Open Space and Recreation
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
NASCO Rivers Database Report by Jurisdiction
NASCO Rivers Database Report By Jurisdiction Photos courtesy of: Lars Petter Hansen, Peter Hutchinson, Sergey Prusov and Gerald Chaput Printed: 17 Jan 2018 - 16:24 Jurisdiction: Canada Region/Province: Labrador Conservation Requirements (# fish) Catchment Length Flow Latitude Longitude Category Area (km2) (km) (m3/s) Total 1SW MSW Adlatok (Ugjoktok and Adlatok Bay) 550218 604120 W N Not Threatened With Loss 4952 River Adlavik Brook 545235 585811 W U Unknown 73 Aerial Pond Brook 542811 573415 W U Unknown Alexis River 523605 563140 W N Not Threatened With Loss 611 0.4808 Alkami Brook 545853 593401 W U Unknown Barge Bay Brook 514835 561242 W U Unknown Barry Barns Brook 520124 555641 W U Unknown Beaver Brook 544712 594742 W U Unknown Beaver River 534409 605640 W U Unknown 853 Berry Brook 540423 581210 W U Unknown Big Bight Brook 545937 590133 W U Unknown Big Brook 535502 571325 W U Unknown Big Brook (Double Mer) 540820 585508 W U Unknown Big Brook (Michaels River) 544109 574730 W N Not Threatened With Loss 427 Big Island Brook 550454 591205 W U Unknown NASCO Rivers Database Report Page 1 of 247 Jurisdiction: Canada Region/Province: Labrador Conservation Requirements (# fish) Catchment Length Flow Latitude Longitude Category Area (km2) (km) (m3/s) Total 1SW MSW Big River 545014 585613 W N Not Threatened With Loss Big River 533127 593958 W U Unknown Bills Brook 533004 561015 W U Unknown Birchy Narrows Brook (St. Michael's Bay) 524317 560325 W U Unknown Black Bay Brook 514644 562054 W U Unknown Black Bear River 531800 555525 W N Not Threatened -
Geological Survey
imiF.NT OF Tim BULLETIN UN ITKI) STATKS GEOLOGICAL SURVEY No. 115 A (lECKJKAPHIC DKTIOXARY OF KHODK ISLAM; WASHINGTON GOVKRNMKNT PRINTING OFF1OK 181)4 LIBRARY CATALOGUE SLIPS. i United States. Department of the interior. (U. S. geological survey). Department of the interior | | Bulletin | of the | United States | geological survey | no. 115 | [Seal of the department] | Washington | government printing office | 1894 Second title: United States geological survey | J. W. Powell, director | | A | geographic dictionary | of | Rhode Island | by | Henry Gannett | [Vignette] | Washington | government printing office 11894 8°. 31 pp. Gannett (Henry). United States geological survey | J. W. Powell, director | | A | geographic dictionary | of | Khode Island | hy | Henry Gannett | [Vignette] Washington | government printing office | 1894 8°. 31 pp. [UNITED STATES. Department of the interior. (U. S. geological survey). Bulletin 115]. 8 United States geological survey | J. W. Powell, director | | * A | geographic dictionary | of | Ehode Island | by | Henry -| Gannett | [Vignette] | . g Washington | government printing office | 1894 JS 8°. 31pp. a* [UNITED STATES. Department of the interior. (Z7. S. geological survey). ~ . Bulletin 115]. ADVERTISEMENT. [Bulletin No. 115.] The publications of the United States Geological Survey are issued in accordance with the statute approved March 3, 1879, which declares that "The publications of the Geological Survey shall consist of the annual report of operations, geological and economic maps illustrating the resources and classification of the lands, and reports upon general and economic geology and paleontology. The annual report of operations of the Geological Survey shall accompany the annual report of the Secretary of the Interior. All special memoirs and reports of said Survey shall be issued in uniform quarto series if deemed necessary by tlie Director, but other wise in ordinary octavos. -
Paddleri 2008 North Kingstown, RI 02852
Rhode Island Blueways Alliance PO Box 1565 PaddleRI 2008 North Kingstown, RI 02852 Celebrating Paddling Chair: Keith Gonsalves On RI’s Rivers and Bay Vice Chair: Bruce Hooke Secretary: Terry Meyer Treasurer: Meg Kerr The PaddleRI 2008 celebration was a huge success with over 200 paddlers participating. PaddleRI was sponsored by the RI Blueways Alliance but the individual trips were organized and hosted by local organizations – watershed councils, Save the Bay and local conservation commissions. The celebration would not have been possible without their enthusiastic participation. The RI Blueways Alliance mission is to develop a water trail network linking Rhode Island’s rivers, lakes and ponds to Narragansett Bay and to use the trail to promote safety, conservation, recreation and economic development. PaddleRI 2008 celebrated the network of paddling opportunities that make up our water trail network. We would like to thank our sponsors -- the New England Grassroots Environmental Fund, the RI Resource Conservation & Development Area Council and the Rhode Island Foundation. Salt Ponds Spring Paddle - Ninigret Pond Saturday, May 31: The Salt Ponds Coalition’s trip was planned for May 31, but the paddle was postponed due to weather. On June 1, about 30 paddlers arrived at the US Fish & Wildlife kayak launch accessed through Ninigret Park at 8:30am with plans to get underway by 9:00am. But Mother Nature had other plans…. The fog was so thick that you couldn’t see where to paddle. Paddlers waited, listening to presentations by the US Fish & Wildlife Service and the Salt Pond’s Coalition’s Art Ganz, hoping for better conditions. -
