HARD Software 9Th Solar & Storage Integration Workshop 2

Total Page:16

File Type:pdf, Size:1020Kb

HARD Software 9Th Solar & Storage Integration Workshop 2 1 Solving the BESS issues in the NEM HARD software 9th Solar & Storage Integration Workshop 2 HORNSDALE POWER RESERVE 3 SOUTH AUSTRALIAN BLACKOUT 28 SEP 2016 4 ISSUES IN SOUTH AUSTRALIAN REGION SA black out on 28 SEP 2016 due to extreme storm Near SA black out on 3 MAR 2017 due to explosion in gas plant switchyard High penetration of wind and later solar generation High reliance on the VIC- SA interconnector (900 MW) Retirement of 520 MW brown coal generator FCAS duopoly leading to extreme high price local events 5 HORNSDALE POWER RESERVE Largest lithium- ion utility scale battery in the world 100MW/129MWh proposed to be delivered in 100 days Revenue of $AUS 90 million with the SA government committing to $AUS 4 million EBITA for 10 years 70 MW – System protection system 30 MW – Actively traded as merchant HARD software to provide hosting and design & develop operator & market systems in same timeframe 6 HPR TRADING & OPERATIONS SYSTEM 7 HORNSDALE BESS PERFORMANCE 8 hours of locally sourced SA AGC services cost $AUS 3.5m less on 14 Jan 2018 compared to 14 Sep 2017 25 AUG 2018 QLD & SA regions islanded after lightening strikes – no load shedding in SA and the lights stayed on HPR revenues of $AUS 29m for 2018 and $AUS 22m profit In 6 months, HPR had revenues of $AUS 6m from SA FCAS & reduced FCAS costs by $AUS 1.6m for Neoen wind farms Q1 2019 BESS had 17% of NEM RREG FCAS, up from 10% in Q4 2018 but recent BESS competition is reducing share 8 THE CHANGING RENEWABLE NEM MARKET 9 QLD RENEWABLE GENERATION PROJECTS EXISTING PROPOSED 10 RECENT QLD MARKET CONDITIONS 11 RECENT QLD MARKET CONDITIONS 12 RECENT QLD MARKET CONDITIONS 13 CHANGED RENEWABLE OPERATIONS Renewable generators now have to manage the competing requirements of avoiding negative prices & binding constraints Simple “once a year” bidding and then just responding to plant generation caps via SCADA is no longer possible PPA partners are requiring generators to respond to negative prices and ensure price risk is managed for them Increased requirements to understand & monitor market out- comes such as constraints & deploy effective trading strategies Automated bidding solutions that manage the rebidding when market conditions change and assist small/medium renewables Large portfolio renewable generators can use full trading optimization solutions if capital & trading operations justified 14 THE ENERGY BATTERY SOLUTION 15 BESS ADVANTAGES FOR RENEWABLES BESS can capture “lost” generated energy when curtailed New revenue streams from energy arbitrage & FCAS market BESS can assist with local voltage & transient stability issues BESS are not just an extra additional project cost like capacitor banks & synchronous condensers Co- location with plant sharing operation & maintenance staff, switchyard & available land is possible Provide NEM with new sources of dispatchable energy 16 ANNOUNCED NEM BESS PROJECTS LOCATION COMPANY SIZE FUNDING GENERATION Hornsdale Power Reserve Jamestown SA Neoen / Tesla 100 MW / 129 MWh SA Gov / private 1 Dec 2017 Dalrymple ESCRI battery Yorke Peninsula SA ElectraNet / AGL 30 MW / 8 MWh ARENA / private Apr 2019 Gannawarra Solar Farm Kerang VIC Edify & Wirsol 25 MW / 50 MW ARENA / private Oct 2018 Bungama Project Port Pirie SA EPS Energy 140 MW / 560 MWh private 2021 Robertson Solar Project Roberston SA EPS Energy 250 MW / 1000 MWh private End 2019 Solar River Project SA Alinta Energy 100 MW / 300 MWh ARENA / private 1st Qtr 2021 Lincoln Gap wind farm BESS Lincoln Gap SA Nexif / Fluence 10 MW / 10 MWh private May 2020 Energy Australia Ballarat VIC Spotless / Downer 30 MW / 30 MWh