115 Bus Time Schedule & Line Map

Total Page:16

File Type:pdf, Size:1020Kb

115 Bus Time Schedule & Line Map 115 bus time schedule & line map 115 Silverstream Station - Gard Street →Upper Hutt View In Website Mode Station - Stop B The 115 bus line (Silverstream Station - Gard Street →Upper Hutt Station - Stop B) has 3 routes. For regular weekdays, their operation hours are: (1) Silverstream Station - Gard Street →Upper Hutt Station - Stop B: 6:25 AM - 6:45 AM (2) Upper Hutt Station - Stop B →Pinehaven Road (Near 67) (Temporary Stop): 5:45 PM - 6:05 PM (3) Upper Hutt Station - Stop B →Upper Hutt Station - Stop B: 7:10 AM - 5:00 PM Use the Moovit App to ƒnd the closest 115 bus station near you and ƒnd out when is the next 115 bus arriving. Direction: Silverstream Station - Gard 115 bus Time Schedule Street →Upper Hutt Station - Stop B Silverstream Station - Gard Street →Upper Hutt 42 stops Station - Stop B Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday Not Operational Silverstream Station - Gard Street 27 Whitemans Road, Upper Hutt Tuesday Not Operational Blue Mountains Road - Fendalton Crescent Wednesday 6:25 AM - 6:45 AM 69 Blue Mountains Road, New Zealand Thursday 6:25 AM - 6:45 AM Blue Mountains Road at Chichester Drive Friday 6:25 AM - 6:45 AM 84 Blue Mountains Road, New Zealand Saturday Not Operational Forest Road at Elmslie Road 20 Forest Road, New Zealand Pinehaven Road at Forest Road 93 Pinehaven Road, New Zealand 115 bus Info Direction: Silverstream Station - Gard Street →Upper Jocelyn Crescent at Pinehaven Road Hutt Station - Stop B 58 Jocelyn Crescent, New Zealand Stops: 42 Trip Duration: 37 min Jocelyn Crescent at Wyndham Road Line Summary: Silverstream Station - Gard Street, 40 Jocelyn Crescent, New Zealand Blue Mountains Road - Fendalton Crescent, Blue Mountains Road at Chichester Drive, Forest Road at Pinehaven Road (Near 67) (Temporary Stop) Elmslie Road, Pinehaven Road at Forest Road, 60 Pinehaven Road, New Zealand Jocelyn Crescent at Pinehaven Road, Jocelyn Crescent at Wyndham Road, Pinehaven Road (Near Blue Mountains Road at Pinehaven Road 67) (Temporary Stop), Blue Mountains Road at (Temporary Stop) Pinehaven Road (Temporary Stop), Blue Mountains 48 Blue Mountains Road, New Zealand Road at Whitemans Road (Temporary Stop), Silverstream School - Whitemans Road (Opposite) Blue Mountains Road at Whitemans Road (School Stop), Field Street (Near 7), Field Street at (Temporary Stop) Kurth Crescent, Field Street (Near 97), Sunbrae Drive 4 Blue Mountains Road, Upper Hutt at Ecclesƒeld Grove, Sunbrae Drive (Near 61), Field Street at Kurth Crescent (Near 52), Field Street (Near Silverstream School - Whitemans Road (Opposite) 8), Silverstream Station - Kiln Street, Pempsey Street (School Stop) at Gloucester Street (Near 3), Pempsey Street at 18 Whitemans Road, Upper Hutt Heretaunga Square (Near 35), Somme Road at Field Street (Near 7) Maadi Place (Near 7), Pinehill Crescent Near 7 Field Street, Upper Hutt Resinosa Street, Gallipoli Road Near Cassino Grove, Messines Avenue Opposite Granville Street, Stafford Field Street at Kurth Crescent Street (Near 5), Trentham Station - Ararino Street, 59 Field Street, Upper Hutt Ararino Street at Ranfurly Street (Near 32), Ararino Street at Miro Street (Near 16), Miro Street (Near 90), Field Street (Near 97) Miro Street at Mchardie Street, Miro Street at Ward 97 Field Street, Upper Hutt Street (Near 2), Wallaceville Animal Research Centre (Opposite), Lane Street (Near 5), Lane Street (Near Sunbrae Drive at Ecclesƒeld Grove 51), Lane Street at Seddon Street (Near 67), Sunbrae Drive, Upper Hutt Blenheim Street Opposite H20 Xtream, Criterion Lane at Wilson Street, Queen Street at Savage Crescent, Sunbrae Drive (Near 61) Queen Street at King Street, Wakeƒeld Street Near 61 Sunbrae Drive, Upper