Cedar Water Treatment Facility Operations Building

Total Page:16

File Type:pdf, Size:1020Kb

Cedar Water Treatment Facility Operations Building Cedar Water Treatment Facility Operations Building City Project Case Study Case City Project Seattle Public Utilities Photo by Lara Swimmer Square Feet: 5,480, 1 story Benefits Site: 16 acres n 61% reduction in energy use Location: Natural area near Renton n 33% less water use inside building, and 42% including site Construction Cost: $200/square feet n 80% sediment removed from stormwater (shell and core) n 90% of building naturally daylit, with views Completed: Summer 2004 n 75% of construction waste diverted from landfills n 5,300 gallons of potable water savings annually LEED Facts - NC Gold n 107,450,000 less BTUs of energy (gas and electric combined) 39 51 Sustainable Sites 8 14 Project Overview Water Efficiency 4 5 The Cedar Water Treatment Facility meeting room, mechanical/electrical room, Energy & Atmosphere 7 17 Operations Building stands among several restrooms and personnel lockers. buildings and installations dedicated to Materials & Resources 7 13 Located in a heavily wooded preserve, drinking water treatment and supply in sustainability strategies hinge upon extremely Indoor Environment 15 8 the Lake Youngs Reservation southeast of low-impact site design backed by constructed Innovation & Design 5 5 Renton, in unincorporated King County. It wetlands to offset impacts to the natural houses the main treatment plant control environment from other project components. room, an analytical laboratory, offices, a Points Achieved Points Available city green building Photo left by Ralph Naess, middle and right by Lara Swimmer The unique design-build-operate In the operations building, a system of are either in or near Lake Youngs, and the procurement contract used for the delivery clerestories combined with thermal mass new system treats up to 180 million gallons in the floor provides integrated natural per day. Much of the control system for of the overall Cedar Water Treatment lighting, heating and cooling inside this operation is located in the Operations Facility called for a different approach to the building. Building. LEED certification, one that was flexible The Cedar Water Treatment Facility Owned by the City of Seattle, the Cedar and incentive-based. It allowed CH2M HILL, Operations Building is staffed 24 hours Water Treatment Facility was built the designer, builder and operator, to find a day by at least one person. Day-to-day according to a unique design-build- occupancy consists of 3-6 operations operate bidding and contracting process its own cost-cutting opportunities while personnel. The meeting room has a that included stipulations and incentives meeting high standards for sustainability. capacity for 40. for sustainable building design. Winning bidder, designer and contractor CH2M The owner, Seattle Public Utilities, Sustainable Sites HILL will operate the facility for up to 25 required that each of the proposals for The well-protected site has been a part years, including a 15-year base term and of the City of Seattle’s Cedar River water extensions at the option of the City. the components of the project include supply system for nearly a century. Since the primary purpose of the entire a Sustainable Design Strategies Report. The Cedar River watershed provides 70 facility is to improve water quality for the Then, upon acceptance of the proposal, percent of all drinking water used by Seattle area, making the project a model the Seattle metropolitan area, about 1.3 SPU required the project attain LEED Silver of environmentally sensitive design and million people. The Operations Building construction was a primary goal. certification, and also placed an incentive is surrounded by second growth forest CH2M HILL conducted a sustainable design upon achieving LEED Gold certification. and wetland habitat on a 2,482 -acre reservation that includes a 721-acre lake. charrette at the beginning of the design The Operations Building was one such process for the entire treatment facility, project that fit this Design-Build strategy The pristine site does not include farmland, and conducted a performance modeling parklands or endangered species habitat. which resulted in a LEED Gold certification and life cycle cost analysis for all of its The Operations Building footprint does not components. achievement. encroach upon any of the wetlands on the reservation, and is held to at least five feet Although the meeting room has a capacity The design for the full-scale water treatment above the 100-year flood level. for 40, parking spaces are minimized to 9, and the site