from Maxam-Chirchiq and Ammofos-Maxam are forcibly sent to pick cotton for up to two months during the harvest. This often involves living and working in inappropriate conditions, away from their families, with inadequate food, water and sanitary facilities. Employees risk dismissal from their jobs for refusal to pick cotton and many who speak to journalists and human rights activists are unwilling to reveal their names for fear of reprisals by their employers. Our research has found that forced labour at Maxam-Chirchiq and Ammofos-Maxam is not limited to picking cotton. In the summer of 2018, 120 employees of Maxam-Chirchiq were forced to go to the city of Akhangaran every day (located 82 km from Chirchiq) to work on demolishing buildings and clearing construction waste. Employees of Maxam-Chirchiq and Ammofos-Maxam have been forcibly mobilised to harvest cotton every autumn for many years under orders of the Government of Uzbekistan. We are aware of two deaths of employees of Maxam-Chirchiq and Ammofos-Maxam related to work in the cotton fields during the harvests of 2014 and 2018.
    [Show full text]
  • Uzbekistan: Population Movement
    Emergency appeal n° MDRUZ002 Uzbekistan: GLIDE n° OT-2010-000113-UZB Population Movement 15 July 2010 This revised Emergency Appeal seeks CHF 1,166,159 in cash, kind, or services to support the Uzbekistan Red Crescent Society which provided assistance to tens of thousands of refugees from Kyrgyzstan in June and July 2010. The revised appeal will cover the period of six months and will be completed by the end of December 2010. A Final Report will be made available by 31 March 2011, three months after the end of the operation. CHF 300,000 was allocated on 15 June from the International Federation of Red Cross and Red Crescent (IFRC) Disaster Relief Emergency Fund (DREF) to support this operation. The Red Crescent provided tents, clothing and mattresses to refugees upon their arrival. Photo: Uzbekistan RC/Namangan Appeal history: • This Emergency Appeal was initially launched with a target of CHF 4.15 million, on a preliminary basis, on 16 June 2010 for 6 months to assist 24,000 beneficiaries. • Disaster Relief Emergency Fund (DREF): CHF 300,000 was allocated from the International Federation’s DREF to support the National Society to respond. • This revised Emergency Appeal seeks CHF 1,166,159 in cash, kind, or services to support the Uzbekistan Red Crescent Society. As per 15 July 2010 the coverage of the revised appeal is 102 per cent. The IFRC is not appealing for additional funding through this appeal due to the changed situation and as initial needs are covered. Please see the donor response list for information on contributing donors.
    [Show full text]
  • T/R 1 1-O'rin 2 2-O'rin 3 3-O'rin 4 5 6 7
    T/r Vaqti Ball F.I.SH Hududingiz 1 12:10:05 20 / 20 RUSTAMOV OG'ABEK ILYOSJON OG'LI Beshariq tumani 1-o'rin 2 12:12:43 20 / 20 Ibrohimov Axror Quva tumani 2-o'rin 3 12:17:33 20 / 20 Xoshimova Sarvinoz Qobiljon qizi Bag'dod tumani 3-o'rin 4 12:19:12 20 / 20 Mamataliyeva Dildoraxon Muhammadali qizi Yozyovon tumani 5 12:21:17 20 / 20 Umarova Sug'diyona Beshariq tumani 6 12:23:02 20 / 20 Egamnazarova Shahloxon Dang'ara tumani 7 12:23:24 20 / 20 Qodirov Javohir Beshariq tumani 8 12:24:38 20 / 20 Jo'raboyeva Zebiniso Farg'ona shahar 9 12:24:46 20 / 20 Sotvoldieva Guloyim Rustambekovna Farg'ona shahar 10 12:25:54 20 / 20 Ismoilova Gullola Farg'ona tumani 11 12:27:46 20 / 20 Bektosheva Mohlaroy Anvarjon qizi Farg'ona shahar 12 12:28:42 20 / 20 Turģunov Shukurullo Quva tumani 13 12:29:18 20 / 20 Yusupova Niginabonu Ne'mat qizi Quva tumani 14 12:29:20 20 / 20 Tohirjonova Diyora Farg'ona shahar 15 12:32:35 20 / 20 Abdullayeva Shaxnoza Farg'ona shahar 16 12:33:31 20 / 20 Qo'chqorov Jahongir O'zbekiston tumani 17 12:43:17 20 / 20 Arabboyev Jòrabek Quva tumani 18 12:48:56 20 / 20 Muhammadjonova Odina Yoqubjon qizi Qo'qon shahar 19 12:51:32 20 / 20 Abdumalikova Ruhshona Abrorjon qizi Dang'ara tumani 20 12:52:11 20 / 20 G'ulomjonov Muhammadjon Rishton tumani 21 12:52:25 20 / 20 Mirzayev Samandar Quva tumani 22 12:55:03 20 / 20 Toirov Samandar Quva tumani 23 12:56:05 20 / 20 Tolipova Gulmira Bag'dod tumani 24 12:57:36 20 / 20 Ikromjonova Shohroʻza Quva tumani 25 12:57:45 20 / 20 Solijonova Marxabo Bag'dod tumani 26 12:06:19 19 / 20 Ochildinova Nilufar
    [Show full text]
  • Essential Fact36 2020 (PDF, 973.8
    NAME OF ISSUER 1 Full company name: “KAFOLAT Insurance Company” Joint Stock Company . Abbreviated company name: “KAFOLAT Insurance Company” JSC Ticker symbol:* KFLT CONTACT INFORMATION Location: 13-13A, Amir Temur Avenue, Mirabad District, Tashkent 100000 2 Postal address: 13-13A, Amir Temur Avenue, Mirabad District, . Tashkent 100000 e-mail: [email protected] Web-site: www.kafolat.uz STATEMENT OF ESSENTIAL FACT Essential fact code: 36 Essential fact name: Changes in the list of affiliated persons The Location (place of number of Type residence) (postal Full name of an individual or full securities of address) of an affiliated Event Type name of a legal entity (the size of securit person (state, province, the share, ies city, district) units) 3 Bakhtiyor R. Rustamov Tashkent, Uzbekistan Excluded . Azizbek A. Ayupov Tashkent, Uzbekistan Excluded Nodirbek J. Khusanov Tashkent, Uzbekistan Excluded Saydullo P. Abdullaev Tashkent, Uzbekistan Added Sharofiddin Sh.Akhmedov Tashkent, Uzbekistan Added Khumoyun O. Bakhtiyorov Tashkent, Uzbekistan Added Date of the issuer making the relevant change to June 26, 2020 the list of affiliated persons: The list of affiliated persons: Location (residence) Full name of affiliated persons Date of № (state, province, city, Grounds of affiliation and legal entity affiliation district) Agency for Management of legal entity which owns State Assets of the June 26, 1 Tashkent, Uzbekistan more than 20 percent of the 2020 Republic of Uzbekistan shares of the JSC a legal entity with twenty or more percent in the authorized
    [Show full text]