Hutt Mumby Lane, Upper Hutt Station - Stop B Field Street at Kurth Crescent (Near 52) 54 Field Street, Upper Hutt Field Street (Near 8) 8 Field Street, Upper Hutt Silverstream Station - Kiln Street 3 Kiln Street, Upper Hutt Pempsey Street at Gloucester Street (Near 3) 1 Pempsey Street, Upper Hutt Pempsey Street at Heretaunga Square (Near 35) 25 Pempsey Street, Upper Hutt Somme Road at Maadi Place (Near 7) 7 Somme Road, Upper Hutt Pinehill Crescent Near Resinosa Street 26 Pinehill Crescent, Upper Hutt Gallipoli Road Near Cassino Grove 7 Gallipoli Road, New Zealand Messines Avenue Opposite Granville Street 3 Messines Avenue, New Zealand Stafford Street (Near 5) 5A Stafford Street, New Zealand Trentham Station - Ararino Street 58 Ararino Street, New Zealand Ararino Street at Ranfurly Street (Near 32) 32 Ararino Street, New Zealand Ararino Street at Miro Street (Near 16) 16 Ararino Street, New Zealand Miro Street (Near 90) 90 Miro Street, New Zealand Miro Street at Mchardie Street 42 Miro Street, New Zealand Miro Street at Ward Street (Near 2) 2 Miro Street, Upper Hutt Wallaceville Animal Research Centre (Opposite) 73 Ward Street, Upper Hutt Lane Street (Near 5) 7 Lane Street, Upper Hutt Lane Street (Near 51) 47-55 Lane Street, New Zealand Lane Street at Seddon Street (Near 67) 56 Lane Street, Upper Hutt Blenheim Street Opposite H20 Xtream 26 Brown Street, New Zealand Criterion Lane at Wilson Street Wilson Street, New Zealand Queen Street at Savage Crescent 17 Queen Street, New Zealand Queen Street at King Street 41 Queen Street, New Zealand Wakeƒeld Street Near Mumby Lane Wakeƒeld Street, New Zealand Upper Hutt Station - Stop B Station Crescent, New Zealand Direction: Upper Hutt Station - Stop B →Pinehaven 115 bus Time Schedule Road (Near 67) (Temporary Stop) Upper Hutt Station - Stop B →Pinehaven Road (Near 31 stops 67) (Temporary Stop) Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday Not Operational Upper Hutt Station - Stop B Station Crescent, New Zealand Tuesday Not Operational Wakeƒeld Street Wednesday 5:45 PM - 6:05 PM 2 Wakeƒeld Street, New Zealand Thursday 5:45 PM - 6:05 PM Queen Street at Logan Plaza Friday 5:45 PM - 6:05 PM 35 Queen Street, New Zealand Saturday Not Operational Queen Street Opposite Savage Crescent 13 Queen Street, New Zealand Wilson Street at Bradley Lane Wilson Street, New Zealand 115 bus Info Direction: Upper Hutt Station - Stop B →Pinehaven Blenheim Street at Swimming Pool Road (Near 67) (Temporary Stop) 26 Brown Street, New Zealand Stops: 31 Trip Duration: 23 min Lane Street at Seddon Street (Near 58) Line Summary: Upper Hutt Station - Stop B, 60 Lane Street, Upper Hutt Wakeƒeld Street, Queen Street at Logan Plaza, Queen Street Opposite Savage Crescent, Wilson Lane Street at Jepsen Grove Street at Bradley Lane, Blenheim Street at Swimming 28-30 Lane Street, New Zealand Pool, Lane Street at Seddon Street (Near 58), Lane Street at Jepsen Grove, Lane Street (Near 4), Lane Street (Near 4) Wallaceville Animal Research Centre, Miro Street at 2A Lane Street, Upper Hutt Ward Street, Miro Street (Near 41), Miro Street (Near 85), Ararino Street at Miro Street (Near 31), Ararino Wallaceville Animal Research Centre Street at Ranfurly Street (Near 61), Trentham Station 73 Ward Street, Upper Hutt (Bus Stop), Stafford Street (Opposite 5), Messines Avenue at Granville Street, Gallipoli Road (Near 7), Miro Street at Ward Street Pinehill Crescent (Near 26), Somme Road at Maadi 2 Miro Street, Upper Hutt Place, Pempsey Street at Heretaunga Square (Near 32), Pempsey Street at Gloucester Street (Near 2), Miro Street (Near 41) Silverstream Station - Gard Street, Blue Mountains 41 Miro Street, New Zealand Road - Fendalton Crescent, Blue Mountains Road at Chichester Drive, Forest Road at Elmslie Road, Miro Street (Near 85) Pinehaven