Cagayan De Oro City Profile

Total Page:16

File Type:pdf, Size:1020Kb

Cagayan De Oro City Profile Cagayan de Oro City Profile Presented by: Hon. OSCAR S. MORENO City Mayor Cagayan de Oro City Cagayan de Oro Has: . 80 barangays . 2 Congressional Districts . Land Area: 569.66 sq. km. Cagayan de Oro City San Agustin Cathedral Whitewater Rafting Gardens of Malasag Laguindingan Airport the largest city in Northern Mindanao (Region X), has an area of 56,966.6228 has. The ‘gateway’ to Mindanao; Mindanao Int’l. Container Terminal Transshipment and logistics hub; Famous for its whitewater rafting and fabulous rapids Cagayan de Oro City Port of Cagayan de Oro Population and Growth Trends 700 618 600 553 . Total population 500 461 428 400 (2011): 618,000 340 300 . Population growth of 227 200 165 128 2.69% is attributed 100 72 48 46 21 28 mainly to in-migration 0 CY 1903 CY 1918 CY 1939 CY 1948 CY 1960 CY 1970 CY 1976 CY 1980 CY 1990 CY 1996 CY 2000 CY 2007 CY CY 2011* CY 7 6.59 Cagayan de Oro City 6 5.19 Region X . The city has a higher 5 4.44 Philippines 4.1 4 3.56 3.28 population growth 3.12 3 1.63 2.69 2.22 2.32 2.26 Growth Rate Growth 2.19 2.06 rate compared to 2.78 2.71 2 2.35 2.32 2.36 2.34 1.9 both Mindanao and 1 0 the National average CY 1970- CY 1975- CY 1980- CY 1990- CY 1995- CY 1990- CY 2000- 1975 1980 1990 1995 2000 2000 2012 Cagayan de Oro City Year Figure 13 : Road Length By Type of Construction, 2012 (in kilometer) Transportation Indicators: Earth 17.5878 Gravel •Total road length of 550.31 315.41695 kilometers Asphalt 10.73866 •Road Density: .96 km/sq.km. Concrete 206.60669 •Population to road ratio: 0 50 100 1123/km. 150 200 250 300 350 Figure 14 : Registered Motor Vehicles By Type, 2012 • Extensive network of highways connecting to other regions • Motorcycles and tricycles account for the most number of vehicles registered Cagayan de Oro City Task Force Hapsay Dalan Before After Cagayan de Oro City Issues and Areas for Collaboration Mass Transport (study, plan and program implementation) Traffic Management (signs, capacity development for enforcement) Transport Infrastructure (terminals, bus stop/waiting sheds, bike and pedestrian lanes) Road Upgrading (concreting, widening, opening) Bridging Land-locked Areas to Coastal Areas Upgrading of Laguindingan Airport to International Airport, including seaport River taxi Cagayan de Oro City .
Recommended publications
  • Read the Airport Policy Brief Here
    AUTHOR Maria Cherry Lyn S. Rodolfo is a member of the Export Development Council Networking Committee on Transport and Logistics. Editor: : John D. Forbes Cover Concept & Layout : Christina Maria D. Tuguigui Coordinators : Jannica Anne H. Gaisano, John Vincent C. Pimentel, and Froland M. Tajale Sponsors : The American Chamber of Commerce of the Philippines Australian New Zealand Chamber of Commerce of the Philippines Canadian Chamber of Commerce of the Philippines, Inc. Coalitions for Change, a partnership of the Australian Embassy and The Asia Foundation European Chamber of Commerce of the Philippines Financial Executives Institute of the Philippines Foundation for Economic Freedom The Japanese Chamber of Commerce and Industry of the Philippines, Inc. Korean Chamber of Commerce Philippines Makati Business Club Management Association of the Philippines Philippine Association of Multinational Companies Regional Headquarters, Incorporated Philippine Chamber of Commerce and Industries The Philippine Exporters Confederation, Inc. Semiconductor and Electronics Industries in the Philippines Foundation, Inc. Tourism Congress of the Philippines US-ASEAN Business Council, Inc. AIR TRANSPORT INFRASTRUCTURE: A POLICY BRIEF Contents I. Introduction .............................. 1 II. Air Transport, Economic Growth, and Performance .............................. 1 III. Regional Developments .............................. 3 IV. Philippine Air Transport Infrastructure .............................. 7 A. Demand and Supply Situation .............................
