1.0 MITCON

 MITCON Consultancy & Engineering Services Ltd. (MITCON), headquartered at Pune, INDIA & having offices at Ahmedabad, Mumbai, New Delhi, Chennai & Nagpur, an ISO 9001 - 2008 Consultancy Company, is promoted by leading financial institutions (ICICI, SIDBI and IFCI), state development corporations (SICOM, MIDC and MSSIDC) and public sector commercial banks. It is established in 1983 & acts as a catalyst for industrial & social development. MITCON provides vide range of consultancy services, particularly for industrial, technical and management sectors. The areas of operation include Renewable Energy, Climate Change, Energy Efficiency & Conservation, Environment Management & Engineering, Sugar, Agriculture, Bio-technology, Market Research, Entrepreneurship & Self Employment, Corporate Training, Computer Education & Formal Education. Corporate sector, bi-lateral agencies, Central & State Governments, financial institutions and individuals enjoys MITCON’s consultancy services. More details about MITCON can be referred at www.mitconindia.com.

2.0 SERVICES OFFERED

 Pre-investment consultancy services for renewable energy projects and applications (small hydro electric, wind power, solar PV & thermal, waste to energy etc.), mainly includes preparation of market assessment reports, feasibility reports, techno-economic feasibility reports, detailed project reports, securing required sanctions / consents, soft loan and interest / capital subsidy syndication services  Technology sourcing  Pre-contract and post-contract project management consultancy services, including basic and detailed engineering services for implementation of renewable energy projects  Third party certification, inspection and monitoring services for commissioned, under commissioning and proposed renewable energy projects  Assistance in performance contracting with plant and machinery suppliers / vendors  Software packages for online renewable energy monitoring, targeting and management in case of utilization of multiple utilities  Macro and policy studies  Capacity building, entrepreneurship development and customized training packages  Consultancy / facilitation services for emission trade business (carbon credits) RENEWABLE ENERGY CONSULTANCY SERVICES : A PROFILE

4.0 PRESTIGIOUS CLIENTS & SERVICE(S) PROVIDED

A. Consultancy Assignments

Solar

Sr. No. Name of Client Services Provided 1.1 Project Management Consultancy 1.1.1 M/s DSK Developers, Pune Concept to Commissioning Consultancy Services for Installation of Solar Hot Water System at Ranwara Housing Complex (1997) 1.1.2 State Power Project Management Consultancy for 1.00 MWp Generation Company Ltd., Grid Interactive Solar PV Power Project at Mumbai Chandrapur, Maharashtra (2008 - 09) 1.1.3 Maharashtra State Power Project Management Consultancy for 4.00 MWp Generation Company Ltd., Grid Interactive Solar PV Power Project at Mumbai Chandrapur, Maharashtra (2010 – 11-12) 1.1.4 M/s Roha Dyechem Pvt. Ltd., Project Management Consultancy Services for Mumbai 25.00 MWp Grid Interactive Solar Power Project in Gujarat (2010-11-12) 1.1.5 M/s Mono Steel (India) Ltd., Project Management Consultancy Services for Bhavnagar 10.00 MWp Grid Interactive Solar Power Project in Gujarat (2010-11-12) 1.1.6 M/s Corner Stone Energy Pvt. Project Management Consultancy Services for Ltd., Mumbai 5.00 MWp Grid Interactive Solar Power Generation Project at Gujarat (2010-11-12) 1.1.7 GSPC Pipavav Power Project Management Consultancy Services for Company Ltd., Gandhinagar 5.00 MWp Grid Interactive Solar Power Project in Gujarat (2010-11-12) 1.1.8 M/s ZF Steering Gear (India) Project Management Consultancy Services for Ltd., Pune 5.00 MWp Grid Interactive Solar Power Project in Gujarat (2010-11-12) 1.1.9 Bharat Petroleum Corporation Project Management Consultancy Services for Ltd., Mumbai 1.00 MWp Grid Interactive Solar Power Project in Punjab (2010-11-12) 1.1.10 M/s Emami Cement Ltd., Project Management Consultancy Services for Kolkatta 10.00 MWp Grid Interactive Solar Power Project in Gujarat (2010-11-12) Solar (contd.)

