Social Monitoring Report

Project Number: 43253-025 May 2020

Period: July 2019 – December 2019

IND: Integrated Urban Water Management Investment Program - Tranche 1

Submitted by Karnataka Urban Infrastructure Development & Finance Corporation (KUIDFC)

This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

From: Shashisekhar SP Sent: Friday, May 15, 2020 3:22 PM To: Pravash Kumar Mishra Cc: Doddihal RR ; H.M.Chidanand ; Sourav Majumder ; jayamalap Subject: [Possible Forged Sender]Re: [Possible Forged Sender]Fwd: SSMR Combained report from July- 2019 to December 2019 for GKW & EGIS reg.,

Dear Pravash,

Hope all is well during covid times!!!

Thank you for your comments on the last SSMR. Please find at the links below the final revised SSMR of Jul-Dec 2020. Also as desired please find the previous SSMR of Jan to Jun 2019 at the links below. https://drive.google.com/open?id=1GNiL68ONiq1f2fTVRQZgQFT5CvE5RRkI - SSMR Jan to Jun, 2019

https://drive.google.com/open?id=1L1m7w3bRpyU3J2KUtrFMJAJObyrZpZhc - SSMR July to Dec 2019

best regards,

Shashi

REcd. 15.05.19 SFG Log: 4139

SEMI ANNUAL SOCIAL SAFEGUARD MONITORING REPORT

Project Number: 43253-027 Loan Number: 3148-IND July -December 2019

India: Karnataka Integrated Urban Water Management Investment Program (Tranche 1)

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

ABBREVIATIONS

ADB : Asian Development Bank APs : Affected Persons BPL : Below Poverty Line CMC : City Municipal Council Gol : Government of GoK : Government of Karnataka GRC : Grievances Redressal Committee KMRP : Karnataka Municipal Reforms Program KUIDFC : Karnataka Urban Infrastructure Development and Finance Corporation KUWSDB : Karnataka Urban Water Supply and Drainage Board LAA : Land Acquisition Act lpcd : Liters Per Capita per Day M/m. : Meter NGO : Non-Government Organization NKUSIP : North Karnataka Urban Sector Investment Program O&M : Operations and Maintenance IPMU : Investment Program Management Unit PWD : Public Works Department RoW : Right of Way STP : Sewage Treatment Plant

ULB : Urban Local Body

ADB KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Contents

1. PROJECT DESCRIPTION ...... 1 2. POPULATION TO BE BENEFITTED ...... ERROR! BOOKMARK NOT DEFINED. 3. CONSULTATIONS/ DISCUSSION WITH THE PROJECT STAKEHOLDERS ...... 33 4. GRIEVANCE REDRESSAL MECHANISM (GRM) ...... 39 5. INSTITUTIONAL ARRANGEMENT ...... 41 6. MITIGATION MEASURES TO MINIMISE THE IMPACTS ERROR! BOOKMARK NOT DEFINED. 7. MONITORING RESULTS- FINDINGS ...... 42 8. FOLLOW UP ACTION, RECOMMENDATIONS AND DISCLOSURE ...... 44

LIST OF TABLES

TABLE 1: Status of Works under Tranche-1 ...... 2

TABLE 2: Social safeguard details (land, affected persons, status) for water supply subprojects ...... 19

Table 3: social safeguard details (land, affected persons, status) for sewerage subprojects ...... 27

Table 4: Details of ConsultatioNS/ DISCUSSIONS ...... 39

TABLE 6: SOCIAL STAFF INVOLVED IN THE PROJECT ...... 41

TABLE 7: STATUS OF OBA TOILETS FROM JULY TO DECEMBER 2019Error! Bookmark not defined.

TABLE 8: Roles and Responsibilities of Institutions in the ProjectError! Bookmark not defined.

LIST OF APPENDEXES

APPENDIX 1: LAND DETAILS FOR SUBPROJECTS ...... 45

ADB KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

APPENDIX 2: LAND OWNERSHIP LETTER FROM THE COMMISSIONER OF CITY CORPORATION FOR CONSTRUCTION OF JACK WELL ...... 50

APPENDIX 3: COPY OF THE LAND RECORDS 40 MLD WTP AT BATHI (DAVANAGERE) .51

APPENDIX 4: LAND RECORDS 20MLD STP SHIVNAGARA ...... 54

APPENDIX 5: LAND RECORDS 5 MLD STP PLANT AVARAGERE ...... 56

APPENDIX 6: DOCUMENTS RELATED TO THE LAND DONATED BY AMARAVATHI HOUSING SOCIETY...... 59

APPENDIX 7: COPY OF THE DOCUMENT RELATED TO THE LAND PROPOSE FOR CONSTRUCTION OHT IN GUTTUR ...... 61

APPENDIX 8: LAND RECORDS OF THE 1LL OHT BYADGI ...... 63

APPENDIX 9: LAND RECORDS OF LAND EARMARKED FOR SEPTIC TANK: AT HAMSABHAVI NEAR AGASANHALLI ...... 65

APPENDIX 10: LAND RECORDS OF LAND EARMARKED FOR SEPTIC TANK...... 69

APPENDIX 11: PUBLIC CONSULTATIONS ...... 71

APPENDIX 12: GRIEVANCE REDRESSAL DETAILS ...... 88

APPENDIX 13: PHOTOGRAPHS OF DISUCSSIONS WITH STEAKHOLDERS AND GRIEVANCE REDRESSALS...... 99

ADB KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

1. PROJECT DESCRIPTION

1.1. Karnataka is one of the most water stressed states in India with approximately 54% of the geographical area declared as drought prone. ADB is assisting the Indian state of Karnataka improve water resources management in selected urban areas of the Upper Tungabhadra sub-basin. Water supply and waste water systems suffer from under-investment throughout the state of Karnataka. Current water supply is intermittent. The absence of scientific wastewater treatment and sewerage systems contaminates ground water posing a health risk to the public. If the issues associated with the poor water management in the state are not resolved, the state’s economic growth will be stunted, public health will deteriorate, and water resource disputes will escalate. 1.2. The Project I of Karnataka Integrated Urban Water Management Investment Program (KIUWMIP, the Program) was initiated by the Asian Development Bank (ADB) with the Government of India (GoI) on Dec 30th 2014 with aims to improve water resource management in urban areas in a holistic and sustainable manner consistent with the principles of Integrated Water Resources Management (IWRM). Investment support is being provided to modernize and expand urban water supply and sanitation (UWSS), and strengthen institutions to improve water use efficiency, productivity, and sustainability. Assistance under the first phase is being used to expand and upgrade water supply and sanitation infrastructure in three towns - Byadagi, Davanagere, and Harihara.

ADB 1 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

TABLE 1: STATUS OF WORKS UNDER TRANCHE-1

Expansion of Sewerage System in Davanagere City (01DVG01)

Areas/ Locations Areas/ Locations % and Achieved up to Achieved July- and distance of achieved Components Unit Total Qty distance December-19 December-19 pipeline laid from against of pipeline July-December -2019 Total Qty to be completed KTJ Nagar, Jali nagar, UGD Network length Km 158.85 158.85 3.15 Bassangouda 99.9% Km badavane,Azad nagar KTJ Nagar, Jali nagar, Flow Test Km 158.85 153.20 10 Bassangouda 96.9% badavane,Azad nagar KTJ Nagar, Jali nagar, Manhole No No 5742 5742 72 Bassangouda 100% badavane,Azad nagar KTJ Nagar, Jali nagar, Bassangouda Road Restoration Km 80 77.42 15.75 96.8% badavane,Azad nagar

KTJ Nagar, Jali nagar, HSC Pipe km 89.64 89.64 0.90 Bassangouda 100% badavane,Azad nagar, KTJ Nagar, Jali nagar, House service No. 7488 7488 73 Bassangouda 100% connection Chambers badavane,Azad nagar,

ADB 2 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Areas/ Locations Areas/ Locations % and Achieved up to Achieved July- and distance of achieved Components Unit Total Qty distance December-19 December-19 pipeline laid from against of pipeline July-December -2019 Total Qty to be completed Over all progress 99.75% EXTRA UGD NETWORK & HSC VARIATION TOTAL COST = 11.05 Cr

Supply km 10.07 3.00 3.00 29.79%

SPS Nagara, Rajivgandhi badavane, Chokipete, SPS Laying km 10.07 2.40 2.40 23.83% Mandkai bhatii, Nagara, Bamboo bazaar road, Rajivgandhi RMC link road. badavane, Chokipete, Road restoration km 10.07 0 0 - Mandkai 0% Manhole Nos 318.00 54 54 bhatii, 16.98% Bamboo SPS Nagara, bazaar Rajivgandhi road, RMC House service badavane, Chokipete, Nos 3075 170 170 link road, 5.5% connection Chambers Mandkai bhatii, Hadai road Bamboo bazaar road, near TV RMC link road. station, SPS Nagara, 110mm dia uPVC Yergunte. Nos 36.90 1.48 1.48 Rajivgandhi 4.0% pipe laying badavane, Chokipete,

ADB 3 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Areas/ Locations Areas/ Locations % and Achieved up to Achieved July- and distance of achieved Components Unit Total Qty distance December-19 December-19 pipeline laid from against of pipeline July-December -2019 Total Qty to be completed Mandkai bhatii, Bamboo bazaar road, RMC link road.

Davanagere bulk water supply (01WS01)

Areas/ Locations and Areas/ Locations % Achieved up to Achieved July- distance of pipeline and distance of achieved Components Unit Total Qty December-19 December-19 laid from July- pipeline to be against December -2019 completed Total Qty

Construction of Intake, Jack Well and Electrical Panel

Civil work of Intake lot 100% 45.00% 6% Rajanahallai Rajanahalli 45.00% well Civil work of Jackwell lot 100% 50.00% 6% Rajanahallai Rajanahalli 50.00% Raw Water Transmission main

Supply of Pipes Km 13.49 13.43 - 99.93% Laying of Pipes and Km 13.49 12.22 0.49 Rajanahalli , Vidya Rajanahalli , Vidya 90.59%

ADB 4 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Areas/ Locations and Areas/ Locations % Achieved up to Achieved July- distance of pipeline and distance of achieved Components Unit Total Qty December-19 December-19 laid from July- pipeline to be against December -2019 completed Total Qty allied works Nagara Nagara Rajanahalli , Vidya Rajanahalli , Vidya Hydrotest Km 13.49 7.16 0.79 58.93% Nagara Nagara

Road restoration Km 13.49 12.22 4.5 90.59%

Water Treatment Plant

Supply lot 100% 15% - Bathi Bathi 15.00%

Construction of new lot 100% 77.93% 13% Bathi Bathi 77.93% 40 MLD

Pure water Rising main from sump to Hillock

Supply of pipes Km 0.63 0.2 - Bathi Bathi 31.75%

Laying of pipes Km 0.63 Bathi Bathi

Over all progress 83.42%

ADB 5 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Davanagere 24x7 Water Supply Scheme (01WS05)

% Areas/ Locations and Achieved up to Achieved July- Areas/ Locations and distance of achieved Components Unit Total Qty distance of pipeline December-19 December-19 pipeline laid from July-December-19 against to be completed Total Qty Clear Water Transmission main

Supply of Pipes km 69.164 67.39 17.55 97% Shamnur, Bathi BIET road and Azad Shamnur, Bathi BIET road and Azad nagara,Basapura,KV nagara,Basapura,KV shety, PB road, shety, PB road, Laying km 69.164 34.32 16.3 Avragere, Devraj Urs, SMK, Budal road, 50% Avragere, Devraj Urs, APMC, Avaragere, Anjaneya mill and SMK, Budal road, Karur. APMC, Avaragere, Anjaneya mill. Shamnur, Bathi BIET road and Azad Shamnur, Bathi BIET road and Azad nagara,Basapura,KV nagara,Basapura,KV shety, PB road, shety, PB road, Hydrotest km 69.164 16.48 5.53 Avragere, Devraj Urs, SMK, Budal road, Avragere, Devraj Urs, 24% APMC, Avaragere, Anjaneya mill and SMK, Budal road, Karur. APMC, Avaragere, Anjaneya mill and Karur. Construction of OHTs(Out of 18 OHTs 14 OHT start)

Karuru, Yaragunta, Devraj URS layout, Karuru, Yaragunta, 18 No. OHTs Lot 100% 36.85% 14.42% 36.85% SSM Layout, Azad Nagar, Kundwada Devraj URS layout,

ADB 6 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

% Areas/ Locations and Achieved up to Achieved July- Areas/ Locations and distance of achieved Components Unit Total Qty distance of pipeline December-19 December-19 pipeline laid from July-December-19 against to be completed Total Qty Zone, Basaveshwara Nagar, SM SSM Layout, Azad Krishna nagar, Subramanya nagar, Nagar, Kundwada Avargere, andhi nagar, TV Station, Zone, Basaveshwara Avaragere, Anjaneya mill, CG Hospitals Nagar, SM Krishna (KV Shetty Park), Nittuvalli nagar, Subramanya nagar, Avargere, andhi nagar, TV Station, Avaragere, Anjaneya mill, CG Hospitals (KV Shetty Park), Nittuvalli Distribution pipe line Supply of Pipes km 1338.67 873.95 521.10 65% Karuru, Yaragunta, Devraj URS layout, SSM Layout, Azad Nagar, Kundwada Karuru, Yaragunta, Devraj URS layout, Zone, Basaveshwara SSM Layout, Azad Nagar, Kundwada Nagar, SM Krishna Zone, Basaveshwara Nagar, SM nagar, Krishna nagar, Halekundwada,Nijaling Halekundwada,Nijalingappa Laying km 1338.67 646.07 443.03 appa badavane,JH 48% badavane,JH patel nagara, KV patel nagara, KV shety,Anjaneyabadavane,Subramanyan shety,Anjaneyabadava agara, ne,Subramanyanagara SOG colony, Bashanagara, DCM , layout, MV park, Basapura, TV station. SOG colony, Bashanagara, DCM layout, MV park, Basapura, TV station.

ADB 7 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

% Areas/ Locations and Achieved up to Achieved July- Areas/ Locations and distance of achieved Components Unit Total Qty distance of pipeline December-19 December-19 pipeline laid from July-December-19 against to be completed Total Qty Karuru, Yaragunta, Devraj URS layout, SSM Layout, Azad Nagar, Kundwada Karuru, Yaragunta, Devraj URS layout, Zone, Basaveshwara SSM Layout, Azad Nagar, Kundwada Nagar, SM Krishna Zone, Basaveshwara Nagar, SM nagar, Krishna nagar, Halekundwada,Nijaling Halekundwada,Nijalingappa Hydrotest km 1338.67 254.37 180.85 appa badavane,JH 19% badavane,JH patel nagara, KV patel nagara, KV shety,Anjaneyabadavane,Subramanyan shety,Anjaneyabadava agara, ne,Subramanyanagara SOG colony, Bashanagara, DCM , layout, MV park, Basapura, TV station. SOG colony, Bashanagara, DCM layout, MV park, Basapura, TV station.

