42018-013: Anhui Integrated Transport Sector Improvement

Total Page:16

File Type:pdf, Size:1020Kb

42018-013: Anhui Integrated Transport Sector Improvement Social Monitoring Report Annual Report December 2012 PRC: Anhui Integrated Transport Sector Improvement Project Prepared by Anhui Communication Vocational and Technical College research institution on immigration for Anhui Provincial Transport Department and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ADB Financed Anhui improvement project of Transportation S105 Longtang to Chaohu section External Monitoring Report of the Resettlement Anhui Communication Vocational and Technical College research institution on immigration 2012.12 Content 1. OVERVIEW ........................................................................................................... 6 1.1 OVERVIEW OF THE PROJECT ......................................................................... 6 1.2 METHOD AND PROCESS IN THE PROJECT .................................................... 6 1.3 BRIEF DESCRIPTION OF RESETTLEMENT PLAN ........................................... 6 1.3.1 Impact ...................................................................................................................... 6 1.3.2 Time of compensation and Implement .................................................................... 6 1.3.3 Organization ............................................................................................................ 7 1.4 MONITORING AND EVALUATION ..................................................................... 9 1.4.1 Basic Investigation ................................................................................................... 9 1.4.2 Contents of Monitoring and Evaluation ................................................................... 9 1.4.3 Method of Monitoring and Evaluation .................................................................. 10 2. MONITORING AND EVALUATION OF RESETTLEMENT PROCESS ............... 11 2.1 LAND ACQUISITION ........................................................................................ 12 2.1.1 Quantity of land acquisition ................................................................................... 12 2.1.2 Compensation standard for land acquisition .......................................................... 12 2.1.3 Recovered measures and compensation................................................................. 14 2.2 HOUSING DEMOLITION .................................................................................. 14 2.2.1 Process and quantity of demolition ........................................................................ 14 2.2.2 Compensation standard for demolition .................................................................. 15 2.2.3 Resettlement .......................................................................................................... 16 2.2.4 Compensation for move and temporary subsidy in transition ............................... 18 2.3 COMPENSATION FOR ELECTRIC POLE AND WIRE ..................................... 19 2.3.1 Affected area .......................................................................................................... 19 2.3.2 Compensation Standard and Removing Progress .................................................. 19 2.4 AFFECTED INDIVIDUAL BUSINESS AND ENTERPRISES ............................. 19 2.5 INFRASTRUCTURE CONSTRUCTION ............................................................ 20 2.6 AFFECTED INDIVIDUAL BUSINESS ................................................................ 20 2.7 AFFECTED VULNERABLE GROUPS ............................................................... 21 3 THE SYSTEM OF MONITORING AND EVALUATION ......................................... 21 3.1 INTERNAL MONITORING AND INSPECTION.................................................. 21 3.2 PUBLIC PARTICIPATION ................................................................................. 21 3.3 COMPLAINT AND APPEAL .............................................................................. 22 4 EVALUATION IN TYPICAL INVESTIGATION ...................................................... 22 5 BASIC EVALUATIONS AND SUGGESTION ........................................................ 22 5.1 BASIC EVALUATION ........................................................................................ 22 5.2 SUGGESTION .................................................................................................. 23 ACCESSORY 1:ANHUI GOVERNMENT HAS AUTHORIZED THE LAND .............. 24 ACCESSORY 2 COMPENSATION AGREEMENT IN ZHONGGAN TOWN OF JUCHAO DISTRICT ................................................................................................ 26 I. 1. OVERVIEW 1.1 Overview of the Project This section starts from the overpass which is the connection of S105 and South Ring highway, through S105, West Cuozhen, Huainan railway, Qiaotouji, local railway, Huaji, Zhongmiaoji and Ganzhen Town and ends at Bantang Road of Chaohu, the total distance is about 50.3 kilometers. All the line is designing in 80km/h, the subgrade is 24.5m which is constructed in first-class highway and four-lane. The project will be finished in 2 years which is the year of 2009 to 20121. The total general estimate in land acquisition, resettlement and other expenses of the project (S105 Longtang~Chaohu Section) is 136.4278 million Yuan according to the price in May 2011. Within the total expense: land acquisition is 48.991 million Yuan for 35.91%; Temporary land acquisition is 6.516 million Yuan for 4.78%; compensation for demolition in city is 6.34 million Yuan for 4.65%; compensation for demolition in rural places is 43.153 million Yuan for 31.63%; infrastructure and appurtenant compensation is 55000 Yuan for 0.04%; all kinds of tax and managing fees are 31.373 million Yuan for 23%. 