Strategic Planning Business Unit Planning Applications

Total Page:16

File Type:pdf, Size:1020Kb

Strategic Planning Business Unit Planning Applications SP - Allocated Applications 04 06 2018 District Area Site Name Planning Site Address Description Xpoint Ypoint Proposal Received Prev.History Consulting Member Date to Deadline Deadline (WSCC Ref.) Reference Date & Comments Officer Date Date S106 Adur & Worthing CDBS - AWDM/1093/17 AWDM/1093/17 Shoreham Airport, Cecil Pashley Way, Lancing, West 520193 105537 Outline planning permission for the erection of new commercial buildings with an 01-Jun-2018 RECONS - Stephen Gee Steven Shaw (HW) Ann Bridges 06-Jun-2018 22-Jun-2018 - Councils Coastal Sussex, BN43 5FF overall height of 14ms to provide up to 25000m2 of floorspace for Light Industrial Kevin Brook (SWD) (Lancing) (Use Class B1c), General Industrial (Use Class B2) and Storage and Distribution (Use Class B8) with access, landscaping and associated infrastructure (including a new pumping facility on the River Adur). More information. Adur & Worthing CDBS - AWDM/1884/17 AWDM/1884/17 Car parking space, Crown & Anchor, 33, High Street, 521482 104971 Partial demolition of garden wall east of parking area to approximately 1m high with 06-Jun-2018 RECONS - Jodie Wilkes Jodie Wilkes (SRU) Kevin Boram 08-Jun-2018 27-Jun-2018 - Councils Coastal Shoreham-by-Sea, BN43 5DD cedar planting boxes atop, new gate and extended fence. Change of Use from (Shoreham South) parking area to seating area. Additional information received. Adur & Worthing CDBS - AWDM/338/18 AWDM/0338/18 Army Reserve Centre, Little High Street, Worthing, West 514979 103040 Proposed single-storey rear extension, mast, replacement door and side light and 06-Jun-2018 RECONS - Katie Kurek Katie Kurek (HW) Roger Oakley 06-Jun-2018 27-Jun-2018 - Councils Coastal Sussex bollards. (Worthing East) Amended plans received. Adur & Worthing CDBS - AWDM/737/18 AWDM/0737/18/SWD 40, Old Shoreham Road, Lancing, West Sussex, BN15 518816 105544 Detached self contained annex to side garden (east) for dependant relative. 05-Jun-2018 - SRU (HW) Ann Bridges 06-Jun-2018 26-Jun-2018 - Councils Coastal 0QZ Kevin Brook (SWD) (Lancing) Adur & Worthing CDBS - AWDM/741/18 AWDM/0741/18 Land At 10, St John Street, Shoreham by Sea, West 521488 105067 Demolition of existing garages and erection of pair of semi-detached three-storey 05-Jun-2018 AWDM/331/17 - Ian Hayward SRU (HW) Kevin Boram 06-Jun-2018 26-Jun-2018 - Councils Coastal Sussex dwellings to frontage facing John Street and one part single and part two-storey (Shoreham South) detached dwelling to rear with associated parking and landscaping. Adur & Worthing CDBS - AWDM/751/18 AWDM/0751/18 18, Crosby Close, Worthing, BN13 2RS 511652 104801 Erection of one 2-bedroom dwelling attached to south-east side elevation of No.18 (to 05-Jun-2018 AWDM/585/11 - Lucy Seymour (nearby) SRU (HW) Noel Atkins 06-Jun-2018 26-Jun-2018 - Councils Coastal replace existing side extension and conservatory) with associated parking and new (Durrington & vehicular Salvington) access. Adur & Worthing CDBS - AWDM/764/18 AWDM/0764/18 The Court House Guest House, Goring Road, Worthing 511130 102619 Change of use from Class C1 (Bed and Breakfast) to C3 (Residential Dwelling). 