Road at Forest Road, Jocelyn Crescent at 85 Miro Street, New Zealand Pinehaven Road, Jocelyn Crescent at Wyndham Road, Pinehaven Road (Near 67) (Temporary Stop) Ararino Street at Miro Street (Near 31) 31 Ararino Street, New Zealand Ararino Street at Ranfurly Street (Near 61) 61 Ararino Street, New Zealand Trentham Station (Bus Stop) 81A Ararino Street, New Zealand Stafford Street (Opposite 5) 7 Stafford Street, New Zealand Messines Avenue at Granville Street 3 Messines Avenue, New Zealand Gallipoli Road (Near 7) 7 Gallipoli Road, New Zealand Pinehill Crescent (Near 26) 26 Pinehill Crescent, Upper Hutt Somme Road at Maadi Place 8 Somme Road, Upper Hutt Pempsey Street at Heretaunga Square (Near 32) 23 Pempsey Street, Upper Hutt Pempsey Street at Gloucester Street (Near 2) 3 Pempsey Street, Upper Hutt Silverstream Station - Gard Street 27 Whitemans Road, Upper Hutt Blue Mountains Road - Fendalton Crescent 69 Blue Mountains Road, New Zealand Blue Mountains Road at Chichester Drive 84 Blue Mountains Road, New Zealand Forest Road at Elmslie Road 20 Forest Road, New Zealand Pinehaven Road at Forest Road 93 Pinehaven Road, New Zealand Jocelyn Crescent at Pinehaven Road 58 Jocelyn Crescent, New Zealand Jocelyn Crescent at Wyndham Road 40 Jocelyn Crescent, New Zealand Pinehaven Road (Near 67) (Temporary Stop) 60 Pinehaven Road, New Zealand Direction: Upper Hutt Station - Stop B →Upper 115 bus Time Schedule Hutt Station - Stop B Upper Hutt Station - Stop B →Upper Hutt Station - 65 stops Stop B Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday Not Operational Upper Hutt Station - Stop B Station Crescent, New Zealand Tuesday Not Operational Wakeƒeld Street Wednesday 7:10 AM - 5:00 PM 2 Wakeƒeld Street, New Zealand Thursday 7:10 AM - 5:00 PM Queen Street at Logan Plaza Friday 7:10 AM - 5:00 PM 35 Queen Street, New Zealand Saturday 7:00 AM - 6:00 PM Queen Street Opposite Savage Crescent 13 Queen Street, New Zealand Wilson Street at Bradley Lane Wilson Street, New Zealand 115 bus Info Direction: Upper Hutt Station - Stop B →Upper
Recommended publications
  • Pinehaven Community Emergency Hub Guide
    REVIEWED JANUARY 2017 Pinehaven Community Emergency Hub Guide This Hub is a place for the community to coordinate your efforts to help each other during and after a disaster. Objectives of the Community Emergency Hub are to: › Provide information so that your community knows how to help each other and stay safe. › Understand what is happening. Wellington Region › Solve problems using what your community has available. Emergency Managment Office › Provide a safe gathering place for members of the Logo Specificationscommunity to support one another. Single colour reproduction WELLINGTON REGION Whenever possible, the logo should be reproduced EMERGENCY MANAGEMENT in full colour. When producing the logo in one colour, OFFICE the Wellington Region Emergency Managment may be in either black or white. WELLINGTON REGION Community Emergency Hub Guide a EMERGENCY MANAGEMENT OFFICE Colour reproduction It is preferred that the logo appear in it PMS colours. When this is not possible, the logo should be printed using the specified process colours. WELLINGTON REGION EMERGENCY MANAGEMENT OFFICE PANTONE PMS 294 PMS Process Yellow WELLINGTON REGION EMERGENCY MANAGEMENT OFFICE PROCESS C100%, M58%, Y0%, K21% C0%, M0%, Y100%, K0% Typeface and minimum size restrictions The typeface for the logo cannot be altered in any way. The minimum size for reproduction of the logo is 40mm wide. It is important that the proportions of 40mm the logo remain at all times. Provision of files All required logo files will be provided by WREMO. Available file formats include .eps, .jpeg and .png About this guide This guide provides information to help you set up and run the Community Emergency Hub.