ARENA / private May 2020 Playford Utility Battery (PUB) Port Pirie SA Simec Energy 100 MW / 100 MWh ARENA / private May 2020 Bulgana Green Energy Hub Stawell, VIC Neoen 20 MW / 34 MWh private Dec 2019 Lake Bonney Wind Farm Lake Bonney SA Infigen Energy 25 MW / 52 MWh ARENA / private Sep 2019 Mt Stuart Power Station North QLD Origin Energy 4 MW / 4 MWh private May 2019 Snowtown mid-north SA Tilt 21 MW / 26 MWh ARENA / private 2021 Kennedy Energy Park North QLD Windlab 2 MW / 4 MWh ARENA / private Sep 2019 17 BESS MARKET ISSUES Market settlement is based on 30 minute dispatch intervals derived from 5 min averages and leads to market distortions (fixed 2021) No storage class of generator (under review) or hybrid class unless plant is fully dispatched requiring large storage & high risk Locating BESS system with renewable plant will incur the same location transmission issues and loss factors Annual marginal loss factors can not predict new plant, are highly variable and are a serious financial risk for generators The FCAS market is shallow and there are lessening opportunities for energy arbitrage Adding new or enhancing transmission capacity in the NEM is a long, consultative & contentious process 18 RECOMMENDATIONS FOR BESS PROJECTS NEM market redesign is urgently needed to address marginal loss factors, many constraints & optimize the use of transmission system The location of BESS system decisions need to consider the suitability of network connections & transmission losses Co- locating with renewable plant may not be the best option Small/medium size renewable generators should consider auto- mated business rule systems to manage BESS & dispatch risk Large portfolio BESS/renewable generators should use trading optimizers that suit their trading & operations Competitive energy market design must evolve to meet the rapid pace of change in technology and generation portfolio 19 Dr. Harley Mackenzie HARD software [email protected].
Recommended publications
  • Energy Storage Report 2019
    21 FEBRUARY 2019 n WWW.RENEWS.BIZ RANKED N°1 The transatlantic IN RELIABILITY law firm close FOR BESS to home FIND OUT MORE Find out more here ENERGY STORAGE REPORT 2019 Storage spark for renewables MADE IN GERMANY CONTENTS 21 February 2019 ENERGY STORAGE 02 UK 03–09 Battery overdrive he global installation of energy service markets, such as the balancing n Developers get creative storage is surging as costs mechanism, are now the name of Energy storage is continue to fall and regulators the game. n Pivot’s ambitious play T n Eelpower and Orsted set to deliver step up efforts to facilitate batteries to “There was a very significant growth n Council and EU salt cavern schemes flourishing as costs help balance growing volumes of in interest in storage, particularly after intermittent generation. the enhanced frequency response Figures compiled by reNEWS show auction, which seems to have peaked,” IRELAND/GERMANY 10–12 fall and regulations around 2.5GW of 1MW-plus storage is said Anthony Price, director at UK loosen in the drive to due online in major markets in 2019 storage consultancy Swanbarton. — more than double the around 1GW “It has turned into a more mature balance grids, writes deployed last year. This expansion is market with more sophisticated types led by the UK, Australia, the US and of investors who are doing it with their Tim Probert South Africa. eyes open,” he added. Storage developers believe the Nonetheless, UK installations are n DS3 capped tender finally launched technology is on an unstoppable path due to hit almost 600MW in 2019, n Brandenburg flagship blueprint as renewables-plus-storage solutions which would top last year’s tally of n German power-to-gas nears reality become increasingly competitive with 460MW.