House service connection

Supply no 97589 81000 63000 83%

Sm Krishna Layout, Sm Krishna Layout, Yaragunta, Ss Yaragunta, Ss Layout, Installation no 97589 3723 3282 Layout, Basapura,Kv Shety. Karur, Basapura,Kv Shety. 4% Mandakkibatti, Sog Colony, Karur, Mandakkibatti, Sog Colony, Over all progress 41.60%

ADB 8 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Davanagere STP Physical and Financial Progress (01DVG01A)

Areas/ Locations Areas/ Locations Achieved up to Achieved Jan-june- and distance of and distance of Components Unit Total Qty June-19 19 pipeline laid from pipeline to be Jan to June-2019 completed 100%(O&M Under 5 MLD STP Construction 100% - - 100%(O&M Under Progress) of STPs Progress) completed 100%(O&M Under 20 MLD STP - - Progress) Over all progress 100%

Harihara Bulk Water Supply (01HRA02)

Areas/ Locations and Areas/ Locations % Achieved up to Achieved July- distance of pipeline and distance of achieved Components Unit Total Qty December-19 December-19 laid from July- pipeline to be against December -2019 completed Total Qty Jackwell and allied Works

Construction of Ramp/Bridge and lot 100% 100% - - - 100.0% storm water drain

ADB 9 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Areas/ Locations and Areas/ Locations % Achieved up to Achieved July- distance of pipeline and distance of achieved Components Unit Total Qty December-19 December-19 laid from July- pipeline to be against December -2019 completed Total Qty Raw Water Transmission main and Clear Water Transmission main Supply of Pipes Km 15.43 15.43 - - - 100.00% Laying of Pipes Km 15.43 15.33 - - - 99.35% Hydrotest Km 15.43 15.33 - - - 99.35% Water Treatment Plant

Demolition of Existing lot 100% 100% - - - 100%

Construction of new lot 100% 94% 4% Harihara Harihara 94.0% 20 MLD

Construction of OHTs

10LL at Jijimatha lot 100% 95.00% - Jijimatha Jijimatha 95.00%

15LL at Amaravathi lot 100% 95.00% - Amaravathi Amaravathi 95.00%

Rehabilitation and Replacement of lot 100% 100% 20% Harihara Harihara 100.00% Pumping Machineries at Head Works Rehabilitation of lot 100% 80.00% - Harihara Harihara 80.00% Existing WTP Over all progress 95.76%

ADB 10 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Expansion of Sewerage System in Harihara City (01HRA01)

Areas/ Areas/ Locations % Locations and Achieved up to Achieved July- and distance of achieved Components Unit Total Qty distance of December-19 December-19 pipeline laid from against pipeline to be July-December-2019 Total Qty completed - UGD Network length Km 74.39 74.39 - 100.0%

Hydrotest Km 74.39 74.39 - - 100.0% Road Restoration Km 74.39 74.39 - - 100.0% Manhole No No 2530 2528 - - 99.9% - Rising Main Km 4.22 4.22 100.0%

House service - 100% Km 62.06 62.60 - connection Pipe line Four wet wells and 98.50% No Construction of 4 wet wells 18 MLD STP 98.50% Construction of 18 MLD FAL Type STP

Over all progress = 99.42%

HSC Variation(4.87 Cr)

House service Amaravathi Amaravathi Km 31.574 1.50 1.5 colony,Jijimatha colony,Jijimatha 4.75% connection Pipe colony, Jaibeem colony,

ADB 11 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Areas/ Areas/ Locations % Locations and Achieved up to Achieved July- and distance of achieved Components Unit Total Qty distance of December-19 December-19 pipeline laid from against pipeline to be July-December-2019 Total Qty completed line nagra,Majjige layout Jaibeem and Anjinaya nagra,Majjige badavane layout and Anjinaya badavane Amaravathi Amaravathi colony,Jijimatha House service colony,Jijimatha colony, colony, Jaibeem Jaibeem connection No 5922 475 475 8.02% nagra,Majjige layout nagra,Majjige Chambers and Anjinaya layout and badavane Anjinaya badavane

ADB 12 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Harihara Water Supply Distribution (01WS04)

Areas/ Locations and Areas/ Locations % Achieved up to Achieved July- distance of pipeline and distance of achieved Components Unit Total Qty December-19 December-19 laid from July- pipeline to be against December-2019 completed Total Qty

Pipeline works

Supply of Pipes km 263.504 257.840 0 97.85%

Guttur, Ashraya Guttur, Ashraya colony, Harlapura, IB, colony, Harlapura, Laying of Pipes km 263.504 214.07 52.31 Amaravathi, New 71.63% IB, Amaravathi, DRM, Old DRM, New DRM, Old Indranagara, DRM, Indranagara,

Guttur, Ashraya Guttur, Ashraya colony, Harlapura, IB, colony, Harlapura, Restoration of roads km 100% 35% 15% Amaravathi, New 35% IB, Amaravathi, DRM, Old DRM, New DRM, Old Indranagara, DRM, Indranagara,

Guttur, Ashraya Guttur, Ashraya colony, Harlapura, IB, colony, Harlapura, Hydro test km 263.504 230.59 70.14 Amaravathi, New 87.51% IB, Amaravathi, DRM, Old DRM, New DRM, Old Indranagara, DRM, Indranagara,

ADB 13 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Areas/ Locations and Areas/ Locations % Achieved up to Achieved July- distance of pipeline and distance of achieved Components Unit Total Qty December-19 December-19 laid from July- pipeline to be against December-2019 completed Total Qty House service connection Supply of HSC meter no 14000 14000 0 100% 84% Guttur, Ashraya Guttur, Ashraya colony, Harlapura, IB, Installation of HSC colony, Harlapura, no 14000 6908 4830 Amaravathi, New meter IB, Amaravathi, DRM, Old DRM, New DRM, Old Indranagara, DRM, Indranagara,

OHT s Court Zone 65% no 100% 65% 51% Indira Nagar 2 no OHTs Bulk flow meters and 70% other works Providing Simple Automation to lot 100% 65% 65% Guttur,Arlpura Pumping Station and DRM,Amaravathi to Control Valves at OHT's

Rehabilitation of OHTs

Rehabilitation works & 85% lot 100% 85% 77% Guttur,Arlpura Other works DRM,Amaravathi Over all progress 84.86%

ADB 14 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Byadgi Water Supply Distribution (01WS03)

Areas/ Locations and Areas/ Locations % Achieved up to Achieved July- distance of pipeline and distance of achieved Components Unit Total Qty December-19 December-19 laid from July- pipeline to be against December-2019 completed Total Qty Supply of Pipes km 112 112 0.00 100 Vidya nagar ,Nehru Vidya nagar ,Nehru Nagar, Bettada Nagar, Bettada Hillock, Gandhi Laying of Pipes km 112 95.35 18.73 Hillock, Gandhi Nagar, 85.0% Nagar, Kollur Kollur camp, camp, Agasenahalli Agasenahalli Vidya nagar ,Nehru Vidya nagar ,Nehru Nagar, Bettada Nagar, Bettada Hillock, Gandhi Hydrotest km 112 49.80 14.28 Hillock, Gandhi Nagar, 40.81% Nagar, Kollur Kollur camp, camp, Agasenahalli Agasenahalli

House service connection 98% Supply of HSC meter no 7389 7259 0

Vidya nagar ,Nehru Vidya nagar ,Nehru 49.99% Nagar, Bettada Nagar, Bettada Installation of HSC no 7389 3690 2055 Hillock, Gandhi Nagar, Hillock, Gandhi meter Kollur camp, Nagar, Kollur Agasenahalli camp,

ADB 15 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Areas/ Locations and Areas/ Locations % Achieved up to Achieved July- distance of pipeline and distance of achieved Components Unit Total Qty December-19 December-19 laid from July- pipeline to be against December-2019 completed Total Qty Agasenahalli

Construction of OHT

Construction of 1 LL 94% lot 100% 94% 6% Nehru Nagar OHT Nehru Nagar

Rehabilitation of OHTs

Rehabilitation works & - 50% lot 100% 50% 0% - Other works Over all progress 59.68%

Byadgi Bulk Water Supply (01BDG02)

Areas/ Locations and Areas/ Locations % Achieved up to Achieved Jan-june- distance of pipeline and distance of achieved Components Unit Total Qty June-19 19 laid from Jan to pipeline to be against June-2019 completed Total Qty Supply of Pipes Km 8.7 8.7 Work completed 100.00% 100% Work completed Laying of Pipes Km 8.7 8.7 100.00% 100% Over all progress 100%

ADB 16 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Byadgi Sewerage and STP (01BDG01)

Areas/ Locations and Areas/ Locations % Achieved up to Achieved July- distance of pipeline laid and distance of achieved Components Unit Total Qty December-19 December-19 from July-December - pipeline to be against 2019 completed Total Qty Malur STP road, Sangameshwara Malur STP road, Nagara, Sangameshwara Nagara, GUmnahalli Road GUmnahalli Road to old UGD Network length to old Mallur Road, Km 78.21 73.44 4.05 Mallur Road, Halepet, 84.4% Km Halepet, Kadaramandlgi, Kadaramandlgi, Vinayaka Nagara, Vinayaka Nagara, Gandhi Nagar, Islampur Gandhi Nagar, Islampur Malur STP road, Malur STP road, Sangameshwara Nagara, Sangameshwara GUmnahalli Road to old Nagara, Mallur Road, Halepet, GUmnahalli Road Kadaramandlgi, to old Mallur Road, Manhole No No 2540 2208 83 75.4% Vinayaka Nagara, Halepet, Gandhi Nagar, Islampur Kadaramandlgi, Vinayaka Nagara, Gandhi Nagar, Islampur Sangameshwara Nagara, Sangameshwara HSC Pipe km 35.00 33.2 3.12 Halepet, Kadaramandlgi, Nagara, Halepet, 97.0% Vinayaka Nagara, Kadaramandlgi,

ADB 17 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Areas/ Locations and Areas/ Locations % Achieved up to Achieved July- distance of pipeline laid and distance of achieved Components Unit Total Qty December-19 December-19 from July-December - pipeline to be against 2019 completed Total Qty Gandhi Nagar, Islampur Vinayaka Nagara, Gandhi Nagar, Islampur Halepet, House service Halepet, Kadaramandlgi, Kadaramandlgi, connection No. 2730 2420 262 Vinayaka Nagara, Vinayaka Nagara, 79.0% Chambers Gandhi Nagar, Islampur Gandhi Nagar, Islampur 5 MLD SBR type STP Lot 100% 95.00% - Byadgi Byadgi 95.0% Over all progress 83.46% HSC variation(2.27 Cr) HSC Pipe Km 25.69 House service connection No 1020 Chambers Note: 1. Pipe lines are laid on one said of the road as per plan. If the People other side of the road has to get connection, the road has to be cut and spoiled

2. People are asking for more number of connections. Under construction houses not enumerated have a demand for connections. Some people are rejecting the HSC as they have the bore wells and the directions and length are not suitable to their requirement.

Source: Monthly reports of EGIS Consultant and GKW Consultant

ADB 18 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

2. DETAILS OF LAND PROCURED IN THE PROJECT 2.1. Detailed attention was paid in detail design phases of the project preparation to avoid and minimize adverse social impacts on land acquisition and resettlement. The details of the social land purchased,, donated and payments made are presented in the table below.

TABLE 2: Social safeguard details (land, affected persons, status) for water supply subprojects Details of Cutoff Project Land Date Sl. Package components Name of Required Affecte Status/ Re- N Name and as per the the City and d Settlement Impact o Number approved Acquired Persons RP/DDR (Ha)

New 40 MLD Built on None No impact- within 15th water existing site; the existing ULB November treatment owned by land and also 2016 plant at ULB; besides existing existing site unused; no WTP. According to at Bathi. adverse land records( RTC)

effects on 8.20 acres in

Davanager neighbourin village

e Bulk g properties of Hobali karaba in

Davanager water Davanagere shows 1 supply e that the land Package belongs to ULB and no: the survey number 01WS01 of these land is 227 March 2017 Laying of Along None No impact. Pipe 13.40 km ROW lines will be laid in raw water the ROW. transmission main.

ADB 19 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Details of Cutoff Project Land Date Sl. Package components Name of Required Affecte Status/ Re- N Name and as per the the City and d Settlement Impact o Number approved Acquired Persons RP/DDR (Ha)

Construction Built on None No impact. Jackwell of new jack existing site; will be constructed well (120 owned by next to the existing MLD) at ULB; jack well and the Rajanalli unused; no land belongs to village. adverse ULB. The land effects on ownership letter neighbourin from the g properties Commissioner of City Corporation Davanagere to the Task Manager, KUIDFC-KUIWIP, Bangalore Dated 23-11-2016 shows that 1 acre 19 guntas of land with survey no 104/P6 at Rajanahalli village belongs to ULB. Refer annexure no.2

Construction Along None No impact Govt. of 150 mt. ROW Nalla RCC bridge over Sulekere nalla.