    [Show full text]
  • From Quiet Homes and First Beginnings 1879-1979 Page 1
    From Quiet Homes and First Beginnings 1879-1979 Page 1 From Quiet Homes and First Beginnings 1879-1979 "FROM QUIET HOMES AND FIRST BEGINNING"* 1879-1979 A History of the Presbyterian and Methodist Churches in Upper Hutt who, in 1976, joined together to form the Upper Hutt Co-operating Parish. By M. E. EVANS Published by THE UPPER HUTT CO-OPERATING PARISH Benzie Avenue, Upper Hutt, New Zealand 1979 *Title quotation from "Dedicatory Ode" by Hilaire Belloc. Digitized by Alec Utting 2015 Page 2 From Quiet Homes and First Beginnings 1879-1979 CONTENTS Acknowledgements Introduction ... THE PRESBYTERIAN CHURCH, 1879-1976 St David's In the beginning, 1897-1904 .... Church Extension, Mission Charge and Home Mission Station, 1904-23 Fully Sanctioned Charge. James Holmes and Wi Tako—1924-27 The Fruitful Years—1928-38 .... Division of the Parish—1938-53 Second Division—The Movement North —1952-59 .... "In My End is My Beginning"—1960-76 Iona St Andrew's THE METHODIST CHURCH, 1883-1976 Whitemans Valley—1883-1927 .... Part of Hutt Circuit—1927-55 .... Independent Circuit: The Years of Expansion—1955-68 Wesley Centre and the Rev. J. S. Olds .... Circuit Stewards of the Upper Hutt Methodist Church—1927-76 OTHER FACETS OF PARISH LIFE Women's Groups Youth Work .... THE CO-OPERATING PARISH, 1976-79 To the Present And Towards the Future SOURCE OF INFORMATION AND ACKNOWLEDGEMENTS PHOTOS AROUND THE PARISH IN 1979 OUTREACH TO THE FUTURE BROWN OWL CENTRE Page 3 From Quiet Homes and First Beginnings 1879-1979 ACKNOWLEDGEMENTS It is my pleasure to thank Mrs M. E.
    [Show full text]
  • Battle of the Bus Shelter
    Be in to win GGreatreat TToyotaoyota a Toyota Yaris GGiveawayiveaway P19-27 Upper Hutt Leader Wednesday, November 2, 2016 SERVING YOUR COMMUNITY SINCE 1939 ‘‘I’ve hit a dead end with the Greater Wellington Regional Council Battle of and Paul Swain, our representative here’’ Dean Chandler-Mills the bus shelter COLIN WILLIAMS Dean Chandler-Mills is taking to the tools. A several year battle to have a bus shelter built at the terminus stop of the 110 service in Gemstone Rd, Birchville, has left the 70-year-old frustrated. A 100-signature petItion was delivered to the regional council in 2013 and plenty of letter writing and submission-making since has produced nothing. ‘‘I’ve hit a dead end with the Greater Wellington Regional Council and Paul Swain, our representative here, ’’ he said. Chandler-Mills said residents were looking at building their own shelter in an effort to highlight the issue. ‘‘There are a lot of people really angry about this. Patronage on the service is increasing and this is not going to go away. ‘‘The next step will be to form a group and build our own shelter. That’ll embarrass the regional council.’’ The Gemstone Rd terminus is next to an open paddock, the width of several sections. ‘‘It services more than 110 households but it is in one of the most exposed commuter areas in the Hutt Valley,’’ Chandler-Mills said. The former Public Service Association organiser recently took his issue to Upper Hutt mayor Wayne Guppy. ‘‘Wayne has expressed an interest in getting some movement on this.