includes designated carpool, facility also included important energy One goal of the overall project was to vanpool and bus spaces. Accommodations saving measures. It integrates the existing improve the existing water supply and for treatment facility staff include bicycle treatment process, all without interrupting bypass pipelines at the site into the racks, shower facilities and lockers. the supply of drinking water for the people treatment facilities so that when water served by the system. Additions include an Landscaping with native plants is designed to eliminate irrigation over the long term. quality and supply constraints allow, water intake pump station, ozone and ultraviolet Temporary irrigation serves the site as the can be delivered to the treatment process light primary disinfection, chlorination and corrosion control, treated water reservoirs new plants become established. by gravity instead of pumping the water out and flow control stations. All these facilities of Lake Youngs. city green building city green building Photos by Lara Swimmer CH2M HILL has made the project a being maintained and monitored for treatment plant. In this way, tempered part of the continuing education of elevated turbidity. water is provided to the heat pump, design professionals by participating Water-saving measures inside the facility similar to a ground-source heat pump. in sustainable design exhibits and include flow restricted and low-flow Heat exchangers also temper incoming competitions. A brochure and website fixtures, sensory fixtures and waterless ventilation air and capture waste heat from are dedicated to the sustainable aspects urinals. These measures save an estimate the exhaust stream. of the project. 5,300 gallons of water annually, enough to The highly insulated building envelope Water Efficiency take a frugal shower every day for a year. places rigid insulation between the exterior moisture barrier and the structural Erosion control was a high priority for Energy & Atmosphere roof. In addition to the high performance the Operations Building site due to its In winter, captured heat from clerestory mechanical heating, other measures sensitive location. It is a part of a larger windows heat interior corridors. Much of include: natural ventilation and high- development area for the entire treatment the Operations Building receives natural efficiency air conditioning systems, water facility and next to wetlands that are daylight from clerestories and translucent source heat pumps reverse cycle for part of the well-protected Lake Youngs skylights. cooling, low-e glazing; shaded, double Reservoir watershed. windows; high-reflectance roofing, high The dark concrete floor in the meeting performance lighting, and Energy Star®- An extra large constructed wetland deten- room captures radiant heat through rated appliances. The energy saved, over tion pond or wetpond was built for on-site thermal mass, and a heat recovery duct 107 million BTUs, is more than enough to stormwater treatment to meet the strin- with an in-line fan transfers that heat to power three household water heaters for a gent level set by King County’s standards receiving spaces. Fans are automatically year at a cost of over $2,000. for sensitive stream protection. This large activated when there is excess heat in the pond has over three times the volume conference room (closed in winter months) Materials & Resources of the basic pond required to remove 80 and heat is called for in other areas. The percent of stormwater sediment for the fans then activate and move warm air to Special emphasis was placed upon locally site. It also meets criteria for removing 50 areas requiring heat. sourced materials with recycled content. percent of the phosphorus in the water, a 63 percent of the materials used in function important for the protection of In the summer time, meeting room doors construction of the Operations Building Lake Youngs. are open to promote natural air flow. have recycled or renewable content, Clerestory windows linked to thermostats Water quality is very closely monitored on including: plastic toilet partitions, gypsum open automatically to purge warm air. wall board, concrete, rebar, carpet, various the site. Sediment ponds and traps have Passive solar shading mitigates heat gain been sized for a 10-year storm instead of metals, roofing, rubber flooring, ceramic in the summer and thermal mass in the tile, and ceiling tiles. the requisite 2-year storm. Even though concrete floor also works to regulate there was no requirement for detention temperature in the warm months. 50 percent of the materials used in the during construction, the project provided project were manufactured or harvested full stormwater detention on site at that The mechanical system consists of a water locally. They include: concrete block, stage if needed. After construction, source heat pump with electric reheat, certified wood, metal doors and windows, receiving waters at three wetlands are connected to