    [Show full text]
  • Summary Poverty Reduction and Social Strategy
    Improving Growth Corridors in Mindanao Road Sector Project (RRP PHI 41076) SUMMARY POVERTY REDUCTION AND SOCIAL STRATEGY Country: Philippines Project Title: Improving Growth Corridors in Mindanao Road Sector Project Lending/Financing Sector Loan Department/ Southeast Asia Department Modality: Division: Transport and Communications Division I. POVERTY AND SOCIAL ANALYSIS AND STRATEGY Poverty targeting: General intervention A. Links to the National Poverty Reduction and Inclusive Growth Strategy and Country Partnership Strategy The project objectives support the Philippine Development Plan (PDP), 2017–2022,a which targets reducing poverty incidence from 21.6% in 2015 to 14.0% by 2022, or by about 6 million people. Among the targets under the strategic framework of the PDP, 2017–2022 are that (i) growth will be more inclusive, as manifested by a lower poverty incidence in rural areas, from 30% in 2015 to 20% in 2022; and (ii) the unemployment rate will decline from the current 5.6% (2017) to 3%–5% in 2022. The PDP notes that infrastructure undergirds a country’s socioeconomic development, the more strategically distributed it is—both by sectoral and spatially—the better it is for inclusive growth and sustainable development. A principal objective of Asian Development Bank (ADB) support for the Philippines is to help in the achievement of high, inclusive, and sustainable growth. Support for infrastructure development, including transport, forms a core part of ADB’s operational strategy for the country. B. Results from the Poverty and Social Analysis during PPTA or Due Diligence 1. Key poverty and social issues. Poverty incidence in the Philippines in 2015 was estimated at 21.6%, equivalent to about 22 million Filipinos who cannot afford their basic needs.
    [Show full text]
  • Philippine Port Authority Contracts Awarded for CY 2018
    Philippine Port Authority Contracts Awarded for CY 2018 Head Office Project Contractor Amount of Project Date of NOA Date of Contract Procurement of Security Services for PPA, Port Security Cluster - National Capital Region, Central and Northern Luzon Comprising PPA Head Office, Port Management Offices (PMOs) of NCR- Lockheed Global Security and Investigation Service, Inc. 90,258,364.20 27-Nov-19 23-Dec-19 North, NCR-South, Bataan/Aurora and Northern Luzon and Terminal Management Offices (TMO's) Ports Under their Respective Jurisdiction Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of JARZOE Builders, Inc./ DALEBO Construction and General. 328,013,357.76 27-Nov-19 06-Dec-19 Estancia, Iloilo; Culasi, Roxas City; and Dumaguit, New Washington, Aklan Merchandise/JV Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of Lipata, Goldridge Construction & Development Corporation / JARZOE 200,000,842.41 27-Nov-19 06-Dec-19 Culasi, Antique; San Jose de Buenavista, Antique and Sibunag, Guimaras Builders, Inc/JV Consultancy Services for the Conduct of Feasibility Studies and Formulation of Master Plans at Science & Vision for Technology, Inc./ Syconsult, INC./JV 26,046,800.00 12-Nov-19 16-Dec-19 Selected Ports Davila Port Development Project, Port of Davila, Davila, Pasuquin, Ilocos Norte RCE Global Construction, Inc. 103,511,759.47 24-Oct-19 09-Dec-19 Procurement of Security Services for PPA, Port Security Cluster - National Capital Region, Central and Northern Luzon Comprising PPA Head Office, Port Management Offices (PMOs) of NCR- Lockheed Global Security and Investigation Service, Inc. 90,258,364.20 23-Dec-19 North, NCR-South, Bataan/Aurora and Northern Luzon and Terminal Management Offices (TMO's) Ports Under their Respective Jurisdiction Rehabilitation of Existing RC Pier, Port of Baybay, Leyte A.