    [Show full text]
  • Heretaungasummaryreport.Pdf
    1 Neal Swindells Practical & Principled Independent Educational Consultant Email: [email protected] 1 July 2021 Report to the Ministry of Education on the Community Consultation Regarding Proposed Changes to the Heretaunga College Enrolment Scheme: May - June 2021 Summary Following a meeting with Shelley Govier, Lead Adviser Network, and Jeena Baines, Network Analyst, at the Ministry of Education Wellington Regional Office and meeting with the Principal of Heretaunga College, Fiona Craven, I launched the consultation on the proposed changes to the Enrolment Scheme for Heretaunga College on May 24th, 2021. The consultation took the form of a letter emailed to both the Presiding Chairs and Principals of 16 state and state integrated schools in the Upper Hutt area. These schools included the two state secondary schools; Heretaunga College and Upper Hutt College; the two Intermediate Schools, Maidstone Intermediate and Fergusson Intermediate; and all the state primaries as well as the two Catholic State Integrated primary schools in the area. The letter had links to the proposed changes to the Enrolment Scheme and maps showing the proposed changes. I then offered Heretaunga College, Upper Hutt College, the two Intermediate schools and St Joseph’s School a short communique designed to be sent to parents / whanau and asked them to send these out to their community to try to ensure all Year 8 parents in the district were aware of the proposed changes and the consultation process. I had a number of conversations with the acting Principal at Maidstone Intermediate whose pupils were likely to be the most directly affected group. Both Maidstone Intermediate and Heretaunga College published the proposed changes to their whole community.
    [Show full text]
  • Conjunctive Water Management Recommendations for the Hutt Valley Conjunctive Water Management Recommendations for the Hutt Valley
    Conjunctive water management recommendations for the Hutt Valley Conjunctive water management recommendations for the Hutt Valley Mark Gyopari Earth in Mind Ltd For more information, contact the Greater Wellington Regional Council: Wellington Masterton GW/ESC-T-15/77 PO Box 11646 PO Box 41 ISBN-978-1-927217-78-8 (online) ISBN-978-1-927217-77-1 (print) T 04 384 5708 T 06 378 2484 F 04 385 6960 F 06 378 2146 July 2015 www.gw.govt.nz www.gw.govt.nz www.gw.govt.nz [email protected] Report prepared by: Mark Gyopari Earth in Mind Ltd Report reviewed by: M Thompson Senior Environmental Scientist Report reviewed by: N Boyens Team Leader, Hydrology Report approved for release by: G Sevicke-Jones Manager, Environmental Science Date: July 2015 DISCLAIMER This report has been prepared by Environmental Science staff of Greater Wellington Regional Council (GWRC) and as such does not constitute Council policy. In preparing this report, the authors have used the best currently available data and have exercised all reasonable skill and care in presenting and interpreting these data. Nevertheless, GWRC does not accept any liability, whether direct, indirect, or consequential, arising out of the provision of the data and associated information within this report. Furthermore, as GWRC endeavours to continuously improve data quality, amendments to data included in, or used in the preparation of, this report may occur without notice at any time. GWRC requests that if excerpts or inferences are drawn from this report for further use, due care should be taken to ensure the appropriate context is preserved and is accurately reflected and referenced in subsequent written or verbal communications.
