Grantham North TRSA A1, Gonerby Moor, Grantham, Lincolnshire NG32 2AB

Total Page:16

File Type:pdf, Size:1020Kb

Grantham North TRSA A1, Gonerby Moor, Grantham, Lincolnshire NG32 2AB INVESTMENT OPPORTUNITY Grantham North TRSA A1, Gonerby Moor, Grantham, Lincolnshire NG32 2AB Prime Trunk Road Service Area • Income guaranteed by Compass Group plc • Unrestricted RPI rent reviews • Very low site coverage (9.78 acres) INVESTMENT SUMMARY Description Tenure & Tenancy Proposal • A self-contained trunk road service area located • Let in its entirety to MOTO Hospitality Ltd. • Offers sought in excess of £12,865,000 (Twelve in a prime position on the A1 Full Compass Group PLC guarantee. This offers a Million Eight Hundred and Si xty Five Thousand Standard and Poors rating of ‘A’ with a 2014 Pounds) reflecting an attractive net initial yield • Situated in the heart of Lincolnshire, 5km north of turnover of £17.058bn and profit of £1.147bn of 7.00% having allowed for purchaser’s costs Grantham of 5.80%. • The property is let on a 25 year lease without • Central pavilion housing WH Smith, Costa and break options from May 2000, giving an Burger King, a BP Petrol Station and a unexpired term of 9.6 years Travelodge Hotel • Current passing rent of £952,768 per annum Guaranteed by • Adjacent to Downtown that comprises Boundary Mill Stores, which is an out-of-town department • Unrestricted RPI uplifts reviewed annually with Compass Group plc superstore, industrial dist ribution units and the next uplift on the 1st April 2016 Downtown Garden Centre • Freehold Unrestricted RPI rent reviews Exceptionally low site cover MM M6 LEEDSLEEDS DOONNCCAASTTEERR LIIVERPOOL 19 A529 HOLYHEAD MANCHESTERMANCHESTER SHEFFIELD A55 A158 M6 M1 A523 GRANTHAAMM NOTTIINGHHAM A52 A17 A458 A1 21A BIIRMIINGHAM COVENTRY A11 ABERYSTWYTH 19 4A 16 A483 A49 M1 M11 LOCATION M5 M40 FELFELIIXXSSTTOOWWEE GLOUCESTER OXFORD Location Communication Grantham North Trunk Road Service Station (TRSA) is Grantham North TR SA benefits from excellent located at the junction of the A1 and B1174, 5 km north road communications being situated adjacent to SHEFFIELD of the Lincolnshire market town of Grantham. Newark the A1 at the Gonerby Moor junction. This is the GONE RBY L G ANE R E on Trent is located 20 km (12 miles) to the north along UK’s principal A-road that in 2014 had an average A D T A O the A1, Nottingham is 40 km (25 miles) to the west via daily flow of 37,032 cars per day (Department for R N N R D the A45, Cambridge and London are located 106 km Transport) providing access from London to many O O A T A O G R D N H (66 miles) and 183 km (114 miles) to the south via the of the major conurbations in East Anglia, the I BEL TO L N G I L H LA A N E A1(M) respectively. North East and the wider UK motorway network. A1 Situation B 1 17 4 A52 The property is situated on the junction where the A1 A1 meets the Great North Road (B1174) in Gonerby B1174 Moor, which provides access immediately onto the A1 in both northerly and southerly directions. MOTO SERVICES GRANTHAM D The main entrance to the TRSA is shared with the ROA DYSART G R Downtown development that includes Boundary Mill E A T N Stores, but can be accessed from adjacent roads that O R T T F H I disperse from the Junction of the A1 and the B1174 R R O D A D E BO H interchange roundabout. UN M T IL DA C L R S Y T A OR ES S T T H O BE L R B VO IR P LONDON 1 1 E RO 7 A 4 D R O A D 1 2 3 4 5 6 7 8 9 1 Sharmans Agricultural AM NTH 2 BP Petrol Station GRA 3 Travelodge Hotel 4 17 4 Grantham B1 Distribution Development Site 5 Boundary Mill