1.2 Method and process in the project From August to November 2008, from the request of ADB, the staff of Anhui Transportation Investigation and Design Institute with the help of villagers to do the investigation for all kinds of things; In August 2008, Construction department of Anhui has authorized Anhui Transportation Investigation and Design Institute to write “FSR of S105”; In March 2009, influence and risk of immigrants are analyzed and evaluated in RAP, and the measures of remediation are put forward; Land reconnaissance were ascertained and RAP in Feidong County and Juchao District was worked out, in January and may 2011, with the help of Anhui Highway Administration Bureau, affected governments and managers in village, the group of Hohai University has done the investigation to Feidong County and Juchao District. 1.3 Brief Description of Resettlement Plan 1.3.1 Impact The project (S105 Longtang~Chaohu2) is involved in 25 Towns and 25 villages, until December 31, 2012, the actual land acquisition is 1719.327Mu; removing house is 60137.02 m2, affected companies are 13. 1.3.2 Time of compensation and Implement 1 Data resource:From FSR and RAP. 2 Base on the request of State Council of the People's Republic of China, which is “Agree to repeal Chaohu city and adjust other administrative division” ( July 14, 2011,[2011]NO.84), repeal Chaohu City which was prefecture-level city and establish Chaohu which is county-level city, and Hefei control the city. The Same as below. Land acquisition, housing demolition, compensation and resettlement plan began in May 2010, the resettlement work is running, and the compensation is paid. 1.3.3 Organization According to RAP, Anhui government authorized PMO in ADB&Anhui Ministry of Transportation to be responsible for the project’ work, the district government has the responsibility of the work in their own area, so does “Internal supervision report”. Details are in the following picture. Picture 1 Resettlement Work Organization Shancun Woniushresettlement groupan Dongcun Tang committee Pingcun Jia committee Yancun Zhonggan Town resettlement Huacun group Jicun Fencun Gan committee Juchao District resettlement group Juchao District resettlement Xucun Tongtang Town resettlement group Yangcun Hecun resettlement resettlement Chaohu Chaohu Pingcun Longtang~ Guangcun Qiaotouji resettlement group S105 group Shancunan Toujian Recycling economy Park Feidong County resettlement group resettlement Feidong County Xingcunan Fengcunan Cuozhen resettlement group resettlement group Guanganzhi Gangcun 1.4 Monitoring and Evaluation Resettlement institution of Anhui Communication Vocational and Technical College was entrusted by Anhui Highway Administration Bureau, which is external supervision department in the work of land requisition, demolition and resettlement. They in charge of monitoring regularly and they should finish “Resettlement External Monitoring Report”. In Octomber 2011, resettlement expert—Zhu Wenlong, Wufei who is in PMO and Zhangkui who is in planning department of Anhui Highway Administration Bureau get together and do field examination for resettlement work; And the group staff do field investigation.(See Picture 2 and picture 3). Picture 2 Expert in the working place Picture 3 Group staff in the discussion 1.4.1 Basic Investigation From Octomber
Recommended publications
  • World Bank Document
    RP552 v 4 Public Disclosure Authorized Anhui Highway Project III (S105 Chaohu ~ Wujiang Section) Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Anhui Highway Bureau East China Investigation and Design Institute March 2007 Approved by: Bian Bingqian Reviewed by: Qiu Qingsong Resposible Designer: Zhou Jianxin Checked by: Zhou Jianxin Prepared by: Zhou Jianxin Gu Chunrong Li Zongjian Participated by: Jiang Zhouping Gao Jun Zhu Qiang Fang Shiwu Wang Jianhua Yan Fenglong Xia Shouguo LiChun Zhang Wei Contents OBJECTIVES OF THE RAP AND THE DEFINITION OF RESETTLEMENT TERMINOLOGY..................................................................................................................... 1 1. GENERAL ......................................................................................................................... 3 1. GENERAL ......................................................................................................................... 3 1.1 PROJECT BACKGROUND..................................................................................................... 3 1.2 GENERAL OF PROJECT........................................................................................................ 4 1.3 PROJECT SERVICE SCOPE AND IMPORTANCE....................................................................... 4 1.4 MEASURES FOR REDUCING PROJECT IMPACT..................................................................... 5 1.4.1 Planning and Design Stages ......................................................................................