    [Show full text]
  • Integrating Energy Storage Systems Into the Nem) Rule 2021
    Australian Energy Market Commission DRAFT RULE DETERMINATION NATIONAL ELECTRICITY AMENDMENT (INTEGRATING ENERGY STORAGE SYSTEMS INTO THE NEM) RULE 2021 AEMO 15 JULY 2021 DETERMINATION Australian Energy Draft rule determination Market Commission Integrating energy storage 15 July 2021 INQUIRIES Australian Energy Market Commission GPO Box 2603 Sydney NSW 2000 E [email protected] T (02) 8296 7800 Reference: ERC0280 CITATION AEMC, Integrating energy storage systems into the NEM, Draft rule determination, 15 July 2021 ABOUT THE AEMC The AEMC reports to the Council of Australian Governments (COAG) through the COAG Energy Council. We have two functions. We make and amend the national electricity, gas and energy retail rules and conduct independent reviews for the COAG Energy Council. This work is copyright. The Copyright Act 1968 permits fair dealing for study, research, news reporting, criticism and review. Selected passages, tables or diagrams may be reproduced for such purposes provided acknowledgement of the source is included. Australian Energy Draft rule determination Market Commission Integrating energy storage 15 July 2021 SUMMARY 1 As the electricity system transitions, energy storage is playing an increasingly important role and the regulatory framework needs to accommodate this shift. This draft determination explains the changes we are proposing to enable the integration of storage into the NEM. 2 On 23 August 2019, the Australian Energy Market Operator (AEMO or proponent) submitted a rule change request to the Australian Energy Market Commission (AEMC or Commission) seeking to amend the National Electricity Rules (NER) to define storage and introduce a new participant category, the bi-directional Resource Provider (BDRP), and apply storage-specific obligations.
    [Show full text]
  • Large-Scale Battery Storage Knowledge Sharing Report
    Large-Scale Battery Storage Knowledge Sharing Report SEPTEMBER 2019 Report prepared by DISCLAIMER This report has been prepared by Aurecon at the request of the Australian Renewable Energy Agency (ARENA). It is intended solely to provide information on the key lessons and innovation opportunities for Large-Scale Battery Systems (LSBS) projects in Australia based on specific project insights gathered through the Australian Renewable Energy Agency (ARENA), Aurecon’s industry experience, and publicly available information. The information contained in this report, including any diagrams, specifications, calculations and other data, remain the property of ARENA. This report may not be copied, reproduced, or distributed in any way or for any purpose whatsoever without the prior written consent of ARENA. The report is provided as is, without any guarantee, representation, condition or warranty of any kind, either express, implied or statutory. ARENA and Aurecon do not assume any liability with respect to any reliance placed on this report by third parties. If a third party relies on the report in any way, that party assumes the entire risk as to the accuracy, currency or completeness of the information contained in the report. © Australian Renewable Energy Agency 2019 B Large-Scale Battery Storage Knowledge Sharing Report CONTENTS 1. Executive Summary 1 2. Introduction 2 2.1 Background 2 2.2 Scope 2 3. Data Collection 3 3.1 General 3 3.2 Desktop research 3 3.3 Knowledge sharing workshop 3 3.4 Electronic survey 4 4. Project Specific Insights 5 4.1 General 5 4.2 ESCRI-SA 6 4.3 Gannawarra Energy Storage System 7 4.4 Ballarat Energy Storage System 9 4.5 Lake Bonney 10 5.
