The —Uganda. (Jhzcttc
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Chapter 5 Traffic Survey and Traffic Demand Forecast
Final Report – Executive Summary The Study on Greater Kampala Road Network and Transport Improvement in the Republic of Uganda November 2010 CHAPTER 5 TRAFFIC SURVEY AND TRAFFIC DEMAND FORECAST 5.1 TRAFFIC SURVEY The Study Team conducted a traffic survey in January 2010 to identify the current traffic condition and to forecast the future traffic demand. A supplemental traffic survey was also conducted on major junctions in June 2010 to study the current intersection condition and problems. The objective, method and coverage of six types of traffic survey are summarized as below: Table 5.1.1 Outline of Traffic Survey Survey Objectives Method Coverage To obtain traffic volumes on 12 locations (12hr) Traffic Count Survey Vehicular Traffic Count major roads 2 locations (24hr) Origin-Destination (O-D) To capture trip information of Interview with drivers at 9 locations Survey vehicles roadsides To obtain traffic volumes and Intersection Traffic Count movement at major Vehicular Traffic Count 2 locations Survey intersections To collect information about Taxi (Minibus) Passenger and Interview with taxi public transport driver and 5 major taxi parks Driver Interview Survey drivers and users users, and their opinions Boda-Boda (Bike Taxi) To collect information about Interview with boda-boda 6 areas on major Passenger and Driver boda-boda drivers and users, drivers and users roads Interview Survey and their opinions To collect information on Actual driving survey by Travel Speed Survey present traffic situation on passenger car major roads Source: JICA Study Team Actual traffic survey was conducted from January to February 2010. Each type of survey schedule is shown in below figure: 2009 2010 Survey Dec. -
Vote:781 Kira Municipal Council Quarter1
Local Government Quarterly Performance Report FY 2017/18 Vote:781 Kira Municipal Council Quarter1 Terms and Conditions I hereby submit Quarter 1 performance progress report. This is in accordance with Paragraph 8 of the letter appointing me as an Accounting Officer for Vote:781 Kira Municipal Council for FY 2017/18. I confirm that the information provided in this report represents the actual performance achieved by the Local Government for the period under review. Name and Signature: Accounting Officer, Kira Municipal Council Date: 27/08/2019 cc. The LCV Chairperson (District) / The Mayor (Municipality) 1 Local Government Quarterly Performance Report FY 2017/18 Vote:781 Kira Municipal Council Quarter1 Summary: Overview of Revenues and Expenditures Overall Revenue Performance Ushs Thousands Approved Budget Cumulative Receipts % of Budget Received Locally Raised Revenues 7,511,400 1,237,037 16% Discretionary Government Transfers 2,214,269 570,758 26% Conditional Government Transfers 4,546,144 1,390,439 31% Other Government Transfers 0 308,889 0% Donor Funding 0 0 0% Total Revenues shares 14,271,813 3,507,123 25% Overall Expenditure Performance by Workplan Ushs Thousands Approved Cumulative Cumulative % Budget % Budget % Releases Budget Releases Expenditure Released Spent Spent Planning 298,531 40,580 12,950 14% 4% 32% Internal Audit 110,435 15,608 10,074 14% 9% 65% Administration 1,423,810 356,949 150,213 25% 11% 42% Finance 1,737,355 147,433 58,738 8% 3% 40% Statutory Bodies 1,105,035 225,198 222,244 20% 20% 99% Production and Marketing -
Vol. CX No. 25 5Th May, 2017