    [Show full text]
  • 2.2 Anhui Province Anhui Wanzhong Group Co., Ltd.1, Affiliated with The
    2.2 Anhui Province Anhui Wanzhong Group Co., Ltd.1, affiliated with the Anhui Provincial Prison Administration Bureau, has 27 prison enterprises Legal representative of the prison company: Xu Xiaogang, Chairman of the company and Director of the Anhui Provincial Prison Administration Bureau.2 The company’s registered capital is 443.469 million yuan. Its total assets amounted to 1.5 billion yuan. Founded in December 1996, it has 19 wholly-owned subsidiaries (other information indicates that it has 27 prison enterprises) spreading out in 11 cities and counties in the province, with more than 7,000 regular workers and 47,000 prisoners. Its main products include railway sleeper fasteners, medium and low-pressure valves, automotive forgings, power accessories, textiles and garments, cement and building materials, specialty agricultural products, various types of labor processing products and hotel catering and other tertiary industry services. In 2007, the group realized an operating income of 1.44 billion yuan and a profit of 82 million yuan, and it paid taxes of 70.9 million yuan. Its total profit and taxes were 156 million yuan. No. Company Name of the Legal Person Legal Registered Business Scope Company Notes on the Prison Name Prison, to and representative / Capital Address which the Shareholder(s) Title Company Belongs 1 Anhui Anhui Anhui Xu Xiaogang 44.3469 Capital management; project 100 Qingxi The Anhui Provincial Prison Administration Province Provincial Provincial Chairman of Anhui million yuan investment, management and Road, Shushan Bureau4 is the administrative agency of the Wanzhong Prison People’s Wanzhong Group operation; material supply and District, Hefei provincial government responsible for the Group Co., Administrati Government Co., Ltd.; Director product sale related to investment City, Anhui administration of prisons throughout the province.
    [Show full text]
  • Spatial Distribution Pattern of Minshuku in the Urban Agglomeration of Yangtze River Delta
    The Frontiers of Society, Science and Technology ISSN 2616-7433 Vol. 3, Issue 1: 23-35, DOI: 10.25236/FSST.2021.030106 Spatial Distribution Pattern of Minshuku in the Urban Agglomeration of Yangtze River Delta Yuxin Chen, Yuegang Chen Shanghai University, Shanghai 200444, China Abstract: The city cluster in Yangtze River Delta is the core area of China's modernization and economic development. The industry of Bed and Breakfast (B&B) in this area is relatively developed, and the distribution and spatial pattern of Minshuku will also get much attention. Earlier literature tried more to explore the influence of individual characteristics of Minshuku (such as the design style of Minshuku, etc.) on Minshuku. However, the development of Minshuku has a cluster effect, and the distribution of domestic B&Bs is very unbalanced. Analyzing the differences in the distribution of Minshuku and their causes can help the development of the backward areas and maintain the advantages of the developed areas in the industry of Minshuku. This article finds that the distribution of Minshuku is clustered in certain areas by presenting the overall spatial distribution of Minshuku and cultural attractions in Yangtze River Delta and the respective distribution of 27 cities. For example, Minshuku in the central and eastern parts of Yangtze River Delta are more concentrated, so are the scenic spots in these areas. There are also several concentrated Minshuku areas in other parts of Yangtze River Delta, but the number is significantly less than that of the central and eastern regions. Keywords: Minshuku, Yangtze River Delta, Spatial distribution, Concentrated distribution 1.