Sr. No. Name of Client Services Provided 1.2 Site Evaluation / Techno-Economic Viability Reports / Detailed Project Reports / Tender Evaluation 1.2.1 Nagpur Municipal Corporation, Techno-Economic Feasibility Report for 315 kWp Nagpur Solar PV Power Project (1999-2000) 1.2.2 M/s DNV Builders, Pune Techno Economic Feasibility Report for 1.00 MWp Grid Interactive Solar PV Power Project at Maharashtra (2008–09) 1.2.3 M/s Rolta Power Ltd., Mumbai Detailed Project Report for 5.00 MWp Grid Interactive Solar PV Power Project at Rajasthan (2009-10) 1.2.4 M/s City Corporation Ltd, Pune Feasibility Study Report for Setting up Grid Interactive Solar Power Project in Maharashtra & Gujarat States and Evaluation of Concentrated Solar PV Technology (2009-10) 1.2.5 Haryana Renewable Energy Feasibility cum Detailed Project Report for Setting Development Agency, Tail-End Grid Connected Solar Power Project Chandigarh upto 1.00 MWp in Haryana State (2009-10) 1.2.6 M/s SMS Infrastructure Pvt. Techno – Economic Feasibility Study Report for Ltd., Nagpur Setting up 5.00 MWp Grid Interactive Solar Power Project in Rajasthan & Gujarat State (2009-10) 1.2.7 M/s Aboli Investments Pvt. Ltd., Detailed Project Report for Setting up 1.00 MWp Pune Grid Interactive Solar Power Project in Maharashtra (2009-10) 1.2.8 M/s Indian Core Oils Pvt. Ltd., Techno – Economic Feasibility Study Report for Faridabad Setting upto 25.00 kWp Roof Top Solar Power project in Haryana State (2009-10) 1.2.9 M/s Ajanta Projects (India) Ltd., Detailed Project Report for 25.00 MWp Grid Mumbai Interactive Solar PV Power Project at Maharashtra (2009-10) 1.2.10 M/s New Delhi Times, New Detailed Project Report for 5.00 MWp Grid Delhi Interactive Solar PV Power Project in Haryana (2009-10) 1.2.11 M/s Nagreeka Exports Limited, Detailed Project Report & EoI for Setting up of Mumbai Solar PV Project of Capacity 1.00 MWp & 2.00 MWp Under JNNSM in Maharashtra (2009–10) 1.2.12 M/s Citra Real Estate Limited, Tender Evaluation & Detailed Project Report for Gurgaon (Indiabulls Group) 2.00 MWp Grid Interactive Solar Power Project in Maharashtra (2010-11) 1.2.13 M/s Priapus Infrastructure Pvt. Tender Evaluation & Detailed Project Report for Ltd., Gurgaon (Indiabulls 2.00 MWp Grid Interactive Solar Power Project in Group) Uttar Pradesh (2010-11) 1.2.14 M/s Sepset Constructions Ltd., Tender Evaluation & Detailed Project Report for Gurgaon (Indiabulls Group) 2.00 MWp Grid Interactive Solar Power Project in Maharashtra (2010-11) Solar (contd.)