04-Jun-2018 AWDM/664/12(A) - Jamie Brown SRU (HW) Steve Waight 06-Jun-2018 25-Jun-2018 - Councils Coastal (Goring) Adur & Worthing CDBS - AWDM/795/18 AWDM/0795/18 82, Brighton Road, Worthing, West Sussex, BN11 2EN 515658 102707 Change of use from Financial and Professional Services (Class A2) to mixed use 07-Jun-2018 WB/566/03- Lawrence Stringer SRU (HW) Roger Oakley 08-Jun-2018 28-Jun-2018 - Councils Coastal Retail (A1) and Drinking Establishment (A4). (Worthing East) Adur & Worthing CDBS - AWDM/961/17 AWDM/0961/17 Land West Of New Monks Farm, Mash Barn Lane, 519006 105270 Hybrid planning application seeking (1) Full planning permission for the demolition of 01-Jun-2018 RECONS - Stephen Gee Steven Shaw (HW) Ann Bridges 06-Jun-2018 22-Jun-2018 - Councils Coastal Lancing, West Sussex existing buildings and erection of 249 dwellings with temporary access via Grinstead Ray Drabble (SWD) (Lancing) Lane, a Country Park, relocation and extension of the Withy Patch Gypsy and Traveller site, permanent access via a new roundabout on the A27, landscaping, and other associated infrastructure (including pumping facility at the River Adur); (2) Outline planning permission (with only landscaping reserved) for a non-food retail store (Use Class A1); and (3) Outline planning permission (with all matters reserved other than access) for the erection of a further 351 dwellings, community hub, primary school, and landscaping. The application is accompanied by an Environmental Impact Assessment. More information. Amended plans and further information. More information 01/06/18 Arun District Council CDBS - A/67/18 A/67/18/DOC Swanbourne Park, Land East of, Roundstone Lane, 507614 104068 Application for approval of details reserved by conditions imposed on planning 08-Jun-2018 RECONS - Tim Townsend Tim Townsend (HW) Deborah Urquhart 08-Jun-2018 29-Jun-2018 - Coastal Angmering, BN16 4AL reference A/82/12 relating to condition no. 8 (car parking) & 10 (roads, footway & (Angmering & Findon) casual parking areas). Additional information received Arun District Council CDBS - BR/122/18 BR/122/18/HH 69, Nyewood Lane, Bognor Regis, West Sussex, PO21 492651 99051 Vehicle crossover & creation of gravel topped hardstanding. 05-Jun-2018 BR/52/06 - Keith Comins (nearby) SRU (HW) Ashvin Patel 06-Jun-2018 26-Jun-2018 - Coastal 2SD (Bognor Regis West & Aldwick Arun District Council CDBS - EP/7/18 EP/7/18/PL Land Rear of Beechlands Cottages, Beechlands Close, 507161 102333 Demolition of existing buildings and erection of 2 no. dwellings with associated car 06-Jun-2018 RECONS - Katie Kurek Katie Kurek (HW) Roger Elkins 08-Jun-2018 27-Jun-2018 - Coastal East Preston, West Sussex, BN16 1JT ports/parking, alterations to existing access and relocation of staircase to flats - (East Preston & Amendment to EP/138/17/PL. Ferring) More information. Arun District Council CDBS - LU/67/18 LU/67/18/PL 14-18, Surrey Street, Littlehampton, West Sussex, BN17 502696 102073 Change of use of part of public highway for external seating area at front comprising 06-Jun-2018 RECONS - Ian Hayward Ian Hayward (SRU) Ian Buckland 08-Jun-2018 27-Jun-2018 - Coastal 5BG of 4 No. tables & 8 No. chairs. This application may affect the setting of a listed (Littlehampton Town) building. More information. Revised plans received. Arun District Council CDBS - LU/81/18 LU/81/18/HH 31, North Ham Road, Littlehampton, BN17 7AS 502499 102622 Single storey rear extension & new vehicle access. 