FINAL Volume 1 July 2018

Total Page:16

File Type:pdf, Size:1020Kb

FINAL Volume 1 July 2018 Volume 1 FINAL July 2018 [This page left blank intentionally.] Seattle Public Utilities 2019 Water System Plan July 2018 VOLUME 1 [This page left blank intentionally.] SPU 2019 Water System Plan Acknowledgements The following have contributed to the preparation of this 2019 Water System Plan: Seattle Public Utilities Executive Directors Mami Hara, GM/CEO Ken Snipes, CAO Madeline Fong Goddard Rick Scott Seattle Public Utilities Contributing Technical Staff Joan Kersnar, Project Manager Black, Kevin Fleming, Paul Lackey, Brent Blackwell, Tony Flory, Bruce Madura, Jalaine Capron, Cheryl Ford, Jon Mantchev, Eugene Carpenter, Regina Garcia, Elizabeth McNerney, Jim Chen, Alex Gladstone, Judi Meyer, Betty Chinn, Alan Goodwin, Ingrid Minsch, Kathy Cross, Judith Gregg, Terri Naess, Ralph Curry, Kathy Hanna, Paul Narog, Jesse Davis, Darian Harper, Wylie Nilson, Jim DeLaTorre-Evans, Tracy Heubach, Bill ORourke, Kelly Edgerly, John Holtz, Cyndy Orr, Matthew Effertz, Kris Hubbert, Bob Pepin-Cato, Ellen Faulds, Paul Igoe, Paige Ryan, Andy Findlay, Cameron Kirby, Lynn Wells, Bill Flagor, Suzanne LaBarge, Amy Worcester, Ned Special appreciation is extended to members of the Seattle Water Supply Operating Board and the Water System Advisory Committee who provided input and comments on preliminary work products for this Water System Plan. Acknowledgements i SPU 2019 Water System Plan [This page left blank intentionally.] ii Acknowledgements SPU 2019 Water System Plan [This page left blank intentionally.] iv Certification SPU 2019 Water System Plan Table of Contents 2019 WATER SYSTEM PLAN ACKNOWLEDGEMENTS ........................................................................................ i CERTIFICATION ................................................................................................... iii TABLE OF CONTENTS ......................................................................................... v ABBREVIATIONS ................................................................................................ xiii PLAN SUMMARY ............................................................................................... S-1 Chapter 1 – Introduction 1.1 SPU’s Drinking Water Line of Business ............................................................. 1-1 1.1.1 History of Water Business ....................................................................... 1-1 1.1.2 System Description .................................................................................. 1-2 1.1.3 Business Areas ......................................................................................... 1-4 1.1.3.1 Major Watersheds Business Area ................................................ 1-4 1.1.3.2 Water Resources Business Area .................................................. 1-4 1.1.3.3 Water Quality and Treatment Business Area............................... 1-5 1.1.3.4 Transmission and Distribution Business Area ............................. 1-5 1.2 Guiding Policies ................................................................................................... 1-5 1.3 Customer Service Levels ..................................................................................... 1-7 1.4 Planning Requirements ........................................................................................ 1-8 1.4.1 WSP Requirements .................................................................................. 1-8 1.4.2 Consistency with Other Plans .................................................................. 1-9 1.4.2.1 Coordinated Water System Plans................................................. 1-9 1.4.2.2 Wholesale Customers’ Individual Water System Plans ............. 1-10 1.4.2.3 King County Comprehensive Plan............................................. 1-10 1.4.2.4 City of Seattle’s Comprehensive Plan ....................................... 1-11 1.4.2.5 Adjacent Purveyors .................................................................... 1-11 1.4.2.6 Purveyors Beyond the Boundaries of SPU’s Service Area ....... 1-11 1.4.2.7 Regional Wastewater and Reclaimed Water Plans .................... 1-12 1.4.2.8 Groundwater Area Management Plans ...................................... 1-12 1.4.2.9 Watershed Plans ......................................................................... 1-12 1.4.2.10 Salmon Recovery Plans ........................................................... 1-13 1.5 Plan Organization............................................................................................... 1-14 Chapter 2 – Water Resources 2.1 Accomplishments Since 2013 WSP..................................................................... 2-1 2.2 Service Level Performance .................................................................................. 2-2 2.3 Existing System and Practices ............................................................................. 2-3 2.3.1 Service Area Characteristics .................................................................... 2-3 Table of Contents v SPU 2019 Water System Plan 2.3.1.1 Changes in Demographics ........................................................... 2-3 2.3.1.2 Retail Customers .......................................................................... 2-6 2.3.1.3 Wholesale Customers................................................................... 2-6 2.3.2 Historical Water Consumption ................................................................ 2-8 2.3.3 Water Conservation Programs ................................................................. 