Stores 6 Downtown Distribution 7DLS Plastics AD 8Downtown RO TH Garden Centre OR T N 9 Brakes EA GR Grantham North TRSA ON LOND A1 LD FFIE SHE SITUATION DESCRIPTION Grantham TRSA first opened in 1983 and provides a self-contained service area. The site is accessed via a shared entrance with the Adjacent to Downtown Downtown development or via the Great North Road (B1174). The site is built around a single-storey central pavilion housing that comprises Boundary traditional franchised services, such as WH Smith, Costa Coffee, Burger King and a Mill Stores Department cafeteria/restaurant operated as The Eat & Drink Company. The pavilion also provides Superstore, industrial facilities for motorists including WCs, showers, internal and external seating areas, units and garden ATMs and an amusement arcade. The TRSA also houses a BP petrol filling station that centre provides its own retail space, ancillary office accommodation and a 40 bedroom Travelodge hotel. The site is laid out to provide a large volume of car, coach and in particular lorry parking. Downtown is adjacent to the subject property and comprises Boundary Mill Stores, which is an out of town department superstore offering quality fashion and homeware brands, industrial distribution units and Downtown Garden Centre. The land either side of the TRSA is currently on the market as future development sites. The land to the south of the site has planning consent for a new distribution warehouse totalling 214,881 sq ft (19,963 sqm). Site The property is situated on a site with an area of approximately 3.96 hectares (9.78 acres). Low site coverage (9.78 acres) ACCOMMODATION The property has been measured by Plowman Craven in accordance with the RICS Code of Measuring Practice on a Gross Internal Area basis as follows: Main Building – Main Building – Main Building – Main Building – Total Burger King MOTO Costa Coffee WH Smith Fuel Payment Office Block GIA Travelodge – 115.7 sq m 1,023.7sq m 91.7 sq m 159.9 sq m 48.0 sq m 60.3 sq m 1,499.3 sq m 40 Bedrooms (1,245 sq ft) (11,019 sq ft) (987 sq ft) (1,721 sq ft) (517 sq ft) (649 sq ft) (16,138 sq ft) Tenancy The property is let and occupied by MOTO Hospitality Ltd on a full repairing and insuring lease with a guarantee from Compass Group PLC (S&P Credit Rating of A) for a term of 25 years from 12th May 2000 without breaks. There is therefore in excess of 9.6 years unexpired. The current passing rent of £952,768 per annum exclusive is subject to annual, unrestricted, upward only increases in line with 100% of the retail price index, with effect from the 1st April every year. The rent review mechanism takes the passing rent and multiplies it by the percentage change in the RPI index over the preceding 12 months, always using the reference index figures for the month of November. Since the start of the lease, the average annual increase has been 2.94% per annum. The retail price index forecast for 2015 is 1.10% (Source: Bloomberg). As at 9th October 2015, the 10 year swap was trading at 3.02%. Tenure The property is held freehold. MOTO Hospitality Limited Compass Group PLC The UK’s leading motorway service area operator. They A world leading food service and support services occupy 45 service stations throughout the UK and employ organisation, which operates in 50 countries and employs over 6,000 staff. The name MOTO was adopted in May 2001 over 470,000 people worldwide. The company provides when Granada rebranded following the demerger of the catering at a variety of events around the globe including ultimate parent company earlier in 2001, Granada Compass exhibitions, conferences and sporting occasions, and serves PLC, into Compass Group PLC and Granada Media. an estimated 4 billion meals per year. Universities Superannuation Scheme Ltd (USS) has Compass Group PLC has a Standard and Poors rating of ‘A’ Let to MOTO Hospitality Ltd, announced it has reached a definitive agreement to acquire and an outlook of Stable. 