Sr. No. Name of Client Services Provided 1.2.15 M/s Presage Technology Site Evaluation / Fixation, Detailed Project Report Solutions Ltd., New Delhi for 5.00 MWp Grid Interactive Solar PV Power Project at Maharashtra & Submission of EoI to NVVN (2010-11) 1.2.16 M/s GeeCee Ventures Ltd., Site Evaluation / Fixation, Detailed Project Report Mumbai (Formerly Gwalior for 3 x 5.00 MWp Grid Interactive Solar PV Power Chemicals) Projects at Rajasthan & Submission of EoI to NVVN (2010-11) 1.2.17 M/s Essel Mining & Industries Detailed Project Report & Tender Evaluation of Ltd., Mumbai (Aditya Birla 5.00 MWp Grid Interactive Solar PV Power Group) Project at Rajasthan & Submission of EoI to NVVN (2010-11) 1.2.18 M/s Aboli Investment Pvt. Ltd., Detailed Project Report & Assistance in Pune (Kalyani Group) Submission of EoI to NVVN for 5.00 MWp Grid Interactive Solar PV Power Project at Maharashtra (2010-11) 1.2.19 M/s Inspira Infrastructure Ltd., Detailed Project Report for 15.00 MWp Grid Mumbai Interactive Solar PV Power Project at Gujarat (2010-11) 1.2.20 M/s Vishwaj Energy Private Detailed Project Report & Assistance in Limited, Pune Submission of EoI to NVVN for 5.00 MWp Grid Interactive Solar PV Power Generation Project in Maharashtra (2010-11) 1.2.21 Kisanveer Satara Sahakari Detailed Project Report & Submission of EoI to Sakhar Karkhana Ltd., Satara NVVN for 5.00 MWp Grid Interactive Solar PV Power Project at Maharashtra (2010-11) 1.2.22 M/s Ecoboard Industries Ltd., Detailed Project Report for 5.00 MWp Grid Pune Interactive Solar PV Power Project at Maharashtra & Submission of EoI to NVVN (2010- 11) 1.2.23 M/s Dante Energy Private Detailed Project Report for 2.00 MWp Grid Limited, Mumbai Interactive Solar PV Power Project at Uttar Pradesh (2010–11) 1.2.24 M/s Louroux Bio Energies Detailed Project Report for 25.00 MWp Grid Limited, Mumbai (Ajanta Interactive Solar PV Power Project at Gujarat Pharma Group) (2010-11) 1.2.25 M/s Corner Stone Energy Pvt. Detailed Project Report & Tender Evaluation for Ltd., Mumbai 5.00 MWp Grid Interactive Solar Power Project in Gujarat (2010-11) 1.2.26 M/s NSL Renewable Power Detailed Appraisal Report for 25.00 MWp Solar Pvt. Ltd., Hyderabad Thermal Power Generation Project in Gujarat (2011-12) 1.2.27 M/s South Asian Agro Detailed Appraisal Report for 25.00 MWp Solar Industries Ltd., Raipur Thermal Power Generation Project in Chattisgarh (2011-12) Solar (Contd.)

Sr. No. Name of Client Services Provided 1.2.28 TATA Capital Ltd., Mumbai Detailed Appraisal Report for 25.00 MWp Solar Thermal Power Generation Project in Gujarat by M/s Cargo Motors Gujarat Solar Pvt. Ltd. (2011- 12) 1.2.29 M/s Essel Infraprojects Ltd., Detailed Appraisal Report for 2 x 5.00 MWp Solar Mumbai (Zee Group) PV Power Generation Project in Gujarat (2011-12) 1.2.30 M/s Firestone Trading Pvt. Ltd., Detailed Appraisal Report for 5.00 MWp Solar PV Mumbai Power Generation Project in Maharashtra (2011- 12) 1.2.31 M/s S. M. Solar Energy (I) Pvt. Detailed Appraisal Report for 25.00 MWp Grid Ltd., Mumbai Interactive Solar PV Power Plant in Rajasthan (2011-12) 1.3 Policy / Inspection / Others 1.3.1 Indian Renewable Energy Inspection and Monitoring Services for Solar Development Agency Ltd., New Home Lighting Systems Installed at Videocon Delhi International (1995) 1.3.2 Indian Renewable Energy Physical Inspection of 35 SPV Water Pumping Development Agency Ltd., New Systems for Agriculture & Related Uses (1995 - Delhi 2004) 1.3.3 Industrial Development Bank of Inspection Services for Solar Systems Installed at India, Mumbai Videocon International & Videocon Appliances, Aurangabad (1999) 1.3.4 M/s The Carbon Neutral Feasibility Study Reports for Solar PV and Solar Company, London Thermal Units Across the South of India (2006-07) (M/s SELCO Project) 1.3.5 M/s Delta Energy & Report on latest Solar Thermal Systems in India Environment, Edinburg (2007-08) 1.3.6 M/s J. P. Morgan Climate Care, Baseline Study for Installed Solar Thermal & Solar Londan (M/s Orb Energy PV Systems in Karnataka State (2008-09) Project) 1.3.7 Maharashtra State Power Assistance for Tariff Fixation for 1.00 MWp Grid Generation Company Ltd., Interactive Solar PV Power Project Maharashtra Mumbai (2008-09) 1.3.8 Public Works Department, New Detailed Project Report & Tariff Petition to Delhi (for Common Wealth Regulatory Commission (2009-10) Games) 1.3.9 M/s I G Petrochemicals Limited, “Owner Engineer” to EPC work for Proposed Mumbai Solar Power Project Karnataka (2009–10) 1.3.10 Ministry of New & Renewable Third Party Inspection of Solar Thermal Systems Energies, Government of India, Installed by Channel Partners / Programme New Delhi Administrator under Off Grid Scheme of JNNSM Solar (Contd.)

