India-Assam-Inland-Water-Transport

Total Page:16

File Type:pdf, Size:1020Kb

India-Assam-Inland-Water-Transport FOR OFFICIAL USE ONLY Report No: PAD2565 Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF US$88 MILLION Public Disclosure Authorized TO INDIA FOR AN ASSAM INLAND WATER TRANSPORT PROJECT November 19, 2019 Public Disclosure Authorized Transport Global Practice South Asia Region Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective May 30, 2019) Currency Unit = Indian Rupee (INR) INR 70.00 = US$1 FISCAL YEAR April 1 – March 31 Regional Vice President: Hartwig Schafer Country Director: Junaid Kamal Ahmad Global and Regional Director: Guangzhe Chen Practice Manager: Shomik Raj Mehndiratta Task Team Leader(s): Atul Agarwal, Ninan Oommen Biju ABBREVIATIONS AND ACRONYMS AFS Annual Financial Statement AIWTDS Assam Inland Water Transport Development Society AIWTP Assam Inland Water Transport Project AIWTRA Assam Inland Water Transport Regulatory Authority APC Assam Ports Company ASC Assam Shipping Company ASPD Additional State Project Director CAPEX Capital Expenditure CE Citizen Engagement CPF Country Partnership Framework CTC Crew Training Center DIWTA Directorate of Inland Water Transport Assam DLI Disbursement-linked Indicator DLR Disbursement-linked Result EEP Eligible Expenditure Program EIA Environment Impact Assessment EIRR Economic Internal Rate of Return EMF Environmental Management Framework EMP Environmental Management Plan ER&SAR Emergency Response, Search and Rescue System/Unit FGD Focus Group Discussion FM Financial Management GB Governing Body GBV Gender-Based Violence GC General Consultant GDP Gross Domestic Product GHG Greenhouse Gas GoA Government of Assam GoI Government of India GRM Grievance Redress Mechanism GRS Grievance Redress Service ICC Internal Complaints Committee IEC Information, Education, and Communication IFR Interim Financial Report IPDF Indigenous Peoples Development Framework IPDP Indigenous Peoples Development Plan IPF Investment Project Financing ISDP Integrated Strategic Development Plan ISM Implementation Support Mission IVA Independent Verification Agency IWAI Inland Waterways Authority of India IWT Inland Water Transport PDO Project Development Objective PGC Project Guidance Council PIU Project Implementation Unit PMU Project Management Unit PPF Project Preparation Facility PPSD Project Procurement Strategy for Development PRAMS Procurement Risk Assessment and Mitigation RA Regulatory Authority RAP Resettlement Action Plan RPF Resettlement Policy Framework SHG Self-Help Group SIA Social Impact Assessment SMF Social Management Framework SMP Social Management Plan SOP Standard Operating Procedure SPD State Project Director STEP Systematic Tracking of Exchanges in Procurement ToR Terms of Reference TSSC Technical Services and Supervision Consultant VOT Value of Time The World Bank Assam Inland Water Transport Project (P157929) Table of Contents DATASHEET ........................................................................................................................... 1 I. STRATEGIC CONTEXT ...................................................................................................... 9 A. Country Context................................................................................................................................ 9 B. Sectoral and Institutional Context .................................................................................................... 9 C. Relevance to Higher Level Objectives ............................................................................................. 12 II. PROJECT DESCRIPTION .................................................................................................. 13 A. Project Development Objective ..................................................................................................... 13 B. Project Components ....................................................................................................................... 14 C. Project Beneficiaries ....................................................................................................................... 16 D. Project Financing ............................................................................................................................ 16 E. Results Chain ................................................................................................................................... 17 F. Rationale for Bank Involvement and Role of Partners .................................................................... 18 G. Lessons Learned and Reflected in the Project Design .................................................................... 19 III. IMPLEMENTATION ARRANGEMENTS ............................................................................ 20 A. Institutional and Implementation Arrangements .......................................................................... 20 B. Monitoring and Evaluation ............................................................................................................. 20 C. Sustainability ................................................................................................................................... 20 IV. PROJECT APPRAISAL SUMMARY ................................................................................... 21 A. Technical, Economic and Financial Analysis ................................................................................... 