Recommended publications
  • Assessment of Current Water Quantity Conditions in the Green River Basin
    ASSESSMENT OF CURRENT WATER QUANTITY CONDITIONS IN THE GREEN RIVER BASIN Prepared for: WRIA 9 Steering Committee Funded by: A King Conservation District Grant For the WRIA 9 Forum of Local Governments King County Department of Natural Resources and Parks Washington Department of Ecology Prepared by: Northwest Hydraulics Consultants, Inc. September 2005 ASSESSMENT OF CURRENT WATER QUANTITY CONDITIONS IN THE GREEN RIVER BASIN Prepared for: WRIA 9 Steering Committee Prepared by: Northwest Hydraulic Consultants, Inc. 16300 Christensen Road, Suite 350 Seattle, Washington 98188 Ph. (206) 241-6000 September 2005 Executive Summary Current water quantity conditions are assessed in the Green River Basin upstream from River Mile 23.8 (RM 23.8) where Mill Creek (Auburn), the last of the basin’s major freely-draining tributaries, enters the Green. In the context of the large Green/Duwamish sub-basins described in other reports, this study focuses on the upper Lower Green, the Middle Green, and the Upper Green River sub-watersheds. Water quantity conditions are evaluated in terms of the monthly mean and 7-day low streamflows at selected locations along the main stem channel and on major tributaries. Current conditions are further defined by the status of land use, water withdrawals, and water exports in the watersheds upstream of each location as of approximately Year 2000. This report identifies and draws upon the many prior studies which have characterized water resources and uses in the study area. An accompanying CD-ROM disk provides copies of recent digitally- published documents including the December 2000 Habitat Limiting Factors and Reconnaissance Assessment Report for the Green/Duwamish Watershed, the July 2001 Tacoma Water Habitat Conservation Plan for the Green River, and the July 2001 Central Puget Sound Regional Water Supply Outlook.
    [Show full text]
  • Capron Seattle's Turbine Pumps
    Seattle’s Turbine Pumps – No Electricity Needed Cheryl Capron - Seattle Public Utilities PNWS-AWWA Conference May 6, 2016 Overview Seattle System Topography Concept Operational Needs The Turbines Seattle System Topography “Seattle has hills, and to spare. With surface elevation of Lake Youngs at 498 feet above sea level, water incoming from Cedar River is vented by gravity into reservoirs at surface elevation 430 feet, as is the reservoir on Capitol Hill. Leo Tank on Beacon Hill is supplied by gravity, off the pipelines, at elevation 480 feet. So are reservoirs on the West Seattle hills, at elevation 440 feet. Topography (cont.) “Hydraulic turbines placed on the lines, take advantage of the kinetic energy of water between elevations. Pumps connected to these units force water to high zone towers and tanks with overflows of 530 feet above sea level, such as Queen Anne Hill.” R.H. Calligan, Superintendent of Water, 1893 Topography & Pressure Zones Pressure Zone Hydraulic Profile Tolt Cedar Service Area (720) 590 550 585 530 530 509 Lake Youngs 430 (502) 430 - 440 326 Tolt Service Area The Concept and The Operational Needs Turbine Schematic 25% - 33% of flow into station is pumped to high service. High Service Pump Storage Direct Coupling Drive Remote Control Ball Valve Low Service Storage 66% - 75% of Supply Line From Intermediate Service flow into station is Reservoir discharged to low service. Operational Needs Hills & multiple pressure zones Stable & adequate suction head Output varies along with gradient on pipeline supply
    [Show full text]
  • Renton and Auburn 7.5-Minute Quadrangles
    PRELIMINARY MAPS OF LIQUEFACTION SUSCEPTIBILITY FOR THE RENTON AND AUBURN 7.5' QUADRANGLES, WASHINGTON by STEPHEN P. PALMER WASHINGTON DIVISION OF GEOLOGY AND EARTH RESOURCES OPEN FILE REPORT 92-7 July 1992 •• WASHINGTON Sl'ATE DEPARTMENT OF -~-~~~~...._,, Natural Resources Bnan Boyle - Commissioner of Public Lands Art Stearns - Supervisor Division of Geology and Earth Resources Raymond Lasmanis. State Geologist CONTENTS Page Summary ..........•............................•........••........•.......•.... Introduction . • . • . • . • . 2 Geology of the Renton and Auburn quadrangles . • • . • . 2 Liquefaction susceptibility maps for the Renton and Auburn quadrangles • . • . • . 