2-9 2.3.3.1 Regional Conservation 2013-2018 ............................................ 2-11 2.3.3.2 Seattle-Only Conservation 2013-2018 ....................................... 2-12 2.3.3.3 Water Use Efficiency Goal and Program 2013-2018 ................ 2-13 2.3.4 Existing Water Supply ........................................................................... 2-14 2.3.4.1 Supply Sources........................................................................... 2-14 2.3.4.2 Water Rights .............................................................................. 2-16 2.3.4.3 Firm Yield and Supply Reliability ............................................. 2-16 2.3.5 Operations .............................................................................................. 2-17 2.3.5.1 Morse Lake Pump Plant ............................................................. 2-18 2.3.5.2 Scour Protection Levels ............................................................. 2-19 2.3.5.3 Water Shortage Contingency Plan ............................................. 2-19 2.3.6 Maintenance ........................................................................................... 2-20 2.4 Needs, Gaps, and Issues ..................................................................................... 2-20 2.4.1 Future Water Demand and Supply ......................................................... 2-20 2.4.1.1 Water Use Efficiency Goal and Program 2019-2028 ................ 2-21 2.4.1.2 Water Demand Forecast ............................................................. 2-22 2.4.1.3 Climate Change and Future Supply Outlook ............................ 2-27 2.4.1.4 Future Supply Opportunities ...................................................... 2-33 2.4.1.5 Wildfire Risk Management in SPU’s Watersheds ..................... 2-34 2.4.2 Infrastructure Needs and Improvements ................................................ 2-34 2.4.2.1 Landsburg Flood Passage Improvements .................................. 2-35 2.4.2.2 Lake Youngs Cascades Dam ..................................................... 2-35 2.4.2.3 Tolt Valve 15 ............................................................................. 2-35 2.4.2.4 Tolt Dam Warning System ........................................................ 2-36 2.4.2.5 Tolt Dam Lob Boom .................................................................. 2-36 2.4.3 South Fork Tolt FERC Relicensing Support ......................................... 2-36 2.5 Implementation/Action Plan .............................................................................. 2-36 Chapter 3 – Water Quality and Treatment 3.1 Accomplishments Since 2013 WSP..................................................................... 3-1 3.2 Service Level Performance .................................................................................. 3-2 3.3 Existing Facilities and Practices .......................................................................... 3-3 3.3.1 Regulatory Requirements and Compliance ............................................. 3-3 3.3.1.1 Total Coliform Rule ..................................................................... 3-3 3.3.1.2 Surface Water Treatment Rule..................................................... 3-5 3.3.1.3 Groundwater Rule ........................................................................ 3-6 3.3.1.4 Disinfection By-Products Rule .................................................... 3-6 3.3.1.5 Lead and Copper Rule ................................................................. 3-7 3.3.2 Other Water Quality Monitoring ............................................................. 3-8 3.3.3 Source Water Protection Programs ........................................................ 3-10 3.3.3.1 Watershed Protection ................................................................. 3-10 vi Table of Contents SPU 2019 Water System Plan 3.3.3.2 Wellhead Protection ..................................................................
Recommended publications
  • 2019 Annual Waste Prevention & Recycling Report
    s 2019 ANNUAL WASTE PREVENTION & RECYCLING REPORT i Submitted to Seattle City Council (SCC) October 2020 [Page deliberately left blank] ii CONTENTS GLOSSARY .............................................................................................................................................................. v EXECUTIVE SUMMARY ........................................................................................................................................... 1 Purpose ...................................................................................................................................................................... 1 Key Results................................................................................................................................................................. 1 Next Steps .................................................................................................................................................................. 2 INTRODUCTION ..................................................................................................................................................... 3 Seattle’s Recycling Rate Goals ................................................................................................................................... 3 Moving Upstream ...................................................................................................................................................... 3 Annual Waste Prevention & Recycling Report..........................................................................................................