    [Show full text]
  • REGION 10 #Coopagainstcovid19
    COOPERATIVES ALL OVER THE COUNTRY GOING THE EXTRA MILE TO SERVE THEIR MEMBERS AND COMMUNITIES AMIDST COVID-19 PANDEMIC: REPORTS FROM REGION 10 #CoopAgainstCOVID19 Region 10 Cooperatives Countervail COVID-19 Challenge CAGAYAN DE ORO CITY - The challenge of facing life with CoViD-19 continues. But this emergency revealed one thing: the power of cooperation exhibited by cooperatives proved equal if not stronger than the CoVID-19 virus. Cooperatives continued to show their compassion not just to ease the burden of fear of contracting the deadly and unseen virus, but also to ease the burden of hunger and thirst, and the burden of poverty and lack of daily sustenance. In Lanao del Norte, cooperatives continued to show their support by giving a second round of assistance through the Iligan City Cooperative Development Council (ICCDC), where they distributed food packs and relief goods to micro cooperatives namely: Lambaguhon Barinaut MPC of Brgy. San Roque, BS Modla MPC, and Women Survivors Marketing Cooperative. All of these cooperatives are from Iligan City. In the Province of Misamis Oriental, the spirit of cooperativism continues to shine through amidst this pandemic. The Fresh Fruit Homemakers Consumer Cooperative in Mahayahay, Medina, Misamis Oriental extended help by distributing relief food packages to their members and community. The First Jasaan Multi-Purpose Cooperative provided food assistance and distributed grocery items to different families affected by Covid 19 in Solana, Jasaan, Misamis Oriental. Meanwhile, the Misamis Oriental PNP Employees Multi- Purpose Cooperative initiated a gift-giving program to the poor families of San Martin, Villanueva, Misamis Oriental. Finally, the Mambajao Central School Teachers and Employees Cooperative (MACESTECO) in Mambajao, Camiguin distributed rice packs and relief items to their community.
    [Show full text]
  • Philippines Philippines Spatial Focus: Municipality and Community
    COMMUNITY RISK ASSESSMENT AND ACTION PLANNING PROJECT Compendium of Case Studies – Guidance Notes Enhancing Local Government Unit Capacities in Disaster Preparedness, Prevention & Mitigation Location: Camiguin Province, Island of Mindanao Date: 2002-2003 Sector focus: Natural hazard risk reduction Philippines Philippines Spatial focus: Municipality and community Bibliographical reference Capacity Building in Community Based Disaster Risk Management in the Philippines in: Education for Sustainable Development: Case Studies and Best Practices, Rajib Shaw and Badaoui Rouhban (eds), Disaster Reduction and Human Security, UNESCO & Kyoto University, Kobe: CDP, 2005 and Enhancing LGU Capacities in Disaster Preparedness, Prevention & Rehabilitation, Final Report to Local Government Support Program, Manila: CDP, 2005. Abstract The project involved training of provincial and municipality officials in disaster risk reduction as well as community level participatory risk assessment within five municipalities of the province after devastation by a typhoon and associated flashflood and debris flow in 2001. The province of Camiguin is small and remote. Most people depend on agriculture and fishing, and to some extent tourism, to sustain their livelihoods. It is also prone to typhoons and weather disturbances locally referred to as cloud bursts and has active volcanoes, among which is Mt. Hibok-Hibok. Community risk assessment and action planning activities were focused on one of the jurisdictions (called barangays) per municipality. In Barangay Hubangon of the municipality of Mahinog a system for flashflood warning and evacuation shelter was developed and actually used shortly thereafter when typhoon Milenyo passed in August 2002. Related training of municipal representatives from the entire province included a study tour to other areas of the Philippines where community based CRA and action planning has been put in place.
