Technical Assistance Layout with Instructions

Total Page:16

File Type:pdf, Size:1020Kb

Technical Assistance Layout with Instructions Updated Resettlement Plan November 2016 PRC: Anhui Huainan Urban Water Systems Integrated Rehabilitation Project-Donghua Urban Water Channel and Old Longwang Urban Water Channel Subprojects Prepared by Huainan International Financial Institutions Loan Project Management Office for the Asian Development Bank. This is an updated version of the draft originally posted in June 2013 available on https://www.adb.org/projects/documents/anhui-huainan-urban-water-systems-integrated- rehabilitation-project-rp This updated resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ADB Financed Project Anhui Huainan Urban Water Systems Integrated Rehabilitation Project Anhui Huainan Urban Water Systems Integrated Rehabilitation Project (Donghua urban water channel, Old Longwang urban water channel) Resettlement Plan Updated Edition Huainan International Financial Institutions Loan Project Management Office November 2016 Updated Instructions for Huainan City Resettlement Plan The updating of this Resettlement Plan is based on both the project detailed design and the DMS. Due to the project contains several contract packages which were implemented in different project phase, the Resettlement Plan is updated based on the contract packages carried out in 2016, the update including the project of Donghua urban water channel, Old Longwang urban water channel. According to the DMS, the project of Donghua urban water channel, Old Longwang urban water channel involved 1 district (Tianjia’an district e), 4 townships/street (Shungeng town, Ancheng town, Chaoyang district street, Quanshan district street), 9 communities/villages (Dongshan community, Caozu community, Yaonan community, Yaobei village, Ancheng community, Xuyu community, Zhaodian community, Linwang village and Baiyuan community) of Huainan, the construction of Donghua urban water channel and Old Longwang urban water channel involved 30 households with 136 people (including 3 households shops with 6 people); the project of Donghua urban water channel and Old Longwang urban water channel will acquired 342.76 mu land in total, including 166.07 mu state-owned land (including 157.54 mu state-owned construction land, with no affect people; 8.53 mu state-owned water area of Anchneg town, with no affect people). It acquired 176.69 mu collective land in total, including 15.69 mu cultivate land, the land are the reserved land along the sidewalk and belonging to the village committee, so there is no affect people; 146.63 mu collective water area, with no affect people; and acquired 14.37 mu collective unused land, with no affect people; the HD area is 6680 m2, affect 27 households with 130 people. The detailed information see in Table 1. Table 1 The Summary of Main Resettlement Impact The original resettlement plan The update Donghua Old Longwang Sub Donghua Old Longwang Sub Item urban water urban water tota urban water urban water tota channel channel l channel channel l 83.3 15.6 Mu 23.12 60.2 10.46 5.23 2 9 Cultiv HH 9 10 19 0 0 0 ate s land Per so 30 46 76 0 0 0 Collec n tive 146. Mu 42.38 104.25 land 63 HH Water 0 0 0 s area Per so 0 0 0 n Const Mu 83.54 8.1 91.6 ructio 4 n land HH 0 0 0 s Per so 0 0 0 n 14.3 Mu 14.37 7 HH Unuse 0 0 s d land Per so 0 0 n 174. 176. Mu 106.66 68.3 52.84 123.85 96 69 HH Subtot 9 10 19 0 0 0 s al Per so 30 46 76 0 0 0 n 157. Mu 129.43 28.11 State- 54 owned HH 0 0 0 constr s uction Per land so 0 0 0 n Mu 8.53 8.53 HH State- 0 0 Water s owne area Per d land so 0 0 n 166. Mu 137.96 28.11 07 HH Subtot 0 0 0 s al Per so 0 0 0 n 174. 342. Mu 106.66 68.3 190.8 151.96 Total 96 76 HH 9 10 19 0 0 0 s Per so 30 46 76 0 0 0 n Are a 451 668 3903 607 6640 40 0 0 m2 HD HH 20 5 25 25 2 27 s Per so 70 19 89 126 4 130 n Are a 200. 