21 B. Fiduciary .......................................................................................................................................... 24 C. Safeguards ...................................................................................................................................... 29 D. Gender Development ..................................................................................................................... 34 V. KEY RISKS ..................................................................................................................... 37 VI. RESULTS FRAMEWORK AND MONITORING ................................................................... 38 VII. INDICATIVE TERMS AND CONDITIONS FOR THE GUARANTEE ......................................... 58 ANNEX 1: Implementation Arrangements and Support Plan ................................................. 59 ANNEX 2: Project Components and Cost .............................................................................. 61 ANNEX 3: Technical Analysis ................................................................................................ 66 ANNEX 4: Economic Analysis................................................................................................ 70 The World Bank Assam Inland Water Transport Project (P157929) DATASHEET BASIC INFORMATION BASIC_INFO_TABLE Country(ies) Project Name India Assam Inland Water Transport Project Project ID Financing Instrument Environmental Assessment Category Investment Project P157929 A-Full Assessment Financing Financing & Implementation Modalities [ ] Multiphase Programmatic Approach (MPA) [ ] Contingent Emergency Response Component (CERC) [ ] Series of Projects (SOP) [ ] Fragile State(s) [✓] Disbursement-linked Indicators (DLIs) [ ] Small State(s) [ ] Financial Intermediaries (FI) [ ] Fragile within a non-fragile Country [ ] Project-Based Guarantee [ ] Conflict [ ] Deferred Drawdown [ ] Responding to Natural or Man-made Disaster [ ] Alternate Procurement Arrangements (APA) Expected Approval Date Expected Closing Date 13-Dec-2019 31-Dec-2024 Bank/IFC Collaboration No Proposed Development Objective(s) The objectives of the Project are to: (a) improve passenger ferry infrastructure and service in Assam, and (b) improve the institutional capacity and framework for inland water transport in Assam Page 1 of 75 The World Bank Assam Inland Water Transport Project (P157929) Components Component Name Cost (US$, millions) Institutional, regulatory and safety strengthening 21.00 Fleet safety improvements and modernization 25.00 Project Management Support 9.00 Improvement in terminal infrastructure 55.00 Organizations Borrower: India Implementing Agency: Transport Dept., Govt. of Assam, Dispur, Guwahati (Assam), India PROJECT FINANCING DATA (US$, Millions) SUMMARY-NewFin1 Total Project Cost 110.00 Total Financing 110.00 of which IBRD/IDA 88.00 Financing Gap 0.00 DETAILS-NewFinEnh1 World Bank Group Financing International Bank for Reconstruction and Development (IBRD) 88.00 Non-World Bank Group Financing Counterpart Funding 22.00 Borrower/Recipient 22.00 Expected Disbursements (in US$, Millions) WB Fiscal Year 2020 2021 2022 2023 2024 2025 Page 2 of 75 The World Bank Assam Inland Water Transport Project (P157929) Annual 1.93 7.63 13.36 26.02 36.64 2.42 Cumulative 1.93 9.56 22.92 48.94 85.58 88.00 INSTITUTIONAL DATA Practice Area (Lead) Contributing Practice Areas Environment, Natural Resources & the Blue Economy, Urban, Transport Resilience and Land, Water Climate Change and Disaster Screening This operation has been screened for short and long-term climate change and disaster risks Gender Tag Does the project plan to undertake any of the following? a. Analysis to identify Project-relevant gaps between males and females, especially in light of Yes country gaps identified through
Recommended publications
  • The National Waterways Bill, 2016
    Bill No. 122-F of 2015 THE NATIONAL WATERWAYS BILL, 2016 (AS PASSED BY THE HOUSES OF PARLIAMENT— LOK SABHA ON 21 DECEMBER, 2015 RAJYA SABHA ON 9 MARCH, 2016) AMENDMENTS MADE BY RAJYA SABHA AGREED TO BY LOK SABHA ON 15 MARCH, 2016 ASSENTED TO ON 21 MARCH, 2016 ACT NO. 17 OF 2016 1 Bill No. 122-F of 2015 THE NATIONAL WATERWAYS BILL, 2016 (AS PASSED BY THE HOUSES OF PARLIAMENT) A BILL to make provisions for existing national waterways and to provide for the declaration of certain inland waterways to be national waterways and also to provide for the regulation and development of the said waterways for the purposes of shipping and navigation and for matters connected therewith or incidental thereto. BE it enacted by Parliament in the Sixty-seventh Year of the Republic of India as follows:— 1. (1) This Act may be called the National Waterways Act, 2016. Short title and commence- (2) It shall come into force on such date as the Central Government may, by notification ment. in the Official Gazette, appoint. 2 Existing 2. (1) The existing national waterways specified at serial numbers 1 to 5 in the Schedule national along with their limits given in column (3) thereof, which have been declared as such under waterways and declara- the Acts referred to in sub-section (1) of section 5, shall, subject to the modifications made under this tion of certain Act, continue to be national waterways for the purposes of shipping and navigation under this Act. inland waterways as (2) The regulation and development of the waterways referred to in sub-section (1) national which have been under the control of the Central Government shall continue, as if the said waterways.