Sr. No. Name of Client Services Provided 1.4 Site Identification 1.4.1 M/s Vraksha Technologies Ltd., Mumbai (Patni Computers) 1.4.2 M/s SMS Infrastructure Pvt. Ltd., Nagpur 1.5 Plant Load Factor Certification 1.5.1 Inspira Infrastructure Ltd., Determination of Plant Load Factor for 25.00 Mumbai MWp Solar PV Project at Gujarat

Wind

Sr. No. Name of Client Services Provided 2.1 M/s Chalukyanath Wind Power Project Developer Services (Pre-investment, Pre- Pvt. Ltd., Khopoli Contract and Post Contract Engineering Services) for 1.00 MW (250 kW x 4 nos. WTG) Wind Power Project at Satara, Maharashtra (2000 - 01) 2.2 M/s Kanyakumari Plantations Detailed Project Report for 30 MW Wind Power Ltd., Mumbai Project at Tamilnadu (2001) 2.3 M/s Jsons Foundry Ltd., Technical Feasibility Report for 350 kW Wind Power Project at Panchgani, Maharashtra (2002) 2.4 Sahara Industrial and Feasibility Report for Wind Power Project at Commercial Corporation Ltd., Ambe Valley (2002) Lonavala 2.5 Indian Wind Manufacturers Assistance in Securing Wind Policy from MERC Association, Pune (2002) 2.6 M/s Mahalaxmi Construction Detailed Project Report and Loan Syndication for Corporation Limited, Pune 800 KW Wind Power Project at Chitradurga, Karnataka (2005-06) 2.7 M/s R. D. S. Construction Detailed Project Report and Loan Syndication for Company, Pune 800 KW Wind Power Project at Chitradurga, Karnataka (2005-06) 2.8 Shri Saibaba Sansthan Trust, Project Management Consultancy Services for Shirdi Setting up 2.5 MW Wind Power Project in Maharashtra State (2007-08) 2.9 M/s Kirloskar Pneumatic Co. Preparation of Techno-Economic Feasibility Ltd., Pune Report for Setting up Wind Turbine Gear Box Manufacturing Unit (2007-08) 2.10 ICICI Bank Ltd., Mumbai Evaluation of Chikkodi wind farm (2007-08) 2.11 M/s Asahi India Glass Ltd., Feasibility study for setting up wind power project Taloja in Maharashtra (2007-08) 2.12 M/s Asahi India Glass Ltd., Feasibility study for setting up wind power project Tamilnadu in Tamilnadu (2007-08) 2.13 M/s Universal Starch-Chem Annual Operation & Maintenance of 3 × 600 kW Allied Ltd., Dondaicha, Dist. – GE make Wind Energy Generators (2007 – 08) Dhule 2.14 ICICI Bank Ltd., Mumbai Assistance in Sale of Chikkodi Wind Farm on ‘As Sr. No. Name of Client Services Provided is Where is Basis (2007 – 08) 2.15 M/s Nagreeka Exports Ltd., Due Diligence Study Report for setting up a wind Mumbai power project (2008 – 09) 2.16 M/s Nagreeka Foils Ltd., Due Diligence Study Report for setting up a wind Mumbai power project (2008 – 09) 2.17 Vishwajeet Lohakarey, Mumbai Feasibility study for setting wind power project in Maharashtra (2008 – 09) 2.18 M/s Tacke Wind Energy (India) Inspection of 4 × 750 kW GE make Wind Energy Pvt. Ltd., Mumbai Generators (2008 – 09) 2.19 Vikram Gaikwad Group of Detailed Appraisal Report for 4 × 1250 kW wind Companies, Pune power project (2008 – 09) 2.20 M/s Bharat Constructions, Detailed Appraisal Report for 1 × 1250 kW wind Solapur power project (2008 – 09) 2.21 M/s SMS Infrastructure Ltd., Wind Resource Assessment & Micrositing Study Nagpur (2009-10) 2.22 M/s WMI Cranes Ltd., Thane Determination of Plant Load Factor for 7 WTGs (5.5 MW) in