RI DEM/Water Resources
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Water Resources WATER QUALITY REGULATIONS July 2006 AUTHORITY: These regulations are adopted in accordance with Chapter 42-35 pursuant to Chapters 46-12 and 42-17.1 of the Rhode Island General Laws of 1956, as amended STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Water Resources WATER QUALITY REGULATIONS TABLE OF CONTENTS RULE 1. PURPOSE............................................................................................................ 1 RULE 2. LEGAL AUTHORITY ........................................................................................ 1 RULE 3. SUPERSEDED RULES ...................................................................................... 1 RULE 4. LIBERAL APPLICATION ................................................................................. 1 RULE 5. SEVERABILITY................................................................................................. 1 RULE 6. APPLICATION OF THESE REGULATIONS .................................................. 2 RULE 7. DEFINITIONS....................................................................................................... 2 RULE 8. SURFACE WATER QUALITY STANDARDS............................................... 10 RULE 9. EFFECT OF ACTIVITIES ON WATER QUALITY STANDARDS .............. 23 RULE 10. PROCEDURE FOR DETERMINING ADDITIONAL REQUIREMENTS FOR EFFLUENT LIMITATIONS, TREATMENT AND PRETREATMENT........... 24 RULE 11. PROHIBITED -
Glacial Geology and Aquifer Characteristics of the Big River Area, Central Rhode Island
U.S. Department of the Interior Stone and Dickerman U.S. Geological Survey Glacial Geology and Aquifer — Characteristics of the GLACIAL Big River Area, Central GEOLOGY Rhode Island AND AQUIFER CHARACTERISTICS OF By JANET RADWAY STONE and DAVID C. DICKERMAN Water-Resources Investigations Report 01-4169 MASSACHUSETTS RHODE ISLAND CONNECTICUT THE BIG RIVER Big River Study Area AREA, CENTRAL RHODE ISLAND Prepared in cooperation with the RHODE ISLAND WATER RESOURCES BOARD — WRIR 01-4169 U.S. Department of the Interior U.S. Geological Survey Glacial Geology and Aquifer Characteristics of the Big River Area, Central Rhode Island By JANET RADWAY STONE and DAVID C. DICKERMAN Water-Resources Investigations Report 01-4169 Prepared in cooperation with the RHODE ISLAND WATER RESOURCES BOARD Northborough, Massachusetts 2002 U.S. DEPARTMENT OF THE INTERIOR GALE A. NORTON, Secretary U.S. GEOLOGICAL SURVEY Charles G. Groat, Director For additional information write to: Copies of this report can be purchased from: Subdistrict Chief U.S. Geological Survey Massachusetts-Rhode Island District Branch of Information Services U.S. Geological Survey Box 25286 Water Resources Division Denver, CO 80225-0286 10 Bearfoot Road Northborough, MA 01532 or visit our Web site at http://ma.water.usgs.gov CONTENTS Introduction ........................................................................................................................................................................... 1 Acknowledgments...................................................................................................................................................... -
West Greenwich, Rhode Island: a Preliminary Report
Historic and Architectural Resources of West Greenwich, Rhode Island: A Preliminary Report RIHPC LIBRARY -- STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS * PRELIMINARY SURVEY REPORT TOWN OF WEST GREENWICH * OCTOBER 1978 RHODE ISLAND HISTORICAL PRESERVATION COMMISSION 150 BENEFIT STREET, PROVIDENCE, RHODE ISLAND 02903 I. un. I I PREFACE The Rhode Island Historical Preservation Commission, established by the General Assembly in 1968, is charged with the reponsibi1ity of safeguarding Rhode Island’s cultural heritage. In order to provide an overview of the physical record of this heritage, the Commission has initiated a "broadbrush" or preliminary planning survey of the rural and suburban towns of the state. The purpose of this initial inventory is to identify and record properties ofhistoric and architectural significance in each town. Presently, archeological resources are treated through a separate survey effort being conducted by the Commission. The preliminary surveys are designed to provide a catalogue of non-renewable cultural resources needed for a variety of planning purposes at the local, state and national levels. They identify sites, districts and structures eligible for nomination to the National Register of Historic Places Wand they become the basis for establishing preservation planning priorities basedon problems and po.tentials.discovéred as part of the survey process. * The preliminary surveys are accomplished by driving all public rights-of-way in a given town and noting on large-scale United States Geological Survey maps or other maps that may he more appropriate each building or ite of particulEr architectural, visual, cultural or historic significance. Each property is photographed and recorded on a standard data * *u .* 11.11: sheet which includes a physical description and notations con cerning history, use, condition and architectural ‘style or period. -
Dam Safety Program