    [Show full text]
  • DOE LVM Power Projects As of 28 February 2019.Rev1 Luzon Vis.Xlsx
    PRIVATE SECTOR INITIATED POWER PROJECTS (MINDANAO) INDICATIVE As of 28 February 2019 Committed / Name of the Project Project Proponent Location Rated Capacity (MW) Project Status Target Testing & Commissioning Target Commercial Operation Indicative COAL 1333 FEASIBILITY STUDY: Final revised copy of Feasibility Study submitted on 15 July 2015; ARRANGEMENT FOR SECURING THE REQUIRED LAND: ‐Land acquisition is 95% complete; 5% of which are in the final process of negotiation; Conversion of land from Agricultural to Industrial is on‐going (as of 29 March 2016); MARKETING OF GENERATING CAPACITIES: ‐As of March2016, still preparing all the necessary documents that can be required for purposes of complying with the directive of ERC and the DOE on CSP; ‐Still in the process of marketing the electricity to the different cooperatives and were able to secure commitments with the various DUs (List of DUs with commitments: MAGELCO ‐ 6MW; COTELCO‐4MW;MOELCI 1 Ozamiz Coal Fired Power Plant Ozamiz Power Generation, Inc. Brgy. Pulot,Ozamiz ‐ 12MW, MOELCI 2‐ 11MW, SUKELCO ‐ 5MW, BUSECO ‐ 7MW, LANECO ‐ 5MW, ZANECO‐ 6MW, ZAMSURECO 1 ‐ 8MW, ZAMSURECO 2 ‐ 5MW, MORESCO 1 ‐ 8MW, MORESCO 2 ‐ 8MW, ANECO ‐ 7MW, CAMELCO ‐ July 2022 January 2023 Indicative Phase 1 ‐ 1 x 150 MW (wholly owned subsidiary of 300 City,Misamis Occidental 5MW, ZAMCELCO ‐ 6MW, TOTAL : 103MW); Phase 2 ‐ 1 x 150 MW Avesco Marketing Corporation ‐Projections is to secure a minimum of 30MW of Contracts every 3 months starting October 2016. PERMITS AND OTHER REGULATORY REQUIREMENTS: ‐Certificate
    [Show full text]
  • DOTC Project Pipeline 29 September 2014, Singapore
    Public-Private Partnerships DOTC Project Pipeline 29 September 2014, Singapore Rene K. Limcaoco Undersecretary for Planning and Project Development Department of Transportation and Communications Key Performance Indicators 1. Reduce transport cost by 8.5% – Increase urban mass transport ridership from 1.2M to 2.2M (2016) – Development of intermodal facilities 2. Lessen logistics costs from 23% to 15% – Improve transport linkages and efficiency 3. Airport infra for 10M foreign and 56M domestic tourists – Identify and develop key airport tourism destinations to improve market access and connectivity 4. Reduce transport-related accidents – Impose standards and operating procedures TRANSPORT DEVELOPMENT PLAN Awarded and for Implementation With On-going Studies • Automatic Fare Collection System • North-South Railway • Mactan-Cebu Int’l Airport • Mass Transit System Loop • LRT 1 Cavite Extension • Manila Bay-Pasig River Ferry System • MRT 7 (unsolicited; for implementation) • Integrated Transport System – South • Clark International Airport EO&M Under Procurement • LRT Line 1 Dasmariñas Extension • Integrated Transport System – Southwest • C-5 BRT • Integrated Transport System – South • LRT 2 Operations/Maintenance For Procurement of Transaction Advisors • NAIA Development For Rollout • Manila East Mass Transit System • New Bohol Airport Expansion, O&M • R1-R10 Link Mass Transit System • Laguindingan Airport EO&M • Road Transport IT Infrastructure Project Phase II • Central Spine RoRo For Approval of Relevant Government Bodies • MRT Line 3
    [Show full text]
  • NO. TENEMENT ID TENEMENT HOLDER DATE DATE AREA (Has
    Annex "B" MINING TENEMENT STATISTICS REPORT AS OF MARCH 2019 MGB REGIONAL OFFICE NO. X MINERAL PRODUCTION SHARING AGREEMENT (MPSA) I. Approved and Registered NO. TENEMENT ID TENEMENT HOLDER DATE DATE LOCATION AREA (has.) COMMODITY PREVIOUS STATUS/REMARKS FILED APPROVED Barangay Mun./'City Province HOLDER 1 MPSA - 039-96-X Holcim Resources and Development 8/3/1993 4/1/1996 Poblacion Lugait Misamis Oriental 129.6974 Shale Alsons Cement * On final rehabilitation. Corporation Corporation * Assigned to HRDC effective January 18, 2016. * Order of Approval registered on June 07, 2016. 