Maharashtra, Gujarat and Tamilnadu (2009-2010) 2.23 IEP Management I, Limited, Technical due diligence of the wind power Mauritius projects in Southern India 2.24 AN International Investor Technical due diligence of the wind power projects in Southern India 2.25 M/s Maharashtra State Power Feasibility Study for the Proposed 100 MW Wind Generation Company Ltd., Turbine Generator at Sakri, Maharashtra Mumbai 2.26 M/s Agarwal Packaging Pvt. Determination of Plant Load Factor for 2 WTGs Ltd., Pune (1.6 MW) in Jaisalmer (2010-2011) 2.27 M/s Aqua Alloys Pvt. Ltd., Determination of Plant Load Factor for 1 WTG Shinoli (1.25 MW) in Maharashtra (2010-2011) 2.28 M/s Ariane Orgachem Pvt. Ltd., Determination of Plant Load Factor for 4 WTGs Mumbai (2.4 MW) in Tamil Nadu (2010-2011) 2.29 M/s Dhariwal Industries Ltd., Determination of Plant Load Factor for 16 WTGs Pune (30.00 MW) in Rajasthan (2010-2011) 2.30 M/s Elveety Ind. Pvt. Ltd., Hubli Determination of Plant Load Factor for 1 WTGs (0.6 MW) in Tamil Nadu (2010-201) 2.31 M/s Hindustan Chemicals Determination of Plant Load Factor for 2 WTGs Company, Mumbai (3.3 MW) in Gujarat (2010-2011) 2.32 Hiten Davada & Co, Bangalore Determination of Plant Load Factor for 1 WTGs (0.25 MW) in Tamil Nadu (2010-2011) 2.33 Dipti N. Chandan, Bangalore Determination of Plant Load Factor for 1 WTGs (0.250 MW) in Tamil Nadu (2010-201) 2.34 M/s Ramraj Handlooms, Tirpur Determination of Plant Load Factor for 2 WTGs (1.7 MW) in Tamil Nadu (2010-2011) 2.35 M/s Shree Minerals, Bellary Determination of Plant Load Factor for 3 WTGs (4.5 MW) in Karnataka (2010-2011) 2.36 M/s Shah Promoters & Determination of Plant Load Factor for 15 WTGs Developers, Pune (12 MW) in Maharashtra (2010-2011) Sr. No. Name of Client Services Provided 2.37 M/s Nagarjuna Agrichem Ltd., Determination of Plant Load Factor for 3 WTGs Hyderabad (6.3 MW) in Tamil Nadu (2010-2011) 2.38 M/s Nagarjuna Fertilizers & Determination of Plant Load Factor for 7 WTGs Chemicals Ltd., Hyderabad (14.7 MW) in Tamil Nadu (2010-2011) 2.39 M/s Pearlite Lines Pvt. Ltd., Determination of Plant Load Factor for 1 WTGs Shimoga (1.25 MW) in Karnataka, (2010-2011) 2.40 M/s Garuda Vayu Shakti Pvt. Preparation TEFR for Wind Turbine Assembly Ltd., Chennai Plant at Chennai (2011-12) 2.41 M/s Shreem Power & Infr. Dev. Wind Resource Assessment & Micrositting for 20 Pvt. Ltd., Mumbai MW Wind Power Project (2011-12) 2.42 M/s PGSD Engineering Pvt. Ltd., Feasibility Study Report for Wind Power Project Delhi in India (2011-12) 2.43 M/s Tata Capital Ltd., Mumbai Techno- Economic Viability Report for Wind Power Project in India (2011-12) 2.44 M/s D. J. Malpani, Sangamner Determination of Plant Load Factor for 10 WTGs (16.5 MW) at Rajasthan,& Madhya Pradesh (2011-2012) 2.45 M/s Chalet Hotels Ltd., Mumbai Project Management Consultancy Services for (K Raheja Corp.) setting up 15 MW Captive Wind Power Project in Maharashtra (2011-12) 2.46 M/s GMR Energy Ltd., Feasibility study to set up wind power project Bangalore Maldives

Hydro

Sr. No. Name of Client Services Provided 3.1 M/s Shaktikumar M. Sancheti Pre-feasibility Study for Setting up Small Hydro Ltd., Nagpur (2001) Projects at following citec in Puniah