06-Jun-2018 RECONS - Ian Hayward Ian Hayward (SRU) Ian Buckland 08-Jun-2018 27-Jun-2018 - Coastal (Littlehampton Town) More information. Arun District Council CDBS - R/105/18 R/105/18/PL Sandon, The Coppice, Rustington, BN16 3TP 505636 102612 Change of use of integral garage to form treatment/waiting room, 2 No. dormers to 07-Jun-2018 - SRU (HW) Daniel Purchese 08-Jun-2018 28-Jun-2018 - Coastal first floor front extension, replacement of rear dormer with 1 No. velux window, (Rustington) balcony to side, change of side window to window & door & 1 No. additional velux to ensuite (amendment to R/45/17/PL). Arun District Council CDBS - SDNP/2446/18 SDNP/18/02446/PROW Downe's Barn, Butt Lane, Slindon 496525 109226 Change of use of existing agricultural barn to education and training space. 05-Jun-2018 - Darryl Hobden (PROW) Derek Whittington 06-Jun-2018 26-Jun-2018 - Coastal Bridleway: 382_2, 401, 405, (Fontwell) 405_1. Arun District Council CDBS - SDNP/2446/18 SDNP/18/02446/FUL Downe's Barn, Butt Lane, Slindon 496525 109226 Change of use of existing agricultural barn to education and training space. 05-Jun-2018 - SRU (HW) Derek Whittington 06-Jun-2018 26-Jun-2018 Coastal (Fontwell) Chichester District CDBS - CC/1038/18 CC/18/01038/FUL The Barn, Little London, Chichester, PO19 1PL 486314 104828 Change of use from retail/office to residential and associated works. 08-Jun-2018 CC/4202/15 - Jamie Brown (nearby) David Boarer (FIRE) Jeremy Hunt 08-Jun-2018 29-Jun-2018 - Council Rural SRU (if Highways is required) (Chichester North) Chichester District CDBS - CC/1863/17 CC/17/01863/FUL Land Adj To Sainsbury & A27 Roundabout, Portfield Way, 487702 105513 Erection of single storey coffee shop unit with associated drive thru facility and car 05-Jun-2018 RECONS - Katie Kurek Katie Kurek (HW) Simon Oakley 06-Jun-2018 26-Jun-2018 - Council Rural Chichester, West Sussex parking, landscaping, reconfiguration of existing car parking and associated works. (Chichester East) More information. More information 5.4.18 Updated technical report 4.5.18. Junction modelling. Chichester District CDBS - CH/224/18 CH/18/00224/DOM White Cottage, Chidham Lane, Chidham, PO18 8TD 479117 103993 Demolition of existing garage, erection of new timber clad garage with first floor 01-Jun-2018 RECONS - Ian Hayward Ian Hayward (SRU) Viral Parikh 06-Jun-2018 22-Jun-2018 - Council Rural store/guest room. Repositioning of heating oil tank. New tool/garden shed and log (Bourne) shed . Landscaping including fencing and gates. Amended plans received. 1 of 4 SP - Allocated Applications 04 06 2018 District Area Site Name Planning Site Address Description Xpoint Ypoint Proposal Received Prev.History Consulting Member Date to Deadline Deadline (WSCC Ref.) Reference Date & Comments Officer Date Date S106 Chichester District CDBS - EWB/1297/18 EWB/18/01297/FUL Belle Plage, West Bracklesham Drive, Bracklesham, PO20 480078 96593 Demolition of existing dwelling and garage, replace with 2 no. detached dwelling 08-Jun-2018 EWB/2766/17 - Jodie Wilkes SRU (HW) Pieter Montyn 08-Jun-2018 29-Jun-2018 - Council Rural 8PF houses with garage. Nearby (The Witterings) Chichester District CDBS - HN/953/18 HN/18/00953/FUL Berrymead Farm, Hunston Road, Chichester, PO20 1NP 486797 102983 Demolition of existing stables and erection of new stables, hay store and manege 07-Jun-2018 RECONS - Jodie Wilkes Jodie Wilkes (SRU) Jamie Fitzjohn 08-Jun-2018 28-Jun-2018 - Council Rural with new courtyard for parking and fencing.