THE REPUBLIC OF UGANDA THE REPUBLIC OF UGANDA Registered at the — General Past Officefor transmission within East Africa as a Newspaper Hiettiuedl ty Vol. CX No. 25 5th May, 2017 Price: Shs. 5,000 yr CONTENTS PAGE General Notice No. 348 of 2017. The Marriage Act—Notice... ae sais 433 The Companies Act—Notices.. F wise 433 THE COMPANIES ACT, LAWS OF UGANDA,2000. The Electoral Commission Act—Notices ... 434-436 (Cap. 110). The Bank of Uganda Act—Notices_... .. 437-438 The Electricity ‘Act—Notices 439-440 NOTICE. The Trademarks Act— Registration of Applications 440-446 PURSUANT to Section 40(4) of the Companies Act, (No. Advertisements.. w. 446-452 SUPPLEMENTS 1/2012) Laws of Uganda, 2000, notice is hereby given that Statutory Instruments KIKAGATE SERVICE STATION LIMITED,has been by a No. 21—The Non-Governmental Organisations (Fees) special resolution passed on 14th March, 2017, and with the Regulations, 2017. approval of the Registrar of Companies, changed in nameto No. 22—The Non-Governmental Organisations Regulations, EDDIES' SERVICE STATION LIMITED, and that such 2017. No, 23—The Electoral Commission (Appointment of Date of new name has been entered in myRegister. Completion of Update of Voters' Register in Tororo Dated at Kampala, this 15th day of March, 2017. District) Instrument, 2017. AYALO VIVIENNE, CORRIGENDUM Assistant Registrar of Companies. Take notice that General Notice No. 276 of 2017, was erroneously advertised in The Uganda Gazette Vol. CX, No. 20 of 5th April, 2017. The name was wrongly typeset as General Notice No. 349 of 2017. Namusoke Rose instead of NAMUKOSE ROSE, the THE COMPANIES ACT, LAWS OF UGANDA,2000. -
E464 Volume I1;Wj9,GALIPROJECT 4 TOMANSMISSIONSYSTEM
E464 Volume i1;Wj9,GALIPROJECT 4 TOMANSMISSIONSYSTEM Public Disclosure Authorized Preparedfor: UGANDA A3 NILE its POWER Richmond;UK Public Disclosure Authorized Fw~~~~I \ If~t;o ,.-, I~~~~~~~ jt .4 ,. 't' . .~ Public Disclosure Authorized Prepared by: t~ IN),I "%4fr - - tt ?/^ ^ ,s ENVIRONMENTAL 111teinlauloln.al IMPACT i-S(. Illf STATEME- , '. vi (aietlph,t:an,.daw,,, -\S_,,y '\ /., 'cf - , X £/XL March, 2001 - - ' Public Disclosure Authorized _, ,;' m.. .'ILE COPY I U Technical Resettlement Technical Resettlement Appendices and A e i ActionPlan ,Community ApenicsAcinPla Dlevelopment (A' Action Plan (RCDAP') The compilete Bujagali Project EIA consists of 7 documents Note: Thetransmission system documentation is,for the most part, the same as fhat submittedto ihe Ugandcn National EnvironmentalManagement Authority(NEMAI in December 2000. Detailsof the changes made to the documentation betwoon Dccomber 2000 and the presentsubmission aro avoiloblo from AESN P. Only the graphics that have been changed since December, 2000 hove new dates. FILE: DOChUME[NTC ,ART.CD I 3 fOOt'ypnIp, .asod 1!A/SJV L6'.'''''' '' '.' epurf Ut tUISWXS XillJupllD 2UI1SIXg Itb L6 ... NOJIDSaS1J I2EIof (INY SISAlVNV S2IAIlVNTIuaJ bV _ b6.sanl1A Puu O...tp.s.. ZA .6san1r^A pue SD)flSUIa1DJltJJ WemlrnIn S- (7)6. .. .--D)qqnd llH S bf 68 ..............................................................--- - -- io ---QAu ( laimpod u2Vl b,-£ 6L ...................................... -SWulaue lu;DwIa:43Spuel QSI-PUU'l Z btl' 6L .............................................----- * -* -SaULepunog QAfjP.4SlUTtUPad l SL. sUOItllpuo ltUiOUOZg-OioOS V£ ££.~~~~~~~~~~~~~~~~~A2~~~~~~~~~3V s z')J -4IOfJIrN 'Et (OAIOsOa.. Isoa0 joJxxNsU uAWom osILr) 2AX)SO> IsaIo4 TO•LWN ZU£N 9s ... suotll puoD [eOT20olla E SS '' ''''''''..........''...''................................. slotNluolqur wZ S5 ' '' '' '' ' '' '' '' - - - -- -........................- puiN Z'Z'£ j7i.. .U.13 1uu7EF ................... -