0 0 0 100.37 100 37 m2 Shops HH 0 0 0 2 1 3 s Per so 0 0 0 4 2 6 n Direct affect Tot 29 15 44 27 3 30 HHs al Direct affect Tot 100 65 165 130 6 136 person al Note: the data from the DMS of 2016. During the preparation of Donghua urban water channel, the construction will acquire 106.66 mu land, including 23.12 mu cultivate land, affect 9 households with 30 people; acquired 83.54 mu collective construction land, with no affect people; the HD area is 3903 m2, affect 20 households with 70 people. According to the final design and detailed field survey, the construction of Donghua urban water channel will acquire 190.80 mu land, including 10.46 mu collective cultivate land belonging to reserved land of Ancheng community, so there is no affect people; acquired 42.38 mu water area (including 11.02 mu of Yaobei village collective, 8.58 mu of Yaonan community, 4.81 mu of Caozu community, 17.49 mu of Ancheng community, and 0.48 mu of Xuyu community), with no affect people; acquired 8.53 mu state-owned construction land, with no affect people; and the HD area is 6640 m2, affect 17 household with 56 people, the demolished shop area is 100.37 m2, affect 2 household with 4 people. During the preparation of Old Longwang urban water channel, the construction will acquire 68.3 mu land, including 6.20 mu cultivate land, affect 10 households with 46 people; acquired 8.10 mu collective construction land, with no affect people; the HD area is 607 m2, affect 5 households with 19 people. According to the final design and detailed field survey, the construction of Old Longwang urban water channel will acquire 151.96 mu land, including 5.23 mu collective cultivate land (including 0.33 mu of Zhaodian community, 1.86 mu of Yaobei community, 3.04 mu of Caozu community, all these land are the reserved land of the villages), so there is no affect people; acquired 104.25 mu water area (including 37.68 mu of Zhaodian community, 18.04 mu of Yaobei village collective, 18.85 mu of Caozu community, 0.57 mu of Yaonan community, and 29.11 mu of Linwang village collective), with no affect people; acquired 14.37 mu collective unused land, the land belonging to Linwang village committee, so with no affect people; and acquired 28.1 mu state-owned construction land, with no affect people; and the temporary simple room HD area is 40 m2, affect 2 household with 4 people, the demolished shop area is 100 m2, affect 1 household with 2 people. During the preparing progress, the Feasibility Study Report state that there are in total of 106.66 mu land has been acquired in Donghua urban water channel, and 68.30 mu in Old Longwang urban water channel. The increase of the construction area is caused because of the final design and measure has not been done, during the Feasibility Study Stage. At present, the construction area of Donghua urban water channel and Old Longwang urban water channel are determined in accordance with the final design and detailed measurement. The HD compensations mainly including house compensation, moving subsidy, underground attachment compensation and so on. The compensation price of original RP is referenced the (Huai Fu No.7 [2011]) compensation document, the original RP compensation standard see in Table 2; and the updating compensation is referenced the new document (Huai Fu No.95 [2015]), the detailed compensation standard see in Table3. Compared with the two compensation standards, it is show that the house structure compensation is single in original RP and the updating report is comprehensive, and the compensation standard is higher than the original. Table 2 The relocation price and compensation standard of rural residential house (the original RP standard) Type of Huainan city Type of structure Unit Remark impact ˄yuan/unit˅ Brick wall with m2 500 House flattop˄brick-tile˅ compensation General building m2 630 (concrete structure) If the relocation subsidy one Moving subsidy m2 5 time is less than 300 RMB, it will be 300 RMB. Other subsidy Temporary ķ Existing apartment resettlement Yuan/m2 10 resettlement: the compensation temporary resettlement Type of Huainan city Type of structure Unit Remark impact ˄yuan/unit˅ period is 4 months, if the temporary resettlement one month is less than 300 RMB, it will be 300 RMB. ĸ Off-the-plan resettlement: calculated according to the actual schedule, but not more than 12 months. Data Source: the original RP Table 3 The relocation price and compensation standard of rural residential house (the updating RP) Standard Type of No. Structure Remark 2 house yuan/m ) The main room is simple room 390 1.If the heights of 1 Simple room eaves lower than 2 Temporary simple room 220 m, the compensation The height of eaves is 2-2.4 m 440 standards will be The height of eaves over 2.4 m 495 decided according to 2 Bungalow The height of eaves is 2.4 m and with the actual situation.
