For Personal Use Only Use Personal For

Total Page:16

File Type:pdf, Size:1020Kb

For Personal Use Only Use Personal For Registered Office: Level 2, 395 Collins Street Melbourne, Victoria 3000 Telephone (03)8611 5320 4th December 2013 ACQUISITION OF CROYDON COAL LTD 3D Resources Ltd. (“3D Resources” or “the company”) is pleased to announce it has agreed to acquire Croydon Coal Ltd (“Croydon Coal”) a New Zealand company which owns a 100% interest in a Tangarakau Coalfield exploration project which the Company believes can potentially offer the company a commercial underground coal project in the short to medium term. The acquisition is subject to any regulatory approvals which may be required. Background 3D Resources has entered into an agreement to acquire 100% of Croydon Coal, a New Zealand company that holds 100% of Exploration Permit 40752. This permit covers a strategic part of the “Tangarakau Coalfield”, which is recognised as one of the largest continuous coal fields in the Taranaki and King Country coalfields of New Zealand. EP40752 (shaded Green) For personal use only EP40752 is located 40 kilometres south west from the farming town of Taumarunui, and 100km south west from the city of Hamilton. More importantly it is located within a few kilometres of the Okahukura to Stratford railway line that offers transport options for the coal into both the local market, as well as the export market through the port of New Plymouth. This port is uncongested and can accommodate panamax vessels. EP40752 surrounds Mining Permit MP41511 and shares the old underground workings of an old State coal mine, the “Tatu State Mine” in the southern boundary of the two permits. From 1940 to 1971, this mine produced over a million tonnes of thermal coal from underground mining, for local domestic consumption. EP40752 comprises 74.38km 2 and contains at least nine drill holes completed mainly by the Government. This drill hole data shows the continuity of the Maryville Coal Measures throughout much of the permit area which comprise at least 9 seams. The main commercial seam, that was the subject of historic mining at the Tatu State Mine, represents a convergence of two seams (Seams 7 & 8). These seams outcrop in the eastern part of the permit and dips to the west at around 3 to 5 degrees. For personal use only Location of Drill holes and Coal Outcrops in and around EP40752 MP41511 (covering an area of just 3.1km 2) is reported to contain a JORC Indicated Resource of 7.3 million gross in-situ tonnes based on an average seam thickness of about 2.0metres. Government drill holes (7864, 7863 and 7860) located some 1.2km, 2.7km and 5.6km north of the mining permit contain coal seam thicknesses of 3.5metres, 2.6metres and 2.03metres of coal respectively for the same coal horizon. Around 3.6km to the south of the mining permit, a recent hole drilled by Solid Energy (9419) have geophysical down the hole logs that indicate there is 2.7metres of potential coal seams with some partings. Only a part of that seam was cored and so sample data is limited. These drill holes confirm that potentially, a mineable coal seam thickness exists over an extensive area both North and South of MP41511, including of course MP41511 itself. The down dip extension to the west remains largely unexplored and, based on the 3-5degree dips prevalent in this area, the main coal seams would be expected to be at around 250- 400m below surface at the western boundary of EP40752. It is 3D Resources’ view, therefore, that within the area surrounding the Mining Permit there is ample room for a target resource potential well in excess of the 20 million gross in-situ tonnes that may be required to give the project a +10year mine life. At this stage the resources in EP40752 are not defined sufficiently to generate a JORC compliant resource but the widely spaced drill hole data demonstrates continuity of potential mineable thicknesses of coal extending over large areas. Both permit areas are located on land owned by the Crown and administered by the Department of Conservation (“DOC”). MP41511 has a land access agreement in place with DOC to mine coal, and EP40752 has a land access agreement in place for defined exploration activities. So there appears to be government support for commercial development of coal in this area. For personal use only Detailed map showing the locations of drill holes approved by the Government, some of which may be utilised by 3D Resources. The initial program by 3D Resources would aim to confirm continuity of mineable seam thicknesses over a wider area. (N.B. Grid shown on map = 1km x 1km) Coal Quality Coal quality has been determined from several sources of coal sampling: • Samples from six different outcrops from within, east and 1.6km southeast of MP41511; • Samples from drill-hole 