    [Show full text]
  • Mortality and Disease Burden of Injuries from 2008 to 2017 in Anhui Province, China
    This may be the author’s version of a work that was submitted/accepted for publication in the following source: Xing, Xiu Ya, Wang, Peng, Xu, Zhiwei, He, Qin, Li, Rui, Chen, Ye Ji, Liu, Li Na, Mao, Yan Mei, Zhao, Chan Na, Dan, Yi Lin, Wu, Qian, Pan, Hai Feng, Liu, Zhi Rong, & Hu, Wenbiao (2020) Mortality and disease burden of injuries from 2008 to 2017 in Anhui Province, China. BioMed Research International, 2020, Article number: 7303897. This file was downloaded from: https://eprints.qut.edu.au/202643/ c The Author(s) This work is covered by copyright. Unless the document is being made available under a Creative Commons Licence, you must assume that re-use is limited to personal use and that permission from the copyright owner must be obtained for all other uses. If the docu- ment is available under a Creative Commons License (or other specified license) then refer to the Licence for details of permitted re-use. It is a condition of access that users recog- nise and abide by the legal requirements associated with these rights. If you believe that this work infringes copyright please provide details by email to [email protected] License: Creative Commons: Attribution 4.0 Notice: Please note that this document may not be the Version of Record (i.e. published version) of the work. Author manuscript versions (as Sub- mitted for peer review or as Accepted for publication after peer review) can be identified by an absence of publisher branding and/or typeset appear- ance. If there is any doubt, please refer to the published source.
    [Show full text]
  • China's Cities
    THE STATE OF THE STATE THE STATE OF CHINA’S CITIES CHINA’S CITIES CHINA’S 2014/2015 2014/2015 THE STATE OF CHINA’S CITIES 2014/2015 SPONSOR International Eurasian Academy of Sciences UNDERTAKER China Science Center of International Eurasian Academy of Sciences CO-ORGANIZERS China Association of Mayors Urban Planning Society of China EDIROR-IN-CHIEF Wang Guangtao, Secretary-General, International Eurasian Academy of Sciences (IEAS), Executive Vice President, China Science Center of International Eurasian Academy of Sciences (CSC-IEAS) HONORARY EDITOR-IN-CHIEF Tao Siliang, Executive Vice President, China Association of Mayors EXECUTIVE EDITOR-IN-CHIEF Mao Qizhi, Academician, IEAS, Professor, School of Architecture, Tsinghua University Shao Yisheng, Academician, IEAS, Deputy Secretary-General, CSC-IEAS AUTHORS Mao Qizhi, Academician, IEAS, Professor, School of Architecture, Tsinghua University Shao Yisheng, Academician, IEAS, Researcher, Vice President, China Academy of Urban Planning and Design Shi Nan, Professor, Secretary-General, Urban Planning Society of China Shen Jianguo, PhD., Inter-Regional Adviser, United Nations Human Settlements Programme Yu Taofang, PhD., Associate Professor, School of Architecture, Tsinghua University Zhang Zhiguo, PhD., Associate Researcher, China Academy of Urban Planning and Design Li Lin, Associate Senior Editor, City Planning Review magazine Chen Xiaohui, Deputy Chief Planner, Jiangsu Institute of Urban Planning and Design Qu Changhong, Senior Engineer, Deputy Secretary-General, Urban Planning Society of
    [Show full text]
  • PRC: Anhui Integrated Transport Sector Improvement Project
    Resettlement Planning Document Resettlement Plan Document Stage: Draft for Consultation Project Number: 42018 July 2009 PRC: Anhui Integrated Transport Sector Improvement Project Prepared by Anhui Highway Administration Bureau. The resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. ADB Financed Anhui Integrated Transport Sector Improvement Project Resettlement Plan for S105 Longtang-Chaohu Section (Draft) Anhui, China May 2009 Letter of Commitment Through the Ministry of Finance, Anhui Provincial Government (hereinafter called as APG) has applied for a loan from ADB to finance this subproject. Therefore, it must be implemented in compliance with the guidelines and policies of ADB on social security. This Resettlement Plan is in line with a key requirement of ADB and will constitute the basis for land acquisition, house demolition and resettlement of this subproject. The Plan also complies with the laws of the People’s Republic of China and local regulations, as well as with some additional measures and the arrangements for implementation and monitoring for the purpose of achieving better resettlement results. APG hereby approves the contents of this Resettlement Plan and guarantees that funds will be made available as stipulated in the budget. APG has discussed the draft Resettlement Plan with relevant units that have confirmed their acceptance via Anhui Highway Administration Bureau and affected counties, and authorizes the Anhui Project Management Office for ADB Financed Projects as the responsible agency to generally manage the implementation of this subproject and relevant resettlement activities, and the local governments of the affected areas to be responsible for the implementation of this subproject and related resettlement activities within the respective jurisdictions.