100% interest in the Moto Group, the largest motorway A summary of the financial performance over the last three guaranteed by Compass service station operator in the UK. USS is one of the largest years is as follows: pension schemes in the UK with over £38bn under Group plc Compass Group management. 30/09/2012 ( £) 30/09/2013 ( £) 30/09/2014 ( £) PLC Further information can be found on their website: Turnover 16,905,000,000 17,557,000,000 17,058,000,000 www. moto-way.com Pre-Tax Profit 789,000,000 721,000,000 1,147,000,000 Further information can be found on their website: www.compass-group.co.uk TENANT COVENANTS Investment Rationale Trunk Road Service Area well located in a prime position on the A1 Leased to MOTO Hospitality Limited for approximately 9.6 years Full Compass Group PLC guarantee, ‘A’ S&P credit rating Freehold Annual upward only unrestricted RPI reviews The yield profile rises annually as follows: Year Passing Rent NIY % 2015 £952,768 7.00 2016 £975,634 7.17 2017 £1,005,879 7.39 2018 £1,036,257 7.61 Unexp Address Date Acres Rent pa Price £ Yield Comments 2019 £1,067,552 7.84 Term Woolley Edge Motorway August 2014 30 £2,534,215.99 11 years £35,100,000 6.8% Purchaser – Orchard Street 2020 £1,099,792 8.08 Service Station Doncaster North Motorway August 2014 15.69 £1,400,023.58 11 years £20,500,000 6.4% Purchaser –CBRE Global Investors 2021 £1,133,005 8.32 Service Station Pease Pottage Motorway January 2011 6.25 £515,057 14 years £8,850,000 5.5% Purchaser –BAE Systems Pension Fund 2022 £1,167,222 8.58 Service Station 2023 £1,202,472 8.83 2024 £1,238,787 9.10 INVESTMENT MARKET 2025 £1,276,198 9.38 * On the basis of the 10 year RPI swap rate.
Recommended publications
  • Multiple Group Description Trading Name Number and Street Name
    Multiple Group Description Trading Name Number And Street Name Post Code Tesco Supermarkets TESCO BALLYMONEY CASTLE ST CASTLE STREET BT53 6JT Tesco Supermarkets TESCO COLERAINE 2 BANNFIELD BT52 1HU Tesco Supermarkets TESCO PORTSTEWART COLERAINE ROAD BT55 7JR Tesco Supermarkets TESCO YORKGATE CENTRE YORKGATE SHOP COMPLEX BT15 1WA Tesco Express TESCO CHURCH ST BALLYMENA EXP 99-111 CHURCH STREET BT43 8DG Tesco Supermarkets TESCO BALLYMENA LARNE ROAD BT42 3HB Tesco Express TESCO CARNINY BALLYMENA EXP 144 BALLYMONEY ROAD BT43 5BZ Tesco Extra TESCO ANTRIM MASSEREENE CASTLEWAY BT41 4AB Tesco Supermarkets TESCO ENNISKILLEN 11 DUBLIN ROAD BT74 6HN Tesco Supermarkets TESCO COOKSTOWN BROADFIELD ORRITOR ROAD BT80 8BH Tesco Supermarkets TESCO BALLYGOMARTIN BALLYGOMARTIN ROAD BT13 3LD Tesco Supermarkets TESCO ANTRIM ROAD 405 ANTRIM RD STORE439 BT15 3BG Tesco Supermarkets TESCO NEWTOWNABBEY CHURCH ROAD BT36 6YJ Tesco Express TESCO GLENGORMLEY EXP UNIT 5 MAYFIELD CENTRE BT36 7WU Tesco Supermarkets TESCO GLENGORMLEY CARNMONEY RD SHOP CENT BT36 6HD Tesco Express TESCO MONKSTOWN EXPRES MONKSTOWN COMMUNITY CENTRE BT37 0LG Tesco Extra TESCO CARRICKFERGUS CASTLE 8 Minorca Place BT38 8AU Tesco Express TESCO CRESCENT LK DERRY EXP CRESCENT LINK ROAD BT47 5FX Tesco Supermarkets TESCO LISNAGELVIN LISNAGELVIN SHOP CENTR BT47 6DA Tesco Metro TESCO STRAND ROAD THE STRAND BT48 7PY Tesco Supermarkets TESCO LIMAVADY ROEVALLEY NI 119 MAIN STREET BT49 0ET Tesco Supermarkets TESCO LURGAN CARNEGIE ST MILLENIUM WAY BT66 6AS Tesco Supermarkets TESCO PORTADOWN MEADOW CTR MEADOW