7864 which intersected 3.5m of coal 1.3km north of MP41511; • Samples from the old Tatu State Mine including two run-of-mine analyses and results of analysis of 28 full face channel samples taken from the mine between 1941 and 1961; and • Samples taken from the outcrop and exposed coal face at the proposed entrance point for the new underground mine within MP41511. The proximate coal quality parameters, on an air dried basis (except for CV which is “gross as received”) are summarised in the table below. CV (GAR) ASH VOL FC TM TS 5700 kcal 5% 40.5% 42.8% 14.5% 1.2% The coal is a high ranking sub-bituminous coal. New Zealand North Island coal, is typically high ranking sub-bituminous, high in vitrinite with reactive qualities, used primarily for feedstock to Huntly Power Station, and Glenbrook Steel Mill, which is a direct reduced iron steel plant, located south of Auckland and west of the Huntly coalfields. Infrastructure One of the attractions of the Croydon Coal project is that it is located close to infrastructure and so any mine development should involve fairly low capital costs. For personal use only A railroad passes the mine area, and a rail siding area has been identified 10km from mine mouth by tarred road. Alternatively, consideration can be given to installing a 3km overland conveyor from mine mouth to the rail siding if warranted. The freight railroad travels 110km southwest from the siding to the town of Stratford, and a further 40km northeast direct to the Port of New Plymouth. The same railroad joins the main trunk-line and travels 300km north to Huntly Power Station and then across to Glenbrook Steel. The railroad is currently moth-balled, but the Government railroad operator, “Kiwirail”, has indicated it will upgrade and re-commission the railroad at its cost, to be amortised in the haulage fee over the life of mine. The Port of New Plymouth has a 12 metre draft which was dredged in 2006 in anticipation of being the point of export for Pike River coal. The Company understands that Bathurst Resources Limited is also planning to utilise the Port for the export of its West Coast coal production by barging the coal from Westport in the South Island to New Plymouth for loading onto panamax vessels. 500KVA power can be supplied to the mine area at around $250,000, although supporting generator power would also be needed. Alternatively, at an estimated cost of $1 million, 1000KVA can be supplied which would be sufficient for an underground mine producing 1 million tonnes per annum. Target Markets The potential markets for the coal include both domestic supply in the North Island and export. Domestic demand in the North Island of New Zealand is driven by Huntly Power Station, a 1500MW Power Station designed for natural gas and coal consumption, and the Glenbrook Steel Mill, a direct reduced iron steel plant that sources its iron from nearby beach iron sands. Coal to the Power Station and the Steel Mill is supplied by Solid Energy New Zealand Limited’s Huntly mines, as well as coal imported by the Power Station and the Steel Mill via the Port of Tauranga in the Eastern Bay of Plenty (typically imported from Indonesia and Australia). Apart from Fonterra, who supply their own milk factory, Solid Energy New Zealand Limited (“Solid Energy”) is the North Island’s only significant coal producer and supplier. There are also several industrial users within the region of EP40752 who have a demand for coal, and who are supplied from quite a distance by Solid Energy. The financial and operational challenges of Solid Energy are well publicised. 3D Resources sees an opportunity to mitigate supplier risk for the Power Station and the Steel Mill, and to possibly be a cheaper source of supply to local industrial users in the North Island. With the availability of rail to the Port of New Plymouth, the export market provides Croydon Coal with good diversification of its coal and its customer base. For personal use only About Croydon Coal Croydon Coal is a New Zealand company with 8million shares on issue . Croydon Coal’s sole asset is a 100% interest in EP40752 which it acquired from Solid Energy New Zealand Ltd(Solid Energy) by an agreement dated April 2013 . EP40752 has been transferred to Croydon Coal with the payment to Solid Energy as follows: • A cash payment ofNZ$50,000 payable on the approval by the relevant Government authority to a two year extension of the permit from 7 November, 2013 to 6 November, 2015; and • a cash payment of NZ$700,000 upon the Company being granted a mining permit; or • If after 6 November, 2015 the Company does not apply for a mining permit but applies for and obtains an appraisal extension, a cash payment of NZ$200,000 on being granted that extension; and a cash payment of NZ$500,000 upon being granted a mining permit.