Construction Along None No impact- ULB of clear ROW land and also in the water existing WTP site. reservoir and pumping main (612 m MS pipe ; 1118 mm dia)

ADB 20 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Details of Cutoff Project Land Date Sl. Package components Name of Required Affecte Status/ Re- N Name and as per the the City and d Settlement Impact o Number approved Acquired Persons RP/DDR (Ha)

None No impact. Along 30th Sept Laying of Along ROW the ROW 2016 60.66 km

pipeline from WTPs (Bathi and Kundwada) to OHTs. None All the OHTs will be Construction constructed in the of 19 OHTs. 0.023 Ha ULB lands. The required for Land ownership each OHT letter form (total of 0.44 Commissioner City Ha) Corporation Built on ULB Davanagere to the Davanager owned sites; Task Manager e water unused; no KUIDFC-Bangalore Davanager supply adverse dated 17-10-2014 2 Distribution e effects on mentioned that the network adjacent site for OHTs Package properties belongs to ULB. no: Refer annexure 01WS05 no.3 for ownership None No impact. Along Laying of the ROW 1,174 kms of distribution Along network ROW pipelines. None No impact Providing 97,589 Onsite House service Réhabilitatio None No impact- Civil, n of existing Mechanical and assets/ Onsite Electrical structures rehabilitations works are in the existing

ADB 21 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Details of Cutoff Project Land Date Sl. Package components Name of Required Affecte Status/ Re- N Name and as per the the City and d Settlement Impact o Number approved Acquired Persons RP/DDR (Ha)

Built on None No impact- ULB 1st March Construction land and within the 2017 of 20 MLD existing site; Water existing WTP site. owned by treatment Plant at the ULB; existing site unused; no (upgrading existing 9 adverse MLD WTP) effects on

Harihara neighboring Bulk water supply properties

Package no: Harihara 01HRA02

March 2017

Revised in

July 2018

3

ADB 22 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Details of Cutoff Project Land Date Sl. Package components Name of Required Affecte Status/ Re- N Name and as per the the City and d Settlement Impact o Number approved Acquired Persons RP/DDR (Ha)

Construction 0.02 Ha of None 0.02 Ha of land in of 2 new land the Amravathi ELSR in identified in Housing Society government the was donated to the lands at Amravathi CMC in June 2014. Guttur Housing According to the Colony and Society Resolution of Amaravathi Amaravathi House Housing 0.02 Ha of Building Corporative society. land Society and the identified on letter to ULB land in Commissioner CMC Guttur dated 26-07-2012, one meeting was assemble on 12th July 2012, Thursday at 6pm and only G B members for present. With reference to CMC, Commissioner’s letter No- KMRP/CR/Misc/202 -13 dated 30th June 2012, it was agreed and 50ft X 50ft land for construction of OHT was handed over. Annexure no.6

ADB 23 KUIDFC -KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Details of Cutoff Project Land Date Sl. Package components Name of Required Affecte Status/ Re- N Name and as per the the City and d Settlement Impact o Number approved Acquired Persons RP/DDR (Ha)

With reference to proceedings of the General Body Meeting held on 23- 12-2013 at 11Am in Guttur Gram Panchayath Meeting Hall chaired by President Mr. A.K Kotrappa, the members unanimously agreed to provide the site measuring 50ft X 50ft in Guttur. Copy of the document of Guttur enclosed in Annexure No.7

Providing None No impact. Pipe line new raw will be laid in the water Along ROW ROW. pumping main from Jack well at Providing None 85 vendors were new clear identified as water temporarily affected pumping persons in input main for a date of survey along length of the Harapanahalli 11,770 m Shivamogga road. from WTP to Along ROW In April 2018, trial individual pits were dug and storage old pipe lines were reservoirs identified. The (total pipeline alignment of the to be laid is pipeline was moved 15,810 m to the other (right including raw towards water Shivamogga). No pumping vendors are

ADB 24 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Details of Cutoff Project Land Date Sl. Package components Name of Required Affecte Status/ Re- N Name and as per the the City and d Settlement Impact o Number approved Acquired Persons RP/DDR (Ha)

On existing None No impact. site Rehabilitation works are within the existing jack well Rehabilitatio n and augmentatio n of existing jack well;

None No impact. 26th Distribution Distribution network Septembe Network of Along ROW 178.59 km pipelines will be laid r 2016 along the ROW Harihara Water Onsite None No impact. Installation of supply 14,000 4 Harihara Distribution domestic network meters Package no: 16 Bulk Onsite None No impact. 01WS04 Meters to be installed at clear water transmission mains Providing None No impact. pipelines 9th Byadgi Bulk new pipe for Along ROW will be laid along the February water the section ROW 2017 supply 5 Byadgi from 20020 Package Number: laying of 8.7 None No impact. 01WS02 km 400 mm Along ROW Distribution network March 2017 Diameter DI pipelines will be laid K-9 class along the ROW th Byadgi Laying of None No impact. 10 water 101.5 Kms of Distribution network February proposed pipelines will be laid 2017 6 Byadgi supply Distribution Distribution Along ROW along the ROW network network Package

ADB 25 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Details of Cutoff Project Land Date Sl. Package components Name of Required Affecte Status/ Re- N Name and as per the the City and d Settlement Impact o Number approved Acquired Persons RP/DDR (Ha)

no: Construction None No impact- ULB 01WS03 of one new land. OHT will be OHT of 1 ll constructed besides capacity at the existing OHT. Nehrunagar The above land with survey No.42+42 in Nehru Nagar at Built on 0.05 Byadgi was certified Ha of ULB owned site; by the Chief Office, unused; no TMC, Byadgi. Refer adverse annexure No.8 for effects on land owner ship adjacent details properties

Providing Onsite None No impact. new House Service connections for about 7389 Nos.

Source:

1) Davanagere Bulk water supply, Due Diligence report, Page No 5-13. For water supply Distribution, Davangere, Due Diligence Report, March, 2017, p. 2-13

2) Harihara Bulk water supply, Revised Due Diligence report, Page No 1-7. Harihara Due Diligence Report, March, 2017, p.1-11

3) Byadgi Bulk water supply, Due diligence report, Page No 1-14. Bydagi Due Diligence Report, March 2017, P. 1-4

Note:

1. For Land Detail and Records please verify from Appendix 01 to Appendix10

2. There are no issues for social safeguards.

ADB 26 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

TABLE 3: SOCIAL SAFEGUARD DETAILS (LAND, AFFECTED PERSONS, STATUS) FOR SEWERAGE SUBPROJECTS

Sl. Name of Package Project Details of Cutoff Name and No the City components Land Date Number Affected Status/Resettlement as per the Required Persons impact approved and RP/DDR Acquired (Ha)

Construction None No impact- sewer 3rd April of 149.13 km network will be laid 2014 Davanagere Along ROW sewer along ROW. City Network Sewerage Onsite and Provide None No impact. sanitation 46,981 UGD scheme house service Package connections No: in 01DVG01 Davanagere. May 2018 1 Davanagere Construction None No impact. Trunk of 8.45 km Along ROW main pipe line will be trunk main. laid along ROW.

Construction None No impact- ULB land. of 20 MLD Refer annexure 4 for Built on 2.02 capacity the land ownership Ha of ULB Package SBR type details owned land; No: sewerage unused; no 01DVG01A treatment adverse May 2018 plant at effects on Sivanagara. adjacent properties

ADB 27 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Sl. Name of Package Project Details of Cutoff Name and No the City components Land Date Number Affected Status/Resettlement as per the Required Persons impact approved and RP/DDR Acquired (Ha)

Construction 0.80 Ha of 2 0.10 Ha of land was of 5 MLD ULB land was purchased through capacity identified for negotiated settlement SBR type the STP. from the two affected sewerage persons for Rs. However, treatment 4,50,000/- 0.10 Ha of plant at land was Based on the survey Avaragere. identified for conducted,the two access to the affected persons STP that were identified as belongs to vulnerable and private parties further assistance (0.06 Ha was provided. belonging to Additional assistance Mr of Rs 72,000/- for 2 Nagarajappa landowners (@ Rs36, and 0.04 Ha 000/- per person paid belonging to on 20.12.2018 and Mr Rs 80,000/- @ Rs Kalleshappa 40,000/- per person Sidappa) paid on 28.12.2018 towards purchase of agricultural equipments. Refer annexure 5 for the land ownership details.

Construction 26th

of 4 pumping Sept stations at: • 0.01 Ha at 1 Rs. 1, 20,000/- paid 2016 APMC through negotiated Harihara, APMC Yard, settlement. for APMC • Sewerage Kesav 0.02 Ha of Land.(Govt ULB land and Nagar, Department) in June at Drainage Amaravathi 2014 Kesavnag Harihara housing 2 Package ar 0.02 Ha of land in the No: society and • 0.02 Ha of Amravathi Housing 01HRA01 Guttur. land in the Society was donated March 2017 Amravathi to the CMC in June Housing 2014

Society Land was purchased • 0.02 Ha in through negotiated Guttur settlement for Rs. 1, belonging 37,500/- paid for

ADB 28 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Sl. Name of Package Project Details of Cutoff Name and No the City components Land Date Number Affected Status/Resettlement as per the Required Persons impact approved and RP/DDR Acquired (Ha) Construction None No impact- sewerage of Sewerage network pipe line will network of be laid along the 72.16 km Along ROW ROW.

ADB 29 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Sl. Name of Package Project Details of Cutoff Name and No the City components Land Date Number Affected Status/Resettlement as per the Required Persons impact approved and RP/DDR Acquired (Ha) Construction 8.01 Ha of 3 Negotiations were of 18 MLD land were conducted with the STP identified by land owners by the the ULB for Deputy construction Commissioner, of STP. Davanagere on 25-1- 2018. KUIDFC A complaint of transferred Rs 35 encroachment lakhs to KUIDFC- by three RPMU Davanagere farmers with (input date) to properties purchase the land adjacent to through a negotiated the site was settlement. In the registered meantime, two of the with the ULB three land owners on 13-6-2017. passed away. New The revenue negotiations were department conducted with the (GoK) families and the conducted a property was new survey purchased through a and confirmed negotiated settlement that 0.74 Ha as a joint property of belonged to the family. The SDO the farmers. KUIDFC RPMU Davanagere and SO- PMDCSC assisted the families at the Sub Registrar’s office, Harihara with the procedure to sell and transfer the land to the ULB. The land registration process was completed on 10th August 2018 with 0.74 Ha registered in the name of Harihara ULB.

Construction None No impact. Sewer 16th Byadgi of a total of network will be laid March 3 Byadgi Town 82. 2 km along ROW. 2015 Sewerage sewer Along ROW subproject network (includes Package 2.9 km

ADB 30 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Sl. Name of Package Project Details of Cutoff Name and No the City components Land Date Number Affected Status/Resettlement as per the Required Persons impact approved and RP/DDR Acquired (Ha) No: trunk main, 01BDG01 2.07 km sub main, and January 77.23 2017 laterals) 6206 UGD Onsite None No impact. HSC in Byadgi

Construction None No impact. Manholes of Manholes Along ROW will be constructed (3202) along the ROW.

3.34 Ha was 3.34 Ha was Construction 3 required for purchased through a of 5 MLD capacity STP the site at negotiated settlement Teredehalli. in March 2015 from This property Mr Girish Siddana belonged to Gouda Patil. Mr Girish Siddana 0.08 Ha was Gouda Patil. purchased in March 2015 through a 0.08 Ha was negotiated settlement required as from Mr Krishnappa an approach Hubballi (0.05 Ha) road to STP. and Mr MB Koppada The land (0.03 Ha belonged to Mr A survey was Krishnappa conducted on 16-3- Hubballi (0.05 2015 to assess the Ha) and Mr socio- economic MB Koppada status of the project (0.03 Ha) affected persons.

All 3 APs have been paid on 09.03.2015 and the total land costis Rs.1,36,12,550/-

Construction Built on 0.05 None No impact- ULB land. of: 0.03 ML Ha of ULB Refer annexure -9 for septic tank in owned land in land details. Hamsabhavi. Agasanahalli; unused; no adverse effects on adjacent

ADB 31 KUIDFC-KIUWMIP

``KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Sl. Name of Package Project Details of Cutoff Name and No the City components Land Date Number Affected Status/Resettlement as per the Required Persons impact approved and RP/DDR Acquired (Ha) properties

Source: 1) Davangere UGD, Resettlement Plan, Page No: 1-14. 2) Harihara UGD, Resettlement Plan, Page No: 2-11. 3) Byadgi UGD, Resettlement Plan, Page No: 1-5 Note: 1. For Land Detail and Records please verify from Appendix 01 to Appendix 10

2. There are no issues for social safeguards.

ADB 32 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for January - June 2019

3. GENDER AND SOCIAL DIMENSIONS

Issues and Challenges

Activities and Targets Achievements (Please include reasons why an activity was not fully implemented, or if targets fall short, or reasons for delay, etc.)

Overall gender focused awareness building and social mobilization activities

Activity 1. Towns Number of Number of participants events Build awareness on gender issues and ensure planned Total Male Female women’s participation in the implementation and monitoring of project activities Davangere 6 282 60 222

Harihar - - - -

Target 1. Partnership with NGO developed to Byadgi - - - - conduct social marketing, social mobilization, and behavior change communications focused Total 6 282 60 222 on gender, health, hygiene, and sanitation (40% female participation)

9Target 2. 3 gender and social inclusion Towns Number of No. of participants focused workshops conducted for women and workshops men staff of KUIDFC, ULBs, PMU, PIUs (>33% planned Total Male Female women participation) [Davangere–1 workshop, The gender and social inclusion Harihar–1 workshop, Byadgi–1 workshop]) Davangere 1 9 9 - focused work shop was conducted at Davanagere on 16.12.2019. foe all 3 Harihar 1 6 6 - project towns and total 18 participants participated in the above workshop. Byadgi 1 3 3 -

Total 3 18 18 -

Output. Expanded and upgraded UWSS infrastructure in three towns of the Upper Tunga Bhadra Subbasin

ADB 33 KUIDFC-KIUWMIP KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for January - June 2019

Activity 2. Towns HH targets FHH BPL targets

Rehabilitation and upgrade of inefficient water 97589 Target Achieved Target Achieved Target Achieved supply systems Davangere 14050 3282 11% 361 17% 557 SC / ST

Harihar 14000 4830 7% 338 36% 1738 Target 3. Byadgi 7381 2055 6% 123 37% 760 16% 525 Households, including for female–headed, BPL/other disadvantaged and SC households1 provided with upgraded, metered water connections and receive 24x7 water supply in 12% 579 program ULBs.2 18% 369

Total 35431 10167 822 2355 1473

Activity 3. Towns HH targets FHH Targets BPL targets SC / ST

Expansion of sanitation, sewerage networks, Target Achieved Target Achieved Target Achieved sewage treatment capacity and effluent reuse infrastructure Davangere 220 170 11% 18 17% 28

Harihar 576 475 7% 33 36% 171 16% 27

Target 4. Byadgi 300 262 6% 15 37% 96

Household coverage of sewerage connection Total 1096 907 66 295 12% 57 increased in the program to cover entire ULBs.3

1. These include households in notified and un-notified slums in the project areas, 70%-87% of whom own their dwellings, but are equally vulnerable.