    [Show full text]
  • Store List For
    Re-opened stores - 18th June 2020 Delivery (via Uber Eats) Leicester St Georges RP LE1 1SG London Tooley Street SE1 2AF Peterbro Brotherhood PE4 6ZR Takeaway & Delivery (via Uber Eats) Leeds Crown Point LS10 1EW Takeaway & Mobile Order (via Costa App) Ascot SL5 7HY Ayr RP KA8 9BF Basildon SS14 1BA Basildon Pipps Hill SS14 3AF Bath BA1 1QH Bath Mero RP BA2 3GL Beckton Shopping Pk E6 7ER Bham Selly Oak B29 6SN Billericay CM129BT Bristol College Grn BS1 5TB Bromley Market Sq BR1 1NF Cambs Viking Way CB23 8EL Carlisle CoUrt Sq CA1 1QX Chadwell Heath RP RM6 4HX Chelmsford Clocktwr CM1 3FJ Cheltenham RP GL51 9RR Chippenham High St SN15 3ET Chorlton M21 9AQ ChristchUrch RP BH23 2BN Crawley CoUntry Oak RH11 7XN Croydon North End CR0 1TL Edin Straiton RP EH20 9QY Enfield RP EN1 3RW Fort Manchester M8 8EP Glasgow George HoUse G2 1EH Great Portland St W1W 8QJ Greenford Westway UB6 0UW Greenwich ChUrch St SE10 9BL Greenwich PeninsUlar SE10 0EN Hale WA15 9SF Haverhill High St CB9 8AR Haverstock Hill NW3 2AG Hayes UB3 3EX Hayle TR27 5LX High Wycombe HP11 2BN Holloway Road N7 6PN Kingston KT1 1JH Leeds Merrion LS2 8BT Leicester Haymarket LE1 3YR Leigh on Sea SS9 1PA Lon Brent Cross Sth NW2 1LS Lon Charlton SE7 7AJ Lon Friern Bridge RP N11 3PW Lon Leyton Mills RP E10 5NH Lon SoUthampton St WC2E 7HG Lon SoUthwark SE1 8LP Lon Staples CornerRP NW2 6LW Lon Wembley Central HA9 7AJ LoUghton IG10 1EZ Manchester Market St M1 1WA Manchester Portland M60 1HR Milton Keynes Kingst MK10 0BA NewqUay TR7 1DH Northampton NN1 2AJ Orpington BR5 3RP Perth Inveralmond RP
    [Show full text]
  • MOTO HOLDINGS LIMITED REPORT and FINANCIAL STATEMENTS CONTENTS Page
    Company Registration No. 5754555 MOTO HOLDINGS LIMITED and subsidiary companies Report and Financial Statements 52 weeks ended 29 December 2010 MOTO HOLDINGS LIMITED REPORT AND FINANCIAL STATEMENTS CONTENTS Page Officers and professional advisers 1 Directors' report 2 Directors' responsibilities statement 8 Independent auditors' report 9 Consolidated profit and loss account 11 Consolidated statement of total recognised gains and losses 11 Consolidated balance sheet 12 Company balance sheet 13 Consolidated cash flow statement 14 Notes to the financial statements 15 MOTO HOLDINGS LIMITED OFFICERS AND PROFESSIONAL ADVISERS REPORT AND FINANCIAL STATEMENTS 2010 DIRECTORS G Parsons M Perusat (appointed 13 December 2010) D Bogg (resigned 3 November 2010) SECRETARY R Prynn REGISTERED OFFICE Toddington Services Area Junction 11-12 M 1 Southbound Toddington Bedfordshire LU56HR AUDITORS Deloitte LLP, Chartered Accountants and Statutory Auditors Nottingham, UK BANKERS Barclays Bank plc 27 Soho Square London WlD 3QR LAWYERS DLA Piper UK LLP 3 Noble Street London EC2V 7EE MOTO HOLDINGS LIMITED DIRECTORS' REPORT The directors present their annual report and the audited financial statements for the 52 weeks ended 29 December 2010. PRINCIPAL ACTIVITIES The principal activity of the company is to act as a holding company and it will continue to do so for the foreseeable future. The principal activity of the group is to operate motorway and trunk road service areas. BUSINESS REVIEW The group has continued to experience steady sales and profit growth (excluding a one-off management bonus and losses on disposal of fixed assets destroyed in a fire at Cherwell Valley) in the period. The directors expect this trend to continue in the near future.