8 Methodology used to evaluate liquefaction susceptibility . • . • . 9 Geotechnical boring data used in evaluation of liquefaction susceptibility . 11 Historic liquefaction . • . • . 13 Liquefaction analysis . 17 Conclusions . • . 22 Acknowledgments . 22 References cited . 23 ILLUSTRATIONS Figure 1 Location map showing the Renton (1) and Auburn (2) 7 .5' quadrangles and Seattle North and South 7.5' quadrangles . • . • . 3 Figure 2 (a) Explanation for the generalized geology maps of the Renton and Auburn quadrangles . • . 4 (b) Map showing generalized geology of the Renton quadrangle . 5 (c) Map showing generalized geology of the Auburn quadrangle • . • . 6 Figure 3 Map showing current and historic waterways in the Renton and Auburn quadrangles (modified from Luzier, 1969) . • . • . 7 Figure 4 Sample of the U.S. Army Corps of Engineers aerial photo mosaic in the vicinity of Longacres Race Track . 10 Figure 5 Cumulative frequency histogram for Category I deposits, M 7.3 event . 17 Figure 6 Graph showing comparison of data for Category I deposits and for Holocene alluvium for M 7.3, 0.15 g events . • . • . 18 Figure 7 Graph showing comparison of data for Category I deposits and for Holocene alluvium for M 7.3, 0.30 g events .
    [Show full text]
  • 415 RAINIER AVENUE N 3-Tenant Retail Property for Sale | Renton, Washington
    415 RAINIER AVENUE N 3-Tenant Retail Property For Sale | Renton, Washington Listing Broker: Rich Cannon Direct: 206.436.2345 Mobile: 206.353.9575 [email protected] 415 Rainier Avenue N Property Aerial | 1 Lake Washintgon Southport (.9 miles) (2.4 miles) The Landing (2.2 miles) Renton Airport ( .1 miles) Subject Property Property Aerial Perspective 415 Rainier Avenue N Executive Summary | 2 SZD Executive Summary Offering Summary Address: 415 Rainier Avenue N Cannon Commercial is pleased to present an exciting opportunity to purchase a retail building located in Renton WA. This 12,800 sq. ft. building is located on a 30,600 sq. ft. lot. Renton, WA 98057 The CA (Commercial Arterial) zoned property offers great retail exposure and is a future mix Parcel #: 420240-1400 used redevelopment site. County: King The property is directly across the street from the Renton Airport and is centrally located Total Building Size: Approx. 12,800 SF (per KCR) approximately 11.9 miles south of downtown Seattle, 11.4 miles from Bellevue and 7.2 miles from Seatac Airport. I-405 and I-90 are easily accessible. Total Lot Size: Approx. 30,600 SF (per KCR) The property is being offered for $2,615,000. Zoning CA Frontage 230' # of Buildings 1 Year Built 1961 Eff. Year 1995 Construction Class Masonry Sprinklers No Financial Summary Price $2,615,000 Price PSF/Building $204.30 Price PSF/Land $85.46 Occupancy 100% NOI (Current) $169,918 Cap Rate (Current) .6.5% Demographics 1 Mile 3 Mile 5 Mile 2019 Population 15,957 103,102 253,881 2019 Median HH Income $67,757
    [Show full text]
  • King County River and Creek Flow and Temperature Summary for Week of 8/17 - 8/23
    KING COUNTY RIVER AND CREEK FLOW AND TEMPERATURE SUMMARY FOR WEEK OF 8/17 - 8/23 Washington Department of Fish and Wildlife has announced limitations on various activities in rivers, including limits on aquatic plant removal and suction dredging. For more information see: http://wdfw.wa.gov/conservation/drought/. Specifically in King County, the Raging River is closed to all aquatic plant removal (except hand pulling) and suction dredging activities. The South Fork Skykomish River from Sunset Falls upstream and all tributaries also has limitations in place for aquatic plant removal and suction dredging. Details can be found here: http://wdfw.wa.gov/conservation/drought/wac_220-660-29000a.pdf and here: http://wdfw.wa.gov/about/regulations/emergency_rules/2015/wsr_15-17-064.pdf WATER SUPPLY STATUS • Seattle, Everett, Tacoma, and the Cascade Water Alliance continue a second stage – voluntary reduction – of their water shortage response plans and are asking customers to help by voluntarily reducing water use by 10 percent. More information available here http://www.seattle.gov/util/MyServices/Water/AbouttheWaterSystem/WaterSupply/index.htm and here http://www.savingwater.org/. • As of August 17, Seattle Public Utilities (SPU) reports that they are making operational changes and activating supplementary water supplies. The combined reservoir storage of Chester Morse Lake, Masonry Pool, Lake Youngs and South Fork Tolt Reservoir remains well below the long term average for this time of the year. See summary graphs from SPU below. FLOW AND TEMPERATURE STATUS • 8 of 16 rivers and 6 of 24 creeks with over 15 years of flow data and real-time data delivery had the lowest flows ever recorded for the week.
