<<

(Y)OUR BROOMIELAW

SUMMARY DOCUMENT

Glasgow City Centre District Regeneration Frameworks Broomielaw District August 2018 Broomielaw District Regeneration Framework as defined in City Centre Strategy 2014-2019

2 3 Project Team Contents

1. Executive Summary 6

Client - Lead designer, strategy Local consultant, Local designer 2. Background and Context 8 3. The District Today 9 4. Themes 10

Connectivity, spatial Property market Socio-economic Community 5. Action Plan 11 economics consultants regeneration animation, consultants engagement 6. Planning Policy 15

Gerry Grams

Smart city consultants Strategic city design Engineering advice Cost consultants adviser

4 5 (Y)OUR BROOMIELAW (Y)OUR BROOMIELAW EXECUTIVE SUMMARY EXECUTIVE SUMMARY Executive Summary

The Broomielaw District is the second of nine Broomielaw and the International Financial Services However there are many challenges and much these interventions will be programmed over a ten districts to see an area Regeneration Framework District (IFSD). potential for improvement, especially along the year period. developed as part of the City Centre Strategy forgotten river, the car dominated public spaces, 2014-19. Preparing this Framework has been a collaborative, the fragmented urban structure and the severance This document is a summary of the Broomielaw collective effort involving the many people with a and disruption of the M8. DRF, which will be available online at www.glasgow- This report is the summary of the approved stake and interest in and citycentrestrategy.com. Regeneration Framework and action plan for the Broomielaw. For this reason this project is The Framework therefore positions its proposals Broomielaw District. underscored by this collective effort, expertise and around 7 main themes: energy.... (Y)our City Centre, (Y)our Broomielaw This District Regeneration Framework outlines a a. (Y)our River Park vision, objectives and a series of proposals to This city’s motto is “Let Glasgow Flourish”. If b. (Y)our urbanised M8 redefine the Broomielaw district of Glasgow in the Glasgow is to flourish in the 21st Century the city c. (Y)our great streets and spaces next ten years and beyond. This Regeneration centre will have to be at the vanguard of wider d. (Y)our updated mobility Framework includes neighbourhoods on both regeneration, with the Broomielaw a key catalyst in e. (Y)our great buildings banks of the beyond the area many redefining (Y)our City Centre in future. f. (Y)our vibrant Broomielaw would define as ‘the Broomielaw’. g. Transforming (Y)our Broomielaw Overall the Framework confirms that the The River is deliberately central to the area covered Broomielaw District contains a plethora of by this District Regeneration Framework. It opportunities such as the River Clyde corridor, The next stage for these projects will be a process considers the northern edge of , many buildings of historical significance, the IFSD of feasibility assessment as the costs, benefits and Springfield Quay, Lancefield Quay, , part attracting business and new employment to the risks are looked at in detail. It is an exciting period of the Central Business District as well as the north bank. for the District – and given the scale of the proposals

6 7 (Y)OUR BROOMIELAW (Y)OUR BROOMIELAW BACKGROUND AND CONTEXT THE DISTRICT TODAY Background and Context The District Today

The City Centre Strategy and Action Plan 2014-19 physical, social and economic regeneration and Taking the views of local stakeholders into consideration, the District Framework gathers data to help sets out a vision and objectives for central Glasgow may inform Supplementary Planning Guidance understand the key issues being raised. and defines nine city centre Districts; one of which (Local Development Frameworks and/or Strategic is Broomielaw. A Regeneration Framework is to be Development Frameworks as defined in the City One of the initial steps was to assess how the district performs in relation to people activity, quality of prepared for each District. Development Plan 2017). place, and social and economy values.

The pilot Framework was prepared for Sauchiehall This District Regeneration Framework has been Some of the findings have been detailed below: + and was completed and published in prepared in collaboration with a wide array of 2016. The next four Districts are: Broomielaw, St. stakeholders and consultees. Enoch, Central and Blythswood. The last four District Regeneration Frameworks will be for the Participants have included residents, businesses, , Learning Quarter, and land and building owners / occupiers, developers + - . and investors, local and national agencies, Council Opportunities & Challenges departments, elected members, charities, voluntary Each District Regeneration Framework will guide organisations and tourists. ++The District has attracted business and new ++The District is rich with an active public life employment to the north bank of the River during the day, particularly on the public Clyde. realm along the River.

-- The regeneration of both banks of the -- But the lack of mixed use means that public River has stalled. The area is currently life decreases dramatically after office hours, dominated by busy car traffic, a poor quality leading to an environment that does not feel inaccessible riverfront and many vacant sites. safe and does not invite public presence. Many zones within the DRF are characterised Cowcaddens by single uses that fail to create a convivial Sauchiehall city centre environment. PHASE 01 Townhead ++The district is easily accessible by public or ++The District offers many development private transport (including active travel opportunities and it has the potential of options) being extremely well connected to becoming a new neighbourhood. Blythswood regional and local networks. PHASE 05 Learning Quarter -- The M8 viaduct dominates the cityscape, -- At the moment, the District presents an Central traversing the DRF area. The River Clyde urban structure which is disrupted and badly PHASE 04 is currently a barrier rather than being a integrated with lots of vacant spaces on both place to come together. The surroundings sides of the River. of Anderston train station are currently uninviting and poorly connected to the rest of the walking network. Broomielaw Merchant City PHASE 02 ++The DRF area is strategically located between ++The District is traversed by the River Clyde, the city centre and key destinations including with offers the opportunity of enjoying nature the SECC/ Hydro, the Airport and the city’s whilst in the middle of a dense urban St. Enoch West End and Southside. environment. PHASE 03 -- The District has the potential of becoming -- At the moment the River Clyde is unattractive, an entrance gateway to Glasgow, but fails to liveless and inaccessible, its edges are capitalise on this significant location. hardly used and the quality of the public realm is very mixed.