    [Show full text]
  • Land Use and Tenure Chapter 9 Land Use and Tenure
    EIS Volume 1 Chapter 9 Land Use and Tenure Chapter 9 Land Use and Tenure Contents 9. Land Use and Tenure ............................................................................................. 9-1 9.1. Key Findings ..................................................................................................................... 9-1 9.2. Setting the Context .......................................................................................................... 9-1 9.2.1. EIS Guidelines ...................................................................................................... 9-2 9.2.2. Requirements in legislation and other standards ............................................... 9-3 9.2.3. Views of stakeholders ......................................................................................... 9-3 9.2.4. Assessment method ............................................................................................ 9-4 9.3. Description of Existing Environment ............................................................................... 9-4 9.3.1. Land uses in the Project region ........................................................................... 9-5 9.3.2. Land uses on the transmission line corridor ....................................................... 9-3 9.3.3. Land tenure ....................................................................................................... 9-16 9.3.4. Native title and agreements with traditional owners ....................................... 9-20 9.3.5. Acquisition
    [Show full text]
  • El Mercado De La Energía Solar En Australia
    ESTUDIO EM DE MERCADO 2021 El mercado de la energía solar en Australia Oficina Económica y Comercial de la Embajada de España en Sídney ESTUDIO EM DE MERCADO 20 de abril de 2021 Sídney Este estudio ha sido realizado por Ana Lázaro Herrasti Bajo la supervisión de la Oficina Económica y Comercial de la Embajada de España en Sídney http://australia.oficinascomerciales.es Editado por ICEX España Exportación e Inversiones, E.P.E. NIPO: 114-21-009-9 EM EL MERCADO DE LA ENERGÍA SOLAR EN AUSTRALIA Índice 1. Resumen ejecutivo 5 2. Definición del sector 10 2.1. El sector eléctrico en Australia 10 2.2. El sector de la energía solar en Australia 13 2.2.1. Clasificación del sector 13 2.2.2. Clasificación arancelaria 17 3. Marco institucional y competencias 19 3.1. Marco normativo 19 3.1.1. Antecedentes 19 3.1.2. Política federal actual 20 3.1.3. Políticas estatales 21 3.2. Incentivos y otras ayudas 22 4. Oferta – Análisis de competidores 23 4.1. Tamaño del sector 23 4.1.1. El sector de la energía renovable 23 4.1.2. Energía solar 30 4.1.3. Retirada de plantas termales de carbón 39 4.2. Exportaciones e importaciones de equipamiento 41 4.3. Principales empresas del sector 44 4.3.1. Segmento de la energía solar FV a pequeña escala 44 4.3.2. Segmento de la energía solar FV a gran escala 45 5. Demanda 52 5.1. Consumo eléctrico en el NEM y efecto de los sistemas fotovoltaicos en cubierta 53 5.2.
    [Show full text]
  • Goyder Master Plan 2018 – 2033
    GOYDER MASTER PLAN 2018 – 2033 “a strategic management plan” document HOW TO BE INVOLVED The ‘Goyder Master Plan’ sets out a vision, objectives, Please note that all submissions and comments will be strategies and actions. It is an evolving document on formal treated as public and will be published in a variety of public display at our Burra & Eudunda Council offices. mediums. If you would like to make a submission without it being made public please contact us directly. You can read the document in its entirety on Councils website www.goyder.sa.gov.au You can make a submission: By emailing [email protected] By post to: CEO David J. Stevenson Regional Council of Goyder 1 Market Square BURRA SA 5417 A WORD FROM THE MAYOR MAYOR PETER MATTEY Council is pleased to release its 2018-2033 Masterplan. This is the broadest and most comprehensive community plan Council has ever embarked upon. It is bold while being Engaging with community intuitive to the needs of our community. Strengthening community Economic resilience The diversity of community needs and how Council meets Our environment and heritage is protected & those needs is often a delicate balance of resource valued allocation and scaled deliverability. Your Council has Community assets & infrastructure worked studiously since amalgamation to ensure the vast Leading the way infrastructure of Goyder is maintained to the best possible standards from which our resources allow all this while maintaining a fair and equitable rating policy. Each pillar has a refreshed set of metrics and aligned objectives. Where there is a direct link to the long term The Masterplan continues to observe the vast majority of capital management and asset plans we have referenced the 2012 community plan consultation pillars; these along with community projects.
    [Show full text]
  • South Australian Fuel and Technology Report
    SOUTH AUSTRALIAN FUEL AND TECHNOLOGY REPORT SOUTH AUSTRALIAN ADVISORY FUNCTIONS Published: March 2017 SOUTH AUSTRALIAN FUEL AND TECHNOLOGY REPORT IMPORTANT NOTICE Purpose The purpose of this publication is to provide information about fuel, resources, and power generation technology related to the energy industry in South Australia. AEMO publishes this South Australian Fuel and Technology Report in accordance with its additional advisory functions under section 50B of the National Electricity Law. This publication is based on information available to AEMO as at 28 February 2017, although AEMO has endeavoured to incorporate more recent information where practical. Disclaimer This publication includes information provided or developed by third parties. AEMO has made every effort to ensure the quality of the information in this publication but cannot guarantee that information, forecasts and assumptions are accurate, complete or appropriate for your circumstances. This publication does not include all of the information that an investor, participant or potential participant in the South Australian electricity market might require, and does not amount to a recommendation of any investment. Anyone proposing to use the information in this publication (including information and reports from third parties) should independently verify and check its accuracy, completeness and suitability for purpose, and obtain independent and specific advice from appropriate experts. Accordingly, to the maximum extent permitted by law, AEMO and its officers, employees and consultants involved in the preparation of this publication: make no representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of the information in this publication; and are not liable (whether by reason of negligence or otherwise) for any statements, opinions, information or other matters contained in or derived from this publication, or any omissions from it, or in respect of a person’s use of the information in this publication.