    [Show full text]
  • 2016-12-31 Response.Esf04annex
    CITY OF SEATTLE CEMP EMERGENCY SUPPORT FUNCTION #4 - FIREFIGHTING Operations .................................................................................................................................... 10-4 11. APPENDIX 3 – Terrorist Attack – Weapons of Masss Destruction ......................................... 11-6 Situation ....................................................................................................................................... 11-6 Assumptions ................................................................................................................................. 11-6 Definitions .................................................................................................................................... 11-6 Chemical, Biological, Radiological, Nuclear, and Explosive (CBRNE) Incidents ............................ 11-7 12. APPENDIX 4 – Emergency Medical Services ......................................................................... 12-8 Situation ....................................................................................................................................... 12-8 Assumptions ................................................................................................................................. 12-8 Definitions .................................................................................................................................... 12-8 Operations ...................................................................................................................................
    [Show full text]
  • Seattle Public Utilities Customer Review Panel C/O [email protected] P.O
    Appendix G Seattle Public Utilities Customer Review Panel c/o [email protected] P.O. Box 34018, Seattle WA 98124-4018 January 20, 2021 Mayor Jenny A. Durkan The City of Seattle 600 Fourth Avenue P.O. Box 94749 Seattle, WA 98124-4749 RE: Seattle Public Utilities Customer Review Panel Comments on the Proposed SPU Strategic Business Plan for 2021-2026 Dear Mayor Durkan: This letter presents our comments on the Proposed Seattle Public Utilities (SPU) Strategic Business Plan for 2021-2026 (Plan) in fulfillment of our duties as members of the Seattle Public Utilities Customer Review Panel (Panel) set forth in Resolution 31800. We endorse the Plan and support its adoption as presented. This letter includes a number of detailed comments regarding the Plan. Our primary messages regarding the Plan are as follows: Rates: We are pleased that the projected 6-year rate path is lower than that in the previous strategic plan: the 6-year weighted average annual rate increase across all SPU’s lines of business in the 2021-2026 period is projected to be 4.2%, down from 5.2% in the 2018-2023 SPU Strategic Business Plan. SPU’s commitment to drive rates down is admirable and should continue to be a priority. SPU provides essential basic services – water, sewer, drainage, solid waste collection and disposal. Ensuring the affordability of these services, particularly for lower income customers and smaller businesses, is a priority for the Panel. That said, the reduction in rates compared to the last plan has largely been accomplished by spending of cash reserves built up over the last three years because SPU’s capital project accomplishment rate was far less than anticipated.
    [Show full text]
  • Assessment of Current Water Quantity Conditions in the Green River Basin
    ASSESSMENT OF CURRENT WATER QUANTITY CONDITIONS IN THE GREEN RIVER BASIN Prepared for: WRIA 9 Steering Committee Funded by: A King Conservation District Grant For the WRIA 9 Forum of Local Governments King County Department of Natural Resources and Parks Washington Department of Ecology Prepared by: Northwest Hydraulics Consultants, Inc. September 2005 ASSESSMENT OF CURRENT WATER QUANTITY CONDITIONS IN THE GREEN RIVER BASIN Prepared for: WRIA 9 Steering Committee Prepared by: Northwest Hydraulic Consultants, Inc. 16300 Christensen Road, Suite 350 Seattle, Washington 98188 Ph. (206) 241-6000 September 2005 Executive Summary Current water quantity conditions are assessed in the Green River Basin upstream from River Mile 23.8 (RM 23.8) where Mill Creek (Auburn), the last of the basin’s major freely-draining tributaries, enters the Green. In the context of the large Green/Duwamish sub-basins described in other reports, this study focuses on the upper Lower Green, the Middle Green, and the Upper Green River sub-watersheds. Water quantity conditions are evaluated in terms of the monthly mean and 7-day low streamflows at selected locations along the main stem channel and on major tributaries. Current conditions are further defined by the status of land use, water withdrawals, and water exports in the watersheds upstream of each location as of approximately Year 2000. This report identifies and draws upon the many prior studies which have characterized water resources and uses in the study area. An accompanying CD-ROM disk provides copies of recent digitally- published documents including the December 2000 Habitat Limiting Factors and Reconnaissance Assessment Report for the Green/Duwamish Watershed, the July 2001 Tacoma Water Habitat Conservation Plan for the Green River, and the July 2001 Central Puget Sound Regional Water Supply Outlook.