 Thablan (6.25 MW)  Phirozpur (3.60 MW)  Saunda (4.375 MW)  Chanarthal (4.90 MW) 3.2 N/s Shaktikumar M. Sancheti Pre-feasibility Study for Setting up Small Hydro Ltd., Nagpur (2001) Projects at lambadug, District Mandi (25.00 MW) & Baragaon, District Kullu (10.50 MW) in Himachal Pradesh 3.3 M/s Shaktikumar M. Sancheti Pre-feasibility study for Setting up Small Hydro, Project Ltd., Nagpur (2003) at Savitridam, Poladpur, Maharashtra State (9.00 MW) 3.4 M/s R. M. Mohite Textiles Appraisal Report, Loan Syndication for 10 MW Hydro Ltd., (2004-05) Electric Project at Dam, Kolhapur, Maharashtra Project Commissioned. 3.5 M/s Mahalaxmi Kona! Urja Appraisal Report, Loan & MNES Subsidy Syndication Private Limited, Pune (2004- and CDM Services for 10 MW Hydro Electric Projects 05) at TilIarwadi Dam, Dist. Sindhudurg, Maharashtra Sr. No. Name of Client Services Provided Project Commissioned. 3.6 M/s Ghatge Patil Industries Pre-feasibility Study for Setting up Small Hydro Electric Limited, Kolhapur (2004-05) Projects at following sites at Maharashtra

 Nira Deoghar (7.00 MW)  Kasari (2.50 MW  Ambai (3.50 MW)  Gaibi

Required consultancy services to pre-qualify for setting up the hydroelectric project at short listed site from Government of Maharashtra — Water Resource Department 3.7 M/s R. M. Mohite Textiles Preparation of E & M tender document, Invitation of Ltd., Kolhapur (2006-07) quotations from E & M suppliars, evaluation of the quotations for 10 WA, Radhanagari S,HP in Maharashtra. Project Commissioned. 3.8 M/s Ndawara Tea Estate, Preparation of Pre-feasibility report of 0.75 MW mini Cameroon (2005-06) hydel project in Cameroon 3.9 M/s Nagreeka Exports Identification of Site and Preparation of Feasibility Limited, Mumbai (In the year Report for 3 x 2.5 MW SHP in Maharashtra 2005-06) 3.10 Bank of Maharashtra, Pune Asset evaluation of following projects (2006-07)  Chaskamaan SHP (3.00 MW SHP)  Vajra SHP (3.00 MW SHP) 3.11 M/s Celerity Power Private Preparation of Detailed Appraisal Report, Loan and Limited, Mumbai (2006-07) Subsidy Syndication for 2 x 3.5 MW Nira Deoghar SHP in Maharashtra Project Commissioned. 3.12 M/s Manish Power Private Detailed Appraisal Report for 1 x 2 MW SHP in Limited, Bangalore (2006-07) Maharashtra 3.13 Shree Tatya Saheb Kore Preparation of Detailed Appraisal Report for Warana Sahkari Nav Shakti Nirman Sanstha Ltd,  1 X 2 MW Chitri SHP Warnanagar (2006-07)  1 X 0.5 MW Janeamhatti SHP  1 X 1.5 MW Kadvi SHP  1 X 2.5 MW Kumbhi SHP  1 X 2.5 MW Patgaon SHP  2 X 0.75 MW Tulshi SHP

3.14 M/s Vishwaj Energy Pvt. Ltd., Preparation of Detailed Appraisal Report & Subsidy Pune (2006-07) Syndication Services for 2.5 MW Kasari SHP in Maharashtra 3.15 M/s Vishwaj Energy Pvt. Ltd., Preparation of Detailed Appraisal Report & Subsidy Pune (2006-07) Syndication Services for 3.5 MW Dhom SHP in

10 Sr. No. Name of Client Services Provided Maharashtra 3.16 Wat-Ere-Source Technologies Preparation of Detailed Appraisal Report & Loan P. Ltd., Pune (2007-08) Syndication Services for 1.4 MW (2 x 0.7 MW) SHP in Maharashtra 3.17 Wat-Ere-Source Technologies Preparation of Detailed Appraisal Report & Loan P. Ltd., Pune (2007-08) Syndication Services for 4.4 MW (2 x 2.2 MW) SHP in Maharashtra 3.18 Wat-Ere-Source Technologies Preparation of Detailed Appraisal Report & Loan P. Ltd., Pune (2007-08) Syndication Services for 13.5 MW (3 x 4.5 MW) SHP in Maharashtra 3.19 M/s Asahi India Glass Ltd., Feasibility study for setting up Small Hydro Projects at Taloja (2007-08) Nisare & Bahe sites in Maharashtra 3.20 M/s Rohan & Rajdeep Pre-feasibility Study for Setting up Small Hydro Electric Infrastructure, Pune (2007-08) Projects at following sites at Himachal Pradesh