    [Show full text]
  • Report and Financial Statements – 2009
    Company Registration No. 5754555 MOTO HOLDINGS LIMITED and subsidiary companies Report and Financial Statements 53 weeks ended 30 December 2009 MOTO HOLDINGS LIMITED REPORT AND FINANCIAL STATEMENTS CONTENTS Page Officers and professional advisers 1 Directors' report 2 Independent auditors' report 8 Consolidated profit and loss account 9 Statement of total recognised gains and losses 9 Consolidated balance sheet 10 Company balance sheet 11 Consolidated cash flow statement 12 Notes to the financial statements 13 MOTO HOLDINGS LIMITED OFFICERS AND PROFESSIONAL ADVISERS REPORT AND FINANCIAL STATEMENTS 2009 DIRECTORS o Bogg A Cowley (resigned 4 June 2009) G Parsons (appointed 4 June 2009) SECRETARY R Prynn REGISTERED OFFICE Toddington Services Area Junction 11-12 M I Southbound Toddington Bedfordshire LU56HR AUDITORS Deloitte LLP, Chartered Accountants and Statutory Auditors Binningham, UK MOTO HOLDINGS LIMITED DIRECTORS'REPORT The directors present their annual report and the audited financial statements for the 53 weeks ended 30 December 2009. PRINCIPAL ACTIVITIES The principal activity of the company is to act as a holding company and it will continue to do so for the foreseeable future. The principal activity of the group is to operate motorway and trunk road service areas. BUSINESS REVIEW The group has continued to experience steady sales and profit growth in the period. The directors expect this trend to continue in the near future. The group turnover has decreased by £12,652,000 (£830,283,000 for the 53 week period ended 30 December 2009, compared to £842,935,000 in the 52 week period ended 24 December 2008). This includes a 7.7% decline in fuel turnover.
    [Show full text]
  • Consultation on Policy for Service Areas and Other Roadside Facilities
    Consultation on Policy for Service Areas and Other Roadside Facilities On Motorways and All-Purpose Trunk Roads in England A Summary of Responses Table of Contents 1 Introduction ....................................................................................................... 1 2 Detailed Summary of Responses .................................................................... 3 2.1 Issue 1 – Determining Need......................................................................... 3 2.2 Issue 2 – Spacing of Motorway Service Areas............................................. 5 Spacing criteria ................................................................................................... 5 Increased frequency versus expansion of existing sites ..................................... 5 Rest areas........................................................................................................... 6 On-line and junction sites.................................................................................... 6 2.3 Issue 3 – Signing of Motorway Service Areas and HGV Parking................. 7 Signing of MSAs.................................................................................................. 7 Signing within Motorway Service Areas .............................................................. 9 Signed HGV parking facilities located off the network....................................... 10 2.4 Issue 4 – Retail Activities at Motorway Service Areas ............................... 11 2.5 Issue 5 – Standards of Facilities
    [Show full text]
  • Name Address Postcode Abingdon 39 Bury Street, Abingdon, Oxfordshire
    Name Address Postcode Abingdon 39 Bury Street, Abingdon, Oxfordshire OX14 3QY Abingdon Thameside 5, The Old Gaol, Abingdon, Oxfordshire OX14 3HE Addlestone 108-110 Station Road, Addlestone, Surrey KT15 2BQ Airdrie Unit 2, 52-54 Graham Street, Airdrie, North Lanarkshire ML6 6BU 26/27 Anchor Parade, Aldridge Shopping Centre, Walsall , Aldridge WS9 8QP West Midlands Allerton L'pool 123 Allerton Road, Liverpool, L18 2DD Allerton Road 2 5 Allerton Road, Liverpool, L18 1LG Alloa 48-50 High Street, Alloa, Clackmannanshire FK10 1JF Ambleside Unit 5, Market Cross Shopping Centre, Ambleside, Cumbria LA22 9BT Archway 35 Junction Road, Archway, London N19 5QT Arnos Grove 354 Bowes Road, Arnos Grove, London N11 1AN Ashby-de-la-Zouch 