Bid Document For

Total Page:16

File Type:pdf, Size:1020Kb

Bid Document For Tender: Construction of Approach Road to Multilevel Parking At Budha Smriti Park, Patna SBD Bihar Urban Infrastructure Development Corporation Ltd. (A Govt. Of Bihar Undertaking) Bid Document For Construction of Approach Road to Multilevel Parking At Budha Smriti Park, Patna Estimated Cost- Rs. 58.96 lakh 1 BUIDCo, Patna Tender: Construction of Approach Road to Multilevel Parking At Budha Smriti Park, Patna SBD SHORT NOTICE INVITING RE-TENDER for CONSTRUCTION OF APPROACH ROAD TO MULTILEVEL PARKING AT BUDHA SMRITI PARK, PATNA No. BUIDCo/Yo-553/14-125 Date- 06.06.2015 (Through e-procurement mode only – www.eproc.bihar.gov.in) 1. Bihar Urban Infrastructure Development Corporation Limited (BUIDCo) invites bids from eligible experienced Firms/Contractors/Agencies/Bidders for execution of works as given below :- Bid Bid Estimated Bid Security Contract Sl.No Name of work Processing Document Cost (EMD) Duration fees (Beltron) Cost Construction of Approach Road to 1 Multilevel Parking at Budha Smriti Park, Rs. 58.96 lakh Rs. 1,124/- Rs. 8,876/- Rs. 1.18 lakh 4 Months Patna 2. Place & Date of Pre-bid meeting : Date 17.06.2015 Time 04.00 PM. BUIDCo office, #303, 3rd Floor, Maurya Tower, Maurya Lok Complex, Budh Marg, Patna – 800 001 3. Date of downloading of bid document : From 12.06.2015 to 27.06.2015 up to 03.00 PM Through website www.eproc.bihar.gov.in only 4. Last date and time for receipt of bids : Date 27.06.2015 up to 04.00 PM Through website www.eproc.bihar.gov.in 5. Last Date and time for Submission of hard copy of bid : Date 29.06.2015 up to 04.00 PM 6. Time and date of opening technical bids : Date 30.06.2015 Time 04.00 PM Through website www.eproc.bihar.gov.in 7. Time and date of opening of financial bids : To be communicated later on 8. Place of opening of bid : Through website www.eproc.bihar.gov.in 9. Period of bids validity : 120 days 10. Officer inviting bids : Managing Director, BUIDCo 11. For participating in E – tendering process, the contractor shall have to get themselves registered to get user ID, Password and Digital signature. This will enable them to access the website www.eproc.bihar.gov.in and download/participate in E – tender. All tender queries related to this tender shall be communicated at [email protected] 12. (i) Bid processing fees to be paid through online mode i.e. Internet payment getaway (Credit/Debit Card), Net Banking, NEFT/RTGS. (ii) Bids along with necessary online payments must be submitted through e-procurement portal www.eproc.bihar.gov.in before the date & time specified in the NIT. The department does not take any responsibility for the delay/Non availability of internet connection, Network Traffic/Holidays or any other reasons". 13. The tender documents can be obtained through website www.eproc.bihar.gov.in and www.buidco.in 14. Bid document cost should be paid by draft of any scheduled banks payable in favour of Managing Director, Bihar Urban Infrastructure Development Corporation Ltd, Original Bank Draft will have to be deposited in the office of Managing Director, Bihar Urban Infrastructure Development Corporation Ltd, #303, 3rd Floor, Maurya Tower, Maurya Lok complex, Budh Marg, Patna - 800001 on or before 04.00 PM on 29.06.2015 failing which the tender will be rejected. 15. Earnest Money(in hard copy) shall be paid in the form of Bank Guarantee and relevant document should be submitted to Managing Director, Bihar Urban Infrastructure Development Corporation Ltd, #303, 3rd Floor, Maurya Tower, Maurya Lok complex, Budd Marg, Patna - 800001 on or before 04.00 PM on 29.06.2015 failing which the tender will be rejected. 16. The Estimated Cost may increase or decrease. 17. All the information/corrigendum/addendum related to the project shall be published on the website www.eproc.bihar.gov.in and www.buidco.in . The authority shall have the right to reject the bid partially or fully without assigning any reason what so ever. 18. For any information department help line No. 18003456109 may be used 19. Further details of works can be obtained from the office of General Manager (Tech.) For clarification, regarding the E – tendering process, please contact e-procurement, Helpdesk, first Floor, M/22, Bank of India Building, Road No-25, Sri Krishna Nagar, Patna – 800 001, Telephone no. 0612-2523006, Mobile No – 07542028164. Sd/- Managing Director BUIDCo, Patna #303, 3rd Floor, Maurya Tower, Maurya Lok Complex, Budh Marg, Patna - 800 001 (Tel: 0612-2210101/02,Email: [email protected]) 2 BUIDCo, Patna Tender: Construction of Approach Road to Multilevel Parking At Budha Smriti Park, Patna SBD SECTION 1 INSTRUCTION TO BIDDERS (ITB) Section 1: Instructions to Bidders Table of Clauses Page No. Page No. A. General D. Submission of Bids 1. Scope of Bid 4 19. Sealing and Marking of Bids 11 2. Source of Funds 4 20. Deadline for Submission of 11 Bids 3. Eligible Bidders 4 21. Late Bids 11 4. Qualification of the Bidder 4 E. Bid Opening and Evaluation 5. One Bid per Bidder 7 22. Bid Opening 12 6. Cost of Bidding 7 23. Process to be Confidential 12 7. Site Visit 7 24. Clarification of Financial 12 Bids B. Bidding Documents 8 25. Examination of Bids and 13 Determination of Responsiveness 8. Content of Bidding Documents 8 26. Correction of Errors 13 9. Clarifications of Bidding 8 27. Evaluation and Comparison 13 Documents of Financial Bids 10. Amendment of Bidding 8 F. Award of Contract Documents C. Preparation of Bids 28. Award Criteria 14 11. Language of Bid 9 29. BUIDCo's Right to Accept 14 any Bid and to Reject any or all Bids 12. Documents Comprising the Bid 9 30. Notification of Award and 14 Signing of Agreement 13. Bid Prices 9 31. Performance Security 14 14. Currencies of Bid and Payment 10 32. Advance Payment and 15 Security 15. Bid Validity 10 33. Corrupt or Fraudulent 15 Practices 16. Bid Security 10 G. Appendix to I TB 16 17. Alternative Proposals by 10 H. Annexure – I 18 Bidders 18. Format and Signing of Bid 11 Annexure – II 19 3 BUIDCo, Patna Tender: Construction of Approach Road to Multilevel Parking At Budha Smriti Park, Patna SBD A. GENERAL 1 . S c o p e o f B i d 1.1 Bihar Urban Infrastructure Development Corporation Ltd (named in Appendix to ITB) invites bids for the construction of works (as defined in these documents and referred to as "the works") detailed in the table given in NIT. 1.2 The successful bidder will be expected to complete the works by the intended completion date specified in the Contract data. 1.3 Throughout these bidding documents, the terms 'bid' and 'tender' and their derivatives (bidder / tenderer, bid/tender, bidding/tendering, etc.) are synonymous. 1.4 Administrative authority shall decide that this agreement would be either PERCENTAGE RATE OR ITEM RATE and accordingly the non-relevant sections of this document must be crossed. 2. Sources of Funds 2.1 The expenditure on this project will be met by State Govt. Fund. 3 E l i g i b l e B i d d e r s 3.1 This Invitation for Bids is open to all bidders. 3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a statement that the Bidder is neither associated, nor has been associated, directly or indirectly, with the Consultant; Engineer-in-Charge or any other entity that has prepared the design, specifications, and other documents for the Project or being proposed as Project Director for the Contract or involved in supervision of the contract. A firm that has been engaged by BUIDCo to provide consulting services for the preparation or supervision of the works, and any of its affiliates shall not be eligible to bid. 3.3 Bidders shall not be under a declaration of ineligibility for delay, failure or corrupt and fraudulent practices by any of the State Govt. or Central Govt. or Public Undertaking or any Autonomous Body. 4 . Q u a l i f i c a t i o n o f t h e B i d d e r 4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a preliminary description of the proposed work method and schedule, including drawings and charts indicating mile stones to complete the project on time. 4.2 A l l b i d d e r s shall also furnish the following information in Section 2. (i) Evidence of access to or availability of credit facilities (minimum 10% of estimated cost) certified by the bankers. (ii) Undertaking that bidder would be able to invest a minimum of cost up to 25% of the contract value of work, during implementation of contract. (iii) Proposals, if any, for sub contracting of elements of work, costing more than 10% of the bid amount. (iv) Power of attorney, if any. 4.3 If BUIDCo has not undertaken prequalification of potential bidders, all bidders shall include the following information and documents with their bids in Section 2: (a) copies of original documents defining the constitution or legal status, place of registration, and principal place of business; written power of attorney of the signatory of the Bid to commit the Bidder; (b) total monetary value of construction work performed for each of the last five years; (c) experience in works of a similar nature and size for