Recommended publications
  • Uncontested Parish Election 2015
    NOTICE OF UNCONTESTED ELECTION Horsham District Council Election of Parish Councillors for Parish of Amberley on Thursday 7 May 2015 I, being the Returning Officer at the above election, report that the persons whose names appear below were duly elected Parish Councillors for Parish of Amberley. Name of Candidate Home Address Description (if any) ALLINSON Garden House, East Street, Hazel Patricia Amberley, Arundel, West Sussex, BN18 9NN CHARMAN 9 Newland Gardens, Amberley, Jason Rex Arundel, West Sussex, BN18 9FF CONLON Stream Barn, The Square, Geoffrey Stephen Amberley, Arundel, West Sussex, BN18 9SR CRESSWELL Lindalls, Church Street, Amberley, Leigh David Arundel, West Sussex, BN18 9ND SIMPSON Downlands Loft, High Street, Tim Amberley, Arundel, West Sussex, BN18 9NL UREN The Granary, East Street, Geoffrey Cecil Amberley, Arundel, West Sussex, BN18 9NN Dated Friday 24 April 2015 Tom Crowley Returning Officer Printed and published by the Returning Officer, Horsham District Council, Park North, North Street, Horsham, West Sussex, RH12 1RL NOTICE OF UNCONTESTED ELECTION Horsham District Council Election of Parish Councillors for Parish of Ashington on Thursday 7 May 2015 I, being the Returning Officer at the above election, report that the persons whose names appear below were duly elected Parish Councillors for Parish of Ashington. Name of Candidate Home Address Description (if any) CLARK Spindrift, Timberlea Close, Independent Neville Ernest Ashington, Pulborough, West Sussex, RH20 3LD COX 8 Ashdene Gardens, Ashington, Sebastian Frederick
    [Show full text]
  • Boating on Sussex Rivers
    K1&A - Soo U n <zj r \ I A t 1" BOATING ON SUSSEX RIVERS NRA National Rivers Authority Southern Region Guardians of the Water Environment BOATING ON SUSSEX RIVERS Intro duction NRA The Sussex Rivers have a unique appeal, with their wide valleys giving spectacular views of Chalk Downs within sight and smell of the sea. There is no better way to enjoy their natural beauty and charm than by boat. A short voyage inland can reveal some of the most attractive and unspoilt scenery in the Country. The long tidal sections, created over the centuries by flashy Wealden Rivers carving through the soft coastal chalk, give public rights of navigation well into the heartland of Sussex. From Rye in the Eastern part of the County, small boats can navigate up the River Rother to Bodiam with its magnificent castle just 16 miles from the sea. On the River Arun, in an even shorter distance from Littlehampton Harbour, lies the historic city of Arundel in the heart of the Duke of Norfolk’s estate. But for those with more energetic tastes, Sussex rivers also have plenty to offer. Increased activity by canoeists, especially by Scouting and other youth organisations has led to the setting up of regular canoe races on the County’s rivers in recent years. CARING FOR OUR WATERWAYS The National Rivers Authority welcomes all river users and seeks their support in preserving the tranquillity and charm of the Sussex rivers. This booklet aims to help everyone to enjoy their leisure activities in safety and to foster good relations and a spirit of understanding between river users.
    [Show full text]
  • Ashington Parish Council
    Ashington Parish Council Minu tes of the meeting held on Thursday 7 th Febr uary 201 9 at 7:45 p.m. in Ashington School, Foster Lane . Present: Councillors : N. Spiers (Chairman), Cllrs : G MacPherson, T Moss , K Wood , T. Watson , L. di Castiglione , J. Stillwell , T Kearney Also present: Acting Clerk – Karen Dare District Cllr J. Blackall 7 Members of the Public The Chairman reminded members of the public the requirement that they limit their participation to the Public Adjournment sections of the meeting. If Members of the Public have questions for Police/Wardens & District/County Councillors then the Clerk will pass these on if these individuals have left the meeting. Members of the Public are reminded that Standing Orders allow for 5 minutes maximum participation. 0 24 /1 9 Apologies for absence Apologies for absence were received and approved from : Councillors S. Ball (Vice - Chairman), M Woolley , R Strudwick, District Councillor s P Circus & D Jenkins and County Cllr P Marshall. The Chairman explained that Clerk Emma Johnston had left the Council’s employment on 21 st January 2019 for personal reasons. Staffing matters would be discussed, in confidence, at the end of the meeting. 0 25 /1 9 Declaration of Interests and notification of change of interest None. The Chairman remind ed c ouncillors that previous declarations still stand (as defined under the Localism Act 2011) . 0 26 /1 9 Minutes of the Parish Council meeting held on 10 th Ja n uary 201 9 The minutes of the meeting dated 10 th January 201 9 were approved as a true record and signed by the Chairman.