Recommended publications
  • Hello Please Find Attached, the Following Statements of Evidence-In-Chief for Genesis Energy
    From: Alice Lin To: Plan Hearings Cc: Karen Sky Subject: Proposed Plan Change 7 - Statements of Evidence for Genesis Energy Ltd (Submitter ID 422) Date: Friday, 17 July 2020 2:02:41 pm Attachments: image001.png image002.png image003.png Statement of Evidence by Mark Alan Cain (final 20200717).pdf Statement of Evidence by Roger Graeme Young (final 20200717).pdf 20200717- CLWRP PC7 - FINAL Phil Mitchell Statement of Planning Evidence.pdf Hello Please find attached, the following statements of evidence-in-chief for Genesis Energy Ltd (Submitter ID 422): Mark Cain (Genesis) Phil Mitchell (planning) Roger Young (ecology) I would appreciate it if a receipt confirmation email could be provided please. Many thanks. Kind regards Alice Lin | Environmental Policy & Planning Manager Genesis Energy Ltd | 660 Great South Road, Greenlane, Auckland M. 021 0221 1943 DDI. 09 951 9334 BEFORE THE HEARING COMMISSIONERS IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER Proposed Plan Change 7 to the Canterbury Land and Water Regional Plan STATEMENT OF EVIDENCE OF MARK ALAN CAIN ON BEHALF OF GENESIS ENERGY LIMITED 17 July 2020 Page 1 of 12 Introduction 1. My name is Mark Alan Cain. I have prepared this evidence on behalf of Genesis Energy (Genesis) in my role as the Tekapo Site Manager. I have 24 years’ experience in the hydro-electricity industry and 11 years’ experience in operational and maintenance roles in the mining industry. 2. I hold an Advanced Trade Certificate and Trade Certificate in Fitting Turning and Machining, a National Certificate in Mechanical Engineering (Level 4), a National Diploma in Business (Level 5), and a National Diploma in Electricity Supply (Level 5) among other qualifications.
    [Show full text]
  • Mapping the Socio- Political Life of the Waikato River MARAMA MURU-LANNING
    6. ‘At Every Bend a Chief, At Every Bend a Chief, Waikato of One Hundred Chiefs’: Mapping the Socio- Political Life of the Waikato River MARAMA MURU-LANNING Introduction At 425 kilometres, the Waikato River is the longest river in New Zealand, and a vital resource for the country (McCan 1990: 33–5). Officially beginning at Nukuhau near Taupo township, the river is fed by Lake Taupo and a number of smaller rivers and streams throughout its course. Running swiftly in a northwesterly direction, the river passes through many urban, forested and rural areas. Over the past 90 years, the Waikato River has been adversely impacted by dams built for hydro-electricity generation, by runoff and fertilisers associated with farming and forestry, and by the waste waters of several major industries and urban centres. At Huntly, north of Taupiri (see Figure 6.1), the river’s waters are further sullied when they are warmed during thermal electricity generation processes. For Māori, another major desecration of the Waikato River occurs when its waters are diverted and mixed with waters from other sources, so that they can be drunk by people living in Auckland. 137 Island Rivers Figure 6.1 A socio-political map of the Waikato River and catchment. Source: Created by Peter Quin, University of Auckland. As the Waikato River is an important natural resource, it has a long history of people making claims to it, including Treaty of Waitangi1 claims by Māori for guardianship recognition and management and property rights.2 This process of claiming has culminated in a number of tribes 1 The Treaty of Waitangi was signed by the British Crown and more than 500 Māori chiefs in 1840.