Croc's 07.Qxd
Croc’s 07.qxd 7/6/2011 5:44 PM Page 2 CLASSIFIED ADVERTS NEW VISION, Thursday, July 7, 2011 29 PROPERTIES KONSULT (U) LTD HIGH POINT JOB SCAN P.O. BOX 71, KAMPALA PROPERTY LTD Sale RONAR CHAMBERS Vacancies NAMIREMBE / BAKULI RD. GOOD NEWS!!!!! (Next to TOTAL Petrol Station) MODERN MAIDS LTD. FOR SALE CALL: 0712 252 605, LAND FOR SALE 0772 850 763, 0312 513444 Entebbe road kitende for sale 2km - Housemaids from main road 20dec with water and - Shamba Boys DEALS OF THE WEEK power at 18m 0772-368798 PLOTS FOR SALE Seguku katale plot for sale 50x100ft at Kakiri - several plots 300mtrs off tax road 12m 50ft x100ft - 3m Seguku katale opp. prayer mt. 1 acre WHOLESALE BUSINESS Mukono- several plots - 4m for sale 2km from main road with lake WANTS: Gayaza - two plots @ 5m view at 200m Bujuuko/Mityana rd 1. Receptionists Naguru hill plot for sale 70 dec at 2. Attendants 100ft x 50ft-3.5m 650,000 dollar 100ft x 100ft - 6m 3. Packers 5 bedroom Wakiso District Kasanjje 30 acres @ at 10m Dealers in Gayaza/Bugema University -near tarmac - 4. Turnboys Headquarters. UGX 160M 800mtrs,with ready Titles Zilobwe Gayaza road 20 acre @ at 100ft x 50ft-5m 4.5m 0775295011 Japanese vehicles. 0701526528 100ft x 100ft-9m Buziga plot for sale1.5acre near King Maya Hill ready titles - Oyo's Palace 500m 100ft x 50ft - 5m Naguru plot for sale 80dec 550,000 LAND - NAMANVE Matuga/Kungu - several plots - 5m dollar 0703-925277 Matuga - power & water on site (50x100)ft - Nakawuka 20 acres for sale near main 7.5m road with water and power at 18m each Gayaza/Namugongo - Prime Estate - 100ft FOR SALE x 50 ft - 7.5m Gayaza road Busiika 35 acres for sale Kayunga/Senge - several plots - 7.5m good for farming at 5m per acre. -
Agent Id Agent Name Actual Location 100375 Annonceur Limited Near Centenary Kawuku, Entebbe Road 101286 Aiyun Investments Ltd Ab
ABAITA Agent Id Agent Name Actual location 100375 Annonceur Limited Near Centenary Kawuku, Entebbe Road 101286 Aiyun Investments Ltd Abaita town near Barclays Branch(Buy&Save Supermarket) 101626 S And S Enterprises Abaita S And S Enterprises Abaita (S and S Mall) 101635 Ferguson Enterprises Ltd Ferguson Ent Ltd Kawuku 101627 S And S Enterprises Nkumba 1 Nkumba 1 ACACIA Agent Id Agent Name Actual location 100480 Gn Associates Kamwokya Kanjokya Street ARUA Agent Id Agent Name Actual location 100653 Abiriga Hassan Ent Arua Town Arua town council 101278 Equata Tobacco Arua Adumi road , Arua 101763 Destiny Chain Traders Arua-Pakwach Road, opposite NN Toyota. 101942 Virah Forex Bureau (U) Limited Amuru Arua Arua 100661 Abiriga Hassan Ent Koboko koboko town council 100662 Abiriga Hassan Ent Yumbe Yumbe trading centre BUGOLOBI Agent Id Agent Name Actual location 100310 Shell Portbell Road Luzira Mbuya mutungo juction 100479 Valley Hostels,Nakawa Akamwesi hostel, nakawa 100611 Kacerere Inv Nakawa Behind Akamwesi hostel nakawa 100711 Kankan Builders Industrial A Sadolin shop industrial area 100842 Jackato Enterprises Middle east zone luthuli rise street bugolobi 100862 Kingdom Services Kinawataka kinawataka trading centre 101003 Nik Tel Traders Portbel Akamwesi hostel, nakawa 101904 Holy Mark hospitality services Plot 13 Kataza Close Maria House Nakawa 102043 Namukasa Hamidah Enterprises Mutungo Kunya opposite Jay Hotel 102044 Kayondo Denis Traders Mutungo Kunya opposite Jay Hotel 102045 Adot Telecom Mutungo Kunya opposite Muggiez 102046 Mujjunga Joseph Retailers Upper Bbina Luzira, Nakawa Division 102114 Riscom Limited Kunya Bina Road Mutungo after Muggiez 102126 Gok And Sons General Enterprises Mutungo Zone 1-7 close to Cielo Diners 102127 Akello Caroline Enterprises Kitintale Trading Centre close Comfort Zone 102280 Uwera Tracy And Family Busines Kinawataka Mbuya Nakawa opposite Mango Tree Shade CSC Agent Id Agent Name Actual location 101300 Honghai International Co. -