    [Show full text]
  • International Passenger Survey, 2008
    UK Data Archive Study Number 5993 - International Passenger Survey, 2008 Airline code Airline name Code 2L 2L Helvetic Airways 26099 2M 2M Moldavian Airlines (Dump 31999 2R 2R Star Airlines (Dump) 07099 2T 2T Canada 3000 Airln (Dump) 80099 3D 3D Denim Air (Dump) 11099 3M 3M Gulf Stream Interntnal (Dump) 81099 3W 3W Euro Manx 01699 4L 4L Air Astana 31599 4P 4P Polonia 30699 4R 4R Hamburg International 08099 4U 4U German Wings 08011 5A 5A Air Atlanta 01099 5D 5D Vbird 11099 5E 5E Base Airlines (Dump) 11099 5G 5G Skyservice Airlines 80099 5P 5P SkyEurope Airlines Hungary 30599 5Q 5Q EuroCeltic Airways 01099 5R 5R Karthago Airlines 35499 5W 5W Astraeus 01062 6B 6B Britannia Airways 20099 6H 6H Israir (Airlines and Tourism ltd) 57099 6N 6N Trans Travel Airlines (Dump) 11099 6Q 6Q Slovak Airlines 30499 6U 6U Air Ukraine 32201 7B 7B Kras Air (Dump) 30999 7G 7G MK Airlines (Dump) 01099 7L 7L Sun d'Or International 57099 7W 7W Air Sask 80099 7Y 7Y EAE European Air Express 08099 8A 8A Atlas Blue 35299 8F 8F Fischer Air 30399 8L 8L Newair (Dump) 12099 8Q 8Q Onur Air (Dump) 16099 8U 8U Afriqiyah Airways 35199 9C 9C Gill Aviation (Dump) 01099 9G 9G Galaxy Airways (Dump) 22099 9L 9L Colgan Air (Dump) 81099 9P 9P Pelangi Air (Dump) 60599 9R 9R Phuket Airlines 66499 9S 9S Blue Panorama Airlines 10099 9U 9U Air Moldova (Dump) 31999 9W 9W Jet Airways (Dump) 61099 9Y 9Y Air Kazakstan (Dump) 31599 A3 A3 Aegean Airlines 22099 A7 A7 Air Plus Comet 25099 AA AA American Airlines 81028 AAA1 AAA Ansett Air Australia (Dump) 50099 AAA2 AAA Ansett New Zealand (Dump)
    [Show full text]
  • Planning Committee (South) Date: 20Th June 2017
    Planning Committee (South) Date: 20th June 2017 Report by the Head of Development: APPEALS Report run from 04/05/2017 to 07/06/2017 1. Appeals Lodged I have received notice from the Department of Communities and Local Government that the following appeals have been lodged:- Officer Committee Ref No. Site Date Lodged Recommendation Resolution High Croft Hampers Lane Storrington DC/16/1930 10th May 2017 Refuse Refuse Pulborough West Sussex RH20 3HY 2 Henderson Walk Steyning DC/16/2673 14th May 2017 Refuse West Sussex BN44 3SG Lower Barn Brooks Green Road Coolham DC/16/2427 16th May 2017 Refuse Horsham West Sussex RH13 8GR Steyning Football Club Shooting Field Refuse Prior DC/17/0383 Steyning 18th May 2017 Approval West Sussex BN44 3RQ Chates Cottage Henfield Road Cowfold DC/16/2719 31st May 2017 Refuse Horsham West Sussex RH13 8DU 2. Live Appeals I have received notice from the Department of Communities and Local Government that the following appeals are now in progress: Appeal Officer Committee Ref No. Site Start Date Procedure Recommendation Resolution 9 Freemans Close Billingshurst 23rd May DC/16/2579 Fast Track Refuse West Sussex 2017 RH14 9UQ St Josephs Hall Greyfriars Lane Storrington 24th May DC/14/1515 Written Reps Refuse Pulborough 2017 West Sussex RH20 4HE Chestnut Cottage Water Lane Storrington 23rd May DC/16/1904 Written Reps Refuse Pulborough 2017 West Sussex RH20 3LY High Chaparral London Road Washington 24th May DC/16/1963 Written Reps Refuse Refuse Pulborough 2017 West Sussex RH20 3BP Yew Tree Stud Farm Harbolets Road West
    [Show full text]
