RAIL DEVELOPMENTAL WORKS Kadapa Parliamentary
Total Page:16
File Type:pdf, Size:1020Kb
Green Initiatives 1. Revival of water bodies is completed at Kadapa station with the cost of `1.66 lakh. 2. 11 Kwp solar panels are installed at 3 stations with the cost of `5.61 lakh. 3. Led lighting is completed at all stations within Kadapa Parliamentary Constituency Jurisdiction. Kadapa Parliamentary Constituency Passenger Train Services Shri Narendra Modi Hon’ble Prime Minister Details of New Trains/ Special Trains/ Provision of Stoppages/ Extension/Increase in frequency of Trains in the jurisdiction of Kadapa Parliamentary Constituency RAIL DEVELOPMENTAL WORKS New Trains Introduction 1. Tr.No.77405/77406 Kadapa‐Pendlimarri‐Kadapa 6 days a week DEMU train is introduced Kadapa Parliamentary Constituency Jurisdiction 2. Tr.No.77401/77402/77403/77404 Nandyal–Kadapa DEMU for 6 days a week Increase in frequency 1. Tr.No.17215/17216 Vijayawada–Dharmavaram Tri Weekly Express to daily South Central Railway Extension of Trains serving the entire state of 1. Tr.No.17487/17488 Visakhapatnam–Tirupati Tirumala Express up to Kadapa Telangana, major portion Provision of Stoppage of Andhra Pradesh and 1. Tr.No.16353/16354 Kacheguda–Nagercoil–Kacheguda Weekly Express stoppage at Kadapa & Yerraguntla considerable portion of 2.Tr.No.17621/17622 Aurangabad–Renigunta–Aurangabad Weekly Express stoppage at Kondapuram, SOUTH CENTRAL Yerraguntla & Kadapa Karnataka, Maharastra 3. Tr.No.17417/17418 Tirupati–Shirdi–Tirupati Weekly Express stoppage at Kadapa, Yerraguntla & Muddanur states and small parts RAILWAY 4. Tr.No.17215/17216 Vijayawada–Dharmavaram–Vijayawada Tri‐weekly Express stoppage at Jammlamadugu, of Tamilnadu and Proddutur & Yerraguntla Madhya Pradesh. 5.Tr.No.17419/17420 Tirupati–Vasco‐da‐Gama–Tirupati Weekly Express stoppage at Kadapa, Yerraguntla & Muddanur Kadapa Parliamentary 6. Tr.No. 77405/77406 Kadapa–Pendlimarri–Kadapa 6 Days a Week DEMU stoppage is given at Pabbapuram & Ganganapalle Constituency falls under 7. Tr.No.11073/11074 LTT–Chennai–LTT (Weekly) Express stoppage at Yerraguntla & Kadapa Andhra Pradesh State. Entire Railway network 8. Tr.No.19419/19420 Chennai–Ahmedabad (Bi‐Weekly) Express stoppage at Yerraguntla & Kadapa of this constituency 9.Tr.No.22920/22919 Ahmedabad–Chennai Central Humsafar Weekly Express stoppage at Kadapa, Yerraguntla & Muddanur is being served by 10. Tr.No.77401/77402 Nandyal–Kadapa–Nandyal DEMU stoppage at Kamalapuram South Central Railway. 11. Tr.No.77403/77404 Nandyal–Kadapa–Nandyal DEMU stoppage at Kamalapuram Safety – The First Priority ASSEMBLY SEGMENTS Proposed FOBs Safety is the priority on SCR, to ensure safety of the Rail users, Foot PREFACE over Bridges (FoBs)/ Road under/over Bridges are Station Cost (` in crore) Badvel constructed / proposed for construction at various stations/ locations Kondapuram 1.50 in Kadapa Parliamentary Constituency Jurisdiction. Kanamalopalle 1.68 Kadapa Pulivendla Road Over / Under Bridges Passenger Amenities Kamalapuram With a view to strengthen safety at Provision of Passenger Amenities and facilities, and Level Crossing gates and to avoid its improvements at Railway Stations is one of the Jammalamadugu untoward incidents and also to provide most important aspect Railway Services. seamless journey to road traffic, the following Road under /over Bridges Station Amenity Amount Status