STATE OF RHODE ISLAND 2009 Annual Report to the Governor on the Activities of the DAM SAFETY PROGRAM Overtopping earthen embankment of Creamer Dam (No. 742), Tiverton Department of Environmental Management Prepared by the Office of Compliance and Inspection TABLE OF CONTENTS HISTORY OF RHODE ISLAND’S DAM SAFETY PROGRAM....................................................................3 STATUTES................................................................................................................................................3 GOVERNOR’S TASK FORCE ON DAM SAFETY AND MAINTENANCE .................................................3 DAM SAFETY REGULATIONS .................................................................................................................4 DAM CLASSIFICATIONS..........................................................................................................................5 INSPECTION PROGRAM ............................................................................................................................7 ACTIVITIES IN 2009.....................................................................................................................................8 UNSAFE DAMS.........................................................................................................................................8 INSPECTIONS ........................................................................................................................................10 High Hazard Dam Inspections .............................................................................................................10 -
RIRC Booklet Combined 2 27 2019
THE RHODE ISLAND RIVERS COUNCIL www.ririvers.org One Capitol Hill Providence, Rhode Island 02908 [email protected] RHODE ISLAND RIVERS COUNCIL MEMBERSHIP Veronica Berounsky, Chair Alicia Eichinger, Vice Chair Robert Billington Rachel Calabro Walter Galloway Charles Horbert Elise Torello INSTITUTIONAL MEMBERS Paul Gonsalves for Michael DiBiase, Department of Administration Eugenia Marks for Kathleen Crawley, Water Resources Board Ernie Panciera for Janet Coit, Department of Environmental Management Peder Schaefer for Mayor James Diossa, League of Cities and Towns Mike Walker for Stefan Pryor, Commerce Corporation Jeff Willis for Grover Fugate, Coastal Resource Management Council ACKNOWLEDGEMENTS Photographs in this publication provided by: Rhode Island Rivers Council Elise Torello, cover photograph, Upper Wood River Charles Biddle, "Children Planting, Middlebridge", pg. 1 Booklet compilation and design services provided by Liz Garofalo THANK YOU This booklet was made possible by a RI legislative grant sponsored by Representatives: Carol Hagan McEntee, (D-District 33, South Kingstown/Narragansett) Robert E. Craven, Sr., (D-District 32, North Kingstown) 2 RHODERHODE ISLANDISLAND WATERSHEDS WATERSHEDS MAP MAP 3 RHODE ISLAND RIVERS COUNCIL ABOUT US The Rhode Island Rivers Council (RIRC) is charged with coordinating state policies to protect rivers and watersheds. Our unique contribution is to strengthen local watershed councils as partners in rivers and watershed protection. Created by statute (RIGL 46-28) in 1991 as an associated function of the Rhode Island Water Resources Board, the RIRC mission is to preserve and improve the quality of Rhode Island's rivers and their watersheds and to work with public entities to develop plans to safely increase river use. Under the Rhode Island Rivers Council statute, rivers are defined as "a flowing body of water or estuary, including streams, creeks, brooks, ponds, coastal ponds, small lakes, and reservoirs." WHAT WE DO The RIRC plays a key role in the state's comprehensive environmental efforts. -
RI 2008 Integrated Report
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS 2008 INTEGRATED WATER QUALITY MONITORING AND ASSESSMENT REPORT SECTION 305(b) STATE OF THE STATE’S WATERS REPORT And SECTION 303(d) LIST OF IMPAIRED WATERS FINAL APRIL 1, 2008 RHODE ISLAND DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF WATER RESOURCES www.dem.ri.gov STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS 2008 INTEGRATED WATER QUALITY MONITORING AND ASSESSMENT REPORT Section 305(b) State of the State’s Waters Report And Section 303(d) List of Impaired Waters FINAL April 1, 2008 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF WATER RESOURCES 235 Promenade Street Providence, RI 02908 (401) 222-4700 www.dem.ri.gov Table of Contents List of Tables .............................................................................................................................................iii List of Figures............................................................................................................................................iii Executive Summary.................................................................................................................................... 1 Chapter 1 Integrated Report Overview.................................................................................................... 7 A. Introduction ................................................................................................................................... 7 B. Background .................................................................................................................................. -