  • A Walk for All Bramber
    Key: Bridleway Main Road Footpath Side Roads St Peter’s Walk For All River A Walk for All Church Wildlife through WC Toilets National Trust Property Downslink Path le ast C PH Public House Historic House r e b Car Park Hotel m the Seasons a Bramber r Restaurant B River Adur The River Adur makes a perfect habitat for many 1. From the car park, cross the road and plants, birds and insects. Look out for these as turn left. you enjoy your walk. Panels on the route will give Bramber START / FINISH you more information. 2. Follow the Castle LaneCastle pavement WC St Nicholas’ The Street past St. Mary’s Church Spring House. Upper Beeding Yellowhammer Stonechat Skylark 3. Turn right at PH the footpath Capo-Bianco Anthony sign along the access path to St. Mary’s Downslink Path Bramber S car park and Downlands Park. T PH EY N IN 4. Look for another footpath sign G BY to the left. Follow this path to the -P AS S A riverside. 283 5. Follow the path along the riverbank. A2037 6. The surfaced Summer path suitable Small Copper Pyramidal Orchid Swallow for pushchairs Downslink Path and wheelchairs runs along the riverbank for 2.2 miles. Beyond this Adur River point the path is unsurfaced and narrower. South Downs Way Shoreham Road 7. When you are ready, simply turn around and retrace your steps back to Botolphs Road Winter the start. S t. Redshank Little Egret Oystercatcher Bo to lp h ’ s C h u r St Botolph’s c h Church Passies Pond All photos: Dorian Mason 0 500m Steyning Walks Can I cycle on the riverbank? Useful Information The wide path on the riverbank is designated as a footpath.
    [Show full text]
  • Steyning, Wiston, Ashurst & Bramber Neighbourhood Plan
    Steyning, Wiston, Ashurst & Bramber Neighbourhood Plan Stage 1 Report: Community Evidence Published by Steyning, Wiston, Ashurst & Bramber Parish Councils. Final revision October 2015 Steyning, Wiston, Ashurst & Bramber Neighbourhood Plan Stage 1 Report – Part B: Community Evidence Contents 1 Introduction ......................................................................................... 1 1.1 Context ......................................................................................... 1 1.2 Vision Paper: .................................................................................. 1 1.3 Stage 1 Report ............................................................................... 1 1.4 Purpose of these reports: ................................................................. 1 1.5 Function of these reports: ................................................................ 2 2 Parish Character ................................................................................... 3 2.1 Location ......................................................................................... 3 2.2 Characteristics ................................................................................ 3 2.3 Map of SWAB Parish Cluster ............................................................. 5 3 Consulting and Engaging with the Community .......................................... 6 3.1 Context ......................................................................................... 6 3.2 Previous Consultations across the Parishes ........................................