    [Show full text]
  • Expanding Tradable Benefits of Inland Waterways Case of India
    Expanding Tradable Benefits of Inland Waterways Case of India Published By D-217, Bhaskar Marg, Bani Park, Jaipur 302016, India Tel: +91.141.2282821, Fax: +91.141.2282485 Email: [email protected], Web site: www.cuts-international.org With the support of © CUTS International, 2017 First published: December 2017 This document has been produced by CUTS International Printed in India by M S Printer, Jaipur This document is the output of the study designed and implemented by CUTS International and its strategic partners – Royal Society for Protection of Nature (RSPN), South Asia Watch on Trade, Economics and Environment (SAWTEE) and Unnayan Shamannay which contributes to the project ‘Expanding tradable benefits of trans-boundary water: Promoting navigational usage of inland waterways in Ganga and Brahmaputra basins’. More details are available at: www.cuts- citee.org/IW/ This publication is made possible with the support of The Asia Foundation. The views and opinions expressed in this publication is that of CUTS International and partners and not of The Asia Foundation. #1715 2 Contents Acknowledgement...................................................................................................... 5 Abbreviations ............................................................................................................ 6 Contributors .............................................................................................................. 7 Executive Summary...................................................................................................
    [Show full text]
  • The National Waterways Bill, 2015
    AS INTRODUCED IN LOK SABHA Bill No. 122 of 2015 THE NATIONAL WATERWAYS BILL, 2015 A BILL to make provisions for existing national waterways and to provide for the declaration of certain inland waterways to be national waterways and also to provide for the regulation and development of the said waterways for the purposes of shipping and navigation and for matters connected therewith or incidental thereto. BE it enacted by Parliament in the Sixty-sixth Year of the Republic of India as follows:— 1. (1) This Act may be called the National Waterways Act, 2015. Short title and commence- (2) It shall come into force on such date as the Central Government may, by notification ment. in the Official Gazette, appoint. 2 Existing 2. (1) The existing national waterways specified at serial numbers 1 to 5 in the Schedule national alongwith their limits given in column (3) thereof, which have been declared as such under waterways and declara- the Acts referred to in sub-section (1) of section 5, shall continue to be national waterways tion of certain for the purposes of shipping and navigation under this Act. inland waterways as (2) The regulation and development of the waterways referred to in sub-section (1) 5 national which have been under the control of the Central Government shall continue, as if the said waterways. waterways are declared as national waterways under the provisions of this Act. (3) The inland waterways specified at serial numbers 6 to 106 in the Schedule along with their limits given in column (3) thereof are hereby declared to be national waterways for the purposes of shipping and navigation.