 Suil (13.00 MW)  Shalvi (7.00 MW)  Kilhi Bahl (7.50 MW)

Required consultancy services to pre-qualify for setting up the hydro electric project at short listed site from Government of Himachal Pradesh 3.21 M/s Rohan & Rajdeep Pre-feasibility Study for Setting up Small Hydro Electric Infrastructure, Pune (2007-08) Projects at following sites at Maharashtra

 Chikotra (1.80 MW)  Dimbhe 51 (0.15 MW)  Dimbhe 53 (0.25 MW)  Girna (0.25 MW)  Uttarmand (0.70 MW)  Arunavati (0.20 MW)  Pentakli (0.25 MW)

Required consultancy services to pre-qualify for setting up the hydro electric project at short listed site from Government of Maharashtra 3.22 M/s Rohan & Rajdeep Pre-feasibility Study for Setting up Small Hydro Electric Infrastructure, Pune (2007-08) Projects at following sites at Maharashtra

 Bhama Ashkhed (2.00 MW)  Pimpalwadi (0.30 MW)

Required consultancy services to pre-qualify for setting up the hydro electric project at short listed site from Government of Maharashtra 3.23 Bank of India, Chennai (2007- Techno- Economic Viability study Report for Daman 08) Ganga SHP I & Daman Ganga SHP II in Gujarat.

11 Sr. No. Name of Client Services Provided 3.24 Ministry of New & Renewable Evaluation of MNRE Scheme / Programme Energy (2008-09) implemented during 10th year plan. 3.25 Bank of India, Chennai (2008- Techno-Economic Viability Study Report for 13.50 MW 09) SHP at Sonathy Village, Gulberga, Karnataka 3.26 M/s Advik Hi-Tech Pvt. Ltd. Providing feasibility study and assistance in bidding for Chakan, Pune (2009-10) setting up Dimbhe SHP (1.50 MW) in Maharashtra 3.27 M/s Nagreeka Exports Ltd., Providing feasibility study & assistance in bidding for Mumbai (2009-10) setting up small hydro electric projects at Hullahalli (Karnataka) 3.28 M/s Nagreeka Exports Ltd. Providing feasibility study & assistance in Bidding for (2009-10) setting up small hydro electric projects at following sites at Maharashtra

 Bhatsa (3.00 MW)  Tarali (5.00 MW) 3.29 M/s Gnat Foundry Pvt. Ltd., Appraisal Report, Loan & MNES Subsidy Syndication Kolhapur (on going) and CDM Services for 3.00 MW SHP in Maharashtra 3.30 M/s Phadnis Power Projects Techno-Economic Viability Study Reports for Six Hydro Pvt. Ltd., Pune (ongoing) Electric Projects of total 216 MW Capacity at Madhya Pradesh 3.31 M/s Shreehari Associates (P) Project Management Consultancy Services for Ltd., Aurangabad (ongoing)  Mukane SHP— 1.50 MW  Waldevi SHP —0.60 MW  Waki SHP —1.00 MW 3.32 M/s Nirman Energy, Pune (on Appraisal Report, Loan & MNES Subsidy Syndication going) and CDM services for 1.00 MW Hydro Electric Project at Satara, Maharashtra 3.33 M/s Surge Power & Detailed Project Report for following SHP sites in Infrastructure Pvt. Ltd., Madhya Pradesh Bhopal  Wainganga SHP on Wainganga River in Seoni Dist.  Wainganga-Tanwar SHP on Wainganga River in Seoni Dist.  Wainganga Upstream SHP on Wainganga River in Seoni Dist.  Wainganga Downstream SHP on Wainganga River in Seoni Dist.  Kanhan SHP on Kanhan River (4 cascading projects) on Kanhan River  Denwa SHP on Denwa River in Hoshangabad Dist. (near Panchmarih)  Ken SHP on Ken River in Khajaraho Dist.  Sonar SHP on Sonar River in Damoh Dist.