    [Show full text]
  • 5560 the NEW ZEALAND GAZETTE No. 225
    5560 THE NEW ZEALAND GAZETTE No. 225 Marshall Roger Stewart BSC MIMARE MIPENZ Care of DMEO, N.Z. Railways, Wellington 26/11/80 Marshall Wolfgang BE MIPENZ Regional Engineer's Office, Post Office, Auckland 28/7/77 Martin Alan David FICE FIPENZ III Cockayne Road, Wellington 4 22/2/49 Martin Barry Oliver BE MIPENZ Ministry of Transport, Wellington 21/12/66 Martin Charles George MSC FICHEME FIPENZ 223 Mount Pleasant Road, Christchurch 8 4/7/78 Martin Colin Edwards BSC MIEE MIPENZ Care of P.O. Box 363, Taumarunui 9/7/73 Martin Gordon Sommerville MIPENZ MIMECHE Huntly Power Station, Private Bag, Huntly 13/4/76 Martin Linden Herbert MIEE 64 Glen Road, Stokes Valley 31/3/53 Martin Noel Stewart BSC MIEE MIPENZ Engineer-in-Chiefs Office, P.O.H.Q., Wellington 5/4/61 Martin Richard John ME MIPENZ Mobil Oil N.Z. Ltd., P.O. Box 2497, Wellington 26/11/80 Martin Robert Steele MICE P.O. Box 878, Rotorua .. 15/1/40 Martin Walter Joseph BE MICE MIPENZ P.O. Box 30-429, Lower Hutt 24/3/53 Marwick Jon BSC BE MIPENZ . Kirchgasse 9, 8907 Wettswil, Switzerland 1/12/82 Mason GeoffreYBsc MIMECHE FIPENZ II Granville Terrace, Dunedin, W. I. 6/12/62 Mason Kevin Jackson BE 65 Pitcairn Street, Dunedin 7/7/83 Mason Seager Woodley BE 19 Cleary Street, Lower Hutt 29/7/81 Mather Ronald Samuel BSC MIEE N.Z.P.O., Napier 24/7/57 Matheson Colin McDonald MIPENZ 13 Scotts Road, Manurewa 7/3/52 Matheson Hugh Cameron BE MIPENZ N.Z.
    [Show full text]
  • Application Note VC6000 at Huntly Power Station
    Application Note VIBROCONTROL 6000™ at Huntly Power Station Introduction Genesis Energy’s Huntly Power Station is located on the banks of the Waikato River between Hamilton and Auckland in the North Island of New Zealand. The station was commissioned from 1982 to 1985 and consists of four 250 MW, single reheat turbo- alternators made by Parsons in UK. Figure 1 Panorama view of Genesis Huntley Power Station The Huntly machines are unique in that the foundations are designed with earthquake isolation in mind and are all steel. The flexible nature of these foundations meant that the generator inboard bearing had a resonance at running speed and the generator 2nd critical was just below the running speed which makes these machines extremely sensitive to couple imbalance. Monitoring Strategy Figure 2 Machine Hall In 1995 the OEM monitoring system was replaced with the Classic Compass system to facilitate better monitoring and protection. In 2011 the Compass system on two of the units was upgraded to the new VC-6000™ system. Figure 4 Classic On the main machine the Compass instrument Compass system monitors rack. relative shaft position and motion on each of the 8 main bearings, the eccentricity of the 3 turbine shafts, the differential Figure 3 Steel Foundation Structure Application Note – VIBROCONTROL 6000™ at Huntly Power Station expansion of the 3 turbine The Compass system is also used to monitor the shafts, the axial position bearing vibration and thrust position on the steam of the shaft relative to the turbine driven feed pump on each unit. thrust bearing, and the pedestal vibration of each of the machine’s 12 bearings.
