Zimbabwean Government Gazette

Total Page:16

File Type:pdf, Size:1020Kb

Zimbabwean Government Gazette i ZIMBABWEAN GOVERNMENT GAZETTE Published by Authority Vol. LXXI, No. 50 13th AUGUST, 1993 Price 2,50 General Notice 468 of 1993. (b) depart Beitbridge Monday, Wednesday and Friday S a.m., arrive Bulawayo 12.03 p.m. ROAD MOTOR TRANSPORTATION ACT [CHAPTER 262] 0/111/93. Motor-onmibus. Permit; 29321. Passenger-capacity: Applications in Connexion with Road Service Permits 75. Route: Bulawayo - Gweru - Mvuma - Chivhu - Range Office - IN terms of subsection (4) of section 7 of the ROad Motor Masasa - Zvimondi - Wedza - Nhekairo - St. Aime's - Nyazura - Transportation Act [Chapter 262], notice is hereby given that the Rusape. applications detailed in the Schedule, for the issue or amendment of By: road service permits, have been received for the consideration of the Controller of Road Motor Transportation. (a) Alteration to times. Any person wishing to object to any such application must lodge (b) Deletion of Nyazura and substitution of Matsika. with die Controller of Road Motor Transportation, P.O. Box 8332, (c) Decrease in route kilometres. Causeway— / The service operates as follows— (a) a notice, in writing, of his intention to object, so as to reach the Controller’s office not later than the 3rd September, (a) depart Bulawayo Tuesday, Thursday and Sunday 8 a.m., 1993; arrive Rusape 2.48 p.m.; (b) his objection and the grounds therefor, on form R.M.T. 24, (b) departRusapeMonday,WednesdayandFriday8a.m.,arrive together with two copies thereof, so as to reach the Controller's Bulawayo 2.27 p.m. office hot later than the 24th September, 1993. The service to operate as follows— Any person objecting to an application for the issue or amendment (a) depart Bulawayo Tuesday, Thursday and Sunday 8 a.m., of a road service permit must confine his grounds of objection to arrive Rusape 2.42 p.m.; matters directly bearing on the considerations referred to in para­ graph (a), (b), (c), (d), (e) or (f) of section 8 of the said Act. (b) departRusapeMonday,WednesdayandFriday6a.m.,atrive Bulawayo 1.05 p.m. V. M. MUPAWOSE (MRS.), 13-8-93. Controller of Road Motor Transportation. F. Pullen and Son (Pvt.) Ltd. Schedule 0/20/93. Permit: 19046. Motor-omnibus. Passenger-capacity: 64. MOTOR-OMNIBUSES Route: Bulawayo - Michel - To-night - Dundula - Insuza - Masayi Amendments - B embesi - Bubi - Lupane - Menyes wa - Tsholotsho - Tshongokwe P. Hall & Co. (Pvt.) Ltd. - Chiwale - Mswazi - Lusulu. 0/154/92. Permit; 25466. Motor-omnibus. Passenger-capacity; By: Increase in passenger-capacity to 75. 76. The service qjerates as follows— Route; Bulawayo - Esigodini - Mbalabala - Gwanda - Gwaranyemba (a) depart Bulawayo Tuesday and Thursday 10.3Q a.m., arrive - Paye -.Mathew Store - Mangisi - Sukwe - Dendele - Zezani - Lusulu 4.08 p.m.; Siyoka - Makado Halt - Mazunga - Tongwe School - Lutumba (b) departBulawayoFridayandSunday5.30p.m.,arriveLusulu - Beitbridge. 