Approved Bodaboda Stages
Approved Bodaboda Stages SN Division Parish Stage ID X-Coordinate Y-Coordinate 1 CENTRAL DIVISION BUKESA 1001 32.563999 0.317146 2 CENTRAL DIVISION BUKESA 1002 32.564999 0.317240 3 CENTRAL DIVISION BUKESA 1003 32.566799 0.319574 4 CENTRAL DIVISION BUKESA 1004 32.563301 0.320431 5 CENTRAL DIVISION BUKESA 1005 32.562698 0.321824 6 CENTRAL DIVISION BUKESA 1006 32.561100 0.324322 7 CENTRAL DIVISION INDUSTRIAL AREA 1007 32.610802 0.312010 8 CENTRAL DIVISION INDUSTRIAL AREA 1008 32.599201 0.314553 9 CENTRAL DIVISION KAGUGUBE 1009 32.565701 0.325353 10 CENTRAL DIVISION KAGUGUBE 1010 32.569099 0.325794 11 CENTRAL DIVISION KAGUGUBE 1011 32.567001 0.327003 12 CENTRAL DIVISION KAGUGUBE 1012 32.571301 0.327249 13 CENTRAL DIVISION KAMWOKYA II 1013 32.583698 0.342530 14 CENTRAL DIVISION KOLOLO I 1014 32.605900 0.326255 15 CENTRAL DIVISION KOLOLO I 1015 32.605400 0.326868 16 CENTRAL DIVISION MENGO 1016 32.567101 0.305112 17 CENTRAL DIVISION MENGO 1017 32.563702 0.306650 18 CENTRAL DIVISION MENGO 1018 32.565899 0.307312 19 CENTRAL DIVISION MENGO 1019 32.567501 0.307867 20 CENTRAL DIVISION MENGO 1020 32.567600 0.307938 21 CENTRAL DIVISION MENGO 1021 32.569500 0.308241 22 CENTRAL DIVISION MENGO 1022 32.569199 0.309950 23 CENTRAL DIVISION MENGO 1023 32.564800 0.310082 24 CENTRAL DIVISION MENGO 1024 32.567600 0.311253 25 CENTRAL DIVISION MENGO 1025 32.566002 0.311941 26 CENTRAL DIVISION OLD KAMPALA 1026 32.567501 0.314132 27 CENTRAL DIVISION OLD KAMPALA 1027 32.565701 0.314559 28 CENTRAL DIVISION OLD KAMPALA 1028 32.566002 0.314855 29 CENTRAL DIVISION OLD -
LG Budget Estimates 201213 Wakiso.Pdf
Local Government Budget Estimates Vote: 555 Wakiso District Structure of Budget Estimates A: Overview of Revenues and Expenditures B: Detailed Estimates of Revenue C: Detailed Estimates of Expenditure D: Status of Arrears Page 1 Local Government Budget Estimates Vote: 555 Wakiso District A: Overview of Revenues and Expenditures Revenue Performance and Plans 2011/12 2012/13 Approved Budget Receipts by End Approved Budget June UShs 000's 1. Locally Raised Revenues 3,737,767 3,177,703 7,413,823 2a. Discretionary Government Transfers 5,373,311 4,952,624 5,648,166 2b. Conditional Government Transfers 28,713,079 27,512,936 32,601,298 2c. Other Government Transfers 6,853,215 4,532,570 10,697,450 3. Local Development Grant 1,757,586 1,949,046 1,756,183 Total Revenues 46,434,958 42,124,880 58,116,921 Expenditure Performance and Plans 2011/12 2012/13 Approved Budget Actual Approved Budget Expenditure by UShs 000's end of June 1a Administration 1,427,411 1,331,440 3,894,714 1b Multi-sectoral Transfers to LLGs 5,459,820 4,818,229 0 2 Finance 679,520 658,550 2,623,938 3 Statutory Bodies 1,017,337 885,126 1,981,617 4 Production and Marketing 3,060,260 3,015,477 3,522,157 5 Health 4,877,837 4,807,510 6,201,655 6 Education 21,144,765 19,753,179 24,948,712 7a Roads and Engineering 6,161,280 4,538,877 11,151,699 7b Water 802,836 631,193 1,063,321 8 Natural Resources 427,251 238,655 659,113 9 Community Based Services 610,472 678,202 1,175,071 10 Planning 630,334 302,574 560,032 11 Internal Audit 135,835 117,414 334,893 Grand Total 46,434,958 41,776,425 58,116,922 Wage Rec't: 22,456,951 21,702,872 24,924,778 Non Wage Rec't: 16,062,717 13,930,979 23,191,011 Domestic Dev't 7,915,291 6,142,574 10,001,133 Donor Dev't 0 0 0 Page 2 Local Government Budget Estimates Vote: 555 Wakiso District B: Detailed Estimates of Revenue 2011/12 2012/13 Approved Budget Receipts by End Approved Budget of June UShs 000's 1. -
