Watershed Planning “From Assessment to Implementation”
Byron Madigan Water Resources Supervisor Bureau of Resource Management Carroll County, MD
Introduction
• NPDES Background
• Next Generation Permit • Issued December, 2014 • Urban Wasteload Allocation • Water Resources Coordination Council (WRCC) • Carroll County Government • Carroll County Health Department • Eight (8) Municipalities • Memorandum of Agreement (MOA) County & Municipal MOA
• Phase II requirements • Purpose • Cost Share
• County share (80%)
• Municipal share
• Annual payment • County Responsibility
• Permit Administration/Compliance • Municipal Responsibility
• Permit compliance support/assistance
Watershed Planning
• NPDES Requirements (Monitoring & Assessment)
• Stream Corridor Assessments (SCA) • Implementation Strategies
• Restoration Plans and TMDL’s
• Assessment of Controls (discharge characterization) • Chemical Monitoring • Biological Monitoring • Physical/geomorphic monitoring
• I.D.D.E. Sampling What are the objectives of the SCA?
• Provide list of observable environmental problems within a stream and along its corridors.
• Provide sufficient data for each problem to determine severity and correctability.
• Prioritize restoration efforts based on information collected for each impairment.
Potential Impairments Not Carroll County
Erosion Exposed Pipes and Pipe Outfalls
Channel Fish Blockages Alteration
Inadequate Unusual Buffer Conditions
Trash In-Stream Dumps Construction Prioritizing
Additional Information Collected:
• Adjacent Land Use
• Possible Cause
• Livestock Present
• Erosion Extent (length/Height)
• Type (Erosion attribute)
• Downcut, headcut, or widening
• Threat to infrastructure (Erosion) Impairment Ratings • Presence of Utilities (Buffer) 1) Severity: 1= Most Severe (wide reaching impact on aquatic life) • Location Plantable? 5= Least Severe (very little impact to stream corridor) • Blockage Type (Fish Barrier) 2) Correctability: 1= Minor (fixable with hand labor) • Type of Alteration 5= Major (require heavy equipment and significant funding • Location of Exposed Pipe 3) Accessibility 1= Easily accessible by car or on foot • Bottom of stream, streambank 5= Difficult to access by foot
Stream Corridor Assessments
Watersheds Assessed
8-Digit Miles Year Major Basin Total Miles % Assessed Watershed Assessed Assessed
Prettyboy Gunpowder 80 97 82% 2011
Liberty Patapsco 255 458 56% 2012
South Branch Patapsco 156 218 72% 2013 Patapsco
Lower N. Branch Patapsco 6 6 100% 2014 Patapsco
Lower Monocacy/Potomac 10 23 43% 2014 Monocacy
Conewago Susquehanna 11 18 61% 2014 Creek
Upper Monocacy/Potomac 70 128 55% 2015 Monocacy
Total: 588 948 62% Watersheds To Be Assessed
8-Digit Miles Year Major Basin Total Miles % Assessed Watershed Assessed Assessed
Double Pipe Monocacy/Potomac 529 2016 SCA Initiatives
• Roads Department • Collapsed/Undersized Culverts
• County/Municipal Utilities • Exposed Sewer Pipes
• Erosion/Outfall Analysis • GIS + Upland Survey • MS4 Storm Drain Network
• Stream Buffer Initiative • Governor’s Stream Restoration Challenge
Stream Buffer Initiative
Prettyboy Watershed Lower Monocacy • 4.74 Acres • 12 Acres • Spring 2013 • Fall 2013
Liberty Watershed Upper Monocacy • 13.56 Acres • 13.7 Acres • Spring 2014 • Fall 2014
South Branch Patapsco Double Pipe Creek • 9.43 Acres • 32.4 Acres • Fall 2014 • Fall 2014/Spring 2015