    [Show full text]
  • Genesis Power
    “Q2 performance reflects our strong commitment to New Zealand’s people, resources and potential” QUARTERLY PERFORMANCE STATEMENT THIS DISCLOSURE INCLUDES MARKET INFORMATION FOR THE QUARTERLY PERIOD ENDING 31 DECEMBER 2011 FOR THE 2011/2012 FINANCIAL YEAR IT ALSO INCLUDES OPERATIONAL INFORMATION FOR THE FIRST SIX MONTHS (FIRST HALF) OF 2011/2012 2 | Second Quarter 2011/12 INTRODUCTION Genesis Energy‟s customer satisfaction result has increased to 93% in Q2 2011/2012 from 1 91% in the Q1 2011/2012 . This result reflects the Company‟s continued focus on delivering an excellent customer experience and improving service levels. During Q2, Genesis Energy launched an Advanced Meter Pricing Tariff trial which offers customers an innovative off peak, shoulder and peak tariff based on different time periods when they use their electricity. At the end of December 2011, the Company had also installed a total of 233,819 advanced meters to support its business and innovation programme. Genesis Energy‟s acquisition campaign in the South Island has continued to progress well with approximately 4,500 new customers acquired in Q2 2011/2012. At the end of December 2011, the Company had 60,714 South Island electricity customers. The electricity wholesale market conditions over Q2 2011/2012 included seasonally warm temperatures and improved hydrological conditions which contributed to moderate prices in the wholesale market over the period. Genesis Energy‟s total generation in Q2 2011/2012 was up 12.4% at 1,791GWh compared to 1,593GWh in the same quarter last year, supported by increased renewable generation. On 11 November 2011, the Company lodged its resource consent applications with the 2 Waikato Regional Council for the on-going operation of the 1,448 Huntly Power Station .
    [Show full text]
  • 02 Whole.Pdf (4.561Mb)
    Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and private study only. The thesis may not be reproduced elsewhere without the permission of the Author. Assessment of the Life Cycle-Based Environmental Impacts of New Zealand Electricity A thesis presented in partial fulfilment of the requirements for the degree of Master in Environmental Management at Massey University, Palmerston North, New Zealand Edgar Eduardo Sacayon Madrigal 2015 ABSTRACT The life cycle-based environmental impacts of New Zealand electricity arise from the different energy generation systems used to provide electricity to the national grid, and construction, maintenance and operation of the national electricity transmission and distribution system. Due to the high share of hydropower in the New Zealand electricity mix, base load electricity is rainfall dependent and its variable supply is balanced by generation from fossil fuelled power plants, geothermal, and to a lesser extent from wind, biogas and biomass power. This temporal variability of energy sources in the mix changes the Life Cycle Assessment (LCA) results for New Zealand electricity when the environmental impacts are assessed over different time periods. Therefore, this research had two main objectives: to conduct an LCA of electricity generation, and to assess the influence of temporal variation in the electricity mix on LCA results. Using the ecoinvent v 3.1 database and New Zealand-specific data, an LCA model of electricity generation and use was developed for the year 2013. The LCA results, using the CML 2001 – Apr.
    [Show full text]
  • IN the MATTER of the Resource Management Act 1991 and in the MATTER of the Submission by GENESIS POWER LIMITED on the Horizons
    IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER of the submission by GENESIS POWER LIMITED on the Horizons Regional Plan One Plan STATEMENT OF EVIDENCE OF ROBERT JOHN WEIR (19 OCTOBER 2009) 1. INTRODUCTION 1.1 I am the General Manager, Production, at Genesis Power Limited (trading as “Genesis Energy”), a position I have held since July 2006. Previously, I held the position of Engineering Services Manager at the Huntly Power Station, a position I held since July 2004. 1.2 I have worked in the electricity generation industry in New Zealand and Australia for the last 24 years. 1.3 I hold the degree of Bachelor of Electrical Engineering from the University of Queensland. I am a member of the Institute of Engineers Australia, a Certified Professional Engineer in Australia and a member of the Institution of Professional Engineers New Zealand. 1.4 I am responsible for the management of Genesis Energy's generation assets including the Tongariro Power Scheme, the Waikaremoana Power Scheme, the Hau Nui Wind Farm, and the Huntly Power Station. I am also responsible for trading wholesale electricity and thermal fuel management. 1.5 In this position, I am required to ensure that the supply of electricity from all Genesis Energy's hydro, thermal, co-generation and wind-powered plants are available to meet the Company’s trading requirements. This involves the management of generating facilities across the Company as a whole, and leading the strategic planning process for these assets and their deployment in the market. 1.6 I have previously presented evidence in relation to the Proposed One Plan.