    [Show full text]
  • Capron Seattle's Turbine Pumps
    Seattle’s Turbine Pumps – No Electricity Needed Cheryl Capron - Seattle Public Utilities PNWS-AWWA Conference May 6, 2016 Overview Seattle System Topography Concept Operational Needs The Turbines Seattle System Topography “Seattle has hills, and to spare. With surface elevation of Lake Youngs at 498 feet above sea level, water incoming from Cedar River is vented by gravity into reservoirs at surface elevation 430 feet, as is the reservoir on Capitol Hill. Leo Tank on Beacon Hill is supplied by gravity, off the pipelines, at elevation 480 feet. So are reservoirs on the West Seattle hills, at elevation 440 feet. Topography (cont.) “Hydraulic turbines placed on the lines, take advantage of the kinetic energy of water between elevations. Pumps connected to these units force water to high zone towers and tanks with overflows of 530 feet above sea level, such as Queen Anne Hill.” R.H. Calligan, Superintendent of Water, 1893 Topography & Pressure Zones Pressure Zone Hydraulic Profile Tolt Cedar Service Area (720) 590 550 585 530 530 509 Lake Youngs 430 (502) 430 - 440 326 Tolt Service Area The Concept and The Operational Needs Turbine Schematic 25% - 33% of flow into station is pumped to high service. High Service Pump Storage Direct Coupling Drive Remote Control Ball Valve Low Service Storage 66% - 75% of Supply Line From Intermediate Service flow into station is Reservoir discharged to low service. Operational Needs Hills & multiple pressure zones Stable & adequate suction head Output varies along with gradient on pipeline supply
    [Show full text]
  • This Application May Be Used to Enroll Customers in the Following Programs: Utility Discount Program, the Seattle Public Utilit
    ☐ SPU-EAP-206-684-5800 th To Submit by Mail -700-5 Ave Ste# 2832 ☐ Seattle, WA 98124 ELIA - 206-684-3688 City of Seattle ☐ PROJECT SHARE ____ To Submit by Fax- 206.287.5356 Assistance Programs Application ☐ $20 Car Tab Rebate ___ Email: [email protected] OR [email protected] ☐ UDP-206-684-5788 Pleas This application may be used to enroll customers in the following programs: Utility Discount Program, The Seattle Public Utility Emergency Assistance Program (SPU-EAP), Project Share, The Emergency Low-Income Assistance Program (ELIA), and the $20 Car Tab Rebate Program. Eligibility is based on meeting each individual program enrollment criteria, meeting annual income criteria, and based on the date the completede check application all that apply is received or by the city. Applications are processed in the order they are received. call if you have questions ☐ Government issued Identification for all persons 18 years and older. Please provide a Copy of one of the items below for each adult: • State driver’s license • State identification card • Passport or Permanent Resident Card ☐ Please provide your Food Assistance SNAP benefits client ID or your social security number below to provide verification of gross income to enroll in the UDP Program. SNAP Benefits Client ID: OR Social Security #: - - ☐ If you are not on SNAP, please provide income documentation for ALL persons 18 years old and older living in your home. Please provide verification of GROSS income received in the previous month: . • Paycheck stubs/ Employer statement
    [Show full text]
  • C I T Y O F S E a T T L E, W a S H I N G T
    C I T Y O F S e a t t l e, W a s h i n g t o n 2002 Adopted Budget Ordinance 120640 PRINTED ON RECYCLED PAPER In response to the Americans with Disabilities Act (ADA), material from the budget is available from the City of Seattle Budget Office in alternative formats. To make a request, or for more information, please call Linda Wokal at (206) 684-8089. CITY OF SEATTLE 2002 ADOPTED BUDGET MAYOR PAUL SCHELL SEATTLE CITY COUNCIL Margaret Pageler, Council President Jim Compton Jan Drago Richard McIver Peter Steinbrueck Richard Conlin Nick Licata Judy Nicastro Heidi Wills DEPARTMENT OF FINANCE CITY BUDGET OFFICE Dwight Dively, Director Joan E. Walters, Budget Director Linda Wokal, Administrative Assistant Janice Pratt, Receptionist Arts, Culture, and Neighborhoods Public Safety and Human Services Team Team Jan Oscherwitz, Lead Doug Carey, Lead Lee Belland Elise Downer Marilynne Gardner Anne Friedlander Sara Levin Barbara Gangwer Carrie McCann Cheryl Swab Helen Welborn Karl Stickel Economics Team Utilities, Transportation, and Glen Lee, Lead Administration Team Janet Credo Jim Echert, Lead Dave Hennes Jeff Davis Tom Kirn Thomas Dunlap JoEllen Kuwamoto Greg Hill Stephen Land Cameron Keyes Erik Sund Carol Mikkelsen Greg Petersen Credits CBO thanks the following, who provided valuable proofreading assistance: Lisa Peyer, Meg Gordon, Diane Clausen, Carolyn Iblings, Eve Sternberg, Tim Morrison. CBO thanks Jan Gibson, Kim Roberts, Jim Waters, Jim Ackerman, Donna Taylor, and Tere Quade-Hepburn of City Design, Print & Copy for their work in printing the CIP. Cover Design: Jay Keiler, Graphic Arts Designer, City Design, Print & Copy.