    [Show full text]
  • CAPITAL Project Trust
    CAPITAL Project Trust Opening Doors to Mental Wellbeing Information and Resources Handbook To Support You and Your Mental Health during Social Distancing and Self Isolation due to Covid-19 Information gathered from multiple sources including Pathfinder, Local Councils and other Charities. Information is subject to change. CAPITAL Project Trust would like to thank all providers for their support and advice. Compiled by CAPITAL Project Trust, April 2020 1 Contents Page Mental Health Apps 3 - 8 Wellbeing Websites 9 - 10 Support Available - Specific Area 11 - 15 Foodbanks 16 - 17 Domestic Abuse Support 18 - 19 Crisis Support Information 20 Pathfinder Contact Details 21 - 22 2 Wellbeing and Mental Health Apps Compiled by Pathfinder West Sussex https://www.pathfinderwestsussex.org.uk/ Self-Management Wellness Recovery Action Plan (WRAP) Free and available for App Store and Play store. • The WRAP is a simple and powerful process for creating the life and wellness you want. • Using the WRAP App, you can develop your WRAP, carry it with you wherever you go and share it with whomever you want. • Based on the WRAP Workbook, the WRAP App walks you through the process of creating your personal WRAP. Use it on your own, with a friend or supporter, or in a WRAP group. Recovery Path - Free to download and available on App Store as well as Play store • For people with addictive behaviour • This app offers many strategies to overcome cravings and supports the user to develop a path to sustained recovery, share progress with others and receive support. MyPlan • MyPlan is a tool to help women with safety decisions, such as abuse in their intimate relationship.
    [Show full text]
  • Highways and Transport Schemes 2012/13
    Strategic Planning Major Schemes 2012/2013 Parish Road Location Prog. Mgr IWP Code Gross Est. Net Est. 2012/2013 SCHEMES CARRIED FORWARD Major Projects Chichester (R) A286 Chichester Rail Station Bill Leath MJR0138 S106 money to deliver the Chichester Bus and Rail £168,873 £0 interchange Crawley (G) Crawley Fastway Peter Bradley MJR0130 £31,553 £31,553 Littlehampton (C) Fitzalan Road Peter Bradley MJR0137 Contribution towards infrastructure work for the £400,000 £400,000 Acadamy Shoreham (C) Connect2 Construction of Shoreham Peter Bradley NMI1067 Bridge £3,947,877 £3,947,877 Major Projects £4,548,303 £4,379,430 2012/2013 SCHEMES CARRIED FORWARD £4,548,303 £4,379,430 R: Rural C: Coastal G: Gatwick Dia C: County-Wide U: Unknown 14/03/2012 ASSET MANAGEMENT GROUP Page 1 of 37 Asset Management Roads Maintenance 2012/2013 Parish Road Location Prog. Mgr IWP Code Gross Est. Net Est. 2012/2013 NEW STARTS HIGHWAY MAINTENANCE PRINCIPAL ROADS Carriageway Resurfacing Billingshurst (G) A29 Five Oaks, Stane Street Robert CWY2336 McLoughlin £55,000 £55,000 Chichester (R) A286 Orchard Street Robert CWY2612 McLoughlin £141,000 £141,000 Colgate (G) A264 Crawley Road Eastbound - Holmbush Robert CWY2617 Farm to Bewbush Roundabout McLoughlin £185,000 £185,000 Crawley - Northgate A2004 Northgate Avenue roundabout Robert CWY2337 (G) McLoughlin £75,000 £75,000 Crawley - Southgate A2220 Horsham Road, Goffs Park Road to Robert CWY1254 (G) level crossing McLoughlin £70,000 £70,000 Findon (C) A24 Findon - By Pass Northbound & Robert CWY2619 Southbound McLoughlin
    [Show full text]
  • Tythe Barn 2 KINSBROOK • BROOKS GREEN
    Tythe Barn 2 KINSBROOK • BROOKS GREEN Tythe Barn 2 KINSBROOK • BROOKS GREEN • NR HORSHAM • WEST SUSSEX • RH13 0AT Description Situated in this blissful rural location in the hamlet of Brooks Green stands this extraordinary imposing six bedroom newly built family house standing in just under an acre of south facing gardens forming part of this exclusive five property gated development constructed by Banner Homes Ltd in 2014. The traditional barn style frontage is complemented by a contemporary style glass façade edged in a substantial oak frame. The spacious entrance hall features a central rising staircase in American walnut show casing a vast vaulted ceiling and the open hall and landing. The accommodation essentially offers 5 principal reception rooms together with a wonderful open plan fully fitted kitchen with large breakfast table space and family seating area. In addition the ground floor provides two cloakroom/WC’s, a utility room and internal access through to the treble garages with their electric up and over doors. The first floor offers a superb master bedroom suite with dressing area and ensuite, the remaining 5 bedrooms all have their own ensuite facilities with one bathroom being dual accessed from the landing. The bedroom above the garage complex has its own access staircase from the utility room and side door making this a perfect room for au pair or dependant relative. The internal area we understand to extend to approximately 490 sqm (5280 sqft). Outside the wide expanse of block paved driveway parking provides ample turning for vehicles in front of the house and garaging.