2. Town–wise targets: Davanagere: 44,000HHs (FHHs – 11%, BPL/other disadvantaged HHs–17%, SC/ST HHs–16%), Harihar: 7,000 HHs (FHHs–7%, BPL/other disadvantaged HHs– 36%, SC/ST HHs–12%), Byadgi: 1,000 HHs (FHHs–6%, BPL/other disadvantaged HHs–37%, SC/ST HHs–18%)

3. Town–wise targets: Davanagere: 44,500 HHs (FHHs –11%, BPL/other disadvantaged HHs–17%, SC/ST HHs–16%), Harihar: 11,500 HHs (FHHs–7%, BPL/other disadvantaged HHs–36%, SC/ST HHs–12%), Byadgi: 4,000 HHs (FHHs–6%, BPL/other disadvantaged HHs–37%, SC/ST HHs–18%)

ADB 34 KUIDFC-KIUWMIP KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for January - June 2019

18% 47

131

Target 5. (DMF Indicator 1.2. (4)) Towns Targets Achievements

5,000 household toilets for the poor and other July to Dec-2019 Cumulative disadvantaged households (including low income female headed households) in program Davangere 3800 375 3302 ULBs constructed and connected to the sewer network. (individual household toilets- Harihar 700 49 284 Davanagere=3800, Harihar=700, Byadgi=500) Byadgi 500 32 251

Total 5000 456 3837

Implementation of existing government policies that ensures affordability of water user rates and installation of household toilets in accordance with the ‘Swachh Bharat mission’.

Output 2. Improved water resources planning, monitoring and service delivery in Karnataka

Activity 4. Target Number of IEC leaflets5 disseminated in each town Improved communication and citizen, including Towns The target already achieved in the women’s, participation. previous reporting period. Davangere 2,000 2000

Harihar 1,000 1000

5. Annex copy of leaflets developed

ADB 35 KUIDFC-KIUWMIP KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for January - June 2019

Target 6. (DMF Indicator 2.3 (2))4 Byadgi 500 500

3,500 IEC leaflets developed and disseminated Total 3,500 3500 to spread awareness on water conservation, health, hygiene and sanitation issues (Target: Davanagere–2,000, Harihar–1,000, and Byadgi–500).

Target 7. (DMF Indicator 1.2. (5))6 CWG targets Number of CWGs CWG members formed 75 CWGs, with equal participation of women in Towns Total Male Female each CWG, formed to promote positive behavior There is no progress during the reporting in health, hygiene and sanitation issues Davangere 25 100 2963 744 2215 period because there were no NGOS in (Davanagere–25, Harihar–25, Byadgi–25) place to perform the activities. It will be Harihar 25 20 1440 309 1131 achieved in the next reporting period provided NGO services obtained. Byadgi 25 20 1755 310 1445

Total 75

Target 8. (DMF Indicator 2.3 (1))7 Number of trainings No. of participants There is no progress during the reporting Social and behavioral change training program Towns Total Male Female period because there were no NGOS in for CWG members on toilet demand creation, place to perform the activities. It will be social leadership, health, hygiene and sanitation Davangere achieved in the next reporting period conducted for women and men, including provided NGO services obtained. promotion of ODF communities. (Town–wise Harihar

4. DMF Indicator-IEC leaflets disseminated to spread awareness on gender equality, health, hygiene and sanitation prepared.

6. DMF Indicator- Community water groups in 3 towns, with equal participation of women, formed to promote water conservation, hygiene, and sanitation

7. DMF Indicator- Social and behavioral change programs conducted across three ULBs conductedfor community members, including women, men and adolescent girls.

ADB 36 KUIDFC-KIUWMIP KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for January - June 2019

targets of participants by sex (50:50)) Byadgi

Total

Output 3: Strengthened KUIDFC capacities

Activity 5. (DMF Indicator 3.1 (3))8

Improved financial intermediation capacity

Procedures to assess and monitor social and gender equality related impacts of subprojects and staff capacity re-evaluated and approved

Activity 6.

Project management system operational

PMIS containing social and gender related monitoring indicators developed and implemented

Sex–disaggregated data collected, analyzed and findings disseminated to address implementation gaps

Activity 7. Number of ULB trainings Participants (T/M/F)

Improved ULB administrative capacity building Total Male Female

8. DMF Indicator- Procedures to assess and monitor theeconomic, social, gender equality, andenvironmental impact of subprojectsapproved.

ADB 37 KUIDFC-KIUWMIP KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for January - June 2019

Target 10 (DMF Indicator 3.2 (1))9

Women participation in training programs (>33%).

9. DMF Indicator- Capacity development programs developed and tested with water sector staff of target ULBs in Tranche 1 towns (target: >75 officials, of which 33% women).

ADB 38 KUIDFC-KIUWMIP KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for January - June 2019

4. CONSULTATIONS/ DISCUSSION WITH THE PROJECT STAKEHOLDERS

4.1. Consultation/discussion with the project stakeholders and information dissemination is a continuous process and needs to be pursued at every stage of the project. 5. Consultation/discussion with the stakeholders during implementation of sub project is required to create awareness about the sub project to be implemented in their area and also to ensure their support for project implementation. . During the reporting period total 175 stakeholders are informed and consulted about the sub-project, and allowed to participate actively in the development of the sub-project. The consultations are held with special emphasis on vulnerable groups. 5.1. Resettlement plans are available at prominent government offices, ward offices and ULB offices and on ULB, KUIDFC and ADB websites. 5.2. Details of the consultations/discussions with the stakeholders during the reporting period are as follows:

TABLE 4: DETAILS OF CONSULTATIONS/ DISCUSSIONS

Name of the City Number of stake holders consulted

Comments July to December 2019

PHE connections restoration in Davangere 65 case affected. Overburden soil removal. PHE connections restoration in case affected. Harihara 72 Road restoration Dust and noise problem.

PHE connections restoration in case affected. Byadagi 38 Road restoration Dust and noise problem.

TOTAL 175 Note: See Appendix No 11

6. GRIEVANCE REDRESSAL MECHANISM (GRM)

6.1. As per the orders of Joint Managing Director KUIDFC, an Official Memorandum dated 28th June 2017 was issued for the concerned for formation of project specific

ADB 39 KUIDFC-KIUWMIP KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for January - June 2019

grievance redress mechanism (GRM). A copy of Official Memorandum is available in the Resettlement Plan/ DDR of each subproject. The GRC has been established to receive, evaluate and facilitate concerns of, complaints and grievances of the affected persons in relation to project’s social and environmental performances. The main objective of the GRM is to provide time bound action and transparent mechanisms to resolve social and environment concerns. 6.2. There are multiple means of registering grievances and complaints by dropping grievance forms in complaint/ suggestion boxes at accessible locations, or through telephone hotlines, email, post or writing in a complaint registrar book in ULB’s project office. There is a complaint registrar book and complaint boxes at construction site office to enable quick response of grievances/ complaints for urgent matters. The name, address and contact details of the persons with details of the complaint/grievance, location of problem area, date of receipt of complaint will be documented. The RPMU’s Safeguards Officer is responsible at the project level for timely resolution of the environmental and social safeguards issues and registration of grievances, and communication with the aggrieved persons.

TABLE 5: STATUS OF GRIEVANCES RECEIVED Sl Project Town No. of Grievances No. of Nature of No. Received (July to Grievances Grievances December 2019) Resolved

Regarding excess soil, waterline damage and 1 Davanagere 76 76 electrical cable damage.

Regarding soil removal, Water 2 Harihara 80 80 supply pipe line broken.

Regarding excess 3 Byadgi 29 29 soil

Note : For Details See Appendix No 12

ADB 40 KUIDFC-KIUWMIP KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for January - June 2019

7. INSTITUTIONAL ARRANGEMENT TABLE 6: SOCIAL STAFF INVOLVED IN THE PROJECT

Office Name Work Designation Contact Details e-mail ID PMU Sri RC Mohan KUIDFC-Bangalore Task Manager 080-25196124 [email protected] PMU Smt Jayamala KUIDFC-Bangalore Deputy General Manager 9849867646 [email protected] PMU Sri Shashisekhar SP KUIDFC-Bangalore AEE-(Env & Social Safeguards 080-25196124 [email protected]

PMU Sri M. Anjinappa KUIDFC-Bangalore Social Development Officer 080-25196124 [email protected]

RPMU Sri. C.Ravi RPMU-Davanagere EE 08192-224433 [email protected] Sri RPMU-Davanagere RPMU Superintendent Engineer 08192-224433 [email protected] A.Sidlabasappa

RPMU Sri.Shivakumar K RPMU-Davanagere Social Development Officer 9986532839 [email protected]

Sri GKW Consult- GKW Prakash Davangere Team Leader 08192-224477 [email protected] Consult Abbigere

Egis ConsultDavangere Egis Consult Sri Sanjay S Kalal [email protected] Team Leader 08192-224477

GKW GKW Consult- Social Development Specialist Sri Balakrishna 08192-224477 gkw.davanagere@gmail. com Consult Davangere

Egis Consult M.Venkataramana Social Development Specialist 08192-224477 [email protected] Egis Consult

ADB 41 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

7.1. The Karnataka Urban Infrastructure Development and Finance Corporation (KUIDFC): is the nodal executing agency (EA) responsible for implementing KIUWMIP. KUIDFC is a fully owned Government of Karnataka (GoK) company incorporated under the Companies Act, 1956. It has appointed a AEE Env & social safeguards along with Social Development Officer (SDO) at KUIDFC Bengaluru to coordinate and monitor community development activities and resettlement implementation across project towns. 7.2. The Regional Program Management Unit (RPMU): Package-1 has been established within the Investment Program area to oversee implementation. Deputy Project Director (DPD) heads the Regional Office. S/he is responsible for Investment Program planning, preparation of sub-project plans and estimates, coordination, technical guidance and supervision, financial control, and overall sub-projects monitoring. A Social Officer (SO) was appointed at RPMU Davanagere in July 2015 to look after the RP implementation. The Safeguards Officer (SO) assists in coordinating safeguard tasks. The SO will assist the urban local bodies (ULB) on the selection of beneficiaries and proper implementation of the project, monitoring and supervising of project activities regarding social development, resettlement plans etc. under instructions of Task Manager/ Superintending Engineer, PMU/RPMU respectively. 7.3. In each PIU, an Assistant Engineer (safeguards) coordinates the safeguards related tasks at PIU/town level. For Tranche 1, PIUs are established at Davangere, Harihara and Byadagi. A PMDCSC assists the PMU and PIUs in the implementation of the entire investment program including compliance with the EARF and resettlement framework. PMDCSC is stationed in Davanagere with field teams in each of the PIUs. PMDCSC team includes an Environmental Specialist and a Social Safeguards and Gender Specialist to prepare, implement and monitor all safeguards activities and ensure safeguards compliance. At the civil works stage, contractors’ staff will include Safeguards/Environment, Health and Safety (EHS) engineer EMP implementation. 7.4. In January 2019, a new PMDSCS, EGIS Consultants was appointed. And correspondingly a new social safeguards specialist is in place. The services of GKW consultant have been extended up to December 2019 on 13.08.2019. NGOs contract ended by 20th April 2019. There is a proposal in KUIDFC office to extend the services of NGOs. The contactors appointed safety officers for their sites.

8. MONITORING RESULTS- FINDINGS

8.1. Monitoring involves periodic checking to ascertain whether activities are progressing according to RP. Monitoring covers physical and financial components and provides feedback to keep the program on schedule. 8.2. . 8.3. The RPMU /PMDCSC monitors the sub-projects on a half yearly basis (Semiannual Social Monitoring Report- SSMR) and submits a report directly to the KUIDFC. PMDCSC also submits a monthly progress report to KUIDFC. KUIDFC submits the SSMR to the ADB for review. 8.4. The Roles and Responsibilities of the involved institutions in the project are as follows.

ADB 42 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

S Name of The Roles and responsibilities Recommendations No Institution

1 Local NGO Interaction with local people, co ordination with The NGOs contract was over by public and the client, implementation of the April-2019. There contract may be assigned activates renewed.

2 Community Involving the public to extend cooperation in the The Community Based Groups shall Based Groups implementation of the project. Keeping interaction carefully follow the objectives of the with the contractor and client for better project, create proper awareness implementation of the project. and follow up of activities during implementation of the project and utilization of the assets. There is no activity during this period as NGOs were not working in the area

3 PMDCSC The PMDCSC will monitor all the technical, Social and Environmental issues of the Project. The Social Development Expert from PMDCSC will monitor the social Safe Guards implemented by the Contractors. Act as a liaison between public, Contractor and the client. He will submit periodical reports to KUIDFC.

4 RPMU The RPMU will monitor all the technical, Social and Environmental issues of the Project

5 Beneficiaries To understand the objectives of the project, Frequent interaction of the involvement in the activities to get optimum benefit beneficiaries with the staff of the from the project. Maintenance of the assets created Contractor and consultants is is also the responsibility of the beneficiary. necessary.

6 Contractor The contractor shall provide insurance in the joint Along with abiding the above, the names of Employer and the contractor from start contractor has to make a follow-up date to the end and policies and certificates for and take care that issues does not insurance shall get prior approval of Project arise from site against the Manager before start date. Provide water for work agreement. The registers for and workmen. Equal wages and benefits shall be attendance and grievance shall be paid to the men and women for work of equal value maintained at site level and make are type. The Contractor shall abide all existing them available to the officials labour enactments and rules made there under whoever inspect the sites. Drinking water is basic requirement and either by Central Govt are local authorities the cannot be denied under any contractor shall not employer forced are compulsory circumstances. The Contractor shall labour. All the registers required as per agreement be aware that better facility will yield shall be maintained properly by the Contractor better quality of work

ADB 43 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

9. FOLLOW UP ACTION, RECOMMENDATIONS AND DISCLOSURE

10.1 No major safeguard compliance issues were-noticed during this reporting period. All proposed actions will be carried out and monitored as scheduled. Reporting of the same, including any changes will be informed to ADB in subsequent reports. 10.2 There were no major issues identified in public consultations. The contractor is attending the suggestions of the people immediately. 10.3 There were no major issues identified in Public Grievances . The contractor is attending the grievances of the people immediately. However site vist registers is being maintained by the contractors.