    [Show full text]
  • Cedar Watershed Lidar Project
    September 9, 2014 Cedar River Watershed & Floodplain, Lake Youngs Reservoir, & SCL/Tolt Reservoir Study Areas LiDAR Technical Data Report – Delivery 2, revised October 22, 2014. Andy Norton QSI Corvallis Office 1011 Western Avenue, Suite 500 517 SW 2nd St., Suite 400 Seattle, WA 98104 Corvallis, OR 97333 PH: 206-464-7427 PH: 541-752-1204 www.quantumspatial.com TABLE OF CONTENTS INTRODUCTION ................................................................................................................................................. 1 Deliverable Products ................................................................................................................................. 3 ACQUISITION .................................................................................................................................................... 5 Planning ..................................................................................................................................................... 5 Ground Control.......................................................................................................................................... 6 Monumentation .................................................................................................................................... 6 Ground Survey Points (GSP) .................................................................................................................. 7 Airborne Survey ......................................................................................................................................
    [Show full text]
  • Washington Division of Geology and Earth Resources Open File Report 84-03, Geology and Coal Resources of Central King County, Wa
    STATE OF WASHINGTON DEPARTMENT OF NATURAL RESOURCES BRIAN J. BOYLE, Commissioner of Public Lands JAMES A. STEARNS, Department Supervisor DIVISION OF GEOLOGY AND EARTH RESOURCES Raymond Lasmanis, State Geologist GEOLOGY AND COAL RESOURCES OF CENTRAL KING COUNTY, WASHINGTON by Timothy J. Walsh State of Washington Department of Natural Resources Division of Geology and Earth Resources Olympia, Washington 98504 Open-File Report 84-3 July 1984 ; GEOLOGY AND COAL RESOURCES OF CENTRAL KING COUNTY, WASHINGTON Introduction Coal mining has been an important industry in King County for more than 130 years, although it is currently in decline (Phillips and Walsh, 1981). Total production as reported to mine inspectors has been 48,233,705 tons from 1879 through 1983, and there was significant production before the earliest mine inspector's report. As of 1960, the reserves of coal in King County were estimated to be 828 million tons (Beikman and others, 1961). In recent years, coal-bearing lands have undergone extensive residential development, as at Issaquah, rendering development of the coal.difficult if not impossible. In 1980, the Division of Geology and Earth Resources set out to eva­ luate the potential coal reserves in areas of encroaching urban develop­ ment. Two such areas are identified in which there may be commercial coal reserves: Grand Ridge to the northeast of Issaquah, and Cedar Mountain in Maple Valley, approximately six miles east of Renton. GRAND RIDGE History of Mining The Grand Ridge coal·area is located in sections 13, 14, 23, 24, and 26, T. 24 N., R. 6 E. Little is known of its history.