each of the last five years, and details of works underway or contractually committed; and clients who may be contacted for further information on those contracts; (d) major items of construction equipment proposed to carry out the Contract or evidence of arrangement; of possessing them on hire/ lease/ buying as defined therein; 4 BUIDCo, Patna Tender: Construction of Approach Road to Multilevel Parking At Budha Smriti Park, Patna SBD (e) qualifications and experience of key site management and technical personnel proposed for contract; (f) reports on the financial standing of the Bidder, such as profit and loss statements and auditor's reports for the past five years; (g) evidence of access to line(s) of credit and availability of other financial resources facilities (10% of contract value), certified by the Bankers (Not more than 3 months old) (h) Undertaking that the bidder will be able to invest minimum cash up to 25% of contract value of work, during implementation of work.
Recommended publications
  • Year 2010-2011
    Note: This sheet is applicable for uploading the particulars related to the unclaimed and unpaid amount pending with company. Make sure that the details are in accordance with the information already provided in e-form IEPF-2 CIN/BCIN U99999MH1911PTC000337 Prefill Company/Bank Name CENTRAL BANK OF INDIA LIMITED Date Of AGM(DD-MON-YYYY) 30-Jun-2017 Sum of unpaid and unclaimed dividend 1018084.00 Sum of interest on matured debentures 0.00 Sum of matured deposit 0.00 Sum of interest on matured deposit 0.00 Sum of matured debentures 0.00 Sum of interest on application money due for refund 0.00 Sum of application money due for refund 0.00 Redemption amount of preference shares 0.00 Sales proceed for fractional shares 0.00 Validate Clear Proposed Date of Investor First Investor Middle Investor Last Father/Husband Father/Husband Father/Husband Last DP Id-Client Id- Amount Address Country State District Pin Code Folio Number Investment Type transfer to IEPF Name Name Name First Name Middle Name Name Account Number transferred (DD-MON-YYYY) 3/8 BLOCK 3 MELATHERU ALATHUR PATTUKKOTTAI 12039400-00062323- Amount for unclaimed and A AMUTHAKANI NA PATTUKKOTTAI INDIA Tamil Nadu 614901 CE00 unpaid dividend 75.00 02-Dec-2017 OLD NO 42 NEW NO 45 POST CHANDRASEKAR OFFICE STREET MELAKALKANDAR 12010600-00796611- Amount for unclaimed and A AN ARUMUGAM KOTTAI TRICHY INDIA Tamil Nadu 620001 CE00 unpaid dividend 63.00 02-Dec-2017 MURUGATHURAN PATTI MALAYA 12028900-00391564- Amount for unclaimed and A CHINNAPPAN AROCKIAM GOUNDAN PATTI (PO) NILAKOTTAI INDIA Tamil
    [Show full text]
  • Assessment of Air Quality of Patna Town at Different Micro-Environment
    ASSESSMENT OF AIR QUALITY OF PATNA TOWN AT DIFFERENT MICRO-ENVIRONMENT Bihar State Disaster Management Authority (Disaster Management Department, Govt. of India) Pant Bhawan, 2nd Floor, Bailey Road, Patna-800001, Phone : +91 (612) 2522032, Fax : +91 (612) 2532311 Visit us: www.bsdma.org; E-mail: [email protected] Sushil Kumar Modi Patna Deputy Chief Minister Bihar 30-04-2018 Dated : ........................... Foreword Air quality plays a critical role in the health of people. Over the years, there is a growing concern on the deteriorating air quality. Given the pace of urbanization, which is often unplanned, there is an increase in pressure on cities and towns to meet the growing demands of the urban population. This has an adverse effect on the environment, affecting air and water quality. Such adverse effects of unplanned urbanization need to be addressed with robust scientific tenacity. The assessment of air quality in the city of Patna is a step in this direction and it covers the critical winter season with a festive Diwali period which appends pollution to the existing ambient air, and needs a greater policy level intervention. Report on air quality assessment of Patna City at different micro environments has come up in a very right time, since, Bihar State Pollution Control Board is in the verge of preparing Clean Air Action Plan. I wish to congratulate Bihar State Disaster Management Authority (BSDMA) for initiating the discourage on air pollution from a health emergency purview. I also acknowledge the efforts of Indian Institute of Tropical Meteorology (IITM), Pune for conducting this study and CEECE at the Asian Development Research Institute for collaborating with BSDMA in dissemination of the findings and outlaying the importance of air pollution as a causal factor for climate change and its diversified impacts.