    [Show full text]
  • Pinehaven Stream Improvements Archaeological Assessment of Pinehaven Stream Floodplain Management
    Pinehaven Stream Improvements Archaeological assessment of Pinehaven Stream Floodplain Management July 2017 Archaeological assessment of Pinehaven Stream Floodplain Management for Jacobs Ltd Kevin L. Jones Kevin L. Jones Archaeologist Ltd 6/13 Leeds Street WELLINGTON 6011 [email protected] Wellington 15 July 2017 Caption frontispiece: Pinehaven c. 1969 viewed from the north. Trentham camp mid-left, St Patricks (Silverstream) College at right. Pinehaven Stream runs across the centre of the photograph. Source: Hutt City Library. 2 EXECUTIVE SUMMARY This assessment reviews the risk of there being archaeological sites as defined in the Heritage NZ Pouhere Taonga Act 2014 in the vicinity of the works proposed for the Pinehaven Stream. The geomorphology of the area has been reviewed to determine whether there are older land surfaces that would have been suitable for pre-European or 19th C settlement. Remnant forest trees indicate several areas of older but low-lying (flood-prone) surfaces but field inspections indicate no archaeological sites. A review of earlier (1943) aerial photographs and 19th C survey plans indicate no reasonable cause to suspect that there will be archaeological sites. A settlement established in 1837 by Te Kaeaea of Ngati Tama in the general area of St Patricks College Silverstream is more or less on the outwash plain of the Pinehaven Stream. The fan north of the college is heavily cut into by the edge of the Hutt valley flood plain. This is the only historically documented 19th C Maori settlement on the Pinehaven Stream fan but it is outside the area of proposed works. Another broad class of archaeological site may be earlier forms of infrastructure on the stream such as dams, mills, races, bridges, abutments, and logging and rail infrastructure.
    [Show full text]
  • Key Native Ecosystem Operational Plan for Kaitoke Regional Park 2017-2020
    Key Native Ecosystem Operational Plan for Kaitoke Regional Park 2017-2020 Contents 1. Purpose 1 2. Policy Context 1 3. The Key Native Ecosystem Programme 2 4. Kaitoke Regional Park Key Native Ecosystem site 3 5. Parties involved 4 6. Ecological values 8 7. Threats to ecological values at the KNE site 11 8. Objectives 14 9. Operational activities 15 10. Operational delivery schedule 20 11. Funding contributions 24 Appendix 1: Site maps 25 Appendix 2: Nationally threatened species list 31 Appendix 3: Regionally threatened plant species list 33 Appendix 4: Ecological weed species 34 Appendix 5: Revegetation plant list 36 References 37 Kaitoke Regional Park 1. Purpose The purpose of the three-year Key Native Ecosystem (KNE) Operational Plan for Kaitoke Regional Park KNE site is to: Identify the parties involved Summarise the ecological values and identify the threats to those values Outline the objectives to improve ecological condition Describe operational activities (eg, ecological weed control) that will be undertaken, who will undertake the activities and the allocated budget KNE Operational Plans are reviewed every three years to ensure the activities undertaken to protect and restore the KNE site are informed by experience and improved knowledge about the site. This KNE Operational Plan is aligned to key policy documents that are outlined below (in Section 2). 2. Policy Context Regional councils have responsibility for maintaining indigenous biodiversity, as well as protecting significant vegetation and habitats of threatened species, under the Resource Management Act 1991 (RMA)1. Plans and Strategies that guide the delivery of the KNE programme are: Greater Wellington 10 Year Plan The 10 Year Plan (2015-2025)2 outlines the long term direction of the Greater Wellington Regional Council (Greater Wellington) and includes information on all our major projects, activities and programmes for the next 10 years and how they will be paid for.