    [Show full text]
  • Download 193.44 KB
    ASIAN DEVELOPMENT BANK TAR:IND 36012 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO INDIA FOR PREPARING THE INLAND WATERWAY SECTOR DEVELOPMENT PROGRAM November 2002 CURRENCY EQUIVALENTS (as of 31 October 2002) Currency Unit – Rupee/s (Re/Rs) Re 1.00 = $0.02 $1.00 = Rs48.325 ABBREVIATIONS ADB – Asian Development Bank CIWTC – Central Inland Water Transport Corporation DEA – Department of Economic Affairs IWAI – Inland waterways Authority of India LAD – least available depth MOS – Ministry of Shipping ton-km – ton-kilometers NOTES (i) The fiscal year (FY) of the Government and its agencies ends on 31 March. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2000 ends on 31 March 2000. (ii) In this report, "$" refers to US dollars . I. INTRODUCTION 1. India has an extensive network of rivers, lakes and canals, which if developed for shipping and navigation, can provide an efficient network of inland transportation. An optimal mix of road, rail and inland waterway transport will provide an efficient transport infrastructure that is flexible and cost-effective. The Government of India (the Government) wants to revive and promote the use of inland waterway transport and requested ADB technical assistance (TA). The Fact-finding Mission visited India from 22-30 April 2001 and reached an understanding with the Government on the goals, purpose, scope, implementation arrangements, cost, financing arrangements, and terms of reference. The TA is included in the 2002 TA program for India.1 II. ISSUES 2. Preliminary estimates prepared by the Government indicate that the capital cost of inland waterways in India is between 5-10 percent of the cost of constructing an equivalent 4- lane road or rail link.
    [Show full text]
  • Dr. Manoj Singh, Adviser (Transport) PLANNING COMMISSION, GOVERNMENT of INDIA NEW DELHI
    INFRASTRUCTURE DEVELOPMENT IN THE NORTH-EAST INTERNATIONAL CONFERENCE ON CROSS-BORDER CONNECTIVITY NEW DELHI, MAY 12, 2014 Dr. Manoj Singh, Adviser (Transport) PLANNING COMMISSION, GOVERNMENT OF INDIA NEW DELHI EXISTING RAIL NETWORK IN THE NORTH EAST State Broad Gauge Meter Gauge Total (Km) Arunachal Pradesh - 1.26 1.26 Assam 1,443.03 990.96 2,433.99 Tripura - 151.40 151.40 Nagaland 11.13 1.72 12.85 Manipur - 1.35 1.35 Mizoram - 1.50 1.50 Meghalaya - - - Sikkim - - - Total 1,454.16 1,148.19 2,602.35 MASTER PLAN FOR THE DEVELOPMENT OF RAIL INFRASTRUCTURE IN THE NORTHEAST REGION RAILWAYS : ON-GOING PROJECTS IN NORTH EAST (2013-14) New Gauge Doubling Total Line Conversion Projects in progress (Nos.) 14 4 2 20 Of which, National Projects 8 2 - 10 (Nos.) Throw forward (Rs. Crore) 25,806 21,689 2,071 2,044 as on 1.4.2013 ($4.3 b) Of which, National Projects 17,940 16,354 1,586 - (Rs. Crore) ($3 b) Length of ongoing works (Km) 965 1,510 44.92 2,520 5 INVESTMENT IN N.E REGION OVER LAST 10 YEARS 10 INN.E REGION OVER LAST INVESTMENT (NEW LINES, GAUGE LINES, GAUGE CONVERSION & (NEW DOUBLING) Rs in Crore 1000 1500 2000 2500 3000 3500 4000 500 0 2004-05 295 2005-06 542 2006-07 845 2007-08 979 2008-09 1403 2009-10 1765 2010-11 1913 in progress) (Including works Total Total 2011-12 2130 – Rs 15,629 Crs(Last 10yrs) 10yrs) Rs 15,629 Crs(Last 2012-13 2365 2013-14 3392 ACHIEVEMENTS Year New Line Gauge Doubling Conversion 2007-08 20 107 - 2008-09 113 170 - 2009-10 - 110 - 2010-11 58 110 31 2011-12 148 409 - 2012-13 61.50 206.18 - 2013-14 2.0 154 - RECENT PROGRESS OF RAILWAY PROJECTS • North Bank GC Project .