11.08 p.m.; By: (c) depart Lusulu Monday, Wednesday, Friday and Sunday (a) Alteration to times. ^ 6 a.m., arrive Bulawayo 11.30 a.m. ^ (b) Deletion of route stages: Esigodini - Paye - Mathew Store - The service to operate as follows— Dendele - Makado Halt - Mazunga and Lutumba. No change. The service operates as follows— (a) depart Bulawayo Tuesday, Thursday and Sunday 8 a.m., Kukura Kurerwa Bus Service (Pvt.) Ltd. arrive Beitbridge 2.45 p.m.; 0/305/93. Permit: 14753. Motor-omnibus. (b) depart Beitbridge Mcmday, Wednesday and, Friday 6 a.m., By: Transfer of the permit from K & S Bus Service (Pvt.) Ltd. .arrive Bulawayo 2.03 p.m. Route 1: Harare - Chabwino - Chitenga - Mumurwi - Fort Valley - The service to operate as follows— Avillion - Bindura - Mupfurudzi - ML Darwin - Chiutsa - Dotito (a) depart Bulawayo Tuesday, Thursday and Sunday 8 a.m., - Chividze - Mavhuradonha - Dande Store - Gomo Kraal - arrive Beittnidge 2.45 p.m.; Nyakatondo - Mukumbura. 696 Zimbabwean Government Gazette, 13th Aud^T, 1993 Route 2: Harare - Mazowe - Glendale - Bindura - Mupfiirudzi - (b) depart Harare Tuesday, Thursday and Saturday 5.30 p.m., Madziwa - Mt. Darwin - Chiutsa - Chividze - Gomo - Nyakatondo arrive Marondera 7 p.m.; - Mukumbura. (c) depart Marondera Wednesday, Friday and Sunday 6 a.m., The service to operate as follows— atiive Harare 7.30 a.m.;- Route 1: (d) depart Harare Wednesday, Friday and Sunday 8.10 a.m., , arrive Mutare 12.50 p.m. (a) depart Harare Tuesday and Thursday 10a.m., arrive Mukumbura 3.24 p.m.; Note.—This application is made to reinstate permit 12376 which (b) depart Harare Saturday 9.30 a.m., arrive Mukumbura expired on the 30th September, 1989. 2.54 p.m.; 0/213/93. Motor-omnibus. Passenger-capacity: 76. (c) depart Mukumbura Wednesday, Friday and Sunday , 7.24 a.m., arrive Harare 12.58 p.m. Route; Harare - Norton - Chegutu - Kadoma - Kwekwe - Gweiu - Shangani - Insiza - Bulawayo. Route 2; The service to operate as follows— (a) depart Harare Friday 5 p.m., arrive Mukumbura Saturday 0.47 a.m.; (a) depart Harare Monday'and Thursday 7.30 a.m., arrive (b) depart Harare Sunday 4.30 p.m., arrive Mukumbura Bulawayo 3 p.m.; 11.37 p.m.; (b) depart Harare Saturday 7 a.m., arrive Bulawayo 2.30 p.m.; (c) depart Mukumbura Monday 7 a.m., arrive Harare (c) depart Bulawayo Tuesday and Sunday 7 a.m., arrive Harare 1.57 p.m.; « 2.30 p.m.; (d) depart Mukumbura Saturday 6 a.m., arrive Harare (d) depart Bulawayo Friday 10 a.m., arrive Harare 5.30 p.m. 12.57 p.m. Nofe.—This application is made to reinstate permit 25243 which Additional! expired on die 30th September, 1988. Tauya Coach Service (Pvt.) Ltd. Munzwandaamo Transport (Pvt.) Ltd. 0/57/93. Motor-omnibus. Passenger-capadty: 75. 0/288/93. Motor-oirmibus. Passenger-c^acity: 75. Route: Harare - Mazowe Hotel - Dandamera - Mwenje River - Route: Torwood/Kwekwe - Gweru - Ch^a - Chatsworth - Gutu - Msonedi - Mvurwi -s Donje Farm - Chipiri Estate - Centenary - Zvavahera - Chinyika - Chitsa - Chinanga School - Runeshanga. Botambudzi - Chiripiro - St. Albert's Mission - Mavuradonha - Muzarabani - Kapembere School - Chadeieka. The service to operate as follows— The service to operate as follows— (a) depart Torwood Tuesday and Thursday 7 a.m., arrive Runeshanga 12.10 p.m.; (a) depart Harare Monday to Sunday 7 a.m., arrive Chadereka 1.20 p.m.; (b) depart Torwood Friday 3.30 p.m., Runeshanga 8.10 p.m.; (b) depart Chadereka Monday to Sunday 2 p.m., arrive