State of Rhode Island
STATE OF RHODE ISLAND 2001 Annual Report to the Governor on the Activities of the DAM SAFETY PROGRAM Dam No. 161 - Spillway at Gainer Memorial Dam, Scituate Department of Environmental Management Prepared by the Office of Compliance and Inspection TABLE OF CONTENTS HISTORY OF RHODE ISLAND’S DAM SAFETY PROGRAM....................................................................1 DAM CLASSIFICATIONS......................................................................................................................................1 STATUTES ..............................................................................................................................................................2 GOVERNOR’S TASK FORCE ON DAM SAFETY AND MAINTENANCE.....................................................2 PROFESSIONAL ASSOCIATIONS .............................................................................................................4 INSPECTION PROGRAM ............................................................................................................................4 ACTIVITIES IN 2001.....................................................................................................................................5 HIGH HAZARD DAM INSPECTIONS..................................................................................................................5 SIGNIFICANT HAZARD DAM INSPECTIONS ..................................................................................................6 LOW HAZARD DAM INSPECTIONS...................................................................................................................8 -
Scientific Information in Support of Water Resource Management of the Big River Area, Rhode Island
Scientific Information in Support of Water Resource Management of the Big River Area, Rhode Island Introduction The Rhode Island Water Resources Board (RIWRB) is acute in central and southern Rhode Island, where groundwater concerned that the demand for water may exceed the avail- is the primary source of drinking water. able public water supply in central and southern Rhode Island. The Big River and Mishnock River Basins (fig. 1) are Although water is often assumed to be plentiful in Rhode Island subbasins of the South Branch of the Pawtuxet River Basin in because of abundant rainfall, an adequate supply of water is not central and southern Rhode Island. These basins—referred to always available everywhere in the state during dry periods. together as “the Big River area” for the purposes of this report— Concerns that water demand may exceed supply are greatest are undeveloped relative to other nearby areas and provide a during the summer, when lower water levels and increased potential source of high-quality public drinking water for central drought potential combine with seasonal increases in peak water and southern Rhode Island. demand (Rhode Island Water Resources Board, 2012). High summer water demands are due to increases in outdoor water Flat River use, such as lawn watering and agricultural irrigation, H Reservoir 71°40' IL L and to increased summer population in coastal 71°35' F areas. Water-supply concerns are particularly A R HA M RK NEY HI RO LL A River R D STATE Brook O Major Findings AD ROUTE 3 Bear Weaver Brook • Three subbasins in the Big River area 41°40' Maple Hill Root Hickory (the Big, Carr, and Mishnock River Pond Basins) function as a single connected C O V E N T R Y Mishnock 1 Lake groundwater resource. -
2018 Hazard Mitigation Plan Update – Coventry, Ri
2018 HAZARD MITIGATION PLAN UPDATE – COVENTRY, RI 2018 Hazard Mitigation Plan Update Town of Coventry, Rhode Island PREPARED FOR Town of Coventry, RI Town Hall 1670 Flat River Road Coventry, RI 02816 401-821-6400 PREPARED BY 101 Walnut Street PO Box 9151 Watertown, MA 02471 617.924.1770 ADOPTED FEBRUARY 2018 2018 Hazard Mitigation Plan Update – Coventry, RI This Page Intentionally Left Blank. Table of Contents Executive Summary ........................................................................................................................................... 1 Introduction ........................................................................................................................................................ 3 Plan Purpose .................................................................................................................................................................................. 3 Hazard Mitigation and Benefits .............................................................................................................................................. 3 Goals.................................................................................................................................................................................................. 5 Background .................................................................................................................................................................................... 6 History .................................................................................................................................................................................