    [Show full text]
  • Coal Strategies for the Huntly Power Station
    143 NZOH Volume 11 Number 2 July 1983 COAL STRATEGIES FOR THE HUNTLY POWER STATION W. R, BAKER UNIVERSITY OF CANTERBURY CHRISTCHURCH, NEW ZEALAND SU1MARY The development and use of a method (1) for determining least cost coal strategies at the Huntly power station is described. The core is a simulation model of the New Zealand power system with two regions, load/flow variation within the year, stochastic hydro inflows and reservoir management rules. The latter are developed by stochastic dynamic programming. The method treats uncertainties in power requirements, oil prices and coal output build-up via scenarios. The method enables explicit consideration of possible regret in optimisation. 1. I N T R O D U C T I O N Huntly Power Station (HPS) is a 960 MW thermal power station currently being commissioned in the North Island of New Zealand. The station can use either natural gas or local Waikato coal for fuel. Gas availability is limited and specified. So the HPS considered is in reality the coal fuelled section of the station, which is fairly low in the merit order of power station fuel costs. Therefore HPS will probably initially provide energy firming by generating electricity at high loads only when the dominant hydro generation system experiences low inflows. Average annual HPS generation should increase as electricity demands increase, with the station being baseloaded eventually. HPS's energy firming fuel use may vary greatly within and between years. When base- loaded at 70% plant factor HPS requires about 2,600,000 tonnes of coal to generate 5800 gWh/yr.
    [Show full text]
  • OHAAKI a POWER STATION on MAORI LAND Evelyn Stokes
    OHAAKI A POWER STATION ON MAORI LAND Evelyn Stokes Te Matahauariki Institute University of Waikato 2003 ii List of Contents 1. Introduction ..................................................................................................1 2. Geothermal Exploration 1966-76 ................................................................4 3. The Environmental Impact Report 1977 ....................................................13 4. The Environmental Impact Audit 1978 .....................................................17 5. MWD Attempts to Purchase the Land .......................................................23 6. The Ministerial Requirement for a Designation ........................................41 7. Appointment of the Ngati Tahu Tribal Trust 1980 ....................................57 8. Negotiations Toward a Lease 1981-82 ......................................................69 9. The Ohaaki Liaison Committee .................................................................85 10. Marae Development and the ‘Amenity Grant’ ..........................................97 11. The Ngawha .............................................................................................113 12. Geothermal Policy Development 1980s ..................................................129 13. The Resource Management Act 1991 ......................................................141 14. Retrospect ................................................................................................155 15. References ................................................................................................160
    [Show full text]
  • Weir Evidence One Plan RJ Weir
    IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER of the submission by GENESIS POWER LIMITED on the Horizons Regional Plan One Plan STATEMENT OF EVIDENCE OF ROBERT JOHN WEIR 1 July 2008 1. INTRODUCTION 1.1 I am the General Manager, Production, at Genesis Power Limited (trading as ―Genesis Energy‖), a position I have held since July 2006. Previously, I held the position of Engineering Services Manager at the Huntly Power Station, a position I held since July 2004. 1.2 I have worked in the electricity generation industry in New Zealand and Australia for the last 23 years. 1.3 I hold the degree of Bachelor of Electrical Engineering from the University of Queensland. I am a member of the Institute of Engineers Australia, a Certified Professional Engineer in Australia and a member of the Institution of Professional Engineers New Zealand. 1.4 I am responsible for the management of Genesis Energy's generation assets including the Tongariro Power Scheme, the Waikaremoana Power Scheme, the Hau Nui Wind Farm, and the Huntly Power Station including the Huntly combined cycle gas power station. I am also responsible for trading wholesale electricity and thermal fuel management. 1.5 In this position, I am required to ensure that the supply of electricity from all Genesis Energy's hydro, thermal, co-generation and wind-powered plants are available to meet the Company’s trading requirements. This involves the management of generating facilities across the Company as a whole, and leading the strategic planning process for these assets and their deployment in the market.
