FISCAL YEARS 2021 – 2024 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Executive Summary
Total Page:16
File Type:pdf, Size:1020Kb
FISCAL YEARS 2021 – 2024 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Executive Summary April 9, 2020 1 TIP Overview OKI is designated as the Metropolitan Planning Organization (“MPO”) by the Governors of Ohio, Kentucky and Indiana acting through the Ohio Department of Transportation, the Kentucky Transportation Cabinet and the Indiana Department of Transportation in cooperation with locally elected officials for the Counties of Butler, Clermont, Hamilton and Warren in the State of Ohio; Boone, Campbell and Kenton in the Commonwealth of Kentucky; and Dearborn in the State of Indiana. As the MPO, OKI is required under Titles 23 and 49 of the U.S.C. to conduct the continuing, cooperative, and comprehensive urban transportation planning process. One product is this TIP that considers all surface transportation modes and supports regional development goals. The TIP is a four year listing of surface transportation projects planned for federal, state and local funding within the OKI region. The TIP is a prerequisite for the use of federal funds and represents the short‐range programming document to complement the OKI’s Metropolitan Transportation Plan, also referred to as the “Plan”. Projects in the TIP are considered to have committed funding, with the specific amount of funds identified by Fiscal year, funding type and phase. The last major update to the TIP was in May 2019, however, this is the first TIP that includes new ODOT projects beyond FY21. This TIP will become part of the statewide TIP (STIP) in Ohio, Kentucky and Indiana. The OKI FY 2021‐2024 TIP includes projects for improving highways that are accompanied by recommendations for improving bus service; advanced technologies to move traffic more efficiently; projects to help reduce drive‐alone commuting including; ridesharing; bicycle and pedestrian projects; upgrading highway operating efficiency and projects that improve freight operations in the region. In total, nearly $2.3 billion in federal, state and local funds are identified in the TIP. Of that $2.3 billion, about $1.2 billion are federal funds. The TIP meets the same requirements as the Plan in that it meets air quality and fiscal constraints. Details on fiscal constraint and the air quality conformity process and results can be found in the TIP document. The development of the TIP meets all U.S. Department of Transportation requirements for content, process and public involvement and is paid for with OKI federal planning funds. This Executive Summary contains a listing of highway projects and maps by county and transit projects for each of the transit operators in the region. Total project costs are summarized in this Executive Summary, with additional details on funding types and project phases by fiscal year to be found in the TIP document. Many routine highway maintenance projects are not included in this list, but are identified in the TIP appendix, as a statewide grouped project. 2 BUTLER COUNTY FY 2021-2024 TIP PROJECTS TS744 TS122 TS503 TS732 TS177 106407 TS73 ¡¾27 ¡¾127 TS63 TS130 TS4 106129 TS129 104195 TS747 75 TS748 ¦¨§ Legend TS128 103371 Bicycle/Pedestrian/OtherTS126 Bridge/Culvert Replacement Maintenance/Reconstruction Studies Transit ¡¾42 Traffic Operations/Safety ITS Widening/Relocation 0 1 2 4Miles ¯ Date: 03-05-2020| Path: T:\GIS\Projects\TIP\TIP21_24\ButlerCounty.aprx EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM Butler County Total Programmed Award/ Sponsor TIP ID Facility Location Description Costs Let Date 104195 BUT SR 129 SR-129 interchange with Liberty Reconfiguration of the interchange of SR-129 Butler $24,623,726 1Q21 25.00 Liberty Way and IR-75; Cox Road north of with Liberty Way and IR-75. SR-129 will be Way Liberty Way extended east to tie into Cox Road, north of Liberty Way. Existing ramps connections will also be reconfigured. 106129 BUT Five Five Points intersection at Improve the five road intersection by converting Butler $3,522,334 1Q22 Points Hamilton-Mason, Tylersville, to a roundabout Roundabout Grand, Hancock and Turley 106407 CR 148 CR 148 at Wayne Madison and install a multi-lane roundabout with pedestrian Butler $3,456,895 3Q21 Hamilton Trenton Road accomodations NP- Liberty Way Between I-75 NB on-ramp and Convert the eastbound and westbound turn Butler $2,472,850 FY23 STBG1 Cox Road intersection lanes at Cox Rd intersection to dual left turn lanes with signal modifications. Extend existing westbound turn lane to Cox Rd. 109757 BUT M2M Gilmore Ponds Preserve Construction of Multi Use Path through Gilmore Butler $2,019,711 3Q22 Trail Extension MetroPark, from parking area on Pons Preserve MetroPark, to extend the Miam 2 County N. Gilmore Rd to SR4 Byp to exist. Miami Regional Trail Metro Parks Trail NP- Hamilton Throughout