    [Show full text]
  • THE STEYNING QUARRY ACTION GROUP RESPONSE to the JOINT LOCAL MINERAL PLAN Policy No. M11 West Sussex Joint Minerals Local Plan
    THE STEYNING QUARRY ACTION GROUP RESPONSE TO THE JOINT LOCAL MINERAL PLAN Policy No. M11 West Sussex Joint Minerals Local Plan: Proposed Submission Draft (Regulation 19) January 2017 Introduction This objection to the inclusion of the Ham Farm Site in the Draft Joint Mineral Plan has been prepared by the Steyning Action Quarry Group (SQAG) and is supported by a petition of more than 2000 written signatures to date (previously submitted to County Hall Chichester) and 1600 online signatures Several Restrictive Covenants are binding on the land at Ham Farm and Wappingthorn Farm. West Sussex County Council were unaware of the existence of the Restrictive Covenants until the 2nd June 2016 (Official copy of Register Ham Farm Title Number WSX171768). Despite assurances to the contrary this undeniably demonstrates a total lack of thorough due diligence has been undertaken prior to the site being proposed. Wappingthorn Manor’s legal team has been in contact with West Sussex County Council several times and clearly state in their letter of the 10th June 2016 that it is their considered view that the use of the land at Ham Farm as a mineral quarry would breach the restrictive covenants and further that their client will not hesitate to issue proceedings to enforce the covenants. Throughout this process WSCC has demonstrated a gross lack of public consultation and incompetence. Indeed WSCC failed to consult with Wiston Parish Council concerning the additional piece of land which has been included in the new site, and which lies within the Wiston parish. We would submit in light of this information and further arguments within this report, that the Ham Farm site should be immediately withdrawn from the plan.
    [Show full text]
  • Adur District Green Infrastructure Wildlife Corridors Study December 2009 FINAL
    South East England Development Agency / Adur District Council Adur District Green Infrastructure Wildlife Corridors Study December 2009 FINAL Halcrow Group Limited South East England Development Agency /Adur District Council Adur District Green Infrastructure Wildlife Corridors Study December 2009 FINAL Halcrow Group Limited Halcrow Group Limited Griffin House 135 High Street Crawley West Sussex RH10 1DQ Tel +44 (0)1293 434500 Fax +44 (0)1293 434599 www.halcrow.com Halcrow Group Limited has prepared this report in accordance with the instructions of their client, SEEDA/ Adur District Council, for their sole and specific use. Any other persons who use any information contained herein do so at their own risk. © Halcrow Group Limited 2010 Halcrow Group Limited Griffin House 135 High Street Crawley West Sussex RH10 1DQ Tel +44 (0)1293 434500 Fax +44 (0)1293 434599 www.halcrow.com South East England Development Agency /Adur District Council Adur District Green Infrastructure Wildlife Corridors Study FINAL Contents Amendment Record This report has been issued and amended as follows: Issue Revision Description Date Signed 1 0 Draft report 22.05.09 RGH 2 A Final 3.7.09 RGH 3 B Final 9.7.09 RGH 4 C Final 19.10.09 RGH 5 D Final Dec 09 RGH 6 E Final Jan 2010 RGH Contents 1 Introduction 1 1.1 The Brief 1 1.2 Green Infrastructure Policy 1 1.3 Methodology 2 2 Adur District - existing extent of Green Infrastructure and Wildlife Corridors (figure 1) 2 2.1 Existing Landscape and Features 2 2.2 Major Designations 3 2.3 Existing Green Corridors and Links
    [Show full text]