Recommended publications
  • Appendix Viii Statutory and General Information
    APPENDIX VIII STATUTORY AND GENERAL INFORMATION A. FURTHER INFORMATION ABOUT OUR COMPANY 1. Incorporation Our company was incorporated in the Cayman Islands on June 26, 2006 under the Cayman Companies Law as an exempted company with limited liabilities. Our company has established a place of business in Hong Kong at Suite 1201, Two Pacific Place, 88 Queensway, Hong Kong and has been registered as an oversea company in Hong Kong under Part XI of the Companies Ordinance, with Mr. Hui and Lin Xiaohui being appointed as authorized representatives of our company for the acceptance of service of process and notices on behalf of our company in Hong Kong. As our company was incorporated in the Cayman Islands, it operates subject to the Cayman Islands laws and to its constitution, which comprises a memorandum of association and articles of association. A summary of various provisions of the constitution of our company and relevant aspects of the Cayman Companies Law is set out in Appendix VII to this prospectus. 2. Changes in share capital Our authorized share capital as at the date of our incorporation was US$50,000 divided into 50,000 shares of US$1.00 each. Upon incorporation, 100 shares of US$1.00 each were allotted and issued to the Original Shareholder. On November 29, 2006, we adopted resolutions to (a) sub-divide and reclassify our authorized and issued shares of US$50,000 divided into 50,000 shares of US$1.00 each into 5,000,000 ordinary shares of US$0.01 each, and (b) increase our authorized share capital from US$50,000 to US$50,000,000 divided into 4,200,000,000 ordinary shares of US$0.01 each and 800,000,000 preferred shares of US$0.01 each.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Research Article Experimental Study on Desorption Characteristics of Coalbed Methane Under Variable Loading and Temperature in Deep and High Geothermal Mine
    Hindawi Advances in Civil Engineering Volume 2020, Article ID 8878125, 17 pages https://doi.org/10.1155/2020/8878125 Research Article Experimental Study on Desorption Characteristics of Coalbed Methane under Variable Loading and Temperature in Deep and High Geothermal Mine Haifeng Ma ,1,2 Lingjie Wang ,2 Housheng Jia ,3 Jucai Chang,2 YingMing Li ,2 Xiangyang Zhang,2,3 Zuxiang Hu,2 and Zhiqiang Yin 2 1State Key Laboratory of Mining Response and Disaster Prevention and Control in Deep Coal Mines, Anhui University of Science and Technology, Huainan, Anhui 232001, China 2Faculty of Energy and Safety Engineering, Anhui University of Science and Technology, Huainan, Anhui 232001, China 3Key Laboratory of Safety and High-Efficiency Coal Mining, Ministry of Education, Anhui University of Science and Technology, Huainan, Anhui 232001, China Correspondence should be addressed to Lingjie Wang; [email protected] and Housheng Jia; [email protected] Received 12 August 2020; Revised 25 September 2020; Accepted 27 October 2020; Published 27 November 2020 Academic Editor: Richeng Liu Copyright © 2020 Haifeng Ma et al. 1is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Due to the influence of deep high stress, geothermal heat, and other factors, the law of desorption of methane in coal seams is more complicated in the process of mining deep coal seams, which is prone to methane over-limit, coal
    [Show full text]
  • Addendum - Incident Tracker Report
    Religious Suppression in China: The Legal Underpinnings and Practical Implications of China's Systematic Repression of Religion Addendum - Incident Tracker Report International Christian Concern P. O. Box 8056 Silver Spring, MD 20907 Copyright © 2020 Title of All Religious Activities for Catholic Youth Prohibited incident: Date of March 2019 – July 2019 incident: Types of ☐ Sinicization ☒ ☐Arrests/Disappea ☒ Social Pressure incident: Demolition/Closure rance of Christians of Churches ☒ Under Legal ☐ Others (please Framework specify) Summary: In the name of separating religion from education, children do not have any contact with the faith of any religion, raised as obedient atheist followers of the Chinese Communist Party (CCP). It is increasingly difficult after the 2018 Revised Religious Regulations. The Chinese Patriotic Catholic Association, the China‐approved Catholic Church., is being forced to close their kindergartens due to the Religious Affairs Bureau clamping down. Even in state‐run Three‐Self churches, allowing children from entering into churches or any other religious event is prohibited. CCP’s goal is to shut down all churches in China. Closing down kindergartens, a significant source of economic support, the churches struggle to find funding in other places. The government will not allow a school to be near a temple or a church. They are attempting to close off any chance of children being exposed to religion at all in Taiyuan, the capital of the northern province of Shanxi. Any Sunday school classes, bible studies, or youth clubs were all shut down. A youth club in Hubei shut down the same day it opened. A 14‐day bible class offered by a state‐run church was discovered and dismissed before it began.