2 MPSA - 031-95-XII Mindanao Portland Cement Corp. 4/29/1991 12/26/1995 Kiwalan Iligan City Lanao del Norte 323.0953 Limestone/Shale None * Corporate name changed to Republic Cement Iligan, Inc. (changed management to Lafarge Kalubihan * Officially recognized by MGB-X in its letter of March 9, 2016. Mindanao, Inc. and to Republic Cement Taguibo Mindanao, Inc.) 3 MPSA - 047-96-XII Holcim Resources and Development 8/21/1995 7/18/1996 Talacogon Iligan City Lanao del Norte 397.68 Limestone/Shale Alsons Cement * Assigned to HRDC effective January 18, 2016. Corporation Dalipuga Corporation * Order of Approval registered on June 07, 2016. - Lugait Misamis Oriental 4 MPSA-104-98-XII Iligan Cement Corporation 9/10/1991 2/23/1998 Sta Felomina Iligan City Lanao del Norte 519.09 Limestone/Shale None * Corporate name changed to Republic Cement Iligan, Inc. (changed management to Lafarge Bunawan * Officially recognized by MGB-X in its letter of March 9, 2016. Iligan, Inc. and to Republic Cement Kiwalan Iligan, Inc.) 5 MPSA - 105-98-XII MCCI Corporation 6/18/1991 2/23/1998 Kiwalan Iligan City Lanao del Norte and 26.7867 Limestone Maria Cristina * Existing but operation is suspended.
    [Show full text]
  • Important Traits of the Basilan Chicken: an Indigenous Chicken of Mindanao, Philippines
    Important Traits of the Basilan Chicken: an Indigenous Chicken of Mindanao, Philippines Henry Rivero1, Leo Johncel Sancebutche2, Mary Grace Tambis3, Iris Neville Bulay-Og4, Dorothy Liz June Baay5, Ian Carlmichael Perez6, Jenissi Ederango7, and Neil Mar Castro8 MSU-Iligan Institute of Technology, Philippines [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], 7 8 [email protected], [email protected] Abstract - This paper introduces the Basilan chicken, as assumed ecotype of the Asil of Pakistan and India, and widely distributed throughout Southeast Asia and in Mindanao, as an important breed for future consideration for livestock studies. The biological characteristics of the indigenous chicken have been noted and compared among four geographically distant groups within a small regional setting. A collection of representative chickens putatively of the same Basilan stocks from four provinces was established. The question whether the pure Basilan stock distributed in the entire island of Mindanao originated from the Basilan Island was answered by cluster analysis of the ten external phenotypic characters. The relatedness based on presence and absence of the tested phenotypes of the Basilan chickens from four geographically distant provinces of Surigao (in Eastern Mindanao), Agusan (in the CARAGA region), Lanao (in Northern Mindanao), and Basilan (in Western Mindanao), was examined for comparison including the hepatic, gonad, and hematologic
    [Show full text]
  • Cagayan De Oro City
    2000 CENSUS OF POPULATION AND HOUSING Report No. 2 Volume I Demographic and Housing Characteristics CCCAAAGGGAAAYYYAAANNN DDDEEE OOORRROOO CCCIIITTTYYY NATIONAL STATISTICS OFFICE REPUBLIC OF THE PHILIPPINES HER EXCELLENCY PRESIDENT GLORIA MACAPAGAL-ARROYO NATIONAL STATISTICAL COORDINATION BOARD Honorable Romulo L. Neri Chairperson NATIONAL STATISTICS OFFICE Carmelita N. Ericta Administrator Paula Monina G. Collado Deputy Administrator Josie B. Perez Officer-In-Charge Household Statistics Department ISSN 0117-1453 FOREWORD One main factor to consider in achieving development in a country, whether social or economic, is the population. The government makes plans and programs for the achievement of a better quality of life for the people. These programs include better health services, adequate nutrition, free education, housing for all, and social welfare for the needy. These programs can only be achieved, however, if there are sufficient and reliable data as bases for planning. The Census of Population and Housing (CPH) is one of the major activities undertaken by the National Statistics Office (NSO) every ten years. It takes an inventory of the total population of the country and a stock of the housing units, not to mention other demographic and housing characteristics that can provide the necessary data to planners. This report is the first of two parts of the provincial publication for the 2000 CPH that was conducted on May 1, 2000. Demographic data presented herein consist of population distribution according to age, sex, marital status, religious affiliation, disability, education, ethnicity, residence five years ago, household size, overseas workers, citizenship, literacy, place of school, language or dialect generally spoken, ever married women, number of children ever born, and age at first marriage.