    [Show full text]
  • Inland Waterways
    Development of Logistics Infrastructure: Inland Waterways 22nd November 2019 Inland Waterways Authority of India Ministry of Shipping, Govt. of India1 IWAI - Overview 111 NWs with total navigable length of ~20,000 km Establishment of Inland Waterways Authority of India 1986* Ganga, Bhagirathi, Brahmaputra Hooghly river system NW-2 Declaration of 5 National 1986 NW-1 to Waterways (NWs) YEAR 2014 NW-1 to NW-5 NW-5 Mahanadi, Brahmani & East coast canal 2014 NW-4 Declaration of 106 new National Godavari, Krishna rivers and onwards Waterways under the National Kakinada-Puducherry Canal Waterways Act, 2016 West Coast Canal, NW-3 * Pre-1986: Sector was under IWT Directorate Udyogmandal & (Ministry of Surface Transport) Champakara Canals *Map not to scale 2 Traffic on NWs TrafficReadiness on NWs of IWAI 14 operational NWs; ~72 million tonne traffic (FY18-19) Cargo traffic on National Waterways (million tonnes) Share of commodities transported on National waterways (in %) 72.31 Sundarbans, 3.23 Flyash 55.01 Steel Gujarat waterways, 5% 4% Gujarat waterways, 28.82 Limestone Others coal & coke 11.52 5% 14% 30% Maharashtra Maharashtra waterways, 25.96 Construction waterways, 28.34 Iron ore material 38% 4% Goa waterways, NW-4, 0.45 11.09 NW-3, 0.4 Goa waterways, 3.76 NW-3, 0.41 NW-2, 0.56 NW-2, 0.50 NW-1, 5.48 NW-1, 6.79 FY 2017 - 18 FY2018 - 19 . Predominantly bulk commodities such as Iron ore, Coal, *NW-4 not operational during FY 2017-18 Limestone, Fly ash currently use IWT mode 3 National Waterway-1: Jal Marg Vikas Project Jal Marg Vikas Project
    [Show full text]
  • Inland Water Transport in NER By
    Presentation on Inland Water Transport in NER By Inland Waterways Authority of India (Ministry of Shipping, Road Transport & Highways) Guwahati, the 9th March 2007 SADIYA Subansiri Hydel project SAIKHOWA Digboi refinery JAMGURI DIBRUGARH BOGIBIL TEJPUR Bongaigon refinery NEAMATI Numaligarh refinery JOGIGHOPA SILGHAT Legend Guwahati refinery DHUBRI Declared waterway (SHISHUMARA) PANDU BANGLADESH River distance B.Border (Dhubri) – Guwahati 260 km BANGLADESH Guwahati - Dibrugarh 508 km Dibrugarh– Sadiya 123 km Total length 891 km 1 North Bank South Bank Subanasiri Noa dihang Burali Burhi dihang Bargang Disang SADIYA Dhansiri Dikhu Puthimari Jhanju SAIKHOWA Pagladiya Dhansiri DIBRUGARH Beki Kopili Manas Kulsi BOGIBIL Aie Krishnai JAMGURI Champamati Jinary Gadadhar TEJPUR SILGHAT R. RA PUT HMA JOGIGHOPA BRA GUWAHATI DHUBRI PANDU H B A N G L A D SHISHUMARA E S Barak Valley Bhanga Badarpur Silchar 2 Objective Freight transportation by IWT to rise from the present level of 0.03 btkm to 5 btkm by 2025 Importance of IWT for NER z IWT offers shorter route compared to Road/rail z IWT operational even during flood season z Best suited for bulk commodities & Project cargo/ODC- z Provides best and low cost connectivity to hinterland z Employment potential enormous (NCAER Study Feb 2006) every km of IWT operation generates about 3000 jobs 1 lakh investment in IWT results in 6.5 manyears while in rail 0.58 and in other modes 0.87 manyears 3 Importance of IWT for NER Therefore, z Development of IWT mode in NER a strategic & economic imperative z Need for an investment & development strategy z Also need for increasing the efficiency of IWT mode.