    [Show full text]
  • Master Plan for Patna - 2031
    IMPROVING DRAFT MASTER PLAN FOR PATNA - 2031 FINAL REPORT Prepared for, Department of Urban Development & Housing, Govt. of Bihar Prepared by, CEPT, Ahmadabad FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031 FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA - 2031 Client: Urban Development & Housing Department Patna, Bihar i Prepared by: Center for Environmental Planning and Technology (CEPT) University Kasturbhai Lalbhai Campus, University Road, Navrangpura, Ahmedabad – 380 009 Gujarat State Tel: +91 79 2630 2470 / 2740 l Fax: +91 79 2630 2075 www.cept.ac.in I www.spcept.ac.in CEPT UNIVERSITY I AHMEDABAD i FINAL REPORT IMPROVING DRAFT MASTER PLAN FOR PATNA-2031 TABLE OF CONTENTS TABLE OF CONTENTS i LIST OF TABLES v LIST OF FIGURES vii LIST OF MAPS viii LIST of ANNEXURE ix 1 INTRODUCTION 10 1.1 Introduction 11 1.2 Planning Significance of Patna as a City 12 1.3 Economic Profile 14 1.4 Existing Land Use – Patna Municipal Corporation Area 14 1.5 Previous Planning Initiatives 16 1.5.1 Master Plan (1961-81) 16 1.5.2 Plan Update (1981-2001) 17 1.5.3 Master Plan 2001-21 18 1.6 Need for the Revision of the Master Plan 19 1.7 Methodology 20 1.7.1 Stage 1: Project initiation 20 1.7.2 Stage 02 and 03: Analysis of existing situation & Future projections and Concept Plan 21 1.7.3 Stage 04: Updated Base Map and Existing Land Use Map 21 1.7.4 Stage 5: Pre-final Master Plan and DCR 24 2 DELINEATION OF PATNA PLANNING AREA 25 i 2.1 Extent of Patna Planning Area (Project Area) 26 2.2 Delineation of Patna Planning Area (Project Area) 27 2.3 Delineated
    [Show full text]
  • List of Candidates Called for Preliminary Examination for Direct Recruitment of Grade-Iii Officers in Assam Judicial Service
    LIST OF CANDIDATES CALLED FOR PRELIMINARY EXAMINATION FOR DIRECT RECRUITMENT OF GRADE-III OFFICERS IN ASSAM JUDICIAL SERVICE. Sl No Name of the Category Roll No Present Address Candidate 1 2 3 4 5 1 A.M. MUKHTAR AHMED General 0001 C/O Imran Hussain (S.I. of Ploice), Convoy Road, Near Radio Station, P.O.- CHOUDHURY Boiragimath, Dist.- Dibrugarh, Pin-786003, Assam 2 AAM MOK KHENLOUNG ST 0002 Tipam Phakey Village, P.O.- Tipam(Joypur), Dist.- Dibrugarh(Assam), Pin- 786614 3 ABBAS ALI DEWAN General 0003 Vill: Dewrikuchi, P.O.:-Sonkuchi, P.S.