    [Show full text]
  • Anhui Integrated Transport Sector Improvement Project
    Environmental Assessment Report Summary Environmental Impact Assessment Project Number: 42018 June 2009 People’s Republic of China: Anhui Integrated Transport Sector Improvement Project Prepared by Anhui provincial government for the Asian Development Bank (ADB). The summary environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. CURRENCY EQUIVALENTS (as of 23 June 2009) Currency Unit – yuan (CNY) CNY1.00 = $0.1463 $1.00 = CNY6.8356 ABBREVIATIONS ACCDI – Anhui Communications Consulting and Design Institute ADB – Asian Development Bank AHAB – Anhui Highway Administration Bureau APCIG – Anhui Provincial Communication Investment Group APEPB – Anhui Provincial Environmental Protection Bureau dBA – A-weighted decibel EA – executing agency EIA – environmental impact assessment EMP – environmental management plan IA – implementing agency PPTA – project preparatory technical assistance PRC – People’s Republic of China NOTE In this report, “$” refers to US dollars. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS Page MAP I. INTRODUCTION 1 II. DESCRIPTION OF THE PROJECT 1 III. DESCRIPTION OF THE ENVIRONMENT 2 A. Physical Environment 3 B. Ecological Environment 5 C. Social and Economic Development 6 IV. ALTERNATIVES 7 A. With and Without Project Alternatives 7 B. Alternatives for the Expressway 8 C. Alternatives for Local Roads 10 V.
    [Show full text]
  • 中國內地指定醫院列表 出版日期: 2019 年 7 月 1 日 Designated Hospital List in Mainland China Published Date: 1 Jul 2019
    中國內地指定醫院列表 出版日期: 2019 年 7 月 1 日 Designated Hospital List in Mainland China Published Date: 1 Jul 2019 省 / 自治區 / 直轄市 醫院 地址 電話號碼 Provinces / 城市/City Autonomous Hospital Address Tel. No. Regions / Municipalities 中國人民解放軍第二炮兵總醫院 (第 262 醫院) 北京 北京 西城區新街口外大街 16 號 The Second Artillery General Hospital of Chinese 10-66343055 Beijing Beijing 16 Xinjiekou Outer Street, Xicheng District People’s Liberation Army 中國人民解放軍總醫院 (第 301 醫院) 北京 北京 海澱區復興路 28 號 The General Hospital of Chinese People's Liberation 10-82266699 Beijing Beijing 28 Fuxing Road, Haidian District Army 北京 北京 中國人民解放軍第 302 醫院 豐台區西四環中路 100 號 10-66933129 Beijing Beijing 302 Military Hospital of China 100 West No.4 Ring Road Middle, Fengtai District 中國人民解放軍總醫院第一附屬醫院 (中國人民解 北京 北京 海定區阜成路 51 號 放軍 304 醫院) 10-66867304 Beijing Beijing 51 Fucheng Road, Haidian District PLA No.304 Hospital 北京 北京 中國人民解放軍第 305 醫院 西城區文津街甲 13 號 10-66004120 Beijing Beijing PLA No.305 Hospital 13 Wenjin Street, Xicheng District 北京 北京 中國人民解放軍第 306 醫院 朝陽區安翔北里 9 號 10-66356729 Beijing Beijing The 306th Hospital of PLA 9 Anxiang North Road, Chaoyang District 中國人民解放軍第 307 醫院 北京 北京 豐台區東大街 8 號 The 307th Hospital of Chinese People’s Liberation 10-66947114 Beijing Beijing 8 East Street, Fengtai District Army 中國人民解放軍第 309 醫院 北京 北京 海澱區黑山扈路甲 17 號 The 309th Hospital of Chinese People’s Liberation 10-66775961 Beijing Beijing 17 Heishanhu Road, Haidian District Army 中國人民解放軍第 466 醫院 (空軍航空醫學研究所 北京 北京 海澱區北窪路北口 附屬醫院) 10-81988888 Beijing Beijing Beiwa Road North, Haidian District PLA No.466 Hospital 北京 北京 中國人民解放軍海軍總醫院 (海軍總醫院) 海澱區阜成路 6 號 10-66958114 Beijing Beijing PLA Naval General Hospital 6 Fucheng Road, Haidian District 北京 北京 中國人民解放軍空軍總醫院 (空軍總醫院) 海澱區阜成路 30 號 10-68410099 Beijing Beijing Air Force General Hospital, PLA 30 Fucheng Road, Haidian District 中華人民共和國北京市昌平區生命園路 1 號 北京 北京 北京大學國際醫院 Yard No.1, Life Science Park, Changping District, Beijing, 10-69006666 Beijing Beijing Peking University International Hospital China, 東城區南門倉 5 號(西院) 5 Nanmencang, Dongcheng District (West Campus) 北京 北京 北京軍區總醫院 10-66721629 Beijing Beijing PLA.