    [Show full text]
  • Huai'nan City
    E4682 V4 Sustainable Development Engineering of Resource-Based Cities Public Disclosure Authorized (Huai’nan City) The World Bank Financed Project for Comprehensive Treatment and Utilization of Coal Mining Subsidence Area Public Disclosure Authorized Social Assessment Report (Draft to be submitted for review) Public Disclosure Authorized Execution Office of the World Bank Financed Project for Comprehensive Treatment and Utilization of Coal Mining Subsidence Area Public Disclosure Authorized June 2014 Preface In September 2013, the Involuntary Resettlement Research Center of China Three Gorges University (hereinafter referred to as CTGU) assumed the work, entrusted by the Anhui Huai’nan WB Project Office, of compiling a special report of social assessment on the World Bank (WB) financed project for comprehensive control and utilization of coal mining subsidence area in the program of sustainable development of resource-based cities (Huai’nan) (hereinafter referred to as Huai’nan WB Project).Earlier in October 2013, CTGU received the “Draft Terms of Reference of the Social Assessment for Anhui Huai’nan Project” provided by the WB experts that was transferred by the project owner Huai’nan WB Project Office. The Draft Terms specifies the scope, goal, content and method of this social assessment and basically shapes up the work of the report compilation. The Draft highlights specific requirements for the goals of the assessment as follows: (1) To determine the scope of affected area and carry out baseline survey, and come to know the social
    [Show full text]
  • Anhui Huainan Urban Water Systems Integrated Rehabilitation Project
    Resettlement Plan Project Number: 46078 June 2013 PRC: Anhui Huainan Urban Water Systems Integrated Rehabilitation Project Prepared by the Huainan Municipal People’s Government for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 28 June 2013) Currency unit – yuan (CNY) CNY1.00 = $0.1626 $1.00 = CNY6.1490 ABBREVIATIONS AAOV – average annual output value ADB – Asian Development Bank AP – affected person/people BOD – biological oxygen demand CNY – yuan renminbi COD – chemical oxygen demand DH – displaced household DMS – detailed measurement survey DP – displaced people EA – executing agency FSR – feasibility study report GDP – gross domestic product HDRC – Huainan Development and Reform Commission HMG – Huainan municipal government IA – implementing agency LA – land acquisition LDI – local design institute LIBOR – London interbank offered rate M&E – monitoring and evaluation PLG – project leading group PMO – project management office PRC – People’s Republic of China RMB – yuan renminbi RP – resettlement plan SPS – ADB’s Safeguard Policy Statement (2009) WWTP – wastewater treatment plant WEIGHTS AND MEASURES cm – centimeter km – kilometer km2 – square kilometer kW – kilowatt m2 – square meter m3 – cubic meter m3/s – cubic meter per second mu = A Chinese unit of measurement (1 mu = 666.67 m2) NOTES (i) The fiscal year of the Government of the People’s Republic of China and its agencies ends on 31 December. (ii) In this report, "$" refers to US dollars. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website.