& Dist.:- Barpeta, Assam, Pin-781314 4 ABDIDAR HUSSAIN OBC 0004 C/O Abdul Motin, Moirabari Sr. Madrassa, Vill, PO & PS-Moirabari, Dist-Morigaon SIDDIQUEE (Assam), Pin-782126 5 ABDUL ASAD REZAUL General 0005 C/O Pradip Sarkar, Debdaru Path, H/No.19, Dispur, Ghy-6. KARIM 6 ABDUL AZIM BARBHUIYA General 0006 Vill-Borbond Part-III, PO-Baliura, PS & Dist-Hailakandi (Assam) 7 ABDUL AZIZ General 0007 Vill. Piradhara Part - I, P.O. Piradhara, Dist. Bongaigaon, Assam, Pin - 783384. 8 ABDUL AZIZ General 0008 ISLAMPUR, RANGIA,WARD NO2, P.O.-RANGIA, DIST.- KAMRUP, PIN-781365 9 ABDUL BARIK General 0009 F. Ali Ahmed Nagar, Panjabari, Road, Sewali Path, Bye Lane - 5, House No.10, Guwahati - 781037. 10 ABDUL BATEN ACONDA General 0010 Vill: Chamaria Pam, P.O. Mahtoli, P.S. Boko, Dist. Kamrup(R), Assam, Pin:-781136 11 ABDUL BATEN ACONDA General 0011 Vill: Pub- Mahachara, P.O. & P.S. -Kachumara, Dist. Barpeta, Assam, Pin. 781127 12 ABDUL BATEN SK. General 0012 Vill-Char-Katdanga Pt-I, PO-Mohurirchar, PS-South Salmara, Dist-Dhubri (Assam) 13 ABDUL GAFFAR General 0013 C/O AKHTAR PARVEZ, ADVOCATE, HOUSE NO.
    [Show full text]
  • “The Heritage” (Mall & Multiplex)
    PROPOSAL FOR ENVIRONMENTAL CLEARANCE FOR “THE HERITAGE” (MALL & MULTIPLEX), PROPOSED COMMERCIAL BUILDING F O R M – I For PLOT NO -671,672,673,674.TAUZI NO. – 5276, THANA NO. : - 36, SURVEY THANA – DANAPUR, KHAGAUL, VILLAGE MUSTAFAPUR, PATNA, BIHAR Project Proponent NAWNIL KUMAR SINGH M/s PLATINUM HERITAGE HOME PVT. LTD. PATNA Consultants Amaltas Enviro Industrial Consultant LLP. (NABET Accredited EIA Consultants Organization) 1104-Vikrant Tower, Rajendra Place, NEW DELHI-110 008 SEP. 2017 Proposed Commercial Building –Heritage Mall and Multiplex, Patna Form-I APPENDIX VIII (See paragraph 6) FORM 1 APPLICATION FOR ENVIRONMENTAL CLEARANCE OF COMMERCIAL BUILDING PROJECT- “HERITAGE Mall and Multiplex” (I) BASIC INFORMATION S.No. Item Details COMMERCIAL BUILDING PROJECT- 1. Name of the Project “HERITAGE Mall and Multiplex” 2. S.No. in the schedule Item 8 (a) -“Building and Construction” The proposed commercial Project will be spread over an area of 2.7 acre (11,128.8 sq.m), which comprises mall and multiplex having total built-up area 54,083.80 sq.m. Name of Project “HERITAGE Mall and Multiplex” Permissible FAR 3.50 Proposed FAR 3.47 Permissible 5,564.4 sq.m (50% of total Ground Coverage plot area) Proposed Proposed Ground 5,500 sq.m. (49.4 % of capacity/area/length/tonnage Coverage (a) total plot area) 3. to be handled/command Road Area (b) area/lease area/number of 1,305 sq.m. (11.72 % of wells to be drilled site/plot area) Paved Area (c) 983.8 sq.m. (8.84 % of site/plot area) Green Area (d) 3,340 sq.m.