Harare (c) depart Torwood Saturday and Sunday 1 p.m., arrive 8.20 p.m. Runeshanga 6.10 p.m.; (d) depart Runeshanga Monday and Wednesday 5 a.m., arrive 0/121/93. Motor-omnibus. Passenger-capacity: 75. Torwood 9.05 a.m.; Route: Harare - Nyabira - Kuwadzana Township (Banket) - Chinhoyi (e) depart Runeshanga Friday to Sunday 6 a.m., arrive Torwood - Murereka Township (Lions Den) - Karoi - Temple Combe - 10.05 a.m. Miami Hospital - Kadunga Township - Machingautsi - Dete. The service to operate as follows— 0/289/93. Motor-omnibus. Passenger-capacity: 75. (a) depart Harare Tuesday and Thursday 10.30 a.m., arrive Dete Route: Bulawayo - Gweru - Mvuma - Chatsworth - Gutu Township , 4.10 p.m.; - Basera - Makura - Chingai. (b) depart Harare Saturday 11 a.m., arrive Dete 4.45 p.m.; The service to operate as follows— (a) depart Bulawayo Monday and Wednesday 7 a.m., arrive (c) depart Harare Sunday 2 p.m., arrive Dete 7 p.m.; Chingai 1.55 p.m.; (d) depart Dete Monday, Wednesday and Friday 7 a.m., arrive Harare 2 p.m.; (b) depart Bulawayo 5 a.m., arrive Chingai 11.55 a.m.; (c) depart Gweru Saturday 10.30 a.m., arrive Chingai 2.55 p.m.; (e) depart Dete Sunday 6.15 a.m., arrive Harare 12 noon. (d) depart Chingai Tuesday and Thursday 5 a.m., arrive Bulawayo Mbizi Motorways. 12.20 p.m.; 0/187/93. Motor-omnibus. Passenger-capacity: 76. (e) depart Chingai Saturday 5 a.m., arrive Gweru 9.50 a.m.; Route: Harare - Bora - Mureh wa - Mutoko - Suswe - Kotwa - Makaha (f) depart Chingai Sunday 8 a.m., arrive Bulawayo 4.20 p.m. TUm-off - Makaha. 0/290/93. Motor-omnibus. Passenger-capacity; 75. The service to operate as follows— Route: Bulawayo - Gweru - Mvuma - Chatsworth - Gutu Township (a) depart Harare Monday to Sunday 7.45 a.m., arrive Makaha - Zvavahera - Chinyika - Makudo. 12.25 p.m.; The service to operate as follows— (b) depart Makaha Monday to Sunday 1.45 p.m., arrive Harare (a) depart Bulawayo Monday 6 a.m., arrive Gutu Township 6.20 p.m. 11.30 a.m.; Zimbabwe United Passenger Company Ltd. (b) depart Bulawayo Tuesday and Thursday 6 a.m., arrive Makudo 12.15 p.m.; 0/162/93. Motor-omnibus. Passenger-capacity: 76 seated and (c) depart Bulawayo Saturday 8 a.m., arrive Makudo 22 standing. 2.15 p.m.; Route 1: Mutare - Riverside - Nyazura - Rusape - Headlands - (d) depart Gutu Township Monday 12 noon, arrive Bulawayo Macheke - Marondera - Bromley - M elfort - Ruwa - Harare. 5.30 p.m.; Route 2: W ithin a 26-kilometre radius of the post office, Mutare. (e) depart Makudo Wednesday and Friday 8 a.m., arrive Condition: As defined in the agreement between the holder and the Bulawayo 3.15 p.m.; Mutare Municipality, approved by the M inister, in terms of (f) depart Makudo Sunday 6 a.m., arrive Bulawayo 12.15 p.m. section 18 of the Road Motor Transportation Act [Chapter 262\. The service to operate as follows— 0/291/93. Motor-omnibus. Passenger-capacity: 75. (a) depart Mutare Tuesday, Thursday and Saturday 7.30 a.m., Route; Bulawayo - Gweru - Mvuma - Chatsworth - Gutu Township arrive Harare 12.10 p.m.; - Basera - Makura - Chingai. &MBABWEAN Government Gazette, 13th August, 1993 $97 The service to operate as follows— P. Shoniwa. (a) depart Bulawayo Tuesday, Thursday and Sunday 7 a.m., 0/312/93.