33 Market Street, Ashby-de-la-Zouch, Leicestershire LE65 1AF Ashton Unit 29 Staveleigh Mill, Ashton Under Lyne, Manchester OL6 7JJ Atherstone 58 Long Street, Atherstone, Warwickshire CV9 1AU Balsall Common Unit 2, Station Road, Balsall Common, Warkwickshire CV7 7FE Barking - Stn Parade 62-64 Station Parade, Barking, Essex IG11 8EA Unit 28 The Spires Shopping Centre, High Street, Barnet, Barnet EN5 5XY London Barnet 2 90 High Street, Barnet, London EN5 5SN Barrow in Furness 160-162 Dalton Road, Barrow in Furness, Cumbria LA14 1PU Bathgate 6 George Place, Bathgate, West Lothian EH48 1NP Battle 11 High Street, Battle, East Sussex TN33 0AE Bearsted 3-6 Yeomans Court, Ashford Road, Bearsted, Kent ME14 4ND Bedale 23 Market Place, Bedale, North Yorkshire DL8 1ED 37 Jansel Square, Camborne Avenue, Bedgrove, Aylesbury, Bedgrove
    [Show full text]
  • Equity Partners Infrastructure Company No. 1 Limited
    Equity Partners Infrastructure Company No. 1 Limited Independent Adviser’s Report 7 June 2012 KordaMentha confirms that it: (a) has no conflict of interest that could affect its ability to provide an unbiased report; and (b) has no direct or indirect pecuniary or other interest in the proposed transaction considered in this report, including any success or contingency fee or remuneration, other than to receive the cash fee for providing this report. KordaMentha has satisfied the Takeovers Panel, on the basis of the material provided to the Panel, that it is independent under the Takeovers Code for the purposes of preparing this report. Table of contents 1 Introduction ................................................................................................................................................... 1 2 Overview of EPIC .......................................................................................................................................... 3 3 The Proposed Transaction .......................................................................................................................... 11 4 Agreed Net Asset Value Per Share ............................................................................................................ 13 5 Valuation ..................................................................................................................................................... 15 6 Merits of Proposed Transaction .................................................................................................................
    [Show full text]
  • Moto Hospitality Ltd (App/E2734/W/20/3261729)
    APPEALS BY (1) APPLEGREEN PLC (APP/ E2734/W/20/3245778) (2) MOTO HOSPITALITY LTD (APP/E2734/W/20/3261729) PROPOSED MOTORWAY SERVICE AREA DEVELOPMENTS AT KIRBY HILL (‘VALE OF YORK MSA’) AND BALDERSBY GATE (‘RIPON MSA’) CLOSING SUBMISSIONS ON BEHALF OF MOTO HOSPITALITY LTD References are as follows: • Core Documents – by document number and page or paragraph as the context demands, e.g. CD6.2/14.3.3 or CD4.1/203 • Proofs of Evidence – by document number, witness and paragraph, e.g. MOTO13/Collins/2.1 • Oral Evidence – by witness, e.g. Collins EIC or Collins xx Introduction 1. The appeal by Moto Hospitality Ltd (Moto) concerns a proposal for a motorway service area (MSA) on a site adjacent to the existing Junction 50 of A1(M) known at this inquiry as Ripon MSA. Particulars of the application are provided in his proof of evidence by Mr Collins1 and in the Statement of Common Ground (SoCG) agreed between Moto and Harrogate Borough Council (HBC).2 The latter also identifies the policies in the development plan agreed to be relevant to the appeal and that there would be substantial compliance but for the issues in the single reason for refusal concerned primarily with landscape and visual effects of the development. 2. Whilst in outline only the details of scale, appearance and landscaping were originally reserved for subsequent approval. As a result of matters raised at the inquiry Moto now asks for layout also to be reserved, albeit by reference to the same drawings and information 1 MOTO13/Collins 6.2 2 SoCG/5.1 & 6.1 1 presented with the application and which formed the basis of the Environmental Impact Assessment (EIA) as before.3 3.