    [Show full text]
  • PRC: Anhui Chao Lake Environmental Rehabilitation Project
    Resettlement Plan Project Number: 44036 January 2017 PRC: Anhui Chao Lake Environmental Rehabilitation Project Prepared by Chaohu ADB Loan Project Office For Chaohu City This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. The Newly-added Subproject in Mid-term Adjustment of Water Environment Improvement Project of Anhui Chao Lake Basin Loaned by Asian Development Bank Resettlement Plan (For Project Scope Change) Project number: Loan 2941 The Water Environment Improvement Engineering of the City Proper of Chaohu City of Water Environment Improvement Project of Anhui Chao Lake Basin Loaned by Asian Development Bank (Mid-term Adjustment) The working group of the people’s government of Chaohu City of the project loaned by Asian Development Bank January, 2017 1 Contents CONTENTS ....................................................................................................................................................... 1 EXECUTIVE SUMMARY .......................................................................................................................... 1 1.1 PROJECT OVERVIEW, LAND REQUISITION
    [Show full text]
  • The Impact of Family Background on Educated Young People's Migration
    Journal of Youth Studies ISSN: 1367-6261 (Print) 1469-9680 (Online) Journal homepage: http://www.tandfonline.com/loi/cjys20 Rich dad, poor dad: the impact of family background on educated young people’s migration from peripheral China Huimin Du To cite this article: Huimin Du (2017): Rich dad, poor dad: the impact of family background on educated young people’s migration from peripheral China, Journal of Youth Studies, DOI: 10.1080/13676261.2017.1343939 To link to this article: http://dx.doi.org/10.1080/13676261.2017.1343939 Published online: 22 Jun 2017. Submit your article to this journal Article views: 30 View related articles View Crossmark data Full Terms & Conditions of access and use can be found at http://www.tandfonline.com/action/journalInformation?journalCode=cjys20 Download by: [University of Florida] Date: 20 July 2017, At: 07:54 JOURNAL OF YOUTH STUDIES, 2017 https://doi.org/10.1080/13676261.2017.1343939 Rich dad, poor dad: the impact of family background on educated young people’s migration from peripheral China Huimin Du David C. Lam Institute for East-West Studies, Hong Kong Baptist University, Kowloon Tong, Hong Kong ABSTRACT ARTICLE HISTORY Along with its rapid economic growth, economic inequality rises Received 15 March 2017 and intergenerational mobility declines in China. Meanwhile, Accepted 13 June 2017 significant growth in HEIs’ enrolment has contributed to major KEYWORDS migration flows across the country. This research investigates the Student migration; graduate impact of family background on the migration location choice of migration; location choice; educated young people from peripheral China, based on data family background; from a life-course survey of recent graduates of tertiary education geographical mobility institutions originating from Chaohu, China.