Recommended publications
  • Governmentgazette
    ste, ZIMBABWEAN GOVERNMENT GAZETTE Published by Authority Vol. LXXI, No. 52 20th AUGUST,1993 Price 2,50 General Notice 499 of 1993. By: ROAD MOTOR TRANSPORTATION ACT [CHAPTER262} (a) Deletion of stages Mvuma - Chatsworth and substitution of Matizha. Applications in Connexion with Road Service Permits (b) Alteration of route kilometres. IN terms of subsection (4) of section 7 of the Road Motor The service operates as follows— @tansportation Act [Chapter 262], notice is hereby given that the (a) depart HarareTuesday, Thursday andSaturday 8 a.m., arrive f upplicationsdetailed in the Schedule,forthe issue or amendment of Magombedzi 1.30 p.m.; . toad service permits, have been received for the consideration ofthe ‘Controller of Road Motor Transportation. (b) depart Harare Sunday 1.30p.m., arrive Magombedzi 7.30 p.m.; Anyperson wishingto object to any such application mustlodge with the Controller of Road Motor Transportation, P.O. Box 8332, (c) depart Magombedzi Monday, Wednesday, Friday and Sun- Causeway— day 6 a.m., arrive Harare 1. p.m. — (a) anotice, in writing, ofhis intention to object, so as to reach The service to operate as follows— the Controller’s office not later than the 10th September, 1993; (a) depart Harare Tuesday, Thursday and Saturday 8 a.m., arrive Magombedzi 12 noon; (b) his objection and the groundstherefor, on form R.M.T.24, together withtwocopies thereof, so as toreach the Controller's (bd)-pen Harare Sunday 12.30 p.m., arrive Magombedzi office not later than the Ist October, 1993. 30 p.m.; Any person objecting to an application forthe issue oramendment (c) depart Magombed2i Monday, Wednesday, Friday and Sun.
    [Show full text]
  • Promotion of Climate-Resilient Lifestyles Among Rural Families in Gutu
    Promotion of climate-resilient lifestyles among rural families in Gutu (Masvingo Province), Mutasa (Manicaland Province) and Shamva (Mashonaland Central Province) Districts | Zimbabwe Sahara and Sahel Observatory 26 November 2019 Promotion of climate-resilient lifestyles among rural families in Gutu Project/Programme title: (Masvingo Province), Mutasa (Manicaland Province) and Shamva (Mashonaland Central Province) Districts Country(ies): Zimbabwe National Designated Climate Change Management Department, Ministry of Authority(ies) (NDA): Environment, Water and Climate Development Aid from People to People in Zimbabwe (DAPP Executing Entities: Zimbabwe) Accredited Entity(ies) (AE): Sahara and Sahel Observatory Date of first submission/ 7/19/2019 V.1 version number: Date of current submission/ 11/26/2019 V.2 version number A. Project / Programme Information (max. 1 page) ☒ Project ☒ Public sector A.2. Public or A.1. Project or programme A.3 RFP Not applicable private sector ☐ Programme ☐ Private sector Mitigation: Reduced emissions from: ☐ Energy access and power generation: 0% ☐ Low emission transport: 0% ☐ Buildings, cities and industries and appliances: 0% A.4. Indicate the result ☒ Forestry and land use: 25% areas for the project/programme Adaptation: Increased resilience of: ☒ Most vulnerable people and communities: 25% ☒ Health and well-being, and food and water security: 25% ☐ Infrastructure and built environment: 0% ☒ Ecosystem and ecosystem services: 25% A.5.1. Estimated mitigation impact 399,223 tCO2eq (tCO2eq over project lifespan) A.5.2. Estimated adaptation impact 12,000 direct beneficiaries (number of direct beneficiaries) A.5. Impact potential A.5.3. Estimated adaptation impact 40,000 indirect beneficiaries (number of indirect beneficiaries) A.5.4. Estimated adaptation impact 0.28% of the country’s total population (% of total population) A.6.