    [Show full text]
  • Huai River Basin Flood Management and Drainage Improvement Project
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 45437-CN PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN Public Disclosure Authorized IN THE AMOUNT OF US$200 MILLION TO THE PEOPLE’S REPUBLIC OF CHINA FOR A HUAI RIVER BASIN FLOOD MANAGEMENT AND DRAINAGE IMPROVEMENT PROJECT Public Disclosure Authorized May 26, 2010 China and Mongolia Sustainable Development Unit Sustainable Development Department East Asia and Pacific Region Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective February 2010) Currency Unit = Renminbi (RMB) Yuan (Y) Y1.0 = US$0.15 US$1.0 = Y6.827 FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS AEP Accelerated Emergency Program CNAO China National Audit Office CPCO Central Project Coordination Office CPLG Central Project Leading Group CPMO Central Project Management Office CPS Country Partnership Strategy DSR Dam Safety Report DUC Dam under Construction EG Expert Group EIA Environmental Impact Assessment EMP Environmental Management Plan FB Finance Bureau FDASS Flood Disaster Assessment and Support System FDIA Farmer Drainage and Irrigation Association HRBC Huai River Basin Commission MWR Ministry of Water Resources NDRC National Development and Reform Commission MIS Management Information System MOF Ministry of Finance O&M Operation and Maintenance PAP Project Affected People PAO Provincial Audit Office PDRC Provincial Development and Reform Commission PFB Provincial Finance Bureau PLG Project Leading Group PIU Project Implementation Unit POE Panel of Expert PPMO Provincial Project Management Office PWRB Provincial Water Resources Bureau RAP Resettlement Action Plan RO Resettlement Office SOCAD State Office for Comprehensive Agricultural Development Vice President: James W.
    [Show full text]
  • Ecosystem Health Assessment of Mining Cities Based on Landscape Pattern
    The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XLII-2/W7, 2017 ISPRS Geospatial Week 2017, 18–22 September 2017, Wuhan, China ECOSYSTEM HEALTH ASSESSMENT OF MINING CITIES BASED ON LANDSCAPE PATTERN Weixuan Yu a, Yue Liu a, Meng Lin a, Feiguo Fang b, Rui Xiao a, * a School of Remote Sensing and Information Engineering, Wuhan University, China - (wxyu, yliu_rs, mlin_, rxiao) @whu.edu.cn b School of Resource and Environmental Sciences, Wuhan University, China - ([email protected]) KEY WORDS: Landscape pattern, Ecosystem health, Assessment index system, VOR model, Panji District ABSTRACT: Ecosystem health assessment (EHA) is one of the most important aspects in ecosystem management. Nowadays, ecological environment of mining cities is facing various problems. In this study, through ecosystem health theory and remote sensing images in 2005, 2009 and 2013, landscape pattern analysis and Vigor-Organization-Resilience (VOR) model were applied to set up an evaluation index system of ecosystem health of mining city to assess the healthy level of ecosystem in Panji District Huainan city. Results showed a temporal stable but high spatial heterogeneity landscape pattern during 2005-2013. According to the regional ecosystem health index, it experienced a rapid decline after a slight increase, and finally it maintained at an ordinary level. Among these areas, a significant distinction was presented in different towns. It indicates that the ecosystem health of Tianjijiedao town, the regional administrative centre, descended rapidly during the study period, and turned into the worst level in the study area. While the Hetuan Town, located in the northwestern suburb area of Panji District, stayed on a relatively better level than other towns.
    [Show full text]
  • CHINA ENERGY ENGINEERING CORPORATION LIMITED* (A Joint Stock Company Incorporated in the People’S Republic of China with Limited Liability) (Stock Code: 3996)
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. CHINA ENERGY ENGINEERING CORPORATION LIMITED* (A joint stock company incorporated in the People’s Republic of China with limited liability) (Stock Code: 3996) VOLUNTARY ANNOUNCEMENT ENTERING INTO AN EPC GENERAL CONTRACT FOR PANJI POWER PLANT PHASE I 2X660MW ULTRA SUPERCRITICAL COAL-FIRED UNIT PROJECT OF HUAINAN MINING GROUP BY A SUBSIDIARY OF THE COMPANY This announcement is made by China Energy Engineering Corporation Limited (the “Company”) on a voluntary basis. The board of directors of the Company (the “Board”) is pleased to announce that, recently, the consortium comprising East China Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group* (中國電力工程顧問集團華東電力設計院有限公司), a subsidiary of China Energy Engineering Group Planning and Design Co., Ltd.* (中國能源建設集團規劃設計有限 公司) (a subsidiary of the Company), China Energy Engineering Group Anhui No. 1 Electric Power Construction Co., Ltd.* (中國能源建設集團安徽電力建設第一工程有限公司) and China Energy Engineering Group Anhui No. 2 Electric Power Construction Engineering Co., Ltd. (中國能源建設集 團安徽電力建設第二工程有限公司), subsidiaries of China Energy Engineering Group Eastern Construction and Investment Co., Ltd.* (中國能源建設集團華東建設投資有限公司) (a subsidiary of the Company), has entered into an EPC general contract for Panji Power Plant Phase I 2x660MW Ultra Supercritical Coal-fired Unit Project of Huainan Mining Group (the “Project”). The Project is located in Jiahe Township, Panji District, Huainan City.