    [Show full text]
  • Members List 2019
    Bihar Chamber of Commerce & Industries Member List (All Details) ALL Reported On: 15/09/2020 Sl Mem Since Zone / Area Member Name & Address Communication Detail Representative Subs. No ID Member Type Ex. Date 1 0290 17/12/1994 Zone - I A K Brothers (O) 2675982 Shri Alok Kumar Rastogi 31/03/2020 Ordinary Member Gupta Mansion (R) 2320475 Shri Ankur Rastogi Bakerganj (M) 9431024752 9304023752 Smt. Sabita Rastogi Patna 800 004 [email protected] 2 0701 29/06/2010 Zone - I A to Z Portfolio Management (P) Ltd (O) Shri Kamal Nopani 31/03/2020 Ordinary Member 205, Shanti Vihar Apartment (R) Fraser Road (M) 9431018530 9334112410 Patna 800 001 [email protected] 3 0658 29/06/2010 Zone - IV A. B. Sons & Automotives (O) 06412452158-59 Shri Binod Kumar Singh, 31/03/2020 Ordinary Member Rani Talab (R) Proprietor Sabour Road (M) 9431600059 9708038259 Shri Amit Kumar Sinha, Executive Fax 06412452159 Bhagalpur [email protected] 4 0697 29/06/2010 Zone - I A. Lohia & Associates (O) 2235244 2236075 Shri Abhishek Lohia 31/03/2021 Ordinary Member 302, Yunus Corporate (R) 2587132 S. P. Verma Road, Beside (M) 9334128026 9431009215 Sukriti Apartment [email protected] Patna 800 001 5 0920 01/04/2018 Zone - I A. Mitra and Associates (Tax (O) 0612-2323947 Shri Arjit Mitra 31/03/2021 Ordinary Member Consultants) (R) 514, Ashiana Tower (M) 9934123303 Exhibition Road [email protected] Patna 800001 Page 1 Bihar Chamber of Commerce & Industries Member List (All Details) ALL Reported On: 15/09/2020 Sl Mem Since Zone / Area Member Name & Address Communication Detail Representative Subs.
    [Show full text]
  • Bihar Urban Infrastructure Development Corporation Limited a Govt
    Bihar Urban Infrastructure Development Corporation Limited A Govt. of Bihar Undertaking #303, Third Floor, Maurya Tower, Maurya Lok Complex, Budh Marg, Patna -800 001 Tel: 0612-2210101/02, Fax-0612-2210103, Website:- http//: buidco.in, Email: [email protected] Request for Proposal for Specialized Fabrication, Production InstallationInstallation seservicesrvices for Museum Exhibits at Buddha Smriti Park NITNITNITnonono: no :::----BUIDCo/SIUBUIDCo/SIU- ---1111/Yo/Yo/Yo/Yo----73737373////201320132013----127127 Dated 080808- 08 ---01010101----20132013 BUIDCo invites proposals for selection of Agency for Specialized Fabrication, Production and installation services for museum exhibits at Buddha Smriti Park, Patna Scope ofofof WorkWork: ::: (Detailed Scope of Work has been provided in the RFP Document) BUIDCo is seeking services for the fabrication, delivery, production and installation of interpretive media and exhibits for the newly designed museum at Buddha Smriti Park, Patna. The exhibit areas in the new museum that fall within the purview of this RFP consist of the following: Lobby Interior Permanent Exhibition Gallery Special Treasure Gallery Buddhist Cave Hall of Light Submission Details The detailed RFP document containing terms and conditions for bidding along with the Instruction to Bidders and scope of work can be downloaded from website of BUIDCo http://buidco.in from 09-01-2013 onwards A non refundable document fee of Rs. 20,000/- (Rupees Twenty Thousand Only) in the form of a Demand Draft in favour of “Managing Director, BUIDCo.” payable at Patna is to be attached along with the RFP at the time of submission. The Project briefing meeting for the project shall be held in BUIDCo office on 17/01/13 at 3.00 PM and the last date for submission of proposal at the address given below is 28/01/13 till 3.00 PM.
    [Show full text]
  • Operations & Maintenance of Bus Queue Shelters in Patna, Bihar EN
    Page 1 Request for Proposal Draft Operation Agreement Operations & Maintenance of Bus Queue Shelters in Patna, Bihar September, 2014 Address: #303, 3rd Floor, Maurya Tower, Maurya Lok Complex, Budh Marg, Patna-800001 Phone: +91-612-2210100-103 Fax: +91-612-2210103 Page 2 OPERATION AGREEMENT THIS AGREEMENT is made on ____ day of _________________ 2014 BETWEEN M/s Bihar Urban Infrastructure Development Corporation Limited, a company incorporated under Indian Companies Act, 1956 and having its registered office at #303, 3 rd Floor, Maurya Tower, Maurya Lok Complex, Budh Marg, Patna - 800001 (herein after referred to as the “Authority” or “BUIDCO”) which expression shall, unless repugnant to the context include it’s successors and assigns) of the First Part; AND ______________________________________________, having its registered office at __________________________________________________________ (herein after referred to as the “Operator” which expression shall, unless repugnant to the context include its successors and assigns) of the Second Part. The Company and the Operator to this Agreement are hereinafter individually referred to as “Party” and collectively as “Parties”. Page 3 3 WHEREAS A. M/s. Bihar Urban Infrastructure Development Corporation Limited (the “Authority” or “BUIDCO”) established in 2009 by government of Bihar, is the nodal agency responsible for promotion and execution of infrastructure projects in urban areas of Bihar. BUIDCO envisages promoting sustainable urban growth all across major cities of Bihar. B. In order to cope with the growing requirement of city transport and development of City Bus service system in Patna Town, need was felt for the “City Bus Stop Queue Shelters”. The Urban Development and Housing Department has planned to develop Bus Queue Shelters (BQS) at 104 locations in Patna through BUIDCO.