    [Show full text]
  • Rise of an Earthkeeping Movement CHAPTER 1
    PART 1 Rise of an earthkeeping movement CHAPTER 1 Waiting for the rain January 1992. Fleeces of white cloud in shimmering pale blue skies - that is all we have. Halfway into the so-called rainy season there is noth­ ing else. Here in Masvingo those white rainless clouds, barren omens of death, shroud from a distance the mud puddle of Lake Kyle, all that remains of the jewel of our province. Have even the symbols switched in the lament of a dying land? Does the whiteness of cloud now evoke thoughts of death, not purity, and the blackness of rain cloud signify life? Or do black and white, the colours of African spirit mediums, still symbolise ancestral protection - a protection apparently lost as grass and leaves shrivel in the heat? For ten years we in Masvingo Province have been waiting for a really good season to break the chronic drought. Hot just scattered showers, as we have had, to fill a few farm dams and nurture only some of the maize crops in outlying districts. Ho! Torrential rains as we have last seen in the mid-seventies; rains that swell the rivers countrywide, fill the lakes, blot out the sun for two weeks on end, until the damp pro­ duces a green sheen on the shoes under your bed. Rains as we saw reg­ ularly as youngsters, when it was impossible to travel the red quagmire of the mountain road leading to Morgenster mission. When, coming from Fort Victoria, we had to walk for miles across the granite rocks of Mount Mugabe - vehicles left far behind at Wayside Farm - to reach home.
    [Show full text]
  • Gonarezhou National Park (GNP) and the Indigenous Communities of South East Zimbabwe, 1934-2008
    Living on the fringes of a protected area: Gonarezhou National Park (GNP) and the indigenous communities of South East Zimbabwe, 1934-2008 by Baxter Tavuyanago A thesis submitted in partial fulfilment of the requirements for the degree Doctor of Philosophy (History) in the Department of Historical and Heritage Studies at the UNIVERSITY OF PRETORIA FACULTY OF HUMANITIES SUPERVISOR: PROFESSOR A. S. MLAMBO July 2016 i © University of Pretoria Abstract This study examines the responses of communities of south-eastern Zimbabwe to their eviction from the Gonarezhou National Park (GNP) and their forced settlement in the peripheral areas of the park. The thesis establishes that prior to their eviction, the people had created a utilitarian relationship with their fauna and flora which allowed responsible reaping of the forest’s products. It reveals that the introduction of a people-out conservation mantra forced the affected communities to become poachers, to emigrate from south-eastern Zimbabwe in large numbers to South Africa for greener pastures and, to fervently join militant politics of the 1960s and 1970s. These forms of protests put them at loggerheads with the colonial government. The study reveals that the independence government’s position on the inviolability of the country’s parks put the people and state on yet another level of confrontation as the communities had anticipated the restitution of their ancestral lands. The new government’s attempt to buy their favours by engaging them in a joint wildlife management project called CAMPFIRE only slightly relieved the pain. The land reform programme of the early 2000s, again, enabled them to recover a small part of their old Gonarezhou homeland.
    [Show full text]
  • Lloyd Moyo FINAL PROJECT.Docx for Library.Pdf
    BINDURA UNIVERSITY OF SCIENCE EDUCATION. DEPARTMENT OF ENVIRONMENTAL SCIENCE. AN ASSESSMENT OF LOCAL VELD FIRE MANAGEMENT IN DRIEFONTAIN GRASSLANDS, CENTRAL ZIMBABWE. MOYO LLOYD K (B1232730) A RESEARCH PROJECT SUBMITTTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS OF THE BACHELOR OF ENVIRONMENTAL SCIENCE DEGREE IN (NATURAL RESOURCES MANAGEMENT) DECEMBER 2015 DEDICATION. To my loving mom Elizabeth Magumise, my uncle Evangelist R. Mukozho-Magumise and my caring brother Louis. i ACKNOWLEDGEMENTS I give thanks to the Lord God Almighty of Paul Mwazha of Africa who has kept me in good health, peace and love through my work related learning. I also wish to extend a word of gratitude and great appreciation to my family for the financial support that enabled me to do this research. Special thanks go to my uncle Evangelist R.M Magumise and my lovely mother E. Magumise. Secondly, I want to thank my supervisors Proffesor G. Nyamadzawo and Mr T.Nyamugure for supervising this project. This research would have been still-born had it not been for the help I received from Chikomba District Environmental Officer Mr J. Maungwa, EMA -Masvingo Provincial Office staff and the respondents who provided information to my study. This work would not have been complete without the input of the above-mentioned individuals. I salute all my lecturers and friends. ABSTRACT. Veld fires are known for destroying habitats of many species. Habitats for birds are not spared from veld fires. This case study evaluated the effects of veld fires on the habitat destruction at the Driefontein Grassland in central of Zimbabwe a RAMSAR wetland site and the only habitat for crane birds in the country.