    [Show full text]
  • Inland Water Transport 2013-14
    STATISTICS OF INLAND WATER TRANSPORT 2013-14 Government of India Ministry of Road Transport & Highways Transport Research Wing New Delhi STATISTICS OF INLAND WATER TRANSPORT 2013-14 Government of India Ministry of Road Transport & Highways Transport Research Wing New Delhi Officers & Staff involved in this Publication **************************************************************** Shri M.M. Hasija Adviser (Statistics) Smt. Anupam Bhatnagar Director (Port & Shipping) Shri Mukesh Deputy Director (Shipping) Shri S.Tyagi Senior Statistical Officer Smt. Rashmi Gupta Junior Investigator Shri Rahul Sharma Junior Statistical Officer C O N T E N T S Tables SUBJECT Page No. INLAND WATERWAYS TRANSPORT - AN OVERVIEW i-xvii SECTION - 1 : NAVIGABLE WATERWAYS & INFRASTRUCTURE 1.1 Navigable Waterways in India 1 to 5 1.2 Infrastructure Facilities Available on National Waterways 6 to 9 1.3 Infrastructure Facilities Available on State Waterways 10 to 11 SECTION - 2 : CARGO MOVED ON VARIOUS WATERWAYS 2.1 Cargo Movement on National Waterways 12 2.2 Details of Cargo Moved on National Waterways 13 to 27 SECTION - 3 : COMMODITY-WISE ROUTE-WISE CARGO CARRIED, FREIGHT EARNED, INCOME AND EXPENDITURE OF CIWTC 3.1 Traffic and Freight Earnings of Central Inland Water Transport Corporation (CIWTC) 28 3.2 Cargo Carried and Freight Earned by CIWTC - Commodity-wise 29 3.3 Commodity-wise, Route-wise Cargo Carried, Freight Earned and Tonne Kms. 30 to 31 Performed by CIWTC 3.4 Income and Expenditure of CIWTC 32 3.5 Source-wise Earnings of CIWTC 33 3.6 Financial Position
    [Show full text]
  • Assam Inland Water Transport P
    COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE Report No.: PIDISDSC18704 30-Jun-2016 Public Disclosure Authorized Date Prepared/Updated: I. BASIC INFORMATION A. Basic Project Data Public Disclosure Copy Country: India Project ID: P157929 Parent Project ID (if any): Project Name: Assam Inland Water Transport Project (P157929) Region: SOUTH ASIA Estimated 28-Aug-2017 Estimated 08-Nov-2017 Public Disclosure Authorized Appraisal Date: Board Date: Practice Area Transport & ICT Lending Investment Project Financing (Lead): Instrument: Borrower(s): India Implementing Transport Dept., Govt. of Assam, Dispur, Guwahati (Assam), India Agency: Financing (in USD Million) Financing Source Amount Borrower 30.00 International Bank for Reconstruction and Development 120.00 Public Disclosure Authorized Total Project Cost 150.00 Environmental A - Full Assessment Category: Public Disclosure Copy Concept Track II - The review did authorize the preparation to continue Review Decision: Is this a No Repeater project? Other Decision (as needed): Public Disclosure Authorized B. Introduction and Context Country Context The Indian economy is likely to sustain a growth rate exceeding 7 percent annually over the next Page 1 of 10 2-3 years if investment levels are maintained. Investment in improved infrastructure is one of GoI➢❨ s building blocks for economic growth. Transport infrastructure is a key component but for inland transport this has traditionally meant roads and railways. GoI➢❨ s increasing commitment to
    [Show full text]
  • Annual Report on Traffic on National Waterways: FY 2019-20
    Annual Report on Traffic on National Waterways: FY 2019-20 Inland Waterways Authority of India Ministry of Shipping Annual Report on Traffic on National Waterways: FY 2019-20 Contents 1. Introduction .................................................................................................................................... 4 2. Traffic on National Waterways ....................................................................................................... 5 3 National Waterway-1 ...................................................................................................................... 8 4 National Waterway-2 .................................................................................................................... 25 5 National Waterway-3 .................................................................................................................... 31 6 National Waterway-4 .................................................................................................................... 37 7 Maharashtra Waterways ................................................................................................................ 39 8 Goa Waterways ............................................................................................................................ 45 9 Gujarat Waterways ....................................................................................................................... 48 10 Newly Operational National Waterways ......................................................................................
