<<

Helping Tampa reach its Vision Zero Goals

Project Specific Safety Enhancements. PROJECT

IMPROVEMENTS Added a left turn lane to reduce backups onto the WILL REDUCE expressway.

NORTHWEST TAMPA 275 Columbus Dr Columbus Dr

20th St TAMPA Palm Ave HEIGHTS 92 Added 735 feet of OLD WEST 45 sidewalk on the

FranklinSt Tampa Added traffic signals side of Euclid Avenue Boulevard 275

improve safety and to improve pedestrian N ebraska Ave to Added a traffic signal WEST mobility. connectivity. to improve safety and TAMPA DOWNTOWN END TAMPA Jefferson St PROJECT Cass St Morgan St NORTH HYDE Hillsborough River Ave mobility. PARK Tampa St LIMITS OAKFORD UNIVERSITY CHANNEL PARK OF TAMPA DISTRICT

Whiting St r

D

MacDill Ave

Willow Ave Willow Armenia Ave Howard AveHoward Kennedy Blvd e Provided a new crosswalk d 60 Kennedy Blvd i 60 nels Cleveland St Brorein St Chan and pedestrian signal at COURIER CITY / Amalie Arena overall GRAY OSCAWANA Platt St Garrison Tampa the Lynwood Avenue GABLES Channel

Lois Ave Convention Center Plant Ave

Dale MabryHwy intersection to improve Tampa General For Illustrative Purposes Only Swann Ave Swann Ave ParkHyde Ave crashes by Hospital 4 PORT OF pedestrian circulation. Hyde Park 3 TAMPA PARKLAND Village HARBOUR ESTATES D ISLAND av Morrison Ave is B

Boulevard l v d

Euclid Ave Henderson Blvd GOLFVIEW 17% 2 DAVIS Provided a new crosswalk and pedestrian WEST ISLANDS Bayshore Blvd signal at the Lynwood Avenue intersection PALMA CEIA EUCLID AVENUE EUCLID Added dedicated bike lane Added a left turn lane from to improve pedestrian circulation. Bay to Bay Blvd markings for a distance of Euclid Ave to help with injury type 735 feet to improve safety VIRGINIA FPO traffic flow. PARK Hillsborough Bay for bicyclists. 92

MacDill Ave crashes by Provided a through El Prado Blvd

HimesAve movement for Lynwood EUCLID 1 Euclid Ave Avenue onto Selmon eastboundallowing direct BAYSHORE access from the 22% NIGHT Dale MabryHwy Beautiful neighborhood. BEGIN PROJECT LIMITS

Gandy Blvd property damage type For Illustrative Purposes Only crashes by

Continued the green 18% colored bike lanes See how this project affects your along Cleveland Avenue and provided neighborhood or commute. Modified the existing traffic a new green bike box allow westbound 1. Choose a section that interests you. signal to enhance traffic flow. to Provided three lanes at the relocated cyclists to have priority off ramp to alleviate weaving and 2. Use the orange number on the map to reference the through the signal. backup issues on the expressway. multiple birdseye view displays for more details about the vehicle proposed design for the Preferred Alternative.

crashes by Removed Selmon westbound off ramp stop condition at Cleveland Streetto 29% improve vehicle safety. Cleveland St

For Illustrative Purposes Only Updated / added pedestrian signals to improve pedestrian safety.

Numbers are WILLOW AVENUE WILLOW approximate. Added 625 feet of new sidewalk on the south side Relocated Selmon of Cleveland St. to improve westbound off-ramp pedestrian connectivity. movements to the Willow/Cleveland signal to eliminate weaving issues. Willow Ave

For Illustrative Purposes Only