    [Show full text]
  • Zimbabwean \ Government Gazette
    c,-"' 'ik."4 V' A ZIMBABWEAN \ GOVERNMENT GAZETTE Published by Authority Vol. LXXI, 1^0. 60 24th SEPTEMBER, 1993 Fhice 2,50 General Notice 569 of 1993. Commencing At its junction with Majoni Road (33/171) and stands 85 and 81. ROADS ACT [CHAPTER 263] Passing through Application for Declaration of Branch Roads: Habane Township Stand Nos. 85,84, 83, 82,431 and 81. Terminating IT is hereby notified, in terms of subsection (3) of section 6 of the At its junction with Robert Mkandla Road (33/177) and stands Roads Act [Chapter 263], that application has been made for the 110 and 432. roads described hereunder, and shown on Provincial Plan RC 33/29/D to be branch roads. Reference Plan RC 23/29/D may be inspected, free of charge, at the offices 33/174 Ngubo Road. of the Secretary for Transport, Kaguvi Building, Fourth Street, Commencing Harare. At its junction with Majoni Moyo Road (33/171) and stands 92 Description of road and 117. Reference Passing through 33/170 Mtonzima Gwebu Road. Stand Nos. 93,94, 95, 115, 116, 118,119, 120, 121, 122 and 123. Commencing TermitMting 1 At its junction with Stella Coulson Road (33/104). On Stand No. 124. Passing through Reference Stand Nos. 2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18, 19, 20,483,484, 22,23, 24,25, 26, 27,28,29, 30,31,32, 33, 33/175 Mtshede Road. 34, 35 and 36. Commencing Terminating At its junction with Majoni Moyo Road (33/171) and stands 125 and 109.
    [Show full text]
  • Gove]Inment Gazette
    GOVE] INMENT GAZETTE Published by Authority Vol. XCI, No. 15 28th FEBRUARY,2014 Price US$2,00 General Notice 29 of 2014. General Notice 3! of 2014. LEGAL PRACTITIONERS (COUNCIL FOR LEGAL LAND SURVEYACT (CHAPTER 20:72] EDUCATION) RULES, 1992 Decision on the Application for Cancellation of Portions of Notice of Examination Dates General Plan No. DT 2928 of Stands 6362-6549 and 6596-6649 - Hatcliffe Township: Salisbury District NOTICEis hereby giventhat, in terms of Rule 10(2) of the Legal Practitioners (Council for Legal Education) Rules, 1992, published FURTHERto the application notice of which appeared as in Statutory Instrument 447 of 1992, professional examinations for advertisement 476935f in the Government Gazette dated 22nd those with law degrees or diplomas but whodonot qualify to register November, 2013, the Minister of Lands and Rural Resettlement, as legalpractitioners in Zimbabwewill be held duringthe following in terms of section 47(3) of the Land Survey Act (Chapter 20:12], periods — hereby gives notice that he has consented to the cancellation of Winter Session, 16th June, 2014 to 27th June, 2014 portions of General Plan No. DT 2928 represented by Stands 6362 SummerSession, 17th November, 2014 to 28th November, 2014. and 6363 Hatcliffe Township and defined by the beacons: —6363A, Any person (“the candidate”) who qualifies and wishes to sit 6363B, 6363C, 6363D, 6363E and 6363A, situate in the district of for these professional examinations must send written notification Salisbury of his or her intention to do so to the Secretary of the Council for E. GUVAZA, Legal Education, Seventh Floor, East Wing, Century House East, 38, 28-2-2014.