Proddatur (RuB/RoB) are constructed / proposed Kadapa Toilets `2 lakh Constructed for construction under Kadapa Bhakarapet Toilets `1 lakh Constructed Mydukur Parliamentary constituency. Muddanuru Platform `3.56 crore Proposed Road Over Bridge Kadapa Platform `63 lakh Proposed 1. R O B i n l i e u o f l e v e l c r o s s i n g Kondapuram Platform `1.86 crore Proposed No.138 between Yerragudipadu and Yerraguntla Platform `63 lakh Proposed RAIL DEVELOPMENTAL WORKS Ye r r a g u n t l a i s c o m p l e t e d a n d Kanamalopalle PF Shelter `25 lakh Provided Kadapa Parliamentary Constituency Jurisdiction commissioned for traffic with a Cost of Kondapuram Station Building `5 lakh In Progress ` 15.39 crore. Yerraguntla Station Building `71 lakh Proposed 2. It is proposed for construction of ROB in Bhakarapeta Waiting Room `25 lakh Constructed Infrastructural Development Electrification of Railway Lines lieu of level crossing No.120 in Kadapa– Yerraguntla Waiting Room `25 lakh Constructed Kamalapuram Section with an estimated Muddanuru Circulating Area `30 lakh Developed New Railway Line Works 1. Electrification of Renigunta–Guntakal for the cost of `35.17 crore. distance of 224 Kms is completed with the cost of Yerraguntla Circulating Area `60 lakh Developed 1. New Line between Nandyal–Yerraguntla for a distance of ` 435 crore. 3. Construction of ROB in lieu of level 5 Stations Wi‐Fi Facility 7.5 lakh Provided 123 Kms with the cost of `966.98 crore is completed. crossing No. 134 with subway 2. Electrification of Nandyal –Yerraguntla Section for (Kamalapuram Yard) in Renigunta– Kadapa Lift `50 lakh Installed 2. New line between Kadapa–Pendlamarri for a distance of ` Kadapa 2 ATVMs Installed a distance of 123 Kms at a cost of 118 crore is in Gooty Section with an estimated cost of `6 lakh 21 .3 kms as a part of Kadapa– Bangarpet (Bangalore) progress `29.06 crore is in progress Yerraguntla 2 ATVMs Installed Section with the cost of `204 crore is completed. Kadapa CoTVM ` 4.5 lakh Installed Capacity Enhancement 4. Construction of ROB in lieu of Manned LC 3. Construction of line between Pendlamarri–Bangarpet No. 145 between Muddanuru–Kadapa Kadapa CIB/TIB `72 lakh Provided section as a part of Kadapa– Bangarpet (Bangalore) 1. Extensionof existing Loading/ Un loading platform by stations is in progress Kadapa Station Façade project for the distance of 187 Kms with an estimated 140 mts length with rail level platform at Krishnapuram Improvement `72 lakh Completed is under progress with the cost of `38 lakh and is 5. Construction of 4 lane ROB in lieu of LC cost of `1824 crore is in progress Kadapa 2 WVMs ‐‐‐ Provided targeted for completion before March 2019. No. 122 between Kadapa–Krishnapuram Stations is proposed Muddanuru Station Building `72 lakh Proposed 4. It is proposed for construction of Cumbum– 2. By‐pass line is proposed at Yerraguntla with Kadapa 6 CCTV Camera `15 lakh Provided Proddutur for the distance of 142 Kms with an estimated cost of `16.89 crore. Road Under Bridge Yerraguntla 18 CCTV Camera `40 lakh Proposed estimated cost of `829 crore. 1. It is proposed for construction of Road under bridge in lieu of level crossing No.131/UM, 156/UM & 167/UM in Renigunta–Gooty section with an estimated cost of `4.10 crore. 2. All Unmanned Level Crossings in Kadapa Parliamentary Constituency are eliminated through construction of RUB/LHS/Manning/Closure.