ADB 44 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Appendix 1: LAND DETAILS FOR SUBPROJECTS

Extent of land Name of the Name of Land Sl. No Purpose Location required in Survey No Status Town owner Hectares

Approach road for Avaragere 0.06 Nagarajappa 372/03 5MLD STP Land purchased through Ti negotiated settlement in Approach road for M.Kalleshappa Avaragere 0.04 372/01 April 2015 5MLD STP Siddappa

Avaragere 5 MLD STP 0.80 ULB Land 371/1 ULB Land 10/1p1, 10/1p2, 10/2, 20MLD STP Sivanagara 2.02 ULB Land 12p1, 13/2p2 & 1 1 Davanagere 120 MLD Intake well Rajanahalli 0.48 ULB Land 104/p6 ULB Land

66/11 Kv Power Rajanahalli 0.44 and 0.14 ULB Land 117/4 and 117/5 ULB Land Substation

40 MLD STP Bathi 0.86 ULB Land 1675 ULB Land

Construction of 3.5LL Devraj Urs 0.023 ULB Land 280 ULB Land OHT Layout

ADB 45 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Extent of land Name of the Name of Land Sl. No Purpose Location required in Survey No Status Town owner Hectares

Construction of 15LL S M Krishna 0.023 ULB Land 842 ULB Land OHT Nagara

Construction of 8LL Yeragunta 0.023 ULB Land 160/33 ULB Land OHT

Construction of 12LL Hale 0.023 ULB Land 1924/202 ULB Land OHT Kunduwada

Construction of 8LL Hosa 0.023 ULB Land 504/2 ULB Land OHT Kunduwada

Construction of 14LL KV Shetty Park 0.023 ULB Land 91/89 ULB Land OHT

Construction of 8LL Avaragere 0.023 ULB Land 283 ULB Land OHT

Construction of 8LL Anjaneya 0.023 ULB Land 3221/3241 ULB Land OHT Layout

Construction of 4LL Subramanya 0.023 ULB Land 213/161 ULB Land OHT Nagar

ADB 46 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Extent of land Name of the Name of Land Sl. No Purpose Location required in Survey No Status Town owner Hectares

Construction of 15LL Basha Nagar 0.023 ULB Land 3126/400/2 ULB Land OHT

Construction of 3.5LL Shekharappa 0.023 ULB Land 636 ULB Land OHT Nagar

Construction of 3LL Azad Nagar 0.023 ULB Land 693 ULB Land OHT

Construction of 10LL Taluk Office 0.023 ULB Land 191 ULB Land OHT

Construction of 12LL K B Extension 0.023 ULB Land 799 ULB Land OHT

Construction of 2 Nittuvalli 0.023 ULB Land 1210/51 ULB Land Numbers 15LL OHT

Construction of 10LL SSM Layout 0.023 ULB Land 723/38 ULB Land OHT

Construction of 11LL Karur 0.023 ULB Land 62 ULB Land OHT

ADB 47 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Extent of land Name of the Name of Land Sl. No Purpose Location required in Survey No Status Town owner Hectares

Sir M Construction of 14LL Vishveswaraia 0.023 ULB Land 348 ULB Land OHT h Park

5 MLD STP SBR type Teredahalli 3.34 Girish Siddanna 67 & 68 Gouda Patil Approach road Teredahalli 0.05 Krishnappa 64 Land purchased through Hubballi negotiated settlement in Approach road Teredahalli 0.03 Mudukappa, 65 & 66 March 2015 2 Byadgi Bassappa Koppada

One Septic tank with 0.05 Government Agasanhalli 151/144 ULB Land 30 KL capacity Land Construction of 1LL Nehru Nagara 0.05 ULB Land 52 ULB Land OHT

Land purchased through Guttur K. Beerappa Pumping station 0.02 142-2 negotiated settlement by colony Duggappa CMC in Nov 2014 3 Harihara Land purchased through Purchased from APMC Pumping station Harihara 0.01 APMC Harihara negotiated settlement by Harihara CMC in June 2014

ADB 48 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Extent of land Name of the Name of Land Sl. No Purpose Location required in Survey No Status Town owner Hectares

ULB Land Pumping station Harihara 0.02 ULB Harihara 3157/3032/3157 KesavNagar 0.74Hectares of land purchased through Construction of negotiated settlement by Harihara 8.01 ULB Harihara 61/1, 62/3 18MLD STP CMC in August 2018,

Pumping station Property No 352-183 & Harihara 0.02 ULB Harihara ULB Land Amaravathi colony survey no183 Construction of 15LL Amaravathi 0.023 ULB Land 22 ULB Land OHT Colony

Construction of 10LL Guttur 0.023 ULB Land 2662 ULB Land OHT

ADB 49 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

APPENDIX 2: LAND OWNERSHIP LETTER FROM THE COMMISSIONER OF CITY CORPORATION DAVANAGERE FOR CONSTRUCTION OF JACK WELL

ADB 50 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

Appendix 3: COPY OF THE LAND RECORDS 40 MLD WTP AT BATHI (DAVANAGERE)

ADB 51 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

ADB 52 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

ADB 53 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

Appendix 4: LAND RECORDS 20MLD STP SHIVNAGARA

ADB 54 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

TRANSLATED VERSION OF LAND RECORDS 20MLD STP SHIVNAGARA Record of Rights and Tenancy Certificate (RTC) Form No 16 Print Page No:1/1 Village Account No 2 Taluk: Davanagere Hobli: Kasaba Village: Doddaboodihal Survey No Total area in Revenue Procession/Land Area in Acre Account No Aceres Tax owners Name Guntas Guntas Rs. Paise Father’s Name address 126 4.06.00.00 5.03 Commissioner 4.06.00.00 125 City Corporation Davanagere

Cultivation and tenancy details: Year & Cultivators Cultivation Class Area Dry, Wet, Name of the Time name and system Acres Garden crop place of Guntas residence 2019- Commissioner Own 7 4.06.00.00 Dry Uncultivated 2020 Davanagere City Corporation

Date: 07/08/2019 RTC digitally signed by: B Sanjay Kumar on 7/4/2019

Karnataka land revenue rules 1996 rules 40,42, 58 and 70

ADB 55 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

Appendix 5: LAND RECORDS 5 MLD STP PLANT AVARAGERE (Old land records before purchase of land.) The copy of new land records after purchase of land through negotiated settlement is provided below.

ADB 56 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

ADB 57 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

LAND RECORDS OF 5 MLD STP PLANT AVARAGERE (NEW LAND RECORDS AFTER PURCHASE OF LAND ON NEGOTIATED SETTLEMENT)

ADB 58 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

Appendix 6: DOCUMENTS RELATED TO THE LAND DONATED BY AMARAVATHI HOUSING SOCIETY

Translation of Previous Documents

ADB 59 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

Resolution of Amaravathi House Building Cooperative Society

To the dated 26 July 2012

Commissioner CMC

Subject: Handing over land measuring 50 ft x50 ft for construction of OHT by Amravati Housing Colony, Harihara Taluk

One meeting was assembled on 12 July 2012, Thursday at 6 p.m. and only GB members were present.

Subject of Meeting:

ADB 60 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

Handing over of 50 ft. by 50 ft. piece of land of Ganapati Devasthana to CMC as per CMC, Commissioner’s letter no. KMRP/CR/Misc/ 202-13 dated 30 June 2012was agreed to.

Secretary,

Amaravathi House Building Cooperative Society,

APPENDIX 7: COPY OF THE DOCUMENT RELATED TO THE LAND PROPOSE FOR CONSTRUCTION OHT IN GUTTUR

ADB 61 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

ADB 62 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

Translated version of the Document related to the land propose for construction OHT in Guttur Village

Meting Resolution Book

Total No. of members: 19 No. of members present: 13 Absent: 06

Proceedings of the General Body meeting held on 23.12.2013 at 11 AM in Guttur Gram Panchayat meeting hall chaired by the president Mr. A. K Kotrapa.

Sl. No Subject Resolution

07 Providing No Objection The members unanimously agreed to provide the site Certificate for measuring 50’X50’ which is located behind the implementation of UGD Ganapathi temple in Guthur under Guthur Gram and 24X7 water supply panchayat to KUIDFC to implement UGD and 24X7 projects under KIUWMIP water supply civil works under KIUWMIP project which Project of KUIDFC which will be implemented through Harihara CMC. It is also will be implemented by agreed to collect the house service connection the Harihara CMC. charges and monthly water traffic and UGD charges from each household to CMC harihara.

Sd -Sd-

President Panchayat Development Officer

Gram Panchayat Grama Panchayat Guttur

Huttur Harihara Taluk

Harihara Taluk Davanagere (Dist)

Davanagere (Dist)

APPENDIX 8: LAND RECORDS OF THE 1LL OHT BYADGI

ADB 63 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

TRANSLATED VERSION OF LAND RECORDS OF THE 1LL OHT BYADGI

TOWN MUNICIPAL COUNCIL BYADAGI

ADB 64 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

28-511-44

Property tax demand, collection, balance and register related to Form-3

Reg. No 42+43 D. No 52

Town Municipal Council Bydagi

Nehru Nagar Tax exempted

Public play ground

Nehru Nagar

05 Gunta 09 Anna

Dry land

Applied for true copy on: 29.04.2016 Remarks

True copy prepared on: 29.4.2016 As per order No K/D/M/B/No-16 dated 29.4.16 of the Chief Officer, the new Issued true copy on: 29.4.2016 document has been prepared.

Appendix 9: LAND RECORDS OF LAND EARMARKED FOR SEPTIC TANK: AT HAMSABHAVI NEAR AGASANHALLI

ADB 65 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

ADB 66 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

TRANSLATED VERSION OF LAND RECORDS OF LAND EARMARKED FOR SEPTIC TANK: AT HAMSABHAVI NEAR AGASANHALLI

Town Municipal Council Bydagi

Property tax demand, collection, balance and register related to form-3 for the year 2015- 2016

Property details

Survey No: 151/144

Name of the owner: Mandal Panchayat Shidenoor Tax exempted Owners address: Agasanahalli

Land users Name: Public

Land users address: Agasanahalli

ADB 67 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

Road/ Place: Agasanahalli

Land usage: Public

Type of building: Open space

Applied for the true copy on: 14/5/15 “ For office purpose only”

-sd- True copy prepared on: 14/5/15 Chief Officer Issued true copy on: 14/5/15 Town Municipal Council Bydagi

ADB 68 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

APPENDIX 10: LAND RECORDS OF LAND EARMARKED FOR SEPTIC TANK

ADB 69 KUIDFC-KIUWMIP

KIUWMIP Tranche 1 Semi – annual Social Safeguard Monitoring Report for July 2019 to December 2019.

Translation of Land records earmarked for Septic Tank

7-4-2015

From,

Chief Officer

Town Municipal Council,

Byadgi.

Sub: Land status for construction of STP.

Municipality Byadgi has indicated that there is no encumbrances of the land proposed

for construction of septic tank/ proposed/ identified by these programme consultants. The

said land belongs to Urban Local Body (ULB) Byadgi and they have no objection for the

construction of the proposed component.

Sd/-

Town Municipal Council

ADB 70 KUIDFC-KIUWMIP

KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

APPENDIX 11: PUBLIC CONSULTATIONS

Consulantaions / Discussions With Individuval Stakeholder and Status of Suggestions Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Overburden Removal of The Contractor K V M D Soil removal, Overburden 04-07- 998039087 Implemented 1 shetty Hanumant Road Soil in time, 2019 7 the Park happa Resroration, Proper suggestions Social Safety Barrcading Overburden Removal of The Contractor Soil removal, Overburden 10-07- Anjenya Prashanth 819754371 Implemented 2 Road Soil in time, 2019 Layout a 3 the Resroration, Proper suggestions Social Safety Barrcading Overburden Removal of The Contractor Soil removal, Overburden 18-07- Azad 988041282 Implemented 3 Kumar Road Soil in time, 2019 Nagar 1 the Resroration, Proper suggestions Social Safety Barrcading Overburden Removal of The Contractor Soil removal, Overburden 25-07- SPS 998035020 Implemented 4 Sami Ulla Road Soil in time, 2019 Nagar 2 the Resroration, Proper suggestions Social Safety Barrcading Overburden Removal of Soil removal, Overburden The Contractor Govt 29-08- 974106271 PHE Soil in time, Implemented 5 Primary Gururaj 2019 7 Connections attension to the School /Utitlity PHE Utility suggestions restroraions restoration Overburden Removal of Soil removal, Overburden The Contractor Govt 29-08- Rathanm PHE Soil in time, Implemented 6 Primary - 2019 ma Connections attension to the School /Utitlity PHE Utility suggestions restroraions restoration Overburden Removal of Soil removal, Overburden The Contractor 03-09- Bunts 998654249 PHE Soil in time, Implemented 7 Suchan 2019 Café 2 Connections attension to the /Utitlity PHE Utility suggestions restroraions restoration Name of S the Mobile Issues Status of Date Place Suggestions No Person Number Disscussed Suggestions Consulte

ADB 71 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

d

Overburden Removal of Soil removal, Overburden The Contractor Govt 03-09- 789911126 PHE Soil in time, Implemented 8 Primary Ramappa 2019 3 Connections attension to the School /Utitlity PHE Utility suggestions restroraions restoration The Contractor 10-09- Bamboo 974302071 Road Proper Implemented 9 Aziz 2019 Bazar 0 Resroration, Barrcading the Social Safety suggestions Overburden Removal of Soil removal, Overburden The Contractor Basaves 13-09- 797559359 PHE Soil in time, Implemented 10 hwara Basavaraj 2019 8 Connections attension to the Nagara /Utitlity PHE Utility suggestions restroraions restoration The Contractor 21-09- SPS Road Proper Implemented 11 Mahadevi 2019 Nagar Resroration, Barrcading the Social Safety suggestions The Contractor 23-09- Bamboo Gurubasa 897029266 Road Proper Implemented 12 2019 Bazar ppa 1 Resroration, Barrcading the Social Safety suggestions Overburden Removal of Soil removal, Overburden The Contractor 23-09- Devaraj PHE Soil in time, Implemented 13 Lokesh 767652795 2019 URS Connections attension to the /Utitlity PHE Utility suggestions restroraions restoration Overburden Removal of Soil removal, Overburden The Contractor 23-09- Avarager 953540190 PHE Soil in time, Implemented 14 Ayusha 2019 e 5 Connections attension to the /Utitlity PHE Utility suggestions restroraions restoration The Contractor 24-09- 998075391 Road Proper Implemented 15 PB Road Nagaraj 2019 0 Resroration, Barrcading the Social Safety suggestions The Contractor Rajiv 27-09- Road Proper Implemented 16 Gandhi Nagesh - 2019 Resroration, Barrcading the Nagar Social Safety suggestions Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d