    [Show full text]
  • An Agrarian History of the Mwenezi District, Zimbabwe, 1980-2004
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by UWC Theses and Dissertations AN AGRARIAN HISTORY OF THE MWENEZI DISTRICT, ZIMBABWE, 1980-2004 KUDAKWASHE MANGANGA A THESIS SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF M.PHIL IN LAND AND AGRARIAN STUDIES IN THE DEPARTMENT OF GOVERNMENT, UNIVERSITY OF THE WESTERN CAPE November 2007 DR. ALLISON GOEBEL (QUEEN’S UNIVERSITY, CANADA) DR. FRANK MATOSE (PLAAS, UWC) ii ABSTRACT An Agrarian History of the Mwenezi District, Zimbabwe, 1980-2004 Kudakwashe Manganga M. PHIL Thesis, Programme for Land and Agrarian Studies, Department of Government, University of the Western Cape. The thesis examines continuity and change in the agrarian history of the Mwenezi district, southern Zimbabwe since 1980. It analyses agrarian reforms, agrarian practices and development initiatives in the district and situates them in the localised livelihood strategies of different people within Dinhe Communal Area and Mangondi Resettlement Area in lieu of the Fast Track Land Reform Programme (FTLRP) since 2000. The thesis also examines the livelihood opportunities and challenges presented by the FTLRP to the inhabitants of Mwenezi. Land reform can be an opportunity that can help communities in drought prone districts like Mwenezi to attain food security and reduce dependence on food handouts from donor agencies and the government. The land reform presented the new farmers with multiple land use patterns and livelihood opportunities. In addition, the thesis locates the current programme in the context of previous post-colonial agrarian reforms in Mwenezi. It also emphasizes the importance of diversifying rural livelihood portfolios and argues for the establishment of smallholder irrigation schemes in Mwenezi using water from the Manyuchi dam, the fourth largest dam in Zimbabwe.
    [Show full text]
  • Zimbabwean Government Gazette
    ZIMBABWEAN GOVERNMENT GAZETTE Publishedby Authority Vol. LXVI,No. 11 : 26th FEBRUARY, 1988 . Price 40¢, General Notice 115of 1988. a ‘{c) depart Sagambe- Saturday 5 am., atrive Mutare - ROAD MOTOR TRANSPORTATION ACT [CHAPTER262] . 9,20. 2.02.5 . 7 (d) depart. Sagambe Sunday 10 am., arrive Harare Applications in Connexion 715 pm So o with Road ServicePermits (e) depart Harare Monday,Wednesday: and Friday 6 a.m., . arrive Sagambe 3.15 p.m.; Po . IN terms of ‘subsection (4) of section 7 of the Road Motor | (f) depart Mutare Thursday and Saturday 10.50 a.m., arrive Transportation Act [Chapter 262], notice is-hereby. giventhat .Sagambe 3.15 p.m. Ss . the applications. detailed in the ‘Schédule, for the issue or The _. amendment of road service .permits, have been received for the service to operate as follows— | ~ “eonsideration of the Controller ‘of. Road.Motor ‘Transportation. (a). depart Sagambe Tuesday andThursday 4 am, atrive — Harare 12,30 p.m.; Any personwishing to object to:any ‘such: application must lodge with the Controller of {b) depart Sagambe Saturday 5 am., arrive Mutare Road Motor’ Transportation, 8.45 a.m; P.O. Box 8332, Causeway-— oe . ‘(c) depart Sagambe Sunday 7.a.m., arrive Harare 3.30 p.m; {a) a notice, in writing, of hie intention to object, soas to (d) depart Harare Monday andWednesday 6 a.m., arrive ~ yeach the Controller’s office not later than the 18th Sagambe3.15 ip.m.; . March, :.1988; @ depart Harare Friday 4 p.m., arrive Sagambe ‘Saturday (b) his’ objection and the grounds therefor, on form R.M.T.
    [Show full text]
  • Rhodesiana 19
    PUBLICATION No. 19 DECEMBER, 1968 The Standard Bank Limited, Que Que 1968 THE PIONEER HEAD KINGSTONS LIMITED have pleasure in announcing a new venture, the re-issue of rare and elusive books of outstanding Rhodesian interest, under the imprint of the PIONEER HEAD, and through the medium of photolithography. It is also intended to publish original works of merit, of Rhodesian origin, when these are available. The first volume, in what will be known as the HERITAGE SERIES, will be the much sought-after classic, AFRICAN NATURE NOTES AND REMINISCENCES, by Frederick Courteney Selous. MR. FRANK E. READ, F.R.P.S., F.I.I.P., F.R.S.A., will be Book Architect for the whole series, and the Publishers believe that this will ensure a standard of book production never before achieved in this country. Since both the Ordinary and Collector's Editions will be strictly limited, the Publishers recommend that you place your order now. Copies can be ordered from the PIONEER HEAD, P.O. Box 591, Salisbury, or from your local Bookseller. THE REPRINT: AFRICAN NATURE NOTES AND REMINISCENCES A complete facsimile reproduction of the text of the First Edition of 1908, with the original illustrations by Edmund Caldwell, but with an additional colour frontispiece, never previously reproduced, being a portrait of Selous by Dickin­ son. New endpapers, reproducing, in facsimile, a letter from Selous to J. G. Millais, Author and Illustrator of "A Breath from the Veldt", and Selous' Biographer. THE EDITIONS: ORDINARY EDITION: Bound in full Buckram, identical to the original binding, lettered gilt on spine and with blind-blocking, top edge trimmed and stained.