12 Rural Energy

Sr. No. Name of Client Services Provided 4.1 Maharashtra Energy Report on Impact of Integrated Rural Energy Development Agency, Pune Planning Program in Maharashtra (1996) 4.2 Maharashtra Energy Energy Survey for Integrated Rural Energy Planning Development Agency, Pune for Tiwsa Block, Amravati District (1999) 4.3 Maharashtra Energy Energy Survey for Integrated Rural Energy Planning Development Agency, Pune for Biloli Block, Nanded District (1999)

Waste to Energy

Sr. No. Name of Client Services Provided 5.1 M/s SBM Starch Pvt. Ltd., Detailed Project Report for Setting up Bio- Chennai (2007-08) Methanation Project on Starch Effluent 5.2 M/s Spid Combines Pvt. Ltd., Detailed Project Report for Bio-methanization & Amravati (2007-08) Composting Project 5.3 M/s CMR Power Projects Pvt. Techno - Economic Feasibility Report to Set-up Ltd., Kakinaka (2007-08) Municipal Solid Waste Management Project by Incinerator Technology 5.4 Madhukar Sahakari Sakhar Project Management Consultancy for Setting Up Karkhana Ltd., Faizpur (2010- Biogas Plant 2011) 5.5 Indian Renewable Energy Techno-Economic Feasibility Report for 1.6 MW Development Agency Ltd., Biogass Based Power Project for M/s SCI India Ltd., New Delhi (2010-11) Kolkata

Renewable Energy Certificates

6.1 Wind Power Project by M/s Jsons Foundry Pvt. Ltd., Sangli 6.2 Wind Power Project by M/s VANAZ Engineers Ltd., Pune

Special Achievements / Assignments

Sr. No. Name of Client Services Provided 7.1 Indian Renewable Energy Business Development Associate from 1994 Development Agency Ltd., New Delhi 7.2 Maharashtra Energy Renewable Energy Application Assessment Study Development Agency, Pune for Earthquake Affected Latur Dist., Maharashtra State (1996) 7.3 Platts Research & Consulting, Market Research for Fuel Cells in India (2003) USA

B. Business Meets, Seminars, Capacity Building Programs, Training Packages etc.

13  Renewable Energy Enterprise Development Program for IREDA at Pune (1995-96)  Business Meet on Promotion of Renewable Energy in Educational Institutions at Goa, sponsored by IREDA (1999-2000)  Business Meet on Wind Energy, sponsored by IREDA (1999-2000)  Business Meet on Promotion of Solar Systems in Hotel Industry at Lonavala, sponsored by IREDA (2000-01)  Implementation of Renewable Energy Entrepreneurship and Institutional Development Scheme in Maharashtra State for 2001-02 and 2002-03, sponsored by MNES  Entrepreneurship Awareness Camp on Renewable Energy at Pune, under REEID Scheme of MNES (2001-02)  Entrepreneurship Awareness Camp on Renewable Energy at Satara, under REEID Scheme of MNES (2001-02)  Entrepreneurship Awareness Camp on Renewable Energy at Ahmednagar, under REEID Scheme of MNES (2001-02)  Entrepreneurship Development Programme on Renewable Energy at Pune, under REEID Scheme of MNES (2001-02)  Renewable Energy Equipment Facilitation Counter at Pune under REEID Scheme of MNES (2001-02)  Training Programme for bank officers on Solar Thermal Systems at New Delhi, sponsored by MNES (2001-02)  Entrepreneurship Awareness Camps on Renewable Energy at Pune, under REEID Scheme of MNES, (2002-03)  Entrepreneurship Development Programs on Renewable Energy at Pune, under REEID Scheme of MNES (2002-03)  Business Meet on Promotion of Renewable Energy in Goa State, sponsored by MNES / IREDA (2002-03)  One week Faculty Development Programme on Renewable Energy in Pune, sponsored by IREDA (2004-05)  Business Interaction Meet on Solar Energy & Energy Efficiency / Conservation in Pune, sponsored by IREDA (2004-05)

Contact - Deepak Zade Sr. Vice President – Energy & Carbon Services MITCON Consultancy & Engineering Services Ltd, Kubera Chambers, Shivajinagar, Pune – 411 005, Maharashtra, INDIA Ph : 91 - 20 – 2553 3309 / 2553 4322, Fax : 91 – 20 – 2553 3206 Mobile : 098226 84106 E-mail : [email protected]