CITY OF BOROONDARA MUNICIPAL-WIDE HERITAGE GAP STUDY Volume 1. Canterbury Adopted 26 November 2018 Prepared for the City of Boroondara Context Pty Ltd 2018 Project Team: Natica Schmeder, Associate Louise Honman, Director Catherine McLay, Consultant Evelina Ericsson, Consultant Vicki McLean, Consultant Bruce Trethowan, Trethowan Architecture Mark Stephenson, Trethowan Architecture Renee Muratore, Trethowan Architecture Sam Nichols, Trethowan Architecture Report Register This report register documents the development and issue of the report entitled City of Boroondara Municipal-Wide Heritage Gap Study: Vol. 1 Canterbury undertaken by Context Pty Ltd in accordance with our internal quality management system. Project Issue Notes/description Issue Date Issued to No. No. 2112 1 Background report, draft 4 November 2016 Rob Costello 2112 2 Full report, draft 21 November 2016 Rob Costello 2112 3 Final draft report 5 December 2016 Rob Costello 2112 4 Final draft report, revised 12 December 2016 Rob Costello 2112 5 Final report 23 January 2017 Rob Costello 2112 6 Revised report after 3 May 2017 Rob Costello community consultation 2112 7 Expanded report 25 May 2017 Rob Costello 2112 8 Report revised post C266 8 October 2018 Shiranthi Widan panel 2112 9 Adopted report 26 November 2018 Shiranthi Widan Context Pty Ltd 22 Merri Street, Brunswick VIC 3056 Phone 03 9380 6933 Facsimile 03 9380 4066 Email
[email protected] Web www.contextpl.com.au ii CONTENTS EXECUTIVE SUMMARY V Introduction v Key Findings v Recommendations v 1 INTRODUCTION 1 1.1