    [Show full text]
  • Government of India /Dakbunglow Road, Patna-800001
    FAX : (0612)2222172 22 (0612)2221002 : [email protected] (0612)2222172 E-Mail. Website : www.mca.eov.in /Government of India 4-L.atom /Ministry of Corporate Affairs an=ti s{ Trcrth iD4-0,f4.717-i7-umtg Office of the Registrar of Companies, Bihar-cum-Official Liquidator, High Court, Patna Floor, 'A' Wing, Maurya Lok Complex 4)-a `T' ,t11,-ics.4.,V4th Sttp 4Tk Erd-qr /Dakbunglow Road, Patna-800001 Dated: 19.06.2018 No.: ROC/Patna/LLP/Section75/ 1432 Reference: In the matter of Striking off of LLPs under section 75 of LLP Act, 2008 read with Rule 37 of LLP Rules, 2009 1. Notice is hereby given that the Registrar has a reasonable cause to believe that the LLPs mentioned in the Annexure (142 LLPs) have not been carrying on any business or operations for a period of two years or more and has failed to file financial statement (Form 8) and Annual Return (Form 11). Therefore, the Registrar has reasonable cause to believe the same for the purpose of taking suo moto action for striking off the name of the LLPs. Accordingly, the Registrar, of Companies, proposes to remove/strike off the name of the said LLPs from the Register and dissolve them. 2. Any person objecting to the proposed removal/striking off the name of the LLPs from the register of LLPs may send his/her objection to the office address mentioned hereinabove within 30 (thirty days) from the date of publication of this notice. Yoursfaithfully, LAA.;6 (HIMANSHU SHEKHAR) Registrar of Companies-Cum- Official Liquidator, Patna.
    [Show full text]
  • Local Bodies Government of Bihar
    CHAPTER-IV PERFORMANCE AUDIT URBAN DEVELOPMENT AND HOUSING DEPARTMENT 4.1 Utilisation of Grants under Civic Amenities Head (State Plan) by Nagar Nigams Executive Summary A Performance Audit on 'Utilisation of Grants under Civic Amenities Head (State Plan) by Nagar Nigams’ covering four sampled Nagar Nigams viz., Bhagalpur, Biharsharif, Gaya and Patna for the period 2011-16 was conducted from June to August 2016 and the major findings are as follows: The Development Plan for providing Civic Amenities was not prepared by the test checked Nagar Nigams and development works executed by them were not part of district plan prepared by District Planning Committees. (Paragraph 4.1.6.1) Grants amounting to ` 4.07 crore were lapsed and an expenditure of ` 10.56 crore was incurred on inadmissible item of works by Biharsharif and Patna Nagar Nigams. (Paragraph 4.1.8.6 & 4.1.8.8) In four test checked Nagar Nigams, grants amounting to ` 48.19 crore meant for civic amenities viz park, special sanitation etc. were not utilised for a period ranging from one to seven years as required land was not made available. (Paragraph 4.1.7.2) Utilisation Certificates of ` 79.35 crore (56.62 per cent ) were not submitted by the four test checked Nagar Nigams to the State Government. (Paragraph 4.1.7.4) Additional liability of ` 83 lakh was created in construction of two parks. Out of six parks physically verified, two parks constructed at a cost of ` 51.25 lakh were found locked, filthy and not put to use. (Paragraph 4.1.8.1) Expenditure of ` 1.58 crore incurred on construction of nine public conveniences was rendered unfruitful as the same were not handed over by Bihar Rajya Pul Nirman Nigam Limited to Nagar Nigam Patna.