the City of Hamilton Installation of a central based signal system for Hamilton $5,251,094 FY22 STBG6 ITS/Traffic the City's 94 traffic signals, upgraded controllers Signal and detection and improved communication Upgrade between traffic signals using fiber optic cable 103371 Butler Warren Intersection of Butler Warren Convert intersection from existing stop- Mason $1,927,632 2Q21 Road & Road with Western Row/Barret controlled to a modern roundabout. Improve Western Row Road curb, gutter, drainage, culvert and geometry. Rd 100188 Great Miami Adjacent to SR 73 from current Construction of 10' wide multi-use trail to extend Middletown $683,500 4Q20 River Trail trail terminus near Briel Blvd. to existing Great Miami River Trail Extension Baxter Dr trailhead north of SR 73 109468 Central Between Verity Parkway and Reconstruction with upgraded pavement, curb, Middletown $6,889,714 4Q22 Avenue University Boulevard storm sewer and pedestrian lighting. Includes left turn lanes, street calming and bike racks. 109591 Great Miami Southern terminus at Monroe 10' multi use path along Great Miami RiverMonroe $1,391,000 1Q22 River Trail - Bicentennial Commons Park and Monroe extends to the northern city limits Section 108112 BUT Oxford Connection of Peffer Park to Construction of shared use path on south side of Oxford $4,535,750 2Q22 Area Trail Talawanda High School Oxford. Also paving the existing crushed Phase 3 aggregate path that connects Bonham Rd and SR 73 on the east side. NP TA - 5 Smith Road Trail from the roundabout at Multi Use Trail from Smith Road/Becket road to West $978,874 1Q22 Connector Smith Road and Becket Road to Smith Road Chester Trail the existing trails on Smith Road Township 25-Mar-20 Ohio-Butler County Page1 Clermont County FY 2021-2024 TIP Projects TS48 TS126 727 TS28 TS TS131 TS450 ¦¨§275 TS286 ¡¾50 TS132 108254 TS133 276 TS32 TS NP-TA5 TS749 TS125 NP-CMAQ3 NP-CMAQ3 TS232 TS222 TS774 TS743 Legend ¡¾52 Bicycle/Pedestrian/Other TS756 Bridge/Culvert/ Replacement ITS Maintenance/Reconstruction Studies Transit Traffic Operations/Safety Widening/Relocation 0 1.5 3 6Miles ¯ Date: 03-05-2020 Path: T:\GIS\Projects\TIP\TIP21_24\ClermontCounty.aprx EXECUTIVE SUMMARY OKI REGIONAL COUNCIL OF GOVERNMENTS FY21 - 24 TRANSPORTATION IMPROVEMENT PROGRAM Clermont County Total Programmed Award/ Sponsor TIP ID Facility Location Description Costs Let Date 103957 CLE 32-2.33 Glen Este Withamsville ramps and CD Road and partial ramps at GEW. Design Clermont $25,791,144 FY24 CD Road under PID 82370. This will be part 1/part 2 with County PID 103959. 103958 CLE CR 55 Glen Este Withamsville Overpass GEW Overpass over SR 32Clermont $500,000 FY24 Overpass over SR32 County 104712 ITS Phase 3 In and around Milford and along Interconnection of 15 traffic signals under Clermont $2,328,920 3Q20 the US 50 and SR 28 corridors municipal and ODOT jurisdiction County 108254 CLE CR 3 West of Eastgate Square Drive to Construct three roundabouts (1) Aicholtz at Clermont $6,687,500 2Q22 Aicholtz Rd Glen-Este Withamsville Rd noth of Eastgate Square Drive (2) realigned Aicholtz with County Roundabouts Burgoyne Drive Glen Este Withamsville (south), and (3) realigned Aicholtz with Glen Este Withamsville (north) NP- US 52 within Village of New Richmond Convert four lanes of US 52 into two lanes and New $7,500,000 FY24 CMAQ3 provide bike/ped path at former SB lanes. Richmond Convert intersections at Front, Sycamore, Walnut and Augusta Streets into roundabouts. 103953 CLE CR 388 Bach Buxton to Marina Drive Realigning Bach Buxton to align with proposed ODOT $6,149,675 FY22 (Bach Buxton) SR32 interchange. This project will include all clearing for PIDs 103953, 103954, 103955, & 103959. Design under PID 82370. 103954 CLE 32-3.50 near intersection with Bach Proposed interchange at SR32 and Bach ODOT $36,533,204 FY22 Buxton Road Buxton. Design under PID 82370. Part 1/Part 2. Part 2 is PID 103956 (WB 3rd lane). 103955 CLE CR 171 Old SR 74 Schoolhouse to SR 32 Old SR74 improvements to allow the proposed ODOT $5,737,578 FY23 (Old SR74) interchange at Bach Buxton. Design under PID 82370. 103956 CLE 32-2.65 between MP 2.65 and 4.98 Westbound 3rd lane with concrete barrier ODOT $250,000 4Q20 median. Design under PID 82370. Part 2 of PID 103954. 103959 CLE 32-2.88 EB 32 ramp to Clepper Lane Ramp from SR32 East Bound to Clepper Lane. ODOT $4,640,000 1Q22 Design under PID 82370. 107292 CLE US 50/SR US 50 and SR 132 intersections in Add turn lanes, curb, sidewalk, storm sewer, Owensville $1,965,154 2Q23 132 Village of Owensville (two curb ramps and upgrade signals. Intersections intersections) 105055 Pierce 1,800 ft of multi use path Construction of sidewalk and multi-use trail to Pierce $263,325 3Q20 Township extending the existing trails to the extend the existing trail network into the Township Park southwestern portion of the park southwest portion of Pierce Township Park.