    [Show full text]
  • Seattle Public Utilities Water System Synopsis As of June 21, 2021
    Seattle Public Utilities Water System Synopsis as of June 21, 2021 Cumulative Precipitation Snowpack (Snow Water Equivalent) Weighted Average Cedar/Tolt Weighted Average Cedar/Tolt 120 70 WY 2021 100 60 WY 2020 50 Median WY 1990 - 2019 80 40 60 30 Inches 40 WY 2021 Inches 20 WY 2020 20 Average WY 1990-2019 10 0 0 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Precipitation was recorded in the Cedar River and South Fork Tolt The average snow accumulation across the sites that we monitor is River Watersheds over the past week. estimated to be about 3.4 inches snow water equivalent which is above the long term median for this time of the year. Combined Reservoir Storage Average 7-Day Water Consumption 50 300 275 WY 2021 40 250 225 WY 2020 200 Average WY 2010-2019 30 175 WY 2021 150 20 WY 2020 125 100 Average WY 1990-2019 75 10 50 Low Reservoir Conditions 25 Millions of GallonsMillionsDay ofper Billions ofofBillions Storage GallonsActive 0 0 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep The combined reservoir storage of Chester Morse Lake, Masonry Water use over the past week averaged about 142 million gallons Pool, Lake Youngs and South Fork Tolt Reservoir is above the long per day (mgd), which is above the 140 mgd used during the same term average for this time of the year.
    [Show full text]
  • Seattle Watercourses
    City of Seattle State of the Waters 2007 Volume I: Seattle Watercourses State of the Waters 2007 Volume I Table of Contents Acknowledgments .................................................................................................................................xi Contents of the 2007 State of the Waters Report.................................................................................xiii Executive Summary.............................................................................................................................xiv Key Findings................................................................................................................................... xv Factors Affecting Seattle Watercourses .........................................................................................xvi Watershed-Scale Conditions.....................................................................................................xvi Stream-Scale Conditions ........................................................................................................xviii Biological Communities............................................................................................................ xx Part 1 Introduction .............................................................................................1 Understanding the State of Seattle Waters.............................................................................................. 1 Overview of Seattle-Area Water Bodies................................................................................................
    [Show full text]
  • Executive Order 2020-05: COVID-19 Civil Emergency Further Extension of City Closures and Relief Measures
    Office of the Mayor City of Seattle Jenny A. Durkan, Mayor Executive Order 2020-05: COVID-19 Civil Emergency Further Extension of City Closures and Relief Measures An Executive Order directing City departments to further extend its actions to combat the spread of the COVID-19 pandemic and to mitigate the impact of the public health emergency on the people of Seattle. WHEREAS, in my capacity as Mayor, I proclaimed that a civil emergency exists in the City of Seattle in the Mayoral Proclamation of Civil Emergency dated March 3, 2020; and WHEREAS, on March 4, 2020, Public Health – Seattle & King County issued guidance recommending that people at higher risk of severe illness should stay home and away from large groups of people as much as possible, including public places; and WHEREAS, on March 10, 2020, I issued Executive Order 2020-03 to provide assistance to Seattle’s small businesses and their workers; and WHEREAS, Executive Order 2020-03 also directed Seattle Public Utilities and Seattle City Light to enroll more customers in the Utility Discount Program, exercise flexibility with customers, including instituting payment plans, and avoid utility shutoffs whenever possible; and WHEREAS, on March 11, 2020, Washington Governor Jay Inslee prohibited all gatherings of 250 or more in western Washington and Dr. Jeff Duchin, Health Officer for Public Health – Seattle & King County also prohibited gatherings of 250 or less unless certain precautions were undertaken; and WHEREAS, as a result, on March 12, 2020, I directed the Seattle Public Library