Fall 2015- 22 additional acres being implemented
Restoration Planning
• Annual MS4 Questionnaire • Alternative BMP’s • WWTP Connections • Street sweeping/Inlet cleaning • Impervious to pervious • Health Department • Septic Upgrades • Center for Watershed Protection • Document Review • Modeling (Mapshed) • Accounting for Stormwater (MDE) • Monitoring Efforts • Innovative/alternative BMP’s • Maintenance Facility • Expert Panel Protocols • Protocol 1 (Prevented Sediment) • Additional Monitoring Programs
Carroll County Maintenance Facility
• Double Pipe Creek Watershed
• Partnership
• Center for Watershed Protection
• Carroll County Government
• Standard vs. Enhanced sand filter
• MDE Alternative/Innovative Technology Review • Construction scheduled Spring 2016
Carroll County Monitoring Programs
• NPDES Monitoring
• Retrofit Locations
• Double Pipe Creek
• Prettyboy Watershed
• South Branch Patapsco
• Bacteria Monitoring
• Liberty Watershed
• Prettyboy Watershed
• Storm Event Monitoring
• Carroll County Maintenance Facility
• MBSS Locations
• Maryland Biological Stream Survey
• Piney Run Reservoir
NPDES Monitoring • Liberty Watershed • Airport Facility • 563 Acre D.A., 140 Acre I.A. (25%) • 28% Commercial/Industrial Retrofit Monitoring
Double Pipe Creek • Manchester Skate Park • Sampled Bi-weekly • TSS, OP, NO32, TP • Spring MBSS
Land Use: • Drainage Area: 99 Acres • Impervious: 24 Acres (24%) • Dominant Land Use: Residential (37%)
Retrofit Monitoring
Double Pipe Creek • Carroll County Farm Museum • Sampled Bi-weekly • TSS, OP, NO32, TP • Spring MBSS
Land Use: • Drainage Area: 23 Acres • Impervious: 4 Acres (17%) • Dominant Land Use: Public Facilities (100%)
Retrofit Monitoring
Prettyboy Watershed • Whispering Valley Phase IV • Sampled Bi-weekly • TSS, OP, NO32, TP • Spring MBSS • Cross Sectional Surveys
Land Use: • Drainage Area: 95 Acres • Impervious: 19 Acres (20%) • Dominant Land Use: Residential (84%)
Retrofit Monitoring
• South Branch Patapsco • Shannon Run/Hawks Ridge • Sampled Bi-weekly • TSS, OP, NO32, TP • Spring MBSS
Land Use: • Drainage Area: 209 Acres • Impervious: 42 Acres (20%) • Dominant Land Use: Residential (63%)
Retrofit Monitoring • South Branch Patapsco • Eldersburg Estates • TSS, OP, NO32, TP • Storm Event Monitoring • Spring MBSS • Cross Sectional Surveys
Land Use: • Drainage Area: 30 Acres • Impervious: 9 Acres (30%) • Dominant Land Use: Residential (73%)
Bacteria Monitoring
Liberty Watershed
• Sampled Monthly • 5 main sub-sheds • Conjunction with Baltimore County • 2015 program expansion
MBSS Locations
Double Pipe Creek (13 Sites) • Retrofit monitoring (4) • Union Mills (9) South Branch Patapsco (15 Sites) • Retrofit Monitoring (3) • Piney Run (7) • Gillis Falls (5) Liberty Reservoir (4 Sites) • Retrofit Monitoring (2) • NPDES Monitoring (2) Prettyboy Reservoir (5 Sites) • Retrofit Monitoring (1) • Prettyboy Temperature/Trout Study (4) • 2009/2010 • DNR Inland Fisheries • Baltimore County DEPRM Piney Run Reservoir
• Reservoir Profile • Bi-weekly • April-November • OP, TP, NO32, NH3, TKN, Chl-A, E-coli, Fe, Mg • pH, Temp, D.O., Sp. Conductance, Turbidity • Plankton and Zooplankton
• Sediment Core Analysis • Soluble Reactive Phosphorus • Seasonal Analysis • December 2014 • April and August 2015 Thank You!
Thank You!