    [Show full text]
  • National Inland Waterways in India a Strategic Status Report
    National Inland Waterways in India A Strategic Status Report Shripad Dharmadhikary JindaSandbhor Published by Manthan Adhyayan Kendra and SRUTI 30 March 2017 National Inland Waterways in India A Strategic Status Report Shripad Dharmadhikary JindaSandbhor Published by Manthan Adhyayan Kendra and SRUTI 30 March 2017 National Inland Waterways in India: A Strategic Status Report Authors: Shripad Dharmadhikary, JindaSandbhor Research and Map Support: AhemadShaikh, Manthan Adhyayan Kendra Published by: SRUTI, New Delhi and Manthan Adhyayan Kendra, Pune & Badwani Date: 30 March 2017 Author Contacts: [email protected], [email protected] Publisher Contacts: SRUTI, Q-1, HauzKhas Enclave, New Delhi - 110016, India Ph. +91 -11 26964946, +91-11 26569023 www.sruti.org.in SRUTI Mail: [email protected] Manthan Adhyayan Kendra www.manthan-india.org Acknowledgements: We gratefully acknowledge all the following for their support and contribution in various ways to this report, and the analysis and field work that went into it. AnandPrakashTiwari, Anil Prakash, ArunShivkar, Bharat Jhunjhunwala, Dhananjay, EktaShekhar, GovardhanPatil, JagritiRahi, Krishna Yashwanth, Nagesh Thakur, Nandikesh, NandiniOza, Pooja Kumar, PrafullaSamantray, PranabChoudhary, PriyabrataSatpathy, Prof. P.K. Mishra, Prof. S.N. Upadhayay, Prof. U.K. Choudhary, RajanZhemse, Rajeshwar Mishra, Ravi Shekhar, RinaParija, SandeepPattnaik, SudarshanChhotoray, Shankar Pani,SurekhaDalvi, UlkaMahajan. In earlier times, we shaped our boats to fit our rivers. Now, we are shaping our rivers to fit the size of our vessels. Inland waterways possibly represent the biggest intervention in our rivers, second only to large dams. FOREWORD Weare very happy to share the Strategic Status Report on National Inland Waterways in India which is now becoming a new dimension of current development paradigm in India.
    [Show full text]
  • India's Emerging Quest to Develop Inland Waterways Inland Waterways
    http://www.maritimeindia.org/ India’s Emerging Quest to Develop Inland Waterways Author: Vasudha Chawla* Date: 16 November 2016 India is the seventh-largest economy in the world as measured by nominal GDP and third- largest economy as measured by purchasing power parity (PPP). The industrial sector registered a growth of 5.9 per cent in 2014-15, and India aims to grow further in this sector. Revitalizing Project ‘Sagarmala’ in 2014 is a major step towards India’s infrastructural growth. It constitutes a series of sub-projects aimed to boost India's port infrastructure development along the coastline. The vision of Sagarmala is port-led development and reduced logistics cost for both domestic and international cargo with improved infrastructure.1 The mammoth project has 150 initiatives with a total outlay of US$ 5.9 billion, spread across four broad areas/pillars2 – port modernization, port connectivity, port-led industrialization, and coastal community development. The project will help India save US$ 600 million annually by 2025.3 Developing inland waterways is one of the 150 initiatives under this project. The development of these waterways is crucial for the Indian economy. It brings enormous benefits to the country’s economy and can prove advantageous for the people. This issue brief aims to highlight the significance of inland waterways in the overall infrastructure development plans. Inland Waterways Inland Waterways Transport (IWT) is an economical, fuel-efficient and environment- friendly mode of transport. In the past, the IWT was extensively used by the Mughals and later by the East India Company, but post-independence the development of waterways was neglected.
    [Show full text]