    [Show full text]
  • Zimbabwe HIV Care and Treatment Project Baseline Assessment Report
    20 16 Zimbabwe HIV Care and Treatment Project Baseline Assessment Report '' CARG members in Chipinge meet for drug refill in the community. Photo Credits// FHI 360 Zimbabwe'' This study is made possible through the support of the American People through the United States Agency for International Development (USAID.) The contents are the sole responsibility of the Zimbabwe HIV care and Treatment (ZHCT) Project and do not necessarily reflect the views of USAID or the U.S. Government. FOREWORD The Government of Zimbabwe (GoZ) through the Ministry of Health and Child Care (MoHCC) is committed to strengthening the linkages between public health facilities and communities for HIV prevention, care and treatment services provision in Zimbabwe. The Ministry acknowledges the complementary efforts of non-governmental organisations in consolidating and scaling up community based initiatives towards achieving the UNAIDS ‘90-90-90’ targets aimed at ending AIDS by 2030. The contribution by Family Health International (FHI360) through the Zimbabwe HIV Care and Treatment (ZHCT) project aimed at increasing the availability and quality of care and treatment services for persons living with HIV (PLHIV), primarily through community based interventions is therefore, lauded and acknowledged by the Ministry. As part of the multi-sectoral response led by the Government of Zimbabwe (GOZ), we believe the input of the ZHCT project will strengthen community-based service delivery, an integral part of the response to HIV. The Ministry of Health and Child Care however, has noted the paucity of data on the cascade of HIV treatment and care services provided at community level and the ZHCT baseline and mapping assessment provides valuable baseline information which will be used to measure progress in this regard.
    [Show full text]
  • Evaluation of FAO Cooperation in Zimbabwe (2006-2010)
    EVALUATION OF FAO COOPERATION IN ZIMBABWE (2006-2010) Report Commissioned by the Office of Evaluation, Food and Agriculture Organization (FAO) Viale delle Terme di Caracalla 00153 Rome, Italy Independent Evaluation Team James K. Gasana Lori Bell Julius Kajume Shinga Mupindu Marjorie Smith-John May 2011 Map of Zimbabwe Source: http://www.goldbamboo.com/topic-t8659-a1-6Zimbabwe_.html ii EXECUTIVE SUMMARY Evaluation of FAO Cooperation in Zimbabwe (2006-2010) 1. This report presents findings and recommendations of the Evaluation of FAO-Zimbabwe Cooperation (2006-2010) which was commissioned by the Office of Evaluation, FAO and was carried out from 1st to 25 February 2011. The period under evaluation saw difficult relations between Zimbabwe and Donors. FAO played a key role of “Coordination/Honest broker” between Donors, Government and other emergency aid and development partners. It followed, with great success, the principle of partnership with government, while taking into account the donors’ funding constraints and the accountability requirements. In most of this period, FAO’s cooperation with Zimbabwe, which consisted mainly of an emergency program, was not guided by an overall official framework document. Nevertheless there was continuity of a rolling strategy consisting in adjusting interventions as needs and the context changed. Furthermore, there is a Draft Country Programming Framework (CPF 2009-2013) as well as a Plan of Action (PoA 2010-2015) entitled “Zimbabwe: Transitioning Emergency into Rehabilitation and Development”. Its expected outcomes are improved food security through increased production and sustainable management of natural resources and the environment. To implement its program, FAO works through a large number of Implementing Partners (IPs).
    [Show full text]