    [Show full text]
  • South Australian Transmission Annual Planning Report
    SOUTH AUSTRALIAN TRANSMISSION ANNUAL PLANNING REPORT June 2017 South Australian Transmission Annual Planning Report June 2017 Copyright and Disclaimer The purpose of this document is to provide information about ElectraNet's assessment of the transmission system’s likely capacity to meet demand in South Australia over the next ten years. It also provides information about ElectraNet’s intended plans for augmentation of the transmission network. This document is not to be used by any party for other purposes, such as making decisions to invest in further generation, transmission or distribution capacity. This document has been prepared using information provided by, and reports prepared by, a number of third parties. Anyone proposing to use the information in this document should independently verify and check the accuracy, completeness, reliability and suitability of the information in this document, and the reports and other information relied on by ElectraNet in preparing it. This document contains certain predictions, estimates and statements that reflect various assumptions concerning, amongst other things, economic growth scenarios, demand forecasts and developments within the National Electricity Market. These assumptions may or may not prove to be accurate. The document also contains statements about ElectraNet’s future plans. Those plans may change from time to time and should be confirmed with ElectraNet before any decision is made or action is taken based on this document. ElectraNet makes no representation or warranty as to
    [Show full text]
  • 2018 | South Australian Electricity Report 3
    South Australian Electricity Report November 2018 South Australian Advisory Functions Important notice PURPOSE The purpose of this publication is to provide information to the South Australian Minister for Energy and Mining about South Australia’s electricity supply and demand. While some historical price information is provided for completeness, this publication does not present any views on the effectiveness of price signals in the National Electricity Market. AEMO publishes this South Australian Electricity Report in accordance with its additional advisory functions under section 50B of the National Electricity Law. This publication is based on information available to AEMO as at 1 July 2018, although AEMO has endeavoured to incorporate more recent information where practical. DISCLAIMER AEMO has made every effort to ensure the quality of the information in this publication but cannot guarantee that information, forecasts and assumptions are accurate, complete or appropriate for individual circumstances. This publication does not include all of the information that an investor, participant or potential participant in the National Electricity Market might require, and does not amount to a recommendation of any investment. Anyone proposing to use the information in this publication (including information and reports provided by third parties) should independently verify and check its accuracy, completeness and suitability for that purpose, and obtain independent and specific advice from appropriate experts. Accordingly, to the maximum extent permitted by law, AEMO and its officers, employees and consultants involved in the preparation of this document: • make no representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of the information in this document; and • are not liable (whether by reason of negligence or otherwise) for any statements or representations in this document, or any omissions from it, or for any use or reliance on the information in it.