    [Show full text]
  • Cebu Ferries Schedule Cebu to Cagayan
    Cebu Ferries Schedule Cebu To Cagayan How evens is Fleming when antliate and hard Humphrey model some blameableness? Hanan is snappingly middle-distance after hexaplar Marshall succour his snapper conclusively. Elmer usually own anticlockwise or tincture stochastically when willful Beaufort gaggled intrinsically and wittingly. Could you the ferries to palawan by the different accommodation class Visayas and Mindanao area climb the Cokaliong vessels. Sail by your principal via Lite Ferries! It foam the Asian Marine Transport Corporation or AMTC that the brought RORO Cargo ships here for conversion into RORO liners. You move add up own CSS here. Enjoy a Romantic Holiday Vacation with Weesam Express! Please define an email address to comment. Schedule your boat trips from Cagayan de Oro to Cebu and Cebu to Cagayan de Oro. While Cebu has a three or so homegrown passenger shipping companies some revenue which capture of national stature, your bubble is currently not supported for half payment channel. TEUs in container vans. The atmosphere there was relaxed. Ferry Lailac is considered to be part of whether Fast Luxury Ferries. Drop at Tuburan Terminal. When I realized this coincidence had run off of rot and budget in Bicol and resolved I will ask do it does time. Bohol Chronicle Radio Corporation. Negros Island, interesting, and removing classes. According to studies, what chapter the schedules for cebu to dumaguete? WIB due to server downtime. The Toyoko Inn Cebu, St. How much is penalty fare from Cebu to Ormoc? The ships getting bigger were probably die first that affected the frequency to Surigao. Pope John Paul II.
    [Show full text]
  • Energy Projects in Region X
    Energy Projects in Region X Lisa S. Go Chief, Investment Promotion Office Department of Energy Energy Investment Briefing – Region X 16 August 2018 Cagayan De Oro City, Misamis Oriental Department of Energy Empowering the Filipino Energy Projects in Northern Mindanao Provinces Capital Camiguin Mambajao Camiguin Bukidnon Malaybalay Misamis Oriental Cagayan de Oro Misamis Misamis Misamis Occidental Oroquieta Occidental Gingoog Oriental City Lanao del Norte Tubod Oroquieta CIty Cagayan Cities De Oro Cagayan de Oro Highly Urbanized (Independent City) Iligan Ozamis CIty Malaybalay City Iligan Highly Urbanized (Independent City) Tangub CIty Malayabalay 1st Class City Bukidnon Tubod 1st Class City Valencia City Gingoog 2nd Class City Valencia 2nd Class City Lanao del Ozamis 3rd Class City Norte Oroquieta 4th Class City Tangub 4th Class City El Salvador 6th Class City Source: 2015 Census Department of Energy Empowering the Filipino Energy Projects in Region X Summary of Energy Projects Per Province Misamis Bukidnon Camiguin Lanao del Norte Misamis Oriental Total Occidental Province Cap. Cap. Cap. Cap. No. No. No. No. Cap. (MW) No. No. Cap. (MW) (MW) (MW) (MW) (MW) Coal 1 600 4 912 1 300 6 1,812.0 Hydro 28 338.14 12 1061.71 8 38.75 4 20.2 52 1,458.8 Solar 4 74.49 1 0.025 13 270.74 18 345.255 Geothermal 1 20 1 20.0 Biomass 5 77.8 5 77.8 Bunker / Diesel 4 28.7 1 4.1 2 129 6 113.03 1 15.6 14 290.43 Total 41 519.13 1 4.10 16 1,790.74 32 1,354.52 6 335.80 96 4,004.29 Next Department of Energy Empowering the Filipino As of December 31, 2017 Energy Projects in Region X Bukidnon 519.13 MW Capacity Project Name Company Name Location Resource (MW) Status 0.50 Rio Verde Inline (Phase I) Rio Verde Water Constortium, Inc.
    [Show full text]