3.3 Current Situation and Key Issues of the Public Transport Sector in Gkma
Final Report The Study on Greater Kampala Road Network and Transport Improvement in the Republic of Uganda November 2010 3.3 CURRENT SITUATION AND KEY ISSUES OF THE PUBLIC TRANSPORT SECTOR IN GKMA 3.3.1 OVERVIEW OF THE PUBLIC TRANSPORT The privately owned Uganda Transport Company (UTC) held the exclusive franchise for bus services in Kampala until its nationalization in 1972. At that time, its only competition came from shared taxis which are saloon or estate cars. Following its nationalization, UTC contracted and focused more closely on its long-distance services. As a result, the market for urban transport services in Kampala became open to private sector operators using small minibus vehicles. In 1994 a commercial vehicle distributor established City Link as a private-sector large bus operation with some 40 vehicles in service. However, UTODA was able to organize an effective competition to this initiative. City Link meanwhile did not succeed by operating similar to that of minibus services based on fill-and-run principle, rather than operating based on scheduled services. Thus, the company shortly collapsed. Feedback from these results indicates that although City Link was popular, its operations were too thinly spread over the network and were not able to provide a reliable service. Public transport passengers within Kampala have very limited choice such as minibus services or motorcycle services with the majority as minibus services locally called taxis. 3.3.2 TAXI/MINIBUS Main supply of public transport in Kampala is now by minibuses, which are known locally as taxi (photographs bellow). KCC estimated that in 2003, there were nearly 7,000 minibuses based in the GKMA. -
Vote:781 Kira Municipal Council Quarter2
Local Government Quarterly Performance Report FY 2018/19 Vote:781 Kira Municipal Council Quarter2 Terms and Conditions I hereby submit Quarter 2 performance progress report. This is in accordance with Paragraph 8 of the letter appointing me as an Accounting Officer for Vote:781 Kira Municipal Council for FY 2018/19. I confirm that the information provided in this report represents the actual performance achieved by the Local Government for the period under review. Name and Signature: Accounting Officer, Kira Municipal Council Date: 24/01/2019 cc. The LCV Chairperson (District) / The Mayor (Municipality) 1 Local Government Quarterly Performance Report FY 2018/19 Vote:781 Kira Municipal Council Quarter2 Summary: Overview of Revenues and Expenditures Overall Revenue Performance Ushs Thousands Approved Budget Cumulative Receipts % of Budget Received Locally Raised Revenues 6,177,725 3,467,321 56% Discretionary Government Transfers 2,130,791 1,182,235 55% Conditional Government Transfers 5,982,048 2,899,735 48% Other Government Transfers 3,356,981 1,247,294 37% Donor Funding 280,000 32,370 12% Total Revenues shares 17,927,545 8,828,955 49% Overall Expenditure Performance by Workplan Ushs Thousands Approved Cumulative Cumulative % Budget % Budget % Releases Budget Releases Expenditure Released Spent Spent Planning 185,173 105,514 73,428 57% 40% 70% Internal Audit 102,947 46,004 44,248 45% 43% 96% Administration 1,542,634 1,004,160 782,571 65% 51% 78% Finance 1,378,790 867,332 728,057 63% 53% 84% Statutory Bodies 671,770 452,301 385,332 67% 57% -