    [Show full text]
  • Mobility and Agency: Private Sector Development in Rural Central China
    MOBILITY AND AGENCY: PRIVATE SECTOR DEVELOPMENT IN RURAL CENTRAL CHINA Genia Kostka Economic inequality is a continuing challenge for China. According to a recent World Bank report, China’s Gini Coefficient rose to .47 in 2009, from .28 thirty years ago, indicating rising income inequalities.1 The rising rural–urban income gap is particularly challenging, as incomes of urban residents are now 3.3 times greater than rural incomes.2 In response to this, the goal of “inclusiVe growth” (growth which benefits all economic strata and regions) has become central to the design of China’s 12th Five-Year Plan (FYP), in line with the commitment of President Hu Jintao and Premier Wen Jiabao to achieving a “harmonious society” in China. To counter rising income inequality between urban and rural China and between coastal regions and the interior, Beijing has poured more than one trillion yuan into infrastructure and social welfare improvements, and has distributed these funds as part of its Western Development Program (since 1999), the Northeast Rejuvenation Initiative (after 2003) and the Central China Developmental Program (after 2005), along with a host of other developmental aid programs.3 While such government-led efforts may provide some benefit to remote regions, the state’s ability to support the generation of private income is of paramount importance. Since 1998, when China privatized the majority of local state-owned enterprises (SOEs) (difang guoying qiye ), the private sector has played an ever more important role in employment, innovation and income generation. Yet, while a number of national policies and laws have improved the business environment for private enterprise over the past 30 years, there continue to be I thank Sarah Eaton, Vivienne Shue and Adrian Wood for their incisive comments on earlier drafts and William Hobbs for his excellent research assistance.
    [Show full text]
  • Spatial Variation of Surface Soil Available Phosphorous and Its Relation with Environmental Factors in the Chaohu Lake Watershed
    Int. J. Environ. Res. Public Health 2011, 8, 3299-3317; doi:10.3390/ijerph8083299 OPEN ACCESS International Journal of Environmental Research and Public Health ISSN 1660-4601 www.mdpi.com/journal/ijerph Article Spatial Variation of Surface Soil Available Phosphorous and Its Relation with Environmental Factors in the Chaohu Lake Watershed Yongnian Gao *, Junfeng Gao and Jiongfeng Chen State Key Laboratory of Lake Science and Environment, Nanjing Institute of Geography and Limnology, Chinese Academy of Sciences, 73 East Beijing Road, Nanjing 210008, China; E-Mails: [email protected] (J.F.G.); [email protected] (J.F.C.) * Author to whom correspondence should be addressed; E-Mail: [email protected]; Tel.: +86-025-8688-2127; Fax: +86-025-8688-2124. Received: 21 June 2011; in revised form: 28 July 2011 / Accepted: 8 August 2011 / Published: 15 August 2011 Abstract: The study presented in this paper attempts to evaluate the spatial pattern of soil available phosphorus, as well as the relation between soil available phosphorus and environment factors including elevation, slope, precipitation, percentage of cultivated land, percentage of forest land, percentage of construction land and NDVI using statistical methods and GIS spatial analysis techniques. The results showed that the Spline Tension method performed the best in the prediction of soil available phosphorus in the Chaohu Lake watershed. The spatial variation of surface soil available phosphorus was high in Chaohu Lake watershed and the upstream regions around Chaohu Lake, including the west of Chaohu lake (e.g., southwest of Feixi county, east of Shucheng county and north of Lujiang county) and to the north of Chaohu Lake (e.g., south of Hefei city, south of Feidong county, southwest of Juchao district), had the highest soil available phosphorus content.
    [Show full text]