    [Show full text]
  • King County River and Creek Flow and Temperature Summary for Week of 8/10 - 8/16
    KING COUNTY RIVER AND CREEK FLOW AND TEMPERATURE SUMMARY FOR WEEK OF 8/10 - 8/16 WATER SUPPLY STATUS • On August 11, Seattle, Everett, Tacoma, and the Cascade Water Alliance moved to the second stage – voluntary reduction – of their water shortage response plans and are now asking customers to help by voluntarily reducing water use by 10 percent. More information available here http://www.seattle.gov/util/MyServices/Water/AbouttheWaterSystem/WaterSupply/index.htm and here http://www.savingwater.org/ . • As of August 10, Seattle Public Utilities (SPU) reports that the combined reservoir storage of Chester Morse Lake, Masonry Pool, Lake Youngs and South Fork Tolt Reservoir is below the long term average for this time of the year. See summary graphs from SPU below. • Cascade Water Alliance has been adding water to Lake Tapps from water stored behind Mud Mountain Dam as part of a capital repair project (see http://cascadewater.org/2015/08/06/reservoir-fill-update/ for more information). The lake is now within the agreed-upon recreation level and minimum instream flows in the White River below the diversion to Lake Tapps are currently being met (see White River flow graph below). FLOW AND TEMPERATURE STATUS • 8 of 16 rivers and 6 of 23 creeks with over 15 years of flow data and real-time data delivery had the lowest flows ever recorded for the week. Conversely and unexpectedly, 16 of these same 23 creeks had flows that were typical or higher-than-typical for the week. • 1 of 12 rivers/streams with over 15 years of temperature data and real-time data delivery had the highest temperatures ever recorded for the week, and another 8 of these 12 were higher than typical for the week.
    [Show full text]
  • Hazard Identification and Vulnerability Analysis (Hiva) Table of Contents
    HHAAZZAARRDD IIDDEENNTTIIFFIICCAATTIIOONN AANNDD VVUULLNNEERRAABBIILLIITTYY AANNAALLYYSSIISS ((HHIIVVAA)) 22nndd EEddiittiioonn DDeecceemmbbeerr 22000055 HAZARD IDENTIFICATION AND VULNERABILITY ANALYSIS (HIVA) TABLE OF CONTENTS Hazard Identification and Vulnerability Analysis I. Introduction II. Geographic Characteristics III. Demographic Characteristics Natural Hazards Drought Earthquakes Fire Hazards Floods Landslides Severe Local Storms Volcanoes Technological Hazards Civil Disorders Dam Failures Energy Shortages and Utility Outages Food and Water Contamination Hazardous Materials Releases Radiation Hazards Terrorism Transportation Air Transportation Crashes Hazard Matrixes and Definitions and Acronyms An Integrated Emergency Management Approach Hazard and Emergency Support Function Matrix Instructions Hazard and Emergency Support Function Matrix Hazard and Impact Matrix Hazard Identification and Vulnerability Analysis 1 City of Covington CEMP 2nd Edition, December 2005 Worksheet #1 – Hazard Identification and Risk Assessment Worksheet #2 – Vulnerability Analysis Worksheet #3 – Mitigation Measures Worksheet #4 – Mitigation Planning Worksheet #5 – Mitigation Actions Definitions Acronyms Hazard Identification and Vulnerability Analysis 2 City of Covington CEMP 2nd Edition, December 2005 Hazard Identification and Vulnerability Analysis 3 City of Covington CEMP 2nd Edition, December 2005 HAZARD IDENTIFICATION AND VULNERABILITY ANALYSIS (HIVA) I. INTRODUCTION State and Federal Regulations require that each jurisdiction within the State of Washington develop an emergency plan to deal with disasters at the local level. The purpose of this vulnerability analysis is to provide information on potential hazards whose impacts would go beyond those considered "routine emergencies" within the City of Covington and its surrounding area. It will be separated into two major categories; Natural and Technological and will serve as a basis for local emergency planning. It is unlikely that this analysis will include every hazard, which could occur.