    [Show full text]
  • 2019 SPU's Risk and Resiliency Assessment and Framework
    SPU’s RISK AND RESILIENCY ASSESSMENT AND FRAMEWORK 2019 Final Report Seattle Public 2019 SPU RISK AND RESILIENCY ASSESSMENT AND FRAMEWORK - 1 Utilities Table of Contents Page Section 3 Section 1: Introduction 7 Section 2: Climate Change 12 Section 3: Disasters 17 Section 4: Investment Priorities 21 Section 5: Economy 24 Section 6: Market Forces 26 Section 7: Technology 28 Section 8: Workforce 31 Section 9: Next Steps 32 Appendix A: Impact-Likelihood Matrix 2019 SPU RISK AND RESILIENCY ASSESSMENT AND FRAMEWORK - 2 Section 1: Introduction Organizations today are faced with multiple risks and uncertainties as they work to fulfill their missions. Being resilient offers a powerful way of addressing risks comprehensively, managing uncertainty, and taking advantage of new opportunities. For Seattle Public Utilities (SPU), resiliency is the capacity to recover in the face of sudden or gradual stressors that impact utility services and the community. SPU delivers essential water, drainage and wastewater, and solid waste services – all fundamental for public and environmental health. Seattle has been a leader in making utility investments that have multiple, long-term community benefits. After the Great Seattle Fire of 1889, the citizens of Seattle voted to create a public water system and develop the Cedar River water supply system. Seattle’s water, drainage, wastewater, and solid waste utilities have faced many challenges over the years and have evolved to improve services and reduce pollution impacts. As a community-centered utility, SPU seeks to proactively address community needs and risks to improve resiliency. In 2017, Seattle City Council requested that SPU “prepare a risk and resiliency management assessment.” SPU delivered the status report to Council on August 1, 2018.
    [Show full text]
  • Renton and Auburn 7.5-Minute Quadrangles
    PRELIMINARY MAPS OF LIQUEFACTION SUSCEPTIBILITY FOR THE RENTON AND AUBURN 7.5' QUADRANGLES, WASHINGTON by STEPHEN P. PALMER WASHINGTON DIVISION OF GEOLOGY AND EARTH RESOURCES OPEN FILE REPORT 92-7 July 1992 •• WASHINGTON Sl'ATE DEPARTMENT OF -~-~~~~...._,, Natural Resources Bnan Boyle - Commissioner of Public Lands Art Stearns - Supervisor Division of Geology and Earth Resources Raymond Lasmanis. State Geologist CONTENTS Page Summary ..........•............................•........••........•.......•.... Introduction . • . • . • . • . 2 Geology of the Renton and Auburn quadrangles . • • . • . 2 Liquefaction susceptibility maps for the Renton and Auburn quadrangles • . • . • . 8 Methodology used to evaluate liquefaction susceptibility . • . • . 9 Geotechnical boring data used in evaluation of liquefaction susceptibility . 11 Historic liquefaction . • . • . 13 Liquefaction analysis . 17 Conclusions . • . 22 Acknowledgments . 22 References cited . 23 ILLUSTRATIONS Figure 1 Location map showing the Renton (1) and Auburn (2) 7 .5' quadrangles and Seattle North and South 7.5' quadrangles . • . • . 3 Figure 2 (a) Explanation for the generalized geology maps of the Renton and Auburn quadrangles . • . 4 (b) Map showing generalized geology of the Renton quadrangle . 5 (c) Map showing generalized geology of the Auburn quadrangle • . • . 6 Figure 3 Map showing current and historic waterways in the Renton and Auburn quadrangles (modified from Luzier, 1969) . • . • . 7 Figure 4 Sample of the U.S. Army Corps of Engineers aerial photo mosaic in the vicinity of Longacres Race Track . 10 Figure 5 Cumulative frequency histogram for Category I deposits, M 7.3 event . 17 Figure 6 Graph showing comparison of data for Category I deposits and for Holocene alluvium for M 7.3, 0.15 g events . • . • . 18 Figure 7 Graph showing comparison of data for Category I deposits and for Holocene alluvium for M 7.3, 0.30 g events .
    [Show full text]