    [Show full text]
  • Friday 18 October 2019 Duration: 9.03Am-3.28Pm Morning Tea: 10.35Am-10.57Am Lunch: 12.35Pm-1.30Pm
    New Zealand Geographic Board Ngā Pou Taunaha o Aotearoa (NZGB) MINUTES Venue: Pōhutukawa and Nikau meeting rooms Level 7, Radio New Zealand House 155 The Terrace Wellington Friday 18 October 2019 Duration: 9.03am-3.28pm Morning tea: 10.35am-10.57am Lunch: 12.35pm-1.30pm NOTE: All information recorded in these Minutes relating to Treaty of Waitangi settlement place name proposals is confidential and is not available to the general public. Some of the information may become available after Deeds of Settlement are signed. General 1. Karakia | Welcome Matanuku Mahuika opened the hui with a karakia. Obituaries Matanuku Mahuika acknowledged the recent passing of Lee Smith of Ngāti Kahungunu and noted the assistance as a te reo Māori translator that Lee Smith had given to the NZGB at various times. The Chairperson acknowledged the recent passing of Tahu Potiki, former Chief Executive of Te Rūnanga o Ngāi Tahu. Welcome The Chairperson welcomed everyone to the hui. He welcomed observer Philip Green from Te Arawhiti and advised that other representatives from Te Arawhiti would join the meeting when agenda item 11 ‘Treaty advice’ and item 9 ‘Standard for Crown Protected Area names’ are discussed. He also welcomed Daniel Wainwright, on secondment as the NZGB’s Advisor responsible for Treaty Names, and other members of the NZGB Secretariat. The Chairperson congratulated Adrienne Staples on her reappointment to Wellington Regional Council. The Chairperson noted that Paulette Tamati-Elliffe would be late arriving due to flight disruption. 2. Present | Apologies NZGB members (9) Anselm Haanen, Chairperson Surveyor-General, Land Information New Zealand (LINZ) Adam Greenland National Hydrographer, LINZ David Barnes Federated Mountain Clubs of New Zealand Inc.
    [Show full text]
  • On the Day Results 2021 Final 16Th May 2021.Xlsx
    2021 Upper Valley Primary Schools XC Championships Year 3 and Under Girls Year Name School Place 3 Maia Henderson Oxford Crescent 1 3 Taylah Nightingale Upper Hutt 2 3 Hazel Roos Oxford Crescent 3 3 Lucy Mclea Totara Park 4 3 Faith Hilton Pinehaven 5 3 Alice Pickering Pinehaven 6 2 Hazel Steel-Baker Pinehaven 7 3 Emily Pearce Upper Hutt 8 2 Ruby-Rose Hepi St Josephs 9 3 Frankie McGlinchey Pinehaven 10 2 Kaia Wilkes St Brendans 11 3 Lily Karena Fraser Crescent 12 3 London Cork Silverstream 13 3 Morgan Maia Pinehaven 14 3 Georgie Kingsbeer Oxford Crescent 15 3 Rosemary Carson Silverstream 16 3 Bonnie Jennings St Brendans 17 2 Eliska Smith Trentham 18 2 Skye O’Brien Trentham 19 1 Isla Burns Totara Park 20 1 Maya Collins St Brendans 21 2 Danni Lee Stewart Plateau 22 3 Nancy Whiting Hau Karetu (formally Māoribank) 23 2 Hazel Jahnke Trentham 24 2 Molly Robins Pinehaven 25 1 Daniela Grout St Brendans 26 2 Millie Flutey Trentham 27 2 Mia Alcock Trentham 28 2 Aria Chatley Plateau 29 3 Ashlee Poeira Mangaroa 30 3 Pippa McKinnel Trentham 31 2 Michelle Jacomb Upper Hutt 32 3 Aven Walkinshaw St Josephs 33 3 Adelyn Broughton Totara Park 34 2 Harper SMith Mangaroa 35 3 Rian Priestly Upper Hutt 36 3 Harmony Pairama Taliu Plateau 37 1 Jessa Blundell St Brendans 38 1 Faith Schutte Totara Park 39 3 Olivia Fisher van der Veen Hau Karetu (formally Māoribank) 40 2 Leah McKinnel Trentham 41 2 Patricia-Lee Whiting Hau Karetu (formally Māoribank) 42 1 Hadley Hewitt Oxford Crescent 43 2 Ariana October Trentham 44 1 Harper Erin Cann Pinehaven 45 3 Paige Duncan
    [Show full text]
  • Flood Hazard Information Sheet 4 Pinehaven Stream
    Flood Hazard Information Sheet 4 Pinehaven Stream What you can do if you intend to develop, What you need to do if you live in build or renovate? this area Consider the following actions if you are building or Know your risk: Find your property on the flood hazard map. renovating in a flood or erosion-prone area. The Hutt Valley Emergency Management Office can give you information about how to reduce the effects of flooding. This ฀ Always speak to Upper Hutt City Council information could cover evacuation plans, how to protect (Telephone 04 527 2169 - ask for environmental consents) items in your home by raising them above floor level, and before you start building. how you can reduce the risk of future flooding to your home. Flood Hazard Information Sheet 4 JUNE 2010 ฀ Development should avoid the area affected by flood or erosion as a first choice. However if this is not possible, Be prepared: You will need to have: Pinehaven Stream such as for an existing dwelling, Upper Hutt City Council ฀ A Household Emergency Plan that will help you and your or Greater Wellington can provide you with site-specific household plan for when disaster strikes. advice. ฀ Emergency Survival Items such as food, water, clothing This information sheet covers the current flood hazard extent for the Pinehaven Stream Catchment that was identified in ฀ Raise your building platform or floor level. We recommend and medical supplies for you and your family. You will Phase 1 of the joint Upper Hutt City Council and Greater Wellington study. These maps may potentially change in the future, the underside of the floor joists or concrete slab should be need enough for at least 3 days.