    [Show full text]
  • Store List For
    Re-opened stores - 16th June 2020 Delivery (via Uber Eats) Leicester St Georges RP LE1 1SG London Tooley Street SE1 2AF Peterbro Brotherhood PE4 6ZR Takeaway & Delivery (via Uber Eats) Leeds Crown Point LS10 1EW Takeaway & Mobile Order (via Costa App) Ascot SL5 7HY Ayr RP KA8 9BF Basildon SS14 1BA Basildon Pipps Hill SS14 3AF Bath BA1 1QH Bath Mero RP BA2 3GL Beckton Shopping Pk E6 7ER Bham Selly Oak B29 6SN Billericay CM129BT Bristol College Grn BS1 5TB Bromley Market Sq BR1 1NF Cambs Viking Way CB23 8EL Carlisle CoUrt Sq CA1 1QX Chadwell Heath RP RM6 4HX Chelmsford Clocktwr CM1 3FJ Cheltenham RP GL51 9RR Chippenham High St SN15 3ET Chorlton M21 9AQ ChristchUrch RP BH23 2BN Crawley CoUntry Oak RH11 7XN Croydon North End CR0 1TL Edin Straiton RP EH20 9QY Enfield RP EN1 3RW Fort Manchester M8 8EP Glasgow George HoUse G2 1EH Great Portland St W1W 8QJ Greenford Westway UB6 0UW Greenwich ChUrch St SE10 9BL Greenwich PeninsUlar SE10 0EN Hale WA15 9SF Haverhill High St CB9 8AR Haverstock Hill NW3 2AG Hayes UB3 3EX Hayle TR27 5LX High Wycombe HP11 2BN Holloway Road N7 6PN Kingston KT1 1JH Leeds Merrion LS2 8BT Leicester Haymarket LE1 3YR Leigh on Sea SS9 1PA Lon Brent Cross Sth NW2 1LS Lon Charlton SE7 7AJ Lon Friern Bridge RP N11 3PW Lon Leyton Mills RP E10 5NH Lon SoUthampton St WC2E 7HG Lon SoUthwark SE1 8LP Lon Staples CornerRP NW2 6LW Lon Wembley Central HA9 7AJ LoUghton IG10 1EZ Manchester Market St M1 1WA Manchester Portland M60 1HR Milton Keynes Kingst MK10 0BA NewqUay TR7 1DH Northampton NN1 2AJ Orpington BR5 3RP Perth Inveralmond RP
    [Show full text]
  • 2Pound-Breakfast-Deal.Pdf
    Store name Address Abingdon 39 Bury Street, Abingdon, Oxfordshire, OX14 3QY Abingdon Thameside 5, The Old Gaol, Abingdon, Oxfordshire, OX14 3HE Airdrie Unit 2, 52-54 Graham Street, Airdrie, North Lanarkshire, ML6 6BU 26/27 Anchor Parade, Aldridge Shopping Centre, Walsall , West Aldridge Midlands, WS9 8QP Allerton L'pool 123 Allerton Road, Liverpool, L18 2DD Allerton Road 2 5 Allerton Road, Liverpool, L18 1LG Alloa 48-50 High Street, Alloa, Clackmannanshire, FK10 1JF Atherstone 58 Long Street, Atherstone, Warwickshire, CV9 1AU Balsall Common Unit 2, Station Road, Balsall Common, Warkwickshire , CV7 7FE Bathgate 6 George Place, Bathgate, West Lothian, EH48 1NP Bedale 23 Market Place, Bedale, North Yorkshire, DL8 1ED 37 Jansel Square, Camborne Avenue, Bedgrove, Aylesbury, Bedgrove Buckinghamshire, HP21 7ET Bedworth Unit 2 Tesco Extra Retail Park, Mill Street, Bedworth, CV12 8SX Blue Boar Motorways Ltd - Roadchef Northampton North Drive Thru, M1 Junction 15a, Northampton North DTO Northampton, Northamptonshire, NN4 9QY Blue Boar Motorways Ltd - Watford Roadchef Services Watford Gap North, M1 between J16 & J17, Gap North DTO Northampton, Northamptonshire, NN6 7UZ Blue Boar Motorways Ltd - Watford Roadchef Watford Gap South Drive Thru, M1 Junction 16/17, Gap South DTO Northampton, Northamptonshire, NN6 7UZ Boldmere 57-59 Boldmere Road, Sutton Coldfield, West Midlands, B73 5XA Bootle 221 Stanley Rd , Bootle, Liverpool, L20 3DY Bourne End 67 The Parade, Bourne End, Buckinghamshire, SL8 5SB Bridge of Allan 8-12 Henderson Street, Bridge of Allan,
    [Show full text]
  • Basingstoke Motorway Service Area Alternative Sites Assessment