    [Show full text]
  • Anhui Huainan Urban Water Systems Integrated Rehabilitation Project
    Environmental Monitoring Report 8th Semestral Report Project Number: 46078-002 January 2021 People's Republic of China: Anhui Huainan Urban Water Systems Integrated Rehabilitation Project Prepared by Huainan International Financial Institutions Loan Project Management Office for the Huainan Municipal Government and the Asian Development Bank This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Director, Management or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Environmental Monitoring Report Loan No. 3054-PRC January 2021 People's Republic of China: Anhui Huainan Urban Water Systems Integrated Rehabilitation Project Semi-annual Environmental Monitoring Report No. 8 Prepared by Huainan International Financial Institutions Loan Project Management Office for the Huainan Municipal Government and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Director, Management or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • Annual Development Report on China's Trademark Strategy 2013
    Annual Development Report on China's Trademark Strategy 2013 TRADEMARK OFFICE/TRADEMARK REVIEW AND ADJUDICATION BOARD OF STATE ADMINISTRATION FOR INDUSTRY AND COMMERCE PEOPLE’S REPUBLIC OF CHINA China Industry & Commerce Press Preface Preface 2013 was a crucial year for comprehensively implementing the conclusions of the 18th CPC National Congress and the second & third plenary session of the 18th CPC Central Committee. Facing the new situation and task of thoroughly reforming and duty transformation, as well as the opportunities and challenges brought by the revised Trademark Law, Trademark staff in AICs at all levels followed the arrangement of SAIC and got new achievements by carrying out trademark strategy and taking innovation on trademark practice, theory and mechanism. ——Trademark examination and review achieved great progress. In 2013, trademark applications increased to 1.8815 million, with a year-on-year growth of 14.15%, reaching a new record in the history and keeping the highest a mount of the world for consecutive 12 years. Under the pressure of trademark examination, Trademark Office and TRAB of SAIC faced the difficuties positively, and made great efforts on soloving problems. Trademark Office and TRAB of SAIC optimized the examination procedure, properly allocated examiners, implemented the mechanism of performance incentive, and carried out the “double-points” management. As a result, the Office examined 1.4246 million trademark applications, 16.09% more than last year. The examination period was maintained within 10 months, and opposition period was shortened to 12 months, which laid a firm foundation for performing the statutory time limit. —— Implementing trademark strategy with a shift to effective use and protection of trademark by law.
    [Show full text]
  • Implementation Timetable for Resettlement
    RP593 V3 Anhui Province Flood Management and Drainage Improvement Project Financed Public Disclosure Authorized by World Bank in Huai River Basin Resettlement Action Plan in first year project Public Disclosure Authorized Public Disclosure Authorized Anhui Province Huai River Basin Flood Management and Drainage Improvement Project Management Office Oct, 2008 Public Disclosure Authorized Letter of Commitment Through Ministry of Finance, Anhui Province Government (APG) is applying for the loan from the World Bank (WB) to finance the present project. Therefore, the implementation of the present project should be in compliance with WB’s policies of Social Safeguards. This Resettlement Plan represents a key requirement of the WB and is the key basis for land acquisition, house demolition and resettlement in the present project. This Resettlement Plan also complies with the laws of the People’s Republic of China and local regulations. Besides, for better resettlement outcome it adopts additional measures and arrangements for implementation and monitoring. APG hereby approves the contents of this Resettlement Plan and guarantees that resettlement budget has been included in the whole project budget and it will be made available as stipulated. APG has discussed the draft Resettlement Plan with relevant departments and the latter have confirmed their acceptance. APG authorizes Anhui WB Project Management Office to be responsible for all project implementation and relevant resettlement activities. Related local governments take charge of actual
    [Show full text]