    [Show full text]
  • Pinehaven Stream Flood Hazard Assessment
    Pinehaven Stream Flood Hazard Assessment FLOOD HAZARD INVESTIGATION REPORT: VOLUME 1 Revision E 25 May 2010 Pinehaven Stream Flood Hazard Assessment FLOOD HAZARD INVESTIGATION REPORT: VOLUME 1 Revision E 25 May 2010 Sinclair Knight Merz Level 12, Mayfair House 54 The Terrace PO Box 10-283 Wellington New Zealand Tel: +64 4 473 4265 Fax: +64 4 473 3369 Web: www.skmconsulting.com COPYRIGHT: The concepts and information contained in this document are the property of Sinclair Knight Merz Limited. Use or copying of this document in whole or in part without the written permission of Sinclair Knight Merz constitutes an infringement of copyright. LIMITATION: This report has been prepared on behalf of and for the exclusive use of Sinclair Knight Merz Limited’s Client, and is subject to and issued in connection with the provisions of the agreement between Sinclair Knight Merz and its Client. Sinclair Knight Merz accepts no liability or responsibility whatsoever for or in respect of any use of or reliance upon this report by any third party. The SKM logo trade mark is a registered trade mark of Sinclair Knight Merz Pty Ltd. Pinehaven Stream Hydraulic Modelling Report: Volume 1 Executive Summary This report details the first phase of the Pinehaven Stream flood hazard investigation undertaken by Sinclair Knight Merz (SKM) for the Greater Wellington Regional Council (GWRC) and Upper Hutt City Council (UHCC). The investigation sought to identify the flooding issues related to the Pinehaven Stream through hydraulic modelling, flood hazard mapping, flood damage assessment, erosion hazard assessment and a planning review. As the primary analysis tool a combined 1D and 2D hydraulic model was constructed of the Pinehaven Stream to assist in the development of flood hazard maps and to further understand the hydraulics contributing to the flood hazard.
    [Show full text]
  • Architectural Living at an Affordable Price
    Architectural living at an affordable price VISIT THERESERVE.CO.NZ Gillies Group welcomes you to the Second Release of our The Reserve takes its name from the conservation area set Welcome to the 83 architecturally-designed homes at The Reserve, aside within Wallaceville Estate. This open field with scattered Wallaceville Estate. native trees is an oasis of green within an urban environment. It is hoped this area will be fully utilized by the surrounding Second Release The offering at The Reserve is unlike anything seen in Upper families that will eventually live in the area. Hutt ever before. It is already proving to be one of the at The Reserve most beautifully presented, greenfield developments in the At the core of the development concept was a desire to Wellington region to date. create a varied community. A functioning community often Wallaceville Estate allows for families of different sizes and stages in life to live For the second release of homes, we have undergone a alongside one another comfortably. complete reimagining of the aesthetic. This new look provides a beautifully contrasting view of what the feel of the reserve The whole of The Reserve at Wallaceville Estate boasts of a could be, whilst enhancing on some of the floor plans to modern, industrial architecture. This was achieved by adopting increase their liveability. stylish contemporary designs and facades, finished with an amazing colour palette that creates a seemingly inextricable link throughout this bespoke development. Type I Type J Type K Type L Type M Type
    [Show full text]