    [Show full text]
  • Mccutcheon, J.M. Operation of Huntly Power Station Including Coal
    23 Proceedings ORSNZ August 1981 OPERATION OF HUNTLY POWER STATION INCLUDING COAL SUPPLY J.M. Mc Cu t c h e o n El e c t r i c i t y D i v i s i o n , M i n i s t r y o f En e r g y In this paper the operation of Huntly power station is discussed in terms of its projected role within the New Zealand electricity system. Aspects of coal supply including underground and opencast mining and coal stockpiling are considered ufeing linear programming and Monte Carlo modelling techniques. 1. Introduction Huntly power station which will soon be commissioned is expected to run as a hydro-firming station for several years. In this mode of operation Huntly would be expected to run at maximum capacity in years when inflows to the electricity systems storage lakes are low ('dry' years) and at minimum output when inflows are high ('wet' years) sub­ ject to there being demand for power. When the four units at Huntly, each rated at 250 MW, are commis­ sioned the station will have the capability of consuming some 2600 kT of coal per year. Even in the event of a very wet year there will always be approximately 350 kT of coal consumed in order to maintain full operational capability. Although the output of Huntly can vary widely there are limitations to the amount of variability that coal mining operations can accommodate. For this reason stockpiling of large quantities of coal must be investigated. However the problem cannot be confined to just the Huntly power station and mines.
    [Show full text]
  • FT9 Huntly Coal, Power Station and the Waikato River
    Geoscience Society of New Zealand 2012 Conference FIELD TRIP GUIDES HAMILTON 25 - 28 November 2012 Geosciences 2012 HOST Sponsor Department of Earth and Ocean Sciences Faculty of Science and Engineering Broad Memorial Fund GOLD Sponsors BRONZE Sponsors NZJGG BBQ Sponsor TEA BREAK Sponsor DINNER PRIZES EXHIBITORS Annual Conference of the Geoscience Society of New Zealand Field Trip Guides Conference Convenor Adrian Pittari (University of Waikato) Organising Committee Roger Briggs, Rochelle Hansen, Chris Hendy, Steve Hood, Peter Kamp, David Lowe, Cam Nelson, Sydney Wright (University of Waikato) Administration Janet George (Absolutely Organised Ltd) Symposium Convenors Peter Almond, Greg Bignall, Carolyn Boulton, Karin Bryan, Hamish Campbell, Martin Crundwell, Jennifer Eccles, Susan Ellis, David Hamilton, Peter Kamp, Gert Lube, David Lowe, Vicki Moon, Nick Mortimer, Adam Munro, Rewi Newnham, Adrian Pittari, Mark Quigley, Andrew Rae, Catherine Reid, Martin Reyners, Glenn Vallender, Russ Van Dissen, Jenny Webster-Brown Field Trip Leaders Roger Briggs, Mike Hall, Chris Hendy, Peter Kamp, Kerri Lanigan, David Lowe, Vicki Moon, Cam Nelson, David Palmer, Adrian Pittari, Andrew Rae Photographs on front cover: Maria Lowe (top), Wendy Peel (bottom left) !"#$%$&%'()*+!%,#)"-")".,"#-')#"*,!#["&0#1)%+#(2%0"#%34 Author, A.N. (2012). Title of Field Trip Guide. In: Pittari, A. (compiler). Field Trip Guides, Geosciences 2012 Conference, Hamilton, New Zealand. Geoscience Society of New Zealand Miscellaneous Publication 134B. p. x. ISBN 978-1-877480-26-3 ISSN (print) 2230-4487 ISSN (online) 2230-4495 Geosciences 2012 Annual Conference of the Geoscience Society of New Zealand, Hamilton Field Trip 9 Thursday 29 November Huntly Coal, Power Station and the Wandering Waikato River Leader: Vicki Moon University of Waikato Bibliographic reference: Moon, V.
    [Show full text]