    BA03 Basingstoke Motorway Service Area Alternative Sites Assessment Contents 1. Introduction 2. Background 3. The Need for an MSA 4. The Appropriate Location for a New MSA 5. Commercial Justification 6. Identifying a Location for an MSA 7. Site Selection – Potential Sites 8. Conclusion 1 1.0 Introduction The Need for the Alternate Sites Assessment 1.1 This Alternative Sites Assessment Report (“ASA”) sets out the approach to site selection to meet the safety and welfare needs of motorists on the M3 motorway. The location promoted for a Motorway Service Area (“MSA”) by Moto Hospitality Limited (“Moto”) lies to the south of Junction 6 on the M3. 1.2 Moto is the leading provider of services on the UK’s motorway network with sites in England, Scotland, and Wales, with MSAs across 45 locations. Moto proposes to expand its service offer at locations where there are gaps in the strategic highway network to meet the safety and welfare needs of the travelling public. The development will represent an investment in the motorway network of approximately £40 million in a location where it is essential to meet the needs of motorists and provide much needed employment. 1.3 This ASA Report should be read in conjunction with the Environmental Report and other documents supporting the planning application for the new MSA at Basingstoke. Structure of the Assessment 1.4 Chapter two sets out the background to MSA development in the UK and the requirement for an Alternative Sites Assessment for new MSA sites looking at Government policy and guidance. It sets out the context for new MSA development in respect of the national strategic road network focusing on the need to address safety and welfare concerns of the travelling public.
    [Show full text]
  • DEVELOPMENT MANAGEMENT COMMITTEE 15Th FEBRUARY 2021
    DEVELOPMENT MANAGEMENT COMMITTEE 15th FEBRUARY 2021 Case No: 19/01445/FUL (FULL PLANNING APPLICATION) Proposal: DEMOLITION OF EXISTING BUILDINGS, ERECTION OF MOTORWAY SERVICE AREA (A SUI GENERIS USE) COMPRISING OF AN AMENITY BUILDING, FUEL STATION, PARKING AND ANCILLARY DEVELOPMENT Location: LAND BETWEEN TOLL BAR WAY AND GREAT NORTH ROAD SAWTRY Applicant: MOTO HOSPITALITY LIMITED Grid Ref: 517651 282511 Date of Registration: 22.07.2019 Parish: SAWTRY RECOMMENDATION - APPROVE subject to the prior completion of a S106 Agreement relating to the following issues, and subject to conditions to include those summarised below: * Off-site biodiversity measures * £6,000 bond for future highway measures to prevent parking on local roads OR REFUSE in the event that the obligation referred to above has not been completed and the applicant is unwilling to agree to an extended period for determination, or on the grounds that the applicant is unwilling to complete the obligation necessary to make the development acceptable This application is referred to the Development Management Committee (DMC) as it is a Departure from the Development Plan as it is for significant development within the countryside and does not accord with any of the specific and limited opportunities for development in the countryside as set out in Huntingdonshire’s Local Plan to 2036. 1. DESCRIPTION OF SITE AND APPLICATION 1.1 The application site covers an area of approximately 4.59 hectares and is located to the south of Sawtry, just off junction 15 of the A1(M). The red line boundary includes part of the highway where works are proposed and includes the landscaped boundaries to the site that are owned by Cambridgeshire County Council and Highways England.
    [Show full text]