ADB 72 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

The Contractor 28-09- SMK 998033907 Road Proper Implemented 17 Magesh 2019 Nagar 7 Resroration, Barrcading the Social Safety suggestions Rectification The Contractor 01-10- Water Pipe of damaged Implemented 18 Ramappa 963288809 2019 Road Connections pipe the connections suggestions Rectification The Contractor 10-10- Kondajji 953867480 Water Pipe of damaged Implemented 19 Beerappa 2019 Road 0 Connections pipe the connections suggestions Vivekand Rectification The Contractor 17-10- ha 876282446 Water Pipe of damaged Implemented 20 Ramesh 2019 Badavan 5 Connections pipe the e connections suggestions Rectification The Contractor 30-10- MCC Venkates 789911126 Water Pipe of damaged Implemented 21 2019 Block h 3 Connections pipe the connections suggestions Rectification The Contractor 12-11- Techars 948048079 Water Pipe of damaged Implemented 22 Tirupathi 2019 Colony 0 Connections pipe the connections suggestions Rectification The Contractor 13-11- SOG Manjunat 953884229 Water Pipe of damaged Implemented 23 2019 Colony ha 1 Connections pipe the connections suggestions Rectification The Contractor 15-11- Azad Basha 895122872 Water Pipe of damaged Implemented 24 2019 Nagar bhai 7 Connections pipe the connections suggestions Rectification The Contractor 19-11- SOG 973187675 Water Pipe of damaged Implemented 25 Geeta 2019 Colony 1 Connections pipe the connections suggestions Rectification The Contractor 26-11- SOG Shantham Water Pipe of damaged Implemented 26 997293557 2019 Colony ma Connections pipe the connections suggestions Rectification The Contractor 28-11- Vidya 998072860 Water Pipe of damaged Implemented 27 Shantha 2019 nagar 0 Connections pipe the connections suggestions Rectification The Contractor 03-12- SPS Yashoda 920661532 Water Pipe of damaged Implemented 28 2019 Nagar mma 7 Connections pipe the connections suggestions Rectification The Contractor 06-12- SPS 740694770 Water Pipe of damaged Implemented 29 Nagesh 2019 Nagar 6 Connections pipe the connections suggestions

ADB 73 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Rectification The Contractor KV 07-12- 814716671 Water Pipe of damaged Implemented 30 Shetty Sunitha 2019 4 Connections pipe the park connections suggestions Rectification The Contractor Rajiv 10-12- 907114539 Water Pipe of damaged Implemented 31 Gandhi Renuka 2019 8 Connections pipe the Nagar connections suggestions Rectification The Contractor 20-12- SPS Gudiyapp 812390575 Water Pipe of damaged Implemented 32 2019 Nagar aa 2 Connections pipe the connections suggestions Rectification The Contractor 22-12- Gandhi Faizal 784701765 Water Pipe of damaged Implemented 33 2019 nagar Khan 4 Connections pipe the connections suggestions Rectification The Contractor 30-12- SPS Shivakum 938084851 Water Pipe of damaged Implemented 34 2019 Nagar ar 8 Connections pipe the connections suggestions

30-06- Rajanaha 973167381 About pipe The issues 35 Lakshman No 2019 lli 6 laying rectify

30-06- Rajanaha Vasantha 722085615 About pipe The issues 36 No 2019 lli ppa 4 laying rectify

30-06- Rajanaha 935125641 About pipe The issues 37 Narayana No 2019 lli 3 laying rectify

30-06- Rajanaha 824895683 About road The issues 38 Imran No 2019 lli 4 levelling rectify

30-06- Rajanaha 814441884 About road The issues 39 Siddesh No 2019 lli 6 levelling rectify

31-07- Rajanaha 897072975 About pipe The issues 40 Halappa No 2019 lli 2 laying rectify

01-08- Rajanaha 996492314 About pipe The issues 41 Majunath No 2019 lli 3 laying rectify

ADB 74 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

02-08- Rajanaha About pipe The issues 42 Ganesh - No 2019 lli laying rectify

Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d

03-08- Rajanaha Hanumant 922085615 About pipe The issues 43 No 2019 lli ha 4 laying rectify

14-09- Rajanaha Uchangap 824824768 The issues 44 Road levelling Yes 2019 lli pa 8 rectify

20-09- Rajanaha 975164214 The issues 45 Sudhakar Road levelling Yes 2019 lli 5 rectify

21-09- Davanag 876086538 The issues 46 Gururaj Piping Yes 2019 ere 3 rectify

25-09- 888392577 The issues 47 Bathi Sharath WTP plant Yes 2019 7 rectify

26-09- 952426742 The issues 48 Bathi Ramesh Bathi WTP Yes 2019 1 rectify

01-10- Rajanaha 888392522 The issues 49 Sharath Road levelling Road levelled 2019 lli 7 rectify

08-10- Rajanaha 958254218 The issues 50 Kumar Road levelling Road levelled 2019 lli 2 rectify

21-10- Rajanaha 952426782 The issues 51 Ashwin Road levelling Road levelled 2019 lli 1 rectify

25-10- Manohara 888385464 The issues 52 Bathi Road levelling Road levelled 2019 ppa 2 rectify

26-10- 645143487 The issues 53 Bathi Ramanna Road levelling Road levelled 2019 6 rectify

01-12- Rajanaha 948965086 The issues 54 Srinath Road level Yes 2019 lli 0 rectify

ADB 75 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

05-12- Rajanaha 952426742 The issues 55 Manju Road level Yes 2019 lli 1 rectify

Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d

10-12- Rajanaha 888392572 The issues 56 Sharath Road level Yes 2019 lli 7 rectify

26-12- 953426742 The issues 57 Bathi Vikas Road level Yes 2019 0 rectify

Barrication Providing ProvideRoad 13-11- Bhagirath Rathnam 947869152 Barricades The issues 58 Restoration 2019 a circle ma 0 and removal rectify Overburden of Debris soil removal Barrication Providing ProvideRoad 18-11- Bhagirath Jayanth 897172526 Barricades The issues 59 Restoration 2019 a circle Acharya 1 and removal rectify Overburden of Debris soil removal Barrication Providing ProvideRoad 27-11- Bhagirath Amith 984406697 Barricades The issues 60 Restoration 2019 a circle Shastri 7 and removal rectify Overburden of Debris soil removal Barrication Provide Providing 30-11- Bhagirath Shiv 926484851 oad Barricades The issues 61 2019 a circle Shankar 7 Restoration and removal rectify Overburden of Debris soil removal Barrication Rajeev Providing ProvideRoad 05-12- Gandi 997208989 Barricades The issues 62 Kallesh Restoration 2019 Badavan 5 and removal rectify Overburden e of Debris soil removal Barrication Rajeev Provide Providing 12-12- Gandi 855305703 Road Barricades The issues 63 Kayappa 2019 Badavan 0 Restoration and removal rectify e Overburden of Debris soil removal Barrication Rajeev Providing ProvideRoad 25-12- Gandi Ravikuma 797541504 Barricadesan The issues 64 RestorationOv 2019 Badavan r 0 d removal of rectify erburden soil e Debris removal

ADB 76 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Barrication Rajeev Provide Providing 29-12- Gandi 701929294 Road Barricades The issues 65 Raju 2019 Badavan 5 Restoration and removal rectify e Overburden of Debris soil removal Rectification The Contractor 02-07- 914811565 Excess Soil in of damaged Implemented 66 Byadgi Jayalaxmi 2019 5 the work done pipe the connections suggestions Rectification The Contractor 09-07- 767626140 Excess Soil in of damaged Implemented 67 Byadgi Reshma 2019 0 the work done pipe the connections suggestions Rectification The Contractor 15-07- 924164188 Excess Soil in of damaged Implemented 68 Byadgi S B hadmi 2019 3 the work done pipe the connections suggestions Rectification The Contractor 16-07- 988082836 Excess Soil in of damaged Implemented 69 Byadgi Ishwarya 2019 7 the work done pipe the connections suggestions Rectification The Contractor 24-07- Nagapad 990202423 Excess Soil in of damaged Implemented 70 Byadgi 2019 ma 3 the work done pipe the connections suggestions Rectification The Contractor 05-08- Subhash 998631110 Excess Soil in of damaged Implemented 71 Mohamed 2019 nagar 6 the work done pipe the connections suggestions Rectification The Contractor 06-08- Agansan Mohamad 960637665 Excess Soil in of damaged Implemented 72 2019 ahalli Ali 8 the work done pipe the connections suggestions Rectification The Contractor 10-08- Agansan 814790297 Excess Soil in of damaged Implemented 73 Mukthar 2019 ahalli 9 the work done pipe the connections suggestions Rectification The Contractor 05-09- Islampur 812341962 Excess Soil in of damaged Implemented 74 Mahabob 2019 a 0 the work done pipe the connections suggestions Rectification The Contractor 18-09- Islampur Mama 962041619 Excess Soil in of damaged Implemented 75 2019 a Safiulla 1 the work done pipe the connections suggestions

ADB 77 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Rectification The Contractor 23-09- Islampur Manjunat 988027604 Excess Soil in of damaged Implemented 76 2020 a ha 9 the work done pipe the connections suggestions Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Rectification The Contractor 24-09- Islampur 997242701 Excess Soil in of damaged Implemented 77 Rasathi 2020 a 0 the work done pipe the connections suggestions Rectification The Contractor 25-09- Islampur 866090782 Excess Soil in of damaged Implemented 78 Kalishwari 2020 a 6 the work done pipe the connections suggestions Rectification The Contractor 09-10- Vidya 973112654 Road Work of damaged Implemented 79 Aslam 2020 nagar 9 restoration pipe the connections suggestions Rectification The Contractor Ashreya 22-10- Dhanujay 973930432 Water Pipe of damaged Implemented 80 Badavan 2020 a 4 Connections pipe the e connections suggestions Rectification The Contractor 30-10- Vidya 914811801 Excess Soil in of damaged Implemented 81 Praveen 2020 nagar 4 the work done pipe the connections suggestions Rectification The Contractor 04-11- Subhash 961187228 Excess Soil in of damaged Implemented 82 Ramesh 2019 Nagar 0 the work done pipe the connections suggestions Rectification The Contractor 14-11- Subhash 988025371 Excess Soil in of damaged Implemented 83 Ivamma 2019 Nagar 6 the work done pipe the connections suggestions Rectification The Contractor 18-11- Subhash 807381673 Excess Soil in of damaged Implemented 84 Elayappa 2019 Nagar 5 the work done pipe the connections suggestions Rectification The Contractor 22-11- Shettur 973138997 Excess Soil in of damaged Implemented 85 Sharadha 2019 Nagar 3 the work done pipe the connections suggestions Rectification The Contractor 22-11- Devanah 990057392 Excess Soil in of damaged Implemented 86 Halappa 2019 alli 4 the work done pipe the connections suggestions Rectification The Contractor 04-12- Subhash 702631006 Excess Soil in of damaged Implemented 87 Renuka 2019 Nagar 4 the work done pipe the connections suggestions

ADB 78 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Rectification The Contractor 10-12- Nehru 810505018 Excess Soil in of damaged Implemented 88 Aditya 2019 Nagar 8 the work done pipe the connections suggestions Rectification The Contractor 23-12- 953581518 Excess Soil in of damaged Implemented 89 Byadgi Mahadevi 2019 8 the work done pipe the connections suggestions Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Discussed about the 01-08- Mallur Mohamm 998631110 The issues 90 issues of road No 2019 road ed Rafiq 6 rectify restoration work Discussed about the 01-08- Mallur Imran 815298493 The issues 91 issues of road No 2019 road Badiger 8 rectify restoration work Discussed about the 01-08- Mallur 973930533 The issues 92 Raja sab issues of road No 2019 road 6 rectify restoration work Discussion 01-08- Mallur 998086075 The issues 93 Shabbir about the soil No 2019 road 3 rectify removal Ask to back fill 01-09- Mallur 948293623 The issues 94 Jafar the trench No 2019 road 9 rectify immediately Remove the 01-09- Mallur Sammi 895115345 excess of soil The issues 95 No 2019 road Ulla 3 infront of their rectify house To provide the 01-09- Mallur 701959700 The issues 96 Akheeb alternation root No 2019 road 2 rectify to the house Road 01-10- Vidya 973112654 The issues 97 Aslam M resoration No 2019 nagar 9 rectify work

01-10- Vidya 855348212 House keeping The issues 98 Kumar No 2019 nagar 3 work rectify

ADB 79 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Discuss about Road Nehru 01-11- M.E.Adina 998626282 resoration The issues 99 Nagar A No 2019 var 8 work and rectify Block House keeping work Nehru Discuss about 10 01-11- 734919192 The issues Nagar A Ragu water pipeline No 0 2019 5 rectify Block damages Nehru Discuss about 10 01-11- 974286370 The issues Nagar A Sangappa water pipeline No 1 2019 7 rectify Block damages Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Nehru Discuss about 10 01-11- 725938294 The issues Nagar A Monish road No 2 2019 1 rectify Block restoration Nehru Discuss about 10 01-11- 734909462 The issues Nagar A Tippusab road No 3 2019 7 rectify Block restoration Removal of The Contractor Excess soil not Overburden 10 04-07- Barampu 984579808 Implemented Suresh removed after Soil in time, 4 2019 ra 3 the excavation Proper suggestions Barrcading Removal of The Contractor Excess soil not Overburden 10 09-07- Prashant 974099225 Implemented Ismail removed after Soil in time, 5 2019 h nagar 9 the excavation Proper suggestions Barrcading Removal of The Contractor Excess soil not Overburden 10 09-07- Prashant 974099225 Implemented Ismail removed after Soil in time, 6 2019 h nagar 9 the excavation Proper suggestions Barrcading Removal of The Contractor Existing PVC Overburden 10 12-07- Bheem 761955558 Implemented Lohith water pipe Soil in time, 7 2019 Nagar 3 the damage Proper suggestions Barrcading Removal of The Contractor Road Overburden 10 17-07- 959150450 Implemented Near IB Sharan restoration Soil in time, 8 2019 8 the works Proper suggestions Barrcading

ADB 80 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Removal of The Contractor Road Overburden 10 22-07- Guttur 990005549 Implemented Vijay restoration Soil in time, 9 2019 road 2 the works Proper suggestions Barrcading Removal of The Contractor Road Overburden 11 27-07- Indira 761955556 Implemented Ganesh restoration Soil in time, 0 2019 nagara 1 the works Proper suggestions Barrcading Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Removal of The Contractor Excess soil not Overburden 11 05-08- 636016995 Implemented Guttur Shivu removed after Soil in time, 1 2019 0 the excavation Proper suggestions Barrcading Removal of The Contractor Existing PVC Overburden 11 14-08- Amaravat Naveen H 906678233 Implemented water Pipe Soil in time, 2 2019 hu V 9 the damage Proper suggestions Barrcading Removal of The Contractor Existing PVC Overburden 11 14-08- Amaravat Naveen H 906678233 Implemented water Pipe Soil in time, 3 2019 hu V 9 the damage Proper suggestions Barrcading Removal of The Contractor Road Overburden 11 19-08- Benki 886714865 Implemented Fatima restoration Soil in time, 4 2019 Nagra 3 the works Proper suggestions Barrcading Removal of The Contractor New Excess soil not Overburden 11 26-08- 789232749 Implemented DRM Bharath removed after Soil in time, 5 2019 4 the College excavation Proper suggestions Barrcading Removal of The Contractor Near Excess soil not Overburden 11 03-09- 761955556 Implemented Amaravat Yugesh removed after Soil in time, 6 2019 0 the hi excavation Proper suggestions Barrcading Removal of The Contractor Excess soil not Overburden 11 09-09- Guttur Mahaballe 789914718 Implemented removed after Soil in time, 7 2019 Colony sh 9 the excavation Proper suggestions Barrcading