Makerere University Business School
MAKERERE UNIVERSITY BUSINESS SCHOOL ACADEMIC REGISTRAR'S DEPARTMENT PRIVATE ADMISSIONS, 2018/2019 ACADEMIC YEAR PRIVATE THE FOLLOWING HAVE BEEN ADMITTED TO THE FOLLOWING PROGRAMME ON PRIVATE SCHEME BACHELOR OF SCIENCE IN ACCOUNTING (MUBS) COURSE CODE ACC INDEX NO NAME Al Yr SEX C'TRY DISTRICT SCHOOL WT 1 U0801/525 NAMIRIMU Carolyne Mirembe 2017 F U 55 NAALYA SEC. SCHOOL ,KAMPALA 45.8 2 U0083/542 ANKUNDA Crissy 2017 F U 46 IMMACULATE HEART GIRLS SCHOOL 45.7 3 U0956/649 SSALI PAUL 2017 M U 49 NAMIREMBE HILLSIDE S.S. 45.4 4 U0169/626 MUHANUZI Robert 2017 M U 102 ST.ANDREA KAHWA'S COL., HOIMA 45.2 5 U0048/780 NGANDA Nasifu 2017 M U 88 MASAKA SECONDARY SCHOOL 44.5 6 U0178/502 ASHABA Lynn 2017 F U 12 CALTEC ACADEMY, MAKERERE 43.6 7 U0060/583 ATUGONZA Sharon Mwesige 2017 F U 13 TRINITY COLLEGE, NABBINGO 43.6 8 U0763/546 NYALUM Connie 2017 F U 43 BUDDO SEC. SCHOOL 43.3 9 U2546/561 PAKEE PATIENCE 2016 F U 55 PRIDE COLLEGE SCHOOL MPIGI 43.3 10 U0334/612 KYOMUGISHA Rita Mary 2011 F U 55 UGANDA MARTYRS S.S., NAMUGONGO 43.1 11 U0249/532 MUGANGA Diego 2017 M U 55 ST.MARIA GORETTI S.S, KATENDE 42.1 12 U1611/629 AHUURA Baseka Patricia 2017 F U 34 OURLADY OF AFRICA SS NAMILYANGO 41.5 13 U0923/523 NABUUMA MAJOREEN 2017 F U 55 ST KIZITO HIGH SCH., NAMUGONGO 41.5 14 U2823/504 NASSIMBWA Catherine 2017 F U 55 ST. HENRY'S COLLEGE MBALWA 41.3 15 U1609/511 LUBANGAKENE Innocent 2017 M U 27 NAALYA SSS 41.3 16 U0417/569 LUBAYA Racheal 2017 F U 16 LUZIRA S.S.S. -
Vote:017 Ministry of Energy and Mineral Development V1: Vote Overview I
Ministry of Energy and Mineral Development Ministerial Policy Statement FY 2019/20 Vote:017 Ministry of Energy and Mineral Development V1: Vote Overview I. Vote Mission Statement ³To ensure reliable, adequate and sustainable exploitation, management and utilization of energy and mineral resources for the inclusion and benefit of all people in Uganda´ II. Strategic Objective a. To meet the energy needs of Uganda's population for social and economic development in an environmentally sustainable manner b. To use the country's oil and gas resources to contribute to early achievement of poverty eradication and create lasting value to society c. To develop the mineral sector for it to contribute significantly to sustainable national economic and social growth III. Major Achievements in 2018/19 ENERGY PLANNING MANAGEMENT AND INFRASTRUCTURE DEVELOPMENT Karuma HPP (600MW) physical progress was as at 89% as at 15th February 2019; Isimba HPP (183MW) final commissioning tests have been done and is already delivering power to the grid. The official commissioning is expected on 21st March 2019; Agago ±Achwa (42MW): The plant is undergoing final commissioning test. Electricity Transmission Projects: The following transmission projects were completed: Kawanda-Masaka T-Line 220kV, 137km line; Kawanda and Masaka substations; Nkenda-Fort Portal -Hoima 220kV, 226km line and associated Substations; Mbarara-Nkenda 132kV 160km; and the Isimba- Bujagali Interconnection project132kV, 41km line, Mbarara-Mirama 220kV, 65km line. The following transmission lines