8 9 (Y)OUR BROOMIELAW (Y)OUR BROOMIELAW THEMES ACTION PLAN Themes Action Plan

Each Strategy will be implemented through a series of proposals for intervention and these have (Y)our River Park (Y)our urbanised M8 number of projects, which can vary from major been consolidated into the draft Action Plan below. capital projects with a longer time-frame, to smaller, Full description of these projects can be found in softer and shorter projects. The main DRF makes a the Broomielaw DRF main document.

(Y)our River Park: To create a world-class linear (Y)our urbanised M8: To maintain the benefits of Strategy Project public space along both banks of the River Clyde 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 an urban motorway whilst reducing its negative impacts River Park YOUR RIVER PARK River Strategy (Y)our great streets and spaces Event and Animation activity (Y)our updated mobility (Y)OUR URBANISED M8 City Centre Motorway Strategy Reconfigured Anderston Cross , animated undercroft space

Public space plan and Gateway spaces (Y)OUR GREAT STREETS AND SPACES Glorious Argyle Street

(Y)our great streets and spaces: To optimise (Y)our updated mobility: To enhance Glasgow’s (Y)OUR UPDATED MOBILITY City Centre Transport Strategy Glasgow’s street grid and address the shortage of public transport and active travel networks to cre- Low Emission Zone quality green spaces ate a sustainable, walkable city North Bank Promenade Street Safety and Accessibility Updated Central/Anderston station surroundings (Y)our great buildings (Y)our vibrant Broomielaw Design guidelines (Y)OUR GREAT DRF Planning Policy: Higher Density, Increase BUILDINGS Building Heights, Flexible Broomielaw

Neighbourhood Identity Strategy (Y)OUR VIBRANT Community Amenity and Infrastructure Plan BROOMIELAW DRF Planning Policy: Mixed and Repopulated (Y)our great buildings: To respect Glasgow’s fine (Y)our vibrant Broomielaw: To create a lively, Broomielaw convivial, attractive mixed use riverfront city centre built heritage with highest quality contemporary Development Health Check district design Repopulated Broomielaw

Broomielaw Masterplan TRANSFORMING (Y)OUR BROOMIELAW TRANSFORMING (Y)OUR Tradeston Masterplan BROOMIELAW Broomielaw Brand Broomielaw Conservation and Heritage Assessment

Transforming (Y)Our Broomielaw: To to initiate change in a way that responds to the vision and guidance set out by the DRF..

10 11 (Y)our Broomielaw Key Projects

Updated Anderston station and surroundings

Updated Central Argyle Street Avenue Station and surroundings

New Anderston Cross

Broomielaw Masterplan

Animate M8 (Y)our Broomielaw Masterplan Undercroft River Park Clyde Street and Broomielaw Avenues

12 13 (Y)OUR BROOMIELAW PLANNING POLICY Planning Policy

LOCAL DEVELOPMENT FRAMEWORK GLASGOW CITY DEVELOPMENT PLAN

The principal purpose of this District Regeneration Glasgow City Development Plan (CDP) Framework (DRF) is to guide forthcoming establishes the spatial strategy for the city with physical, social and economic regeneration and the key aims of creating 1) a healthy, high quality development in the area of the city centre place and 2) a compact city form that supports

designated by the City Centre Strategy 2014-19 Context Policy sustainable development. as the Broomielaw district. The City Centre Strategy states that each DRF will contribute to A number of detailed planning policies within the Supplementary Planning Guidance. CDP, are particularly relevant to the DRF, in particular CDP 1: Placemaking Principle, CDP 2: BROOMIELAW DISTRICT REGENERATION Sustainable Spatial Strategy, CDP 3: Economic FRAMEWORK OBJECTIVES Development, CDP 4: Network of Centres, CDP 5: Resource Management, CDP 6: Green Belt The aims of this DRF are to: and Green Network, CDP 7: Natural Environment, CDP 8: Water Environment, CDP 9: Historic a. To outline the vision and ambition for the Environment, CDP 10: Meeting Housing Need, Broomielaw DRF CDP 11: Sustainable Transport, CDP 12: b. To create an attractive and vibrant mixed-use Delivering Development. urban district c. To provide a planning and delivery framework For more detail on how the DRF reaches its to support and enable the delivery of objectives by addressing each of the policies regeneration of the Broomielaw district listed above, please see the planning section on d. To support and encapsulate the Placemaking the full DRF (Y)our Broomielaw document. Principles outlined in the CDP.

National Planning Framework (NPF3) Cydeplan

City Development Plan (2011) City Centre Strategic Development Framework (in progress)

City Centre Strategy New Projects

City Centre Lanes

City Deal EIIPR

Stakeholder Engagement

Data = Analysis

DRFS

14 15 If you have any questions, comments, or would like further information on the High Street Area Strategy, please contact: [email protected]

16