ADB 81 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Removal of The Contractor Excess soil not Overburden 11 14-09- Sunil 819722059 Implemented Harlpura removed after Soil in time, 8 2019 Kumar 5 the excavation Proper suggestions Barrcading Removal of The Contractor Road Overburden 11 18-09- Keerthi 636063678 Implemented Harlpura restoration Soil in time, 9 2019 Kumar 2 the works Proper suggestions Barrcading Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Removal of The Contractor Excess soil not Overburden 12 25-09- Amaravat 897125804 Implemented Pradeep removed after Soil in time, 0 2019 hi colony 7 the excavation Proper suggestions Barrcading Removal of The Contractor Excess soil not Overburden 12 05-10- Benki Bharath H 953867694 Implemented removed after Soil in time, 1 2019 nagara R 0 the excavation Proper suggestions Barrcading Removal of The Contractor Excess soil not Overburden 12 11-10- Halladker Hanumant 990288150 Implemented removed after Soil in time, 2 2019 i ha R 4 the excavation Proper suggestions Barrcading Removal of The Contractor Excess soil not Overburden 12 19-10- Amaravat 819745256 Implemented Barmappa removed after Soil in time, 3 2019 hi Colony 8 the excavation Proper suggestions Barrcading Removal of The Contractor Excess soil not Overburden 12 28-10- Indira Neelamm 944874909 Implemented removed after Soil in time, 4 2019 nagara a 1 the excavation Proper suggestions Barrcading Removal of The Contractor Overburden 12 03-11- Gandi PVC Pipe Implemented Ramesh - Soil in time, 5 2019 nagara Damaged the Proper suggestions Barrcading Removal of The Contractor Overburden 12 03-11- Gandi PVC Pipe Implemented Ramesh - Soil in time, 6 2019 nagara Damaged the Proper suggestions Barrcading

ADB 82 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Removal of The Contractor Overburden 12 11-11- Birla PVC Pipe Implemented Kumar - Soil in time, 7 2019 Mantapa Damaged the Proper suggestions Barrcading Removal of The Contractor Overburden 12 17-11- Tahasild PVC Pipe Implemented Vijay - Soil in time, 8 2019 ar Road Damaged the Proper suggestions Barrcading Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Removal of The Contractor Overburden 12 26-11- Sugnar PVC Pipe Implemented Khan - Soil in time, 9 2019 beedi Damaged the Proper suggestions Barrcading Removal of The Contractor Overburden 13 02-12- Gandhi PVC Pipe Implemented Ismail - Soil in time, 0 2019 Nagar Damaged the Proper suggestions Barrcading Removal of The Contractor Birla Overburden 13 15-12- PVC Pipe Implemented kalian Shankar - Soil in time, 1 2019 Damaged the Matapa Proper suggestions Barrcading Removal of The Contractor Overburden 13 20-12- Gandhi Implemented Siddesh - Housekeeping Soil in time, 2 2019 Nagar the Proper suggestions Barrcading Removal of The Contractor Overburden 13 23-12- Gandhi Implemented Siddesh - Housekeeping Soil in time, 3 2019 Nagar the Proper suggestions Barrcading Removal of The Contractor Overburden 13 26-12- Gandhi Implemented Siddesh - Housekeeping Soil in time, 4 2019 Nagar the Proper suggestions Barrcading Removal of The Contractor Overburden 13 26-12- Gandhi Implemented Siddesh - Housekeeping Soil in time, 5 2019 Nagar the Proper suggestions Barrcading

ADB 83 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Barrication Providing Y.H. ProvideRoad 13 02-07- 966356581 Barricades The issues Kavalettu Durgamm Restoration 6 2019 9 and removal rectify a Overburden of Debris soil removal Barrication Providing ProvideRoad 13 06-07- Yallappa 810508352 Barricades The issues Kavalettu Restoration 7 2019 Koppada 4 and removal rectify Overburden of Debris soil removal Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Barrication Provide Providing 13 09-07- Krishnego 725974667 Road Barricades The issues Kavalettu 8 2019 wda 2 Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 13 13-07- M.H.Shan 973162046 Road Barricades The issues Kavalettu 9 2019 thi 6 Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 14 16-07- 973567438 Road Barricades The issues Harihara Jijamath 0 2019 3 Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 14 17-07- Vishwas T 801312357 Road Barricades The issues Harihara 1 2019 Gowder 7 Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 14 24-07- M.G 886159801 Road Barricades The issues Harihara 2 2019 Hamim 4 Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 14 27-07- G.S 789905540 Road Barricades The issues Harihara 3 2019 Koppad 0 Restoration and removal rectify Overburden of Debris soil removal

ADB 84 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Barrication Provide Providing 14 03-08- 701996720 Road Barricades The issues Kavalettu Bhujanga 4 2019 2 Restoration and removal rectify Overburden of Debris soil removal Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d Barrication Provide Providing 14 06-08- 984432764 Road Barricades The issues Kavalettu Praveen 5 2019 2 Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 14 09-08- Ramesh 637342693 Road Barricades The issues Kavalettu 6 2019 N 3 Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 14 12-08- 903532704 Road Barricades The issues Kavalettu Moulana 7 2019 1 Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 14 14-08- 636292427 Road Barricades The issues Kavalettu Kumar T 8 2019 0 Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 14 19-08- DRM Road Barricades The issues Kiran P 701324270 9 2019 Tank Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 15 23-08- DRM Road Barricades The issues Keshav R 943267741 0 2019 Tank Restoration and removal rectify Overburden of Debris soil removal Barrication Provide Providing 15 26-08- DRM 984434781 Road Barricades The issues Sharif 1 2019 Tank 1 Restoration and removal rectify Overburden of Debris soil removal

ADB 85 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d

15 31-07- 948608170 The issues Harihara Ganesh About STP No 2 2019 1 rectify

15 31-07- Hanumant 949831214 The issues Harihara About STP No 3 2019 ha 5 rectify

15 14-08- Amjad 912009188 About road in The issues Harihara No 4 2019 Khan 6 STP Site area rectify

15 14-08- Suresh H 960861498 About road in The issues Harihara No 5 2019 V 8 STP Site area rectify

15 14-08- 888392577 About Road The issues Harihara Sharath No 6 2019 7 Crossing rectify

About 15 14-08- Hanumant 960001495 The issues Harihara Highway No 7 2019 ha 8 rectify Crossing

15 06-09- KMS 897126980 The issues Zakir Pollution level No 8 2019 Institute 0 rectify

15 12-09- KMS 984496281 The issues Raj K N Noise No 9 2019 Institute 7 rectify

16 19-09- KMS S 779533721 The issues Road levelling No 0 2019 Institute Mallanna 9 rectify

16 21-09- KMS 990121468 The issues Shivappa Road levelling No 1 2019 Institute 7 rectify

16 22-09- KMS 831078423 The issues Nagaraj Road levelling No 2 2019 Institute 5 rectify

16 11-10- 888392577 The issues Harihara Sharath Road levelling To level Road 3 2019 7 rectify

16 16-10- 989454547 The issues Harihara Asif Road levelling To level Road 4 2019 43 rectify

ADB 86 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the S Mobile Issues Status of Date Place Person Suggestions No Number Disscussed Suggestions Consulte d

16 19-10- 949865086 The issues Harihara Srinath Road levelling To level Road 5 2019 0 rectify

16 25-10- 850410213 The issues Harihara Kumar Road levelling To level Road 6 2019 8 rectify

16 01-11- Benki 975114356 About road The issues Irsath ali No 7 2019 nagar 1 restoration rectify

Mahalax 16 05-11- mi 974516279 About Pipe The issues Dinesh No 8 2019 Badavan 3 Laying rectify e About 16 08-11- Bheema Izaz 987543645 The issues Manhole No 9 2019 Nagar Ahmed 1 rectify Construction

17 21-11- Bheema 997658532 About road The issues Althaf No 0 2019 Nagar 4 restoration rectify

Jai 17 22-11- Mohamm 827457869 About Pipe The issues Bheema No 1 2019 ed 1 Laying rectify Nagar

17 04-12- Amaravat Mahesh 900854599 The issues Pipe line No 2 2019 hi colony Kumar 1 rectify

17 07-12- Amaravat 888392577 The issues Sarathi Pipe line No 3 2019 hi colony 7 rectify

17 21-12- Amaravat 902040709 The issues Veeresh Pipe line No 4 2019 hi colony 6 rectify

17 26-12- Bheema 948608170 The issues Shrinath Pipe line No 5 2019 Nagar 1 rectify

ADB 87 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

APPENDIX 12: GRIEVANCE REDRESSAL DETAILS

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained Rajiv Gandhi 9972089 Rectified same 05.12.2019 Kallesh 01DVG01 Trench cutting layout 895 day 05.12.2019 Rectified on 9980966 Water pipe line 08.12.2019 SPS nagara Mehabub 01DVG01 next day 721 damage 09.12.2019 Rajiv Gandhi 8553057 Rectified same 12.12.2019 Jayappa 01DVG01 Trench filling layout 030 day 12.12.2019 Rectified on 9611250 Existing UGD 20.12.2019 SPS nagara Dadappa 01DVG01 next day 996 repair 21.12.2019 Rectified on Rajiv Gandhi 9900561 Water pipe line 23.12.2019 Durgappa 01DVG01 next day layout 788 damage 2412.2019 Rectified on 7975415 25.12.2019 SPS nagara Ravikumar 01DVG01 Trench filling next day 040 26.12.2019 Rectified on Rajiv Gandhi 9980493 Existing UGD 25.12.2019 Anand 01DVG01 next day layout 723 repair 26.12.2019 Rectified on 7019292 29.12.2019 SPS nagara Raju 01DVG01 Trench filling next day 945 30.12.2019 Work area Construction Fencing Mohamad team using his 10.07.19 Azad Nagar - 01WS05 provided Salman area for Material shfiting 10.07.19 No House Cleaning Done - Keeping near 17.07.19 Yarrgunta Rajesh 01WS05 17.07.19 House Davanagere City Contractor corporation 08.08.19 P B Road Shettappa - 01WS05 Solved the Supervision Problem (Water section)

ADB 88 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained 08.08.2019

Contractor Davanagere City Solved the - corporation 09.08.19 Karur Harish 01WS05 Problem Supervision 09.08.2019

Contractor Excess oil not Solved the removed from 13.08.19 Yarragunta Nagaraju 01WS05 Problem the site 13.08.2019

Not provided Contractor Basaveshawar walkway and to 9980390 Solved the 19.08.19 Muragan 01WS05 cross exuviating a Nagara 877 Problem trench to reach 19.08.2019 home Contractor 8220015 House service Solved the 23.08.19 Bambo Bazar Sulthan 877 01WS05 connection Problem Damaged 23.08.2019

Contractor Soil sinked Anjeneya 9916900 Solved the 26.08.19 Viresh 303 01WS05 (HDPE back Layout Problem filled area) 26.08.2019 Contractor Solved the 7258338 RMC Road 10.09.19 SPS Nagar Aziz 01WS05 010 Bamboo Bazar Problem 10.09.19

Contractor 9980390 Electrical Cable Solved the 27.09.19 Rajiv Nagar Ningaraju 791 01WS05 Problem damaged 27.09.19

Contractor Not Provided 9980390 Solved the 28.09.19 SMK Nagar Mogesh 792 walkway to cross 01WS05 Problem excavated tranch 28.09.19 Contractor Vehicle got 9980390 Solved the 16.10.19 SPS Nagar Hanumatha 877 01WS05 stroked to the Problem soil 16.10.19 Contractor Mandakki 9880912 Barricading not Solved the 21.10.19 Basha 821 01WS05 Bathhi done properly Problem 21.10.19

ADB 89 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained Contractor House Cable 7899111 Solved the 24.10.19 Rajiv Nagar Manju 263 01WS05 connection Problem damaged 24.10.2019 Contractor 9538842 PVC pipe Solved the 13.11.19 SOG Colony Manjunatha 291 01WS05 Damaged Problem 13.11.19 House Contractor SOG Colony C 9731876 Connection Solved the 19.11.19 Geetha 751 01WS05 Colony Water Pipe Problem damaged 19.11.19 01WS05 House Contractor SOG Colony B 9977293 Connection Solved the 26.11.19 Shanthamma 557 Block current cable Problem damaged 26.11.19 01WS05 Contractor 8970191 PVC water pipe Solved the 09.12.19 SPS Nagar Manjula 628 damaged Problem 09.12.19 01WS05 Contractor Rajib Gandhi 9535039 PVC water pipe Solved the 10.12.19 Renuka 322 Badavane damaged Problem 10.12.19 01WS05 Contractor K M 9632176 PVC water pipe 10.12.19 SPS Nagara 765 Solved the Gaddihayyer damaged Problem 01WS05 Contractor 9206615 UPVC water Solved the 11.12.19 SPS Nagar Yashodamma 327 pipe damaged Problem 11.12.19 01WS05 Contractor Rajib Gandhi 7847017 UPVC water Solved the 11.12.19 Faizal Khan Badavane 654 pipe damaged Problem 11.12.19 01WS05 Contractor 9380848 UPVC water Solved the 12.12.19 SPS Nagar Shivakumar 518 pipe damaged Problem 12.12.19 01WS05 Contractor 7406947 UPVC water Solved the 12.12.19 SPS Nagar K Nagesh 706 pipe damaged Problem 12.12.19 9845798 Excess soil not Contractor 04.07.19 Barampura Suresh 083 01WS04 removed after informed about excavation the issue to

ADB 90 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained concern engineer and rectified 05.07.19 Contractor informed about the issue to 9740992 Excess soil not Prashanth concern 09.07.19 Ismail 259 01WS04 removed after nagar engineer and excavation rectified 10.07.19

Contractor informed about the issue to Existing PVC concern 7619555 12.7.19 Bheem Nagar Lohith water pipe engineer and 583 01WS04 damage rectified the damage also closing the pit 12.07.19 Contractor informed about the issue to concern 9591504 Road restoration engineer and 17.07.19 Near IB Sharan 508 01WS04 works rectified the issue by restoring the cc road 17.07.19

Contractor informed about the issue to concern 9900055 Road restoration engineer and 22.07.19 Guttur road Vijay 492 01WS04 works rectified the issue by restoring the cc road25.07.19

Contractor informed about 7619555 Road restoration the issue to 27.7.19 Indira nagara Ganesh 01WS04 561 works concern engineer and rectified the

ADB 91 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained issue by restoring the cc road 30.07.19