    [Show full text]
  • REGIONAL OFFICE Mauryalok Complex, Block-A, 2Nd Floor Dak Bungalow Road, PATNA - 800001
    CWC/RO-Patna/Busi/H&T-Madhepura/04/2018 Dated: 09.08.2018 CENTRAL WAREHOUSING CORPORATION (A GOVT. OF INDIA UNDERTAKING) REGIONAL OFFICE: PATNA E-TENDER DOCUMENT FOR APPOINTMENT OF REGULAR H&T CONTRACTOR AT CW, MADHEPURA DATE FOR DOWNLOADING TENDER 14.08.2018 (10:00 hrs.) to FORM 11.09.2018 (upto 23:59hrs). : LAST DATE FOR ONLINE SUBMISSION : UPTO 11:30 HRS ON OF TENDER 12.09.2018 AT 12:00 HOURS ON DATE OF OPENING [TECHNICAL BID] : 15.09.2018 REGIONAL OFFICE Mauryalok Complex, Block-A, 2nd Floor Dak Bungalow Road, PATNA - 800001 Phone: (0612) 2225949/2225421/2220760, Fax : (0612) 2226491 E-mail: [email protected] /[email protected] Web Site: www.cewacor.nic.in Page 1 of 121 CENTRAL WAREHOUSING CORPORATION (A GOVT. OF INDIA UNDERTAKING) REGIONAL OFFICE Mauryalok Complex, Block-A, 2nd Floor Dak Bungalow Road, PATNA – 800001 Phone: (0612) 2225949/2225421/2220760, Fax : (0612) 2226491 E-mail: [email protected] /[email protected] Web Site: www.cewacor.nic.in CWC/RO-Patna/Busi/ H&T-Madhepura/04/2018 Dated: 09.08.2018 E-Tender Notice Central Warehousing Corporation invites online e-tendering under two bids system from professionally competent and financially sound interested parties for appointment of regular contractor for handling and transportation of Food grains & allied Services at Central Warehouse, Madhepura as detailed below: Scope of work Handling and transportation work of food grains and allied materials etc at Central Warehouse, Madhepura Tender notice Online (e-tendering) for above work. Tender documents will be available on website:www.tenderwizard.com/CWC, www.cewacor.nic.in,www.tenderhome.comand www.cppp.gov.in Tender type Open Document downloading date and time 14.08.2018 (10:00 hrs.) to 11.09.2018 (23:59 hrs.) Pre- bid meeting 01.09.2018 at 11:00 hrs.
    [Show full text]
  • RFP for Selection of Operators for City Bus Service in 18 Cities in Bihar
    Request for Proposal for SELECTION OF OPERATORS FOR CITY BUS SERVICE IN 18 CITIES IN BIHAR (Reference Notification Number: BUTSL/VI-39/15/06 dated- 21.07.2015) Bihar Urban Transport Services Limited #303, 3rd Floor, Maurya Tower, Maurya Lok Complex, Budh Marg, Patna -800 001 Phone – +91 612 2210100-103 Fax No - +91 612 2210103 E-mail: [email protected] RFP for Selection of Operators for City Bus Service in 18 Cities in Bihar 1. BACKGROUND To improve the city bus operations in Bihar, buses have been procured under JnNURM scheme. For the new buses sanctioned to Government of Bihar for operations within different cities in Bihar, there is a need to engage private operators who will operate and maintain these buses. These operators will run the buses on pre-defined routes in these cities. Bihar Urban Transport Services Limited (BUTSL) will be working towards making fast and safe intra-city transport in cities of Bihar. BUTSL proposes to engage private operators to operate buses on several routes in the cities of Bihar as detailed in the table below for a period of 7 years (the “Project”). No. City Bus Type No of Buses 1. Arrah Midi, diesel, non AC buses 53 2. Aurangabad-Arwal Std. Non AC, Diesel midi buses 40 3. Bairgania-Sheohar Midi, Non AC, Diesel buses 43 Mini, diesel, non AC buses 14 4. Begusarai Std. Non AC, Diesel midi buses 36 5. Bhabhua-Sasaram Std. Non AC, Diesel midi buses 30 900 mm, Diesel, midi, non AC 49 6. Bhagalpur 650 mm, Diesel, mini, non AC 6 7.
    [Show full text]