    [Show full text]
  • Newman Lake Battles Eurasian Watermilfoil
    A L P A The W a s hington State L a ke Pro t ect ion Assoc i ati on New sletter W WATERLINE SEPT 2009 Newman Lake battles Eurasian In This Issue: watermilfoil Cyanobacteria events Newman Lake is a 1200-acre lake twenty miles northeast of Spokane, near the in Snohomish County Washington-Idaho border. Eurasian watermilfoil, a non-native and highly lakes ................................. 2 invasive aquatic weed, was first discovered at Newman Lake in September 2002 in a small area near the outlet gate at the lake’s southeast end. In 2003, See you in Spokane! ......... 3 the Newman Lake Flood Control Zone District (NLFCZD) began control efforts, including frequent boat and diver surveys, hand-pulling by divers, Recent changes in and herbicide treatment with granular (Aqua-Kleen and Navigate) and liquid (DMA4) formulations of 2, 4-D. Staff considered these methods most likely to algae affect treatment control the milfoil given the extent and conditions of the lake’s infestation. This operations at Seattle’s approach also met the goals of the community, with its history of passionate Lake Youngs .................... 6 involvement in improving Newman Lake’s water quality, which were to minimize costs as well as impacts to recreation and natural ecosystems. Team assembles to test The different control Western Washington lakes methods have had for toxic blooms .........back varied rates of success and milfoil has remained under moderate control, but this tenacious invasive has not been eradicated. In 2008, to reduce overall milfoil biomass, the NLFCZD treated some areas twice. Timing and scope were changed from previous years to provide greater control early in the WATERLINE is the newsletter growing season and to of the Washington State Lake reach more areas with Protection Assoc.
    [Show full text]
  • Inventory of Agricultural Resources of King County
    Survey Report Intensive-level Survey of Historic Agricultural Resources in King County, Washington Certified Local Government Grant No. FY10-61020-001 Principal Investigators: Ken Halgren, Lee O’Connor and Todd Scott King County Historic Preservation Program Department of Natural Resources and Parks 201 S. Jackson, Suite 700 Seattle, WA 98104 Submitted to: Washington State Department of Archaeology and Historic Preservation 1063 S. Capitol Way, Suite 106 Olympia, WA 98501 August 2011 This project was financed in part with Federal funds from the National Park Service, Department of the Interior administered by the Department of Archaeology and Historic Preservation (DAHP) and the King County Historic Preservation Program. However, the contents and opinions do not necessarily reflect the views or policies of the Department of the Interior or DAHP. Regulations of the U.S. Department of Interior strictly prohibit unlawful discrimination in departmental Federally Assisted Programs on the basis of race, color, national origin, age, or handicap. Any person who believes he or she has been discriminated against in any program, activity, or facility operated by a recipient of Federal assistance should write to: Director, Equal Opportunity Program, U.S. Department of the Interior, National Park Service, 1849 C Street, NW, Washington, D.C. 20240. ii Executive Summary The current physical landscape of the Hobart – May Valley area of central King County, Washington, was significantly altered by the arrival of Euro-American settlers, and the historic built environment which remains is a result primarily of the area’s development into a coal mining center, and the attendant farms required to supply the miners and their families.
    [Show full text]
  • Planning-Area-Wide Elements
    King County Hazard Mitigation Plan Update Volume 1: Planning-Area-Wide Elements REVIEW DRAFT April 2014 King County HAZARD MITIGATION PLAN UPDATE VOLUME 1: PLANNING-AREA-WIDE ELEMENTS REVIEW DRAFT APRIL 2014 Prepared for: King County Office of Emergency Management 3511 NE 2nd Street Renton, WA 98056 Prepared by: Project #103S2548 King County Hazard Mitigation Plan Update; Volume 1—Planning-Area-Wide Elements TABLE OF CONTENTS Executive Summary .............................................................................................................. ES-1 PART 1— THE PLANNING PROCESS Chapter 1. Introduction to the Planning Process.................................................................. 1-1 1.1 Why Prepare This Plan? ....................................................................................................................... 1-1 1.1.1 The Big Picture ................................................................................................................... 1-1 1.1.2 Local Concerns ................................................................................................................... 1-1 1.1.3 Purposes for Planning ......................................................................................................... 1-2 1.2 Who Will Benefit From This Plan? ..................................................................................................... 1-2 1.3 How to Use This Plan .........................................................................................................................
    [Show full text]