    [Show full text]
  • 2018 Annual Market Performance Review (AMPR) As Required by the National Electricity Rules (Rules Or NER)
    RELIABILITY PANEL Reliability Panel AEMC FINAL REPORT ANNUAL MARKET PERFORMANCE REVIEW REVIEW 2018 04 APRIL 2019 Reliability Panel AEMC Final report Annual market performance review 2018 04 April 2019 INQUIRIES Reliability Panel c/- Australian Energy Market Commission PO Box A2449 Sydney South NSW 1235 E [email protected] T (02) 8296 7800 F (02) 8296 7899 Reference: REL0067 CITATION Reliability Panel, Annual market performance review 2018, Final report, 04 April 2019 ABOUT THE RELIABILITY PANEL The Panel is a specialist body established by the Australian Energy Market Commission (AEMC) in accordance with section 38 of the National Electricity Law and the National Electricity Rules. The Panel comprises industry and consumer representatives. It is responsible for monitoring, reviewing and reporting on reliability, security and safety on the national electricity system, and advising the AEMC in respect of such matters. This work is copyright. The Copyright Act 1968 permits fair dealing for study, research, news reporting, criticism and review. Selected passages, tables or diagrams may be reproduced for such purposes provided acknowledgement of the source is included. Reliability Panel AEMC Final report Annual market performance review 2018 04 April 2019 RELIABILITY PANEL MEMBERS Dr Brian Spalding, Chairman and AEMC Commissioner Trevor Armstrong, Chief Operating Officer, Ausgrid Stephen Clark, Technical and Economic Lead - Project Marinus, TasNetworks Mark Collette, Executive - Energy, Energy Australia Kathy Danaher, Chief Financial Officer
    [Show full text]
  • Integrating Energy Storage Systems Into the Nem) Rule 2021
    Australian Energy Market Commission DRAFT RULE DETERMINATION NATIONAL ELECTRICITY AMENDMENT (INTEGRATING ENERGY STORAGE SYSTEMS INTO THE NEM) RULE 2021 Proponent: AEMO 15 JULY 2021 DETERMINATION Australian Energy Draft rule determination Market Commission Integrating energy storage 15 July 2021 INQUIRIES Australian Energy Market Commission GPO Box 2603 Sydney NSW 2000 E [email protected] T (02) 8296 7800 Reference: ERC0280 CITATION AEMC, Integrating energy storage systems into the NEM, Draft rule determination, 15 July 2021 ABOUT THE AEMC The AEMC reports to the Energy Ministers Meeting (formerly the Council of Australian Governments Energy Council). We have two functions. We make and amend the national electricity, gas and energy retail rules and conduct independent reviews for the Energy Ministers Meeting. This work is copyright. The Copyright Act 1968 permits fair dealing for study, research, news reporting, criticism and review. Selected passages, tables or diagrams may be reproduced for such purposes provided acknowledgement of the source is included. Australian Energy Draft rule determination Market Commission Integrating energy storage 15 July 2021 SUMMARY 1 As the electricity system transitions, energy storage is playing an increasingly important role and the regulatory framework needs to accommodate this shift. This draft determination explains the changes we are proposing to enable the integration of storage into the NEM. 2 On 23 August 2019, the Australian Energy Market Operator (AEMO or proponent) submitted a rule change request to the Australian Energy Market Commission (AEMC or Commission) seeking to amend the National Electricity Rules (NER) to define storage and introduce a new participant category, the bi-directional Resource Provider (BDRP), and apply storage-specific obligations.
    [Show full text]
  • South Australia Electricity Report
    South Australian Electricity Report November 2019 South Australian Advisory Functions Important notice PURPOSE The purpose of this publication is to provide information to the South Australian Minister for Energy and Mining about South Australia’s electricity supply and demand. While some historical price information is provided for completeness, this publication does not present any views on the effectiveness of price signals in the National Electricity Market. AEMO publishes this South Australian Electricity Report in accordance with its additional advisory functions under section 50B of the National Electricity Law. This publication is based on information available to AEMO as at 14 November 2019, although AEMO has endeavoured to incorporate more recent information where practical. DISCLAIMER AEMO has made every effort to ensure the quality of the information in this publication but cannot guarantee that information, forecasts and assumptions are accurate, complete or appropriate for individual circumstances. This publication does not include all the information that an investor, participant or potential participant in the National Electricity Market might require and does not amount to a recommendation of any investment. Anyone proposing to use the information in this publication (including information and reports provided by third parties) should independently verify and check its accuracy, completeness and suitability for that purpose, and obtain independent and specific advice from appropriate experts. Accordingly, to the maximum extent permitted by law, AEMO and its officers, employees and consultants involved in the preparation of this document: • make no representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of the information in this document; and • are not liable (whether by reason of negligence or otherwise) for any statements or representations in this document, or any omissions from it, or for any use or reliance on the information in it.
    [Show full text]