Contractor informed about 6360169 Excess soil not the issue to 05.08.19 Guttur Shivu 950 01WS04 removed after concern excavation engineer and rectified 06.08.19 Contractor informed about the issue to 9066782 Existing PVC concern 14.08.19 Amaravathu Naveen H V 339 01WS04 water Pipe engineer and damage rectified the damage also closing the pit 14.08.19 Contractor informed about the issue to 8867148 Road restoration concern 19.08.19 Benki Nagra Fatima 653 01WS04 engineer and works rectified the damaged road surface 23.08.19

Contractor informed about Excess soil not the issue to New DRM 7892327 26.08.19 Bharath 494 removed after concern College 01WS04 excavation engineer and rectified 30.08.19 Contractor informed about Excess soil not the issue to Near 7619555 03.09.19 Yugesh 01WS04 removed after concern Amaravathi 560 excavation engineer and rectified 06.09.19 Contractor Excess soil not 7899147 informed about 09.09.19 Guttur Colony Mahaballesh 189 01WS04 removed after the issue to excavation concern

ADB 92 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained engineer and rectified 11.09.19 Contractor informed about 8197220 Excess soil not the issue to 14.09.19 Harlpura Sunil Kumar 595 01WS04 removed after concern excavation engineer and rectified 16.09.19 Contractor informed about the issue to 6360636 Keerthi Road restoration concern 18.09.19 Harlpura 782 01WS04 Kumar works engineer and rectified the issue 22.09.19

Contractor informed about Excess soil not the issue to Amravati 8971258 25.09.19 Pradeep 01WS04 removed after concern colony 047 excavation engineer and rectified 30.09.19 Contractor informed about 9538676 Excess soil not the issue to 05.10.19 Benki nagara Bharath H R 940 01WS04 removed after concern excavation engineer and rectified 07.10.19 Contractor informed about Excess soil not the issue to Hanumantha 9902881 11.10.19 Halladkeri 01WS04 removed after concern R 504 excavation engineer and rectified 15.10.19 Contractor informed about Excess soil not the issue to Amaravathi 8197452 19.10.19 Barmappa 568 01WS04 removed after concern Colony excavation engineer and rectified 22.10.19

ADB 93 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained Contractor informed about 9448749 Excess soil not the issue to 28.10.19 Indira nagara Neelamma 091 01WS04 removed after concern excavation engineer and rectified 31.10.19 Contractor PVC Pipe Solved the 03.11.19 Gandi nagara Ramesh - 01WS04 Damaged Problem 05.11.19 Contractor PVC Pipe Solved the 11.11.19 Birla Mantapa Kumar - 01WS04 Damaged Problem 15.11.19 Contractor Tahasildar PVC Pipe Solved the 17.11.19 Vijay - 01WS04 Road Damaged Problem 18.11.19 Contractor PVC Pipe Solved the 26.11.19 Sugnar beedi Khan - 01WS04 Damaged Problem 29.11.19 Contractor PVC Pipe Solved the 02.12.19 Gandhi Nagar Ismail - 01WS04 Damaged Problem 05.12.19 Contractor Birla kalian PVC Pipe Solved the 15.12.19 Shankar - 01WS04 Matapa Damaged Problem 15.12.19 Contractor Solved the 20.12.19 Gandhi Nagar Siddesh - 01WS04 Housekeeping Problem 20.12.19 Contractor Solved the 23.12.19 Gandhi Nagar Siddesh - 01WS04 Housekeeping Problem 24.12.19 Contractor Solved the 26.12.19 Gandhi Nagar Siddesh - 01WS04 Housekeeping Problem 29.12.19 Contractor 9148115 Excess soil to be 06.08.19 Kakol Road Jayanthi 01WS03 Solved the 655 removed Problem

ADB 94 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained 06.08.19 Contractor Housekeeping to S B 9241641 Solved the 20.08.19 APMC yard 01WS03 be done at water Harshmani 883 Problem pipe line area 20.08.19 Contractor Soil back filling 9902024 Solved the 29.08.19 APMC yard Nagappan to be done 233 01WS03 Problem properly 29.08.19 Contractor 9448022 Water Pipeline Solved the 12.09.19 Islampur Devaraj 885 01WS03 damaged Problem 12.09.19 Contractor 9148048 Housekeeping Solved the 11.10.19 Vidya Nagar Praveen 014 01WS03 work Problem 11.10.19 Contractor 9591756 Water pipe line Solved the 21.11.19 Agasanahalli Akbar 583 01WS03 damaged Problem 21.11.19 Contractor 8105050 Water pipe line Solved the 17.12.19 Nehru Nagar Aditya 01WS03 188 damaged Problem 17.12.19 9659208 Rectified same 09.08.2019 Rajanahalli Veeresh 01WS01 Road levelling 513 day 09.08.2019 975176 Rectified next 13.08.2019 Rajanahalli Nagaraj 01WS01 Road levelling 3515 day 14.08.2019 880746 Rectified next 24.08.2019 Rajanahalli Hanumath 01WS01 Road levelling 6940 day 25.08.2019 984535 Rectified same 28.08.2019 Rajanahalli Beema 01WS01 Road levelling 8618 day 28.08.2019 Rectified same 30.08.2019 Rajanahalli Shekar - 01WS01 Road levelling day 30.08.2019

Amaravathi Bharath 888392 Road proper Rectified next 12.09.2019 01WS01 colony 5777 drainage day 13.09.2019

Near Vasaudevapp 722085 Rectified same 15.09.2019 01WS01 Road levelling Rajanahalli a 61524 day 15.09.2019

Hanumath 01WS01 23.09.2019 Amaravathi 954612 Shrinkage of Rectified next

ADB 95 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained colony 3541 road day 24.09.2019

953486 Rectified same 23.09.2019 Bathi Suresh 01WS01 Road levelling 7451 day 23.09.2019

Amaravathi 954612 Rectified next 28.09.2019 Hanumath 01WS01 Road levelling colony 2354 day 29.09.2019

952426 Rectified next 02.10.2019 Bathi Ashok 01WS01 Road levelling 1412 day 03.10.2019

958425 Rectified same 05.10.2019 Bathi Mubharak 01WS01 Road levelling 4211 day 05.10.2019

954325 Rectified next 17.10.2019 Bathi Manju 01WS01 Shrinking of soil 4212 day 18.10.2019

948965 Rectified same 24.10.2019 Rajanahalli Srinath 01WS01 Road levelling 0860 day 24.10.2019

888392 Rectified next 28.10.2019 Rajanahalli Sharath 01WS01 Road levelling 5777 day 29.10.2019

811091 Rectified same 02.11.2019 Rajanahalli Sunil 01WS01 Road levelling 5345 day 02.11.2019

975105 Rectified next 04.11.2019 Rajanahalli Amaranath 01WS01 Road levelling 3861 day 05.11.2019

998032 Rectified next 18.11.2019 Rajanahalli Mallikarjun 01WS01 Road levelling 5553 day 19.11.2019

975165 Rectified next 21.11.2019 Rajanahalli Sudhakar 01WS01 Road levelling 4291 day 22.11.2019

948912 Rectified next 02.12.2019 Rajanahalli Aswin 01WS01 Road problem 3224 day 03.12.2019

948965 Rectified next 12.12.2019 Rajanahalli Srinath 01WS01 Road problem 0860 day 13.12.2019

814772 Rectified next 22.12.2019 Bathi Ramesh 01WS01 Road problem 0885 day 23.12.2019

975861 Rectified next 26.12.2019 Rajanahalli Veeresh 01WS01 Road problem 2001 day 27.12.2019

897453 Rectified on 05.08.2019 Vidayanagar Mubarak 01HRA01 Road levelling 5401 07.08.2019

ADB 96 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained Amravathi Rectified same 12.08.2019 Akbar - 01HRA01 Road levelling colony day 12.08.2019

Amravathi Rectified same 22.08.2019 Gothur - 01HRA01 Soil over burned colony day 22.08.2019

Amravathi Rectified same 25.08.2019 Nagappa - 01HRA01 Shrinking of soil colony day 25.08.2019

Amravathi Rectified same 28.08.2019 Sharath - 01HRA01 Shrinking of soil colony day 28.08.2019

897126 Rectified next 05.09.2019 KMS institute Zabir 01HRA01 Road levelling 9610 day 06.09.2019

888392 Rectified same 11.09.2019 KMS institute Sarath 01HRA01 Road condition 5777 day 11.09.2019

894565 Rectified same 18.09.2019 STP site area Rajesh 01HRA01 Gravel filling 3421 day 18.09.2019

954860 Rectified next 23.09.2019 STP site area Kumar 01HRA01 Noise level 81700 day 24.09.2019

Amravathi 845132 Rectified same 01.10.2019 Mahaveer 01HRA01 Road problem colony 2319 day 01.10.2019

Amravathi 948912 Rectified same 12.10.2019 Rajappa 01HRA01 Road problem colony 3452 day 12.10.2019

Amravathi 888392 Rectified same 21.10.2019 Sarath 01HRA01 Road shrinkage colony 5777 day 21.10.2019

Amravathi 986577 Rectified same 24.10.2019 Athiff 01HRA01 Road problem colony 7894 day 24.10.2019

948608 Rectified next 02.11.2019 Beemnagara Srinath 01HRA01 About road 1701 day 03.11.2019

Amravathi 888392 Rectified next 08.11.2019 Sarath 01HRA01 About pipe colony 5777 day 09.11.2019

975105 About damaged Rectified next 21.11.2019 Beemnagara Hanumath 01HRA01 8611 pipe day 22.11.2019

Amravathi 948651 Rectified next 25.11.2019 Rajappa 01HRA01 About road colony 8225 day 26.11.2019

26.11.2019 Hanumatha Ramesh 958612 01HRA01 About pipe Rectified same

ADB 97 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained nagara 8251 damage day 26.11.2019

797585 Rectified next 03.12.2019 Beem nagara Sanjay 01HRA01 Road problem 7831 day 04.12.2019

About pipe Rectified next 11.12.2019 Beem nagara Sammi - 01HRA01 damage day 12.12.2019

Amravathi 900854 About pipe Rectified next 23.12.2019 Maheskumar 01HRA01 colony 5119 damage day 24.12.2019

Amravathi 814772 Rectified next 25.12.2019 Devaraj 01HRA01 Road problem colony 6885 day 25.12.2019

Viveaknadha 882578 Water pipe Rectified next 05.07.2019 Raju 01BDG01 nagara Byadgi 2027 damaged day 06.07.2019

959083 House keeping Rectified next 16.07.2019 APMC Nagaraj 01BDG01 4017 to done day 17.07.2019

Station Road 916466 Excess soil to be Rectified next 23.07.2019 Subhash 01BDG01 Byadgi 2129 removed day 24.07.2019

Kurbhara oni 910067 Housekeeping to Rectified next 29.07.2019 Suresh 01BDG01 Byadgi 2066 done day 29.07.2019

Retihali road 978728 Soil filling at Rectified next 03.08.2019 Shavanur 01BDG01 Byadgi 2134 trench day 04.08.2019

Mallur road 887212 Housekeeping to Rectified next 16.08.2019 Nagraj 01BDG01 Byadgi 8791 done day 17.08.2019

Station road 916466 Excess soil to be Rectified next 22.08.2019 Subash 01BDG01 Baydgi 2129 removed day 23.08.2019

Mallur road 948293 Water pipe line Rectified on 17.09.2019 Jafar 01BDG01 Byadgi 6239 damage 02.09.2019

BSNL office 929860 OFC cable Rectified same 25.09.2019 BSNL office 01BDG01 Byadgi 9422 damaged day 25.09.2019

Vidya nagara 973112 Rectified same 22.10.2019 Aslam 01BDG01 Road restoration Byadgi 6549 day 22.10.2019

Vinayak nagara 988627 31.10.2019 Shivakumar 01BDG01 Bund restoration 9847 Byadgi

ADB 98 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Name of the Contact Package Grievances Redressed Date Place Person Number Number received Status Complained Neharu nagara 974286 Water pipe line Rectified next 28.11.2019 Sanagappa 01BDG01 3701 damage day 29.11.2019 Byadgi

953564 Soil filling at Rectified same 30.11.2019 Benipete Rohit 01BDG01 3208 trench day 30.11.2019

Mallur road Mahesh 725938 Rectified next 30.11.2019 01BDG01 Road restoration Byadgi bedikar 2941 day 01.12.2019

Mallur road 996281 Water pipe line Rectified next 19.12.2019 Rama 01BDG01 Byadgi 2432 damage day 20.12.2019

Appendix 13: PHOTOGRAPHS OF DISUCSSIONS WITH STEAKHOLDERS AND GRIEVANCE REDRESSALS.

Package: 01DVG01

Consultation with stakeholder At Rajieev Consultation with stakeholder At Rajieev Gandhi Badavane Gandhi Badavane

ADB 99 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Consultation with stakeholder At SPS nagara Consultation with stakeholder At SPS nagara

Package: 01WS 01

Consultation with stakeholder Rajanahalli Consultation with stakeholder Rajanahalli Village Village

ADB 100 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Consultation with stakeholder Rajanahalli Consultation with stakeholder Rajanahalli

Village Village

Package: 01WS 05

ADB 101 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Consultation with stakeholder at SOG Consultation with stakeholder at SOG Colony C Colony B Block water supply pipe line works. Block water supply pipe line works.

Consultation with stakeholder at SPS nagar Consultation with stakeholder at MCC b Block water supply pipe line works. water supply pipe line works.

Package: 01HRA01

ADB 102 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Consultation with stakeholder At JaiBeem Consultation with stakeholder At JaiBeem nagara nagara

Consultation with stakeholder At Amaravathi Consultation with stakeholder At Amaravathi colony colony

Package: 01HRA02

ADB 103 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Consultation with stakeholder At PB road Consultation with stakeholder At PB road

Consultation with stakeholder At PB road Consultation with stakeholder At PB road

Package: 01WS04

ADB 104 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Package: 01BDG01

ADB 105 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Consultation with stakeholder at Consultation with stakeholder at Hallepete ValmikiNagara Block

Consultation with stakeholder at Shivapura Consultation with stakeholder at Gandhi Nagara

Package: 01WS03

ADB 106 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Consultation with stakeholder at Gumnahalli Consultation with stakeholder at Vidya nagara water supply pipe line works. water supply pipe line works.

Consultation with stakeholder at Ashraya Consultation with stakeholder at Valmukinagar Badavani water supply pipe line works. water supply pipe line works.

ADB 107 KUIDFC-KIUWMIP KIUWMIP Semi – annual Social Safeguard Monitoring Report for the period from July 2019 to December 2019.

